SUEZ CANAL.—This great work permits a reduction of about 3750 miles in

the length of a voyage from Western Europe to India. Compared with some

of the other great canals of the world, its construction was easy. The

total length between termini is about 101 statute miles, of which about

nine miles required no excavation; sixteen miles more required only

a slight excavation to make the channel of sufficient depth through

existing dry depressions, called “lakes;” and the remaining seventy-six

miles of excavation were cut chiefly through a soft alluvial soil. At

only one point did the excavation reach fifty or sixty feet in depth,

and here also was found the only instance of rock excavation. Even

this rock (gypsum) was so soft that part of it was excavated by the

steam shovels. About 80,000,000 cubic yards of material were removed.

If this material had been loaded on to cars carrying twenty-five cubic

yards per car, made up into trains of twenty cars per train, and

the trains were strung along at the rate of five per mile, it would

have required 32,000 miles of such trains to transport the material

that was excavated. Work was actually begun in 1800. The Viceroy of

Egypt originally agreed to furnish the laborers required, and at

one time about 30,000 laborers were thus employed. On a change of

administration in Egypt, the new Viceroy refused to furnish the native

labor, and it then became necessary to import labor from Europe, and to

supplement this insufficient and high-priced supply of labor by very

large dredging machines, or steam shovels, of which about sixty were

employed. The task of supplying water for the vast army of workmen

was an engineering feat of no mean character and cost, as the entire

route lies through an arid desert. A system of waterworks, having its

source at Cairo, on the Nile, and distributing the water throughout

the length of the canal, was therefore constructed. In the latter part

of 1869, the waters of the Red and Mediterranean seas were joined,

large arid depressions had been transformed into great lakes, and

ocean-going vessels were sailing through what had been a desert. The

canal is 26 feet deep, 72 feet wide at the bottom, the sides sloping

variably, according to the nature of the material, the resulting width

at the top varying from 190 to 328 feet. Although not deep enough for

the very largest vessels afloat, it will accommodate the great bulk

of ocean travel, including war vessels. The total cost of this work,

including the breakwaters, lighthouses, etc., at each terminus, was,

approximately, £20,000,000, or $100,000,000.

[Illustration: COMPLETE ROCK CUT. CHICAGO DRAINAGE CANAL.

(Depth 35 feet.)]

Unlike most canals, the Suez canal has no locks. The original plan

of the Panama canal did not include locks, but the revised plan

provided for them, in order to save excessive cutting. The Nicaragua

canal scheme necessarily includes locks. The water for the Suez

canal comes directly from the seas which are connected. A canal with

locks necessarily requires an ample water supply from some river or

fresh-water lake. If the Suez canal had been constructed at a higher

level than the Mediterranean and Red seas, had been supplied with water

from the Nile, and had, therefore, been constructed with suitable

locks at each end (as was actually recommended by some engineers), the

cost of construction, as well as the perpetual expense of maintenance,

would have been greatly in excess of its actual cost. And so the fact

that it was possible to construct the canal without locks, and without

providing for a supply of water, was a great advantage that facilitated

the promotion of the enterprise.

MANCHESTER CANAL.—This canal, having a total length of only

thirty-five and one half miles, has transformed the city of Manchester,

England, from an inland city to a seaport. Actual excavation was begun

in November, 1887, and just six years afterwards the whole canal was

filled with water. It has a depth of 26 feet, and a width at the

bottom of from 120 to 170 feet, thus giving a greater capacity than

the Suez canal or the proposed Panama canal. Some of the greatest

difficulties involved arose from the necessity of providing for the

existing canals and railroads with which that busy portion of England

is so crowded. Perhaps the most interesting feat of engineering was

the drawbridge carrying the Duke of Bridgewater’s canal at Barton.

This small canal, having originally a depth of only four and one half

feet, here crosses the River Irwell. It was justly considered a great

feat of engineering when James Brindley constructed the canal, during

the eighteenth century, so that it crossed the river on a viaduct. A

waterway crossing a waterway on a viaduct was then a new idea. But

this old canal was constructed considerably above the desired level of

the Manchester canal, and yet, of course, not so high that a masted

ship might pass under it. Therefore a draw became necessary. To add to

the complication, the water supply of the small canal being somewhat

limited, it was considered very undesirable to lose a troughful of

water (roughly, 200,000 gallons) each time the draw was opened. To

allow this water to flow into a tank and then pump it back would

consume too much time, to say nothing of the expense. Therefore the

bridge must swing with the trough full of water. That required gates

at each end of the draw, as well as at the ends of the canal on each

abutment. These gates were comparatively simple; but the difficult

problem was to ensure a water-tight joint between the ends of the draw

trough and the corresponding ends of the canal. Temperature changes, as

well as many other considerations, would preclude the possibility of

making even a fairly tight joint by swinging the draw to a close fit

with the abutments. The desired result was accomplished by placing at

each end of the draw a very short U-shaped structure, having the same

cross section as the cross section of the trough, and having beveled

ends fitting corresponding bevels on the ends of the trough. These

beveled ends are faced with rubber. To open the draw the gates are

closed, the water between the gates at each end (a comparatively small

amount) is drained off and wasted, the U-shaped wedges are raised,

and the draw is then free to turn. The wedges are operated by hydraulic

rams.

[Illustration: AN “ATLAS” POWDER BLAST UNDER A TRAVELING CABLEWAY.

CHICAGO DRAINAGE CANAL.]

CHICAGO DRAINAGE CANAL.—It will probably be a surprise to many people

to learn that this “drainage” canal has a greater cross section

throughout the “earth-work” sections than any ship canal in existence,

and is only exceeded through the rock sections by the Manchester canal.

The city of Chicago obtains its water supply from Lake Michigan. The

“intake” pipe was at first located comparatively near the shore. As the

population of the city grew and the volume of its sewage increased,

it was observed that the water supply was becoming contaminated. The

Chicago River, into which the sewage was emptied, became so foul that

the odor was intolerable. The very evident fact of this odor probably

had more to do with the promotion and accomplishment of the means of

relief adopted than the far less evident but very dangerous pollution

of the water supply. An extension of the intake pipe to a point several

miles from shore by means of a tunnel (which was in itself a notable

feat of engineering) only deferred the time when the water supply would

again be fatally contaminated if the sewage continued to flow into

the lake. It was accordingly determined to dispose of the sewage by

discharging it into an artificial channel where it might become diluted

with water from Lake Michigan, and thence pass from the watershed of

the Great Lakes to the watershed of the Mississippi. The level of Lake

Michigan is so high that there was no trouble about obtaining the

requisite grade, and the divide between the watersheds is so low that

the depth of the required cutting at the summit was not forbidding. But

why have such a large canal? It was required that the sewage should

be diluted, so as not to become offensive to the inhabitants of the

region through which the canal must pass. The law under which the work

was authorized required that the flow should be 600,000 cubic feet per

minute, and that the minimum width at the bottom of the channel must be

160 feet. According to the well-known laws of hydraulics, it was seen

that a deep canal would have a greater capacity per unit of excavation

than a very wide shallow canal. This is especially true through the

sections of deepest cut, since excavation _above_ the water line adds

nothing whatever to the capacity for flow. The sections adopted called

for a depth of water of 22 feet. The side walls in rock are practically

vertical, the width of channel being 160 feet at the bottom and 162

feet at the top. In earthwork the cross section is larger than in rock,

thus reducing the velocity of flow and danger of scouring the banks.

The width of channel at the bottom is 202 feet, the width at the water

surface being 290 feet, and the side slopes 2 horizontal to 1 vertical.

A very expensive feature of this great work was the necessity for

constructing a diversion channel for the Desplaines River throughout

that portion of the river valley occupied by the canal. Lack of space

forbids a further discussion of this feature. The canal drains into the

Desplaines River at a point where the slope of the river is so great

that there will never be danger that a strong west wind or an unusual

lowering of the level of Lake Michigan can possibly cause the current

to flow eastward.

Work on the canal was commenced only after many years of discussion,

planning, legislation, litigation, and bitter opposition by the varied

interests which considered themselves more or less injured. But the

work was actually commenced in July, 1892. The estimated excavation

was approximately 40,000,000 cubic yards—about one half that of the

Suez canal; but the length is only 29 miles, compared with 101 miles

for the Suez canal. The total cost was estimated at something over

$27,000,000. On August 22, 1900, the Congressional River and Harbor

Committee approved the work as far as completed.

V. GEODESY.

It may be that many, who have read of the incredulity of all Europe

when the voyages of navigators during the fifteenth and sixteenth

centuries first demonstrated the sphericity of the earth, will be

surprised to learn that this knowledge had been acquired almost

two thousand years before, and had since then been _forgotten_.

To Eratosthenes, a Grecian, belongs the honor of first making a

measurement (about the year 230 B. C.) of the size of the earth, which,

while very rude and inaccurate, used the same fundamental principle

as is now employed by geodesists. But the appliances of those ancient

Grecians and of the Arabians, who later carried on the work, were

exceedingly crude. Even during the sixteenth and seventeenth centuries,

when the French, English, and Dutch were working very hard on the

problem, and were gradually obtaining results which came closer and

closer to those now known to be correct, the appliances for measuring

angles were so rough and inaccurate that it was only possible to assert

that the earth is spherical, with a diameter of about 7900 miles. The

seventeenth century was nearly past when Picard first used spider lines

to determine the “line of collimation,” or the true line of sight, in a

telescope. This marked a new era in methods of work, but the eighteenth

century was about half gone when it was first authoritatively

proven that the earth is not a sphere, but is more truly an “oblate

spheroid,”—such a figure as would be obtained by flattening a sphere

at the poles. Some idea of the accuracy of the work done, even at this

stage, may be obtained by considering that the computed flattening is

so slight that if we had a perfect reproduction of the earth, reduced

to a diameter of 12 inches, the flattening would be less than 1/25 of

an inch—almost imperceptible even to a trained eye. The very highest

mountain would be considerably less than 1/100 of an inch in height on

such a sphere.

The present marvelous state of the science is due to the great

improvements which have been made in the construction and use of

angle-measuring instruments and of “base bars;” also to the development

of the mathematical theory and processes involved, notably that of

the “method of least squares.” As an illustration of the accuracy

attainable in the construction of theodolites, the writer recently

made an elaborate test of the error of the centering of one of these

angle-measuring instruments. Of course no _direct_ measurement is

possible. The result is based on a long series of observations, which,

when combined according to certain mathematical principles, will give

the desired result. The error was thus computed to be _forty-two

millionths_ of an inch. To realize what is meant when an angle is

measured with a “probable error” of a few hundredths of a second of

arc, it should be remembered that one second of arc on a circle 10

inches in diameter is less than 1/40000 of an inch. The accuracy which

has been attained in the measurement of base lines is not easily

realized by a layman. An engineer realizes the practical impossibility

of measuring a line twice and obtaining _precisely_ the same result

to the finest unit of measurement. The initiated are therefore able

to appreciate the achievement of measuring a base line having a

length of over nine miles, with a “probable error” of less than one

five-millionth of its length. The words “probable error,” as used

above, have a scientifically exact meaning, but they may be taken by

the uninitiated as representing a measure of the precision obtained.

At about the close of the last century the great mathematician,

Laplace, had declared that the results of the surveys which had then

been made were inconsistent with the theory that the form of the earth

is exactly that of an oblate spheroid. That form would require that

the equator and all parallels of latitude shall be true circles, and

that all meridian sections shall be equal ellipses. Laplace showed that

the discrepancies between the actual results obtained and the results

which the theory would call for are too great to be considered as mere

inaccuracies in the work done. With the extension, during this century,

of the great geodetic surveys, carried on by the various governments

of the world, more and more evidence has developed that the meridian

sections of the earth are not equal, which is equivalent to saying that

the equator is not a perfect circle. This has led to the next stage,

which has been to prove that the form of the earth may be more closely

represented by an “ellipsoid” than by a spheroid, that is, that _every_

section of the earth is an ellipse. Several calculations have been made

to determine the length and location of the principal axes of such a

figure. But these calculations are considered unsatisfactory, because

evidence has developed that the true form of the earth cannot be

represented even by an ellipsoid. This figure is symmetrical above and

below the equator. There are reasons for believing that the southern

hemisphere of the earth is slightly larger than the northern, and that

the form of the earth is more nearly that of an “ovaloid,”—a figure of

which the ordinary hen’s egg is an exaggerated example.

All the above forms, the sphere, spheroid, ellipsoid, and ovaloid

are geometrical forms which represent with more and more exactness

the true form of the earth, but even this increasing exactness will

not account for the discrepancies and irregularities which have been

found at various places, and which cannot be explained on the ground

of inaccurate work. Geodesists have been forced to the conclusion that

the true form of the earth is not a regular geometrical form, but is

a “geoid,” that is, like the earth and like nothing else, unless we

admit the exaggerated comparison that it is “like a potato.” It should

be understood that the words “form of the earth” do not refer to the

actual surface of mountain, valley, or ocean bottom, but to the actual

ocean surface, and to the surface which the free ocean would assume if

it could penetrate into the heart of the continents. The astounding

accuracy of the work done may be appreciated when we consider that the

differences between the “geoid” and the more accurate mathematical

forms are distances which should be measured in feet rather than in

miles. For many purposes, it is sufficiently exact to consider the

earth as a sphere. For some very precise work it is necessary to

consider it as a spheroid. The more exact forms have little or no

utilitarian value, and the vast amount of work that has been spent

on these researches has been due to man’s thirst for knowledge as

such,—due to the same enthusiasm which advances the sciences in fields

which only broaden man’s knowledge of the world in which we live.

VI. RAILROADS.

The achievements of engineering skill on the line of bridges, canals,

tunnels, etc., have been great, but their effect is insignificant

compared with the social revolution that was created by the invention

and development of railroads. The railroads of this country represent

a value of about $12,000,000,000—one sixth of the national wealth.

Their pay-rolls include about 850,000 employees—1/28 of the working

population. They support, directly or indirectly, about 5,000,000

people. They collect an annual revenue of about $1,200,000,000, which

is greater than the value of the combined products of gold, silver,

iron, coal, and other minerals, wheat, rye, oats, barley, potatoes,

and tobacco, produced by the entire nation. Such a stupendous social

institution requires special discussion, and it will be found treated

separately under the heading of “Evolution of the Railway.”

VII. TUNNELS.

Tunnels are of exceedingly ancient origin, if by tunnels we include

all artificial underground excavations. From prehistoric times natural

caves have been used as burial places, and, following this practice,

tunnels and artificial rock chambers have been cut out by kings and

rulers in Thebes, Nubia, and India during periods so ancient that we

call the study of their history archæology. Nor were the ancient

tunnels confined to tombs. The Babylonians constructed tunnels through

material so soft that a lining of brick masonry had to be used to

sustain the work. The Romans constructed a tunnel over three and one

half miles long to drain the waters of Lake Fucino. About 30,000

laborers were occupied on this work for eleven years. The nineteenth

century can hardly boast of works that represent a greater amount

of labor (measured in mere days of work) than some of these ancient

monuments of constructive skill, but the masterpieces of this century

are works which have been greatly aided and even rendered possible by

three modern inventions,—compressed-air drilling machines, modern

explosives, and the compressed-air process used in subaqueous work.

The advance in methods of tunnel surveying is as great and nearly

as important. Progress in excavating tunnels is necessarily slow,

because the working face is so small that only a few men can work

there at a time, and the rate of advance depends upon them. As an

illustration: although the Mont Cenis tunnel belongs to the latter

half of this century, the first blast being made in 1857, yet for

the first four years hand drilling was employed, when the average

progress was about nine inches per day. Then machine drilling with

compressed air was adopted, when the rate of advance was multiplied

five times. The invention of compressed-air drills simultaneously

solved two difficulties: (1) The compressed air furnishes an extremely

convenient and safe form of power, which enables holes to be drilled

much more rapidly than it is possible to drill them by hand. (2) The

compressed air, after doing its work, is exhausted into the tunnel,

and thus furnishes a continuous supply of fresh air. The necessity

for ventilation has often required the construction and operation of

expensive ventilating plants. Add to these improvements the lighting of

the tunnel, even during construction, by electric lights which consume

no oxygen, and the comparison between ancient and modern methods

becomes especially marked. Before the invention of explosives, hard

rock was sometimes broken by building wood fires next to the rock,

and then, when the rock had become very hot, cooling it suddenly with

water. The sudden contraction would split the rock. Ventilation was

attempted by waving fans at the tunnel entrances. With torches and

fires to consume the precious oxygen, and no effective ventilation, it

is a wonder how those earlier tunnels were constructed. The compressed

air methods for subaqueous work will be referred to under a special

case. The essential principles have already been described under

caissons.

[Illustration: AMERICAN PORTAL, ST. CLAIR TUNNEL. NORTH OF DETROIT,

MICH.]

TUNNEL SURVEYING.—The tunnel surveying developed during this century

is one of the marvels of surveying work. If a tunnel is to be several

miles in length, not only is the excavation commenced at each end, but

one or more intermediate shafts are frequently sunk to the level of the

tunnel, and excavation is extended in each direction from the shafts.

It is extremely important that these sections of the tunnel should

“meet” exactly. If they should fail to do so by any appreciable amount,

the necessary modifications are frequently costly and therefore justify

the most elaborate precautions in the surveying work, especially since

the surveying costs much less than the consequences of such a blunder.

The Hoosac tunnel is over 25,000 feet long. The heading from the east

end met the heading from the central shaft at a point 11,274 feet from

the east end and 1563 feet from the shaft. The error in alignment was

five sixteenths of an inch, that of levels “a few hundredths,” error

of distance “trifling.” The corrected alignment was then carried on

toward the heading from the west end, which it met at a point 10,138

feet (nearly two miles) from the west end and 2056 feet from the shaft.

Here the error of alignment was 9/16 of an inch and that of levels

about 1-5/8 inches. The surveying work of the spiral tunnels on the

St. Gothard Railway (to be described later) is another example of

marvelously accurate work under peculiarly unfavorable circumstances.

ST. GOTHARD TUNNEL.—To appreciate the magnitude of the problem

involved, of which this great tunnel is the crowning feature, some idea

should be obtained of the Alpine topography lying between Silenen, in

Switzerland, and Bodio, in Italy, less than forty miles apart. The

idea of connecting Switzerland and Italy by a railroad passing over or

through the Alps, by utilizing the St. Gothard Pass as far as possible,

dates back to 1850, or even earlier. An enterprise of such magnitude

could be consummated only after years of discussion, planning,

surveying, negotiations, and even international agreements. In 1871 a

treaty was finally ratified between Germany, Italy, and Switzerland, by

which the construction and financiering was duly authorized. On August

7, 1872, the contract for the construction was signed, with a proviso

that the work must be completed within eight years. On April 30, 1880,

the advance headings met, and soon thereafter the mails were regularly

carried through, although the tunnel was not actually completed in the

specified time.

Triumphs and Wonders of the 19th Century: The True Mirror of a Phenomenal Era A volume of original, entertaining and instructive historic and descriptive writings, showing the many and marvellous achievements which distinguish an hundred years of material, intellectual, social and moral progress · 第 37 / 76 段