REDUCTION WORKS OF THE PRESENT DAY.

Description of the Process of Working Comstock Silver Ore.

In speaking of the works at present in use for the reduction of silver

ore, it will only be necessary to describe the process in use in one

mill, as all work after the same system. Being the most recently

erected, and quite perfect in all its arrangements, the new mill of the

Nevada Mill and Mining Company, commonly called the Chollar Mill (as it

stands near the Chollar old shaft), shall furnish the illustration

necessary to an understanding of the method of working Comstock ores now

generally in use. The mill covers nearly an acre of ground, and the

machinery is at present (March, 1889) driven in part by a Pelton water

wheel 11 feet in diameter, and in part by power electrically transmitted

from the Sutro Tunnel level. The mill building stands in a depression

near the head of a small ravine. Such a site was selected in order that

from the time the ore enters the mill its course at each stage necessary

to its complete reduction, shall be downward—that there shall be no

lifting or hoisting of ore or pulp.

The mill stands a little over one hundred yards south of the Chollar

shaft. From the shaft the ore is run in the same cars in which it is

hoisted from the mine directly into the upper story of the mill. It is

there dumped through openings in the floor into the ore bins. Over these

ore bins are placed in a slanting position iron bars three inches apart,

forming screens called “grizzlies.” Through these screens the fine ore

falls into the bins, while the large lumps of rock roll down upon a

floor in front of the rock-breaker, an apparatus that works much on the

same principle as a lemon-squeezer. Between the jaws of this powerful

machine the largest and hardest piece of quartz rock is at once chewed

into fragments sufficiently small to be fed into the batteries, where

the heavy stamps reduce it to pulp. The ore is delivered into the

batteries by self-feeders, which are so regulated as to keep constantly

under the stamps the proper quantity of rock to do well the most work.

At the Chollar (or Nevada) Mill there are sixty stamps,—twelve batteries

of five stamps each. Each stamp weighs about eight hundred pounds. On

the end of each stamp is a heavy head or block of iron or steel called a

“shoe,” and in the bottom of the mortar (a long iron box in which the

stamps of each battery work) is a similar block of iron called a “die,”

upon which the shoe of the stamp strikes when it pulls. It is between

these two blocks of steel that the quartz is crushed.

A small stream of water flows into each battery, and as the ore is

reduced to a powder the water floats it out through the fine screens

that are fitted into the face of each mortar. The pulverized ore and

water, on passing through the screens, falls into a small trough, or

sluice, which carries the muddy mixture down to the settling tanks, on a

floor below, in the amalgamating room. In the tanks the crushed ore

settles and the water runs off. From the tanks the pulverized ore, which

resembles thin mortar, is shoveled out upon the floor alongside the

amalgamating pans, into which it is shoveled whenever they are to

receive a fresh charge of ore.

The pans are of iron and each holds a “charge” of about 3,000 pounds of

the mortar-like pulp. In the bottom of each pan are thick plates of

chilled iron or steel called “dies,” while revolving upon these are

other heavy pieces of steel, called “shoes” or mullers. In the pans the

pulverized ore is ground till it is much finer than when it passed

through the screens of the battery.

When a pan has received its charge of pulverized ore (“pulp”) a small

amount of water is added to render it sufficiently thin to be readily

stirred by the mullers. The pans have tight covers and double bottoms.

The double bottoms are steam chambers by means of which the pulp in the

pan is kept hot while it is ground and agitated. After a charge has been

ground about two hours, some 300 pounds of quicksilver are added (for

3,000 pounds of pulp), also a certain quantity of salt and sulphate of

copper; and sometimes soda or caustic potash and other chemicals, if

thought necessary, when the agitation in the pan is continued two hours

longer. The time of working in the pan varies from three to five hours.

The Chollar Mill has thirty of these pans. On a platform below that on

which stand the pans are fifteen settlers. These are about twice the

size of the pans. At the end of three or five hours each settler has

drawn off into it the contents of two pans. In the settler the pulp,

quicksilver, and amalgam are kept in motion for about two hours. During

this time water is let in and the pulp made very thin. The quicksilver

and amalgam settle to the bottom of the “settler,” and are drawn off

through a pipe and pass into a strainer—a strong canvas bag. There is an

iron box around each strainer, and this is kept locked.

It is in the pan that amalgamation takes place. There the sulphuret and

chloride of silver is changed to the metallic form by the chemical

action of the sulphate of copper (bluestone) and salt, and when it takes

the metallic form it at once unites with quicksilver. The gold contained

in the ore (generally one-third of its whole value) being always in the

metallic form, is amalgamated as soon as it is ground out of its

inclosing shell of quartz, or pyrites of iron.

The thinned pulp—mere muddy water in appearance—on leaving the settlers

passes into large wooden tubs called “agitators,” in which are revolving

rakes. In these tubs is caught some valuable material—principally

amalgam and quicksilver. From the “agitators” the pulp flows out of the

reduction works through a small flume which conducts it to the blanket

sluices, fifty yards away in the open air. The blanket sluices are

broad, shallow flumes in the bottom of which are placed strips of coarse

woolen blanketing. In passing over these blankets the pulp deposits

pulverized iron pyrites containing gold, some fine particles of amalgam,

and quicksilver; also such silver sulphurets as escaped being

amalgamated in the pans. From time to time the blankets are taken out of

the sluices and rinsed in a large tank, in which operation is saved

whatever of value they may have caught.

The amalgam collected in the strainers standing below the settlers is

placed in a press and as much quicksilver as possible pressed out, when

it is placed in retorts, which are heated till all the mercury is driven

off. There then remains behind the silver and gold, in a dull,

rough-looking mass. This “crude bullion” is then broken up and placed in

the melting pots, to be made into “bricks” and assayed. The bars or

bricks made weigh about 100 pounds each. From the top and bottom of each

pot or crucible of molten gold and silver is taken a small quantity of

the fluid metals from which assays are made to determine the value of

the bars. About thirty per cent of the value of the Comstock bullion

bars is in gold, though it has at times run up to fifty per cent in some

mines, and as low as ten per cent in others.

Though the Nevada Mill is in part driven by water, half the power used

is electrically transmitted from six forty-inch Pelton water wheels set

up in a large chamber excavated on the Sutro Tunnel level of the Chollar

Mine, 1,630 feet below the surface. These small Pelton wheels drive six

Brush dynamos, which generate the current that passes over the copper

wires to the electric motors in the mill. The electric apparatus

transmits to the main driving shaft of the mill about sixty-five per

cent of the power developed by the Pelton wheels. Each Pelton wheel

drives a dynamo, and one, two, four or all the dynamos may be run at the

same time, just as may be required, each Pelton and dynamo being

independent of the others.

After the water is used on the large-surface Pelton wheel in the mill it

is caught up and by means of a small flume is conducted to the shaft of

the Chollar Mine, near at hand, down which two large iron pipes carry it

to the six small Peltons below. By thus twice using the same water a

saving of one-half is made. The pressure on the lower Pelton wheels is

immense. Never before has any water wheel been operated under a vertical

pressure of 1,630 feet.

The Nevada Mill was built to work the ores of the Hale and Norcross,

Chollar and Potosi Mines. It is one of the most substantial mills in the

country, and no mill in the State is better arranged. It is lighted with

electricity, and the grounds in front are illuminated by means of an arc

light on a tall mast.

The Two California Mills.

The California stamp and pan-mills in Virginia City reduce the ores of

the Consolidated California and Virginia Mine. The stamp-mill is

situated immediately east of the C and C shaft of the mine. It contains

eighty stamps. The ore crushed in this mill is amalgamated in the

pan-mill, which stands about 1,500 feet further east. The crushed ore is

conducted from the stamp-mill to the pan-mill through an iron pipe four

inches in diameter. The process of amalgamation is much the same as at

the Chollar Mill, except that the pulp goes directly into the

amalgamating pans instead of being first received in settling tanks. It

flows from pan to pan—the outflow of the first pan passing into the

second through a pipe, thence into a third, and so on and from settler

to settler, being in all about three hours in passing through the

series. This is called the Boss Continuous Process. It is in use in no

other mill on the Comstock, as yet. In connection with the Rae

electrical process of amalgamation (in which a current of electricity is

passed through the settlers) it is found to work satisfactorily. The

electric current prevents loss of “floured” quicksilver. Both mills are

driven by Pelton water wheels. A single Pelton wheel eleven feet in

diameter, placed on the surface, drives the eighty stamps of the

battery-mill, and also twelve Boss grinding pans. The water used on the

surface Pelton is caught up and conducted to the C and C shaft, where it

is used on a series of Pelton wheels of the same size. These wheels are

placed in chambers made for their reception 500 feet apart from the top

of the shaft down to the Sutro Tunnel level (there 1,500 feet), and by

means of steel wire cables, used as belts, the power of all the lower

wheels is brought to a main driving shaft on the surface. The whole

power is then transmitted to the pan-mill (about 1,600 feet) by means of

steel wire cables passing over pulleys placed on a series of tall wooden

towers. The cables pass over a considerable depression between the top

of the C and C shaft and the pan-mill; three high towers are required in

the middle portion.

River and Canyon Mills.

The Mexican Mill, on the Carson River, contains forty-four stamps and a

corresponding number of pans, settlers, and other amalgamating

machinery. The Morgan Mill has forty stamps. It works ore from the

Consolidated California and Virginia Mine. The Brunswick Mill contains

seventy-six stamps, the Vivian sixteen, Santiago thirty-eight, and

Eureka sixty. All these mills are about and below Empire City, and all

work Comstock ores. The Eureka Mill is run on ore from the Consolidated

California and Virginia. The Rock Point Mill (thirty stamps), at Dayton,

and the Douglas Mill (ten stamps), in Lower Gold Hill, also work

Comstock ores.

At and about Silver City are two or three small mills that work the ores

of mines in that neighborhood, and on the Carson River are the Douglas

and Woodworth Mills, which work tailings.

On Six-mile Canyon, below Virginia City to the east, are several small

water mills having an aggregate of about thirty stamps. These work ores

from the mines on the canyon and in Flowery District. On the canyon are

also one or two small mills that work tailings and the concentrations

from blanket sluices.

The Alta Mining Company has a ten-stamp mill, with concentrators,

immediately adjoining the hoisting works at their mine. The Justice

Company have a new ten-stamp mill near their mine.

Owing to the fact that many mines are now at the same time producing

large quantities of ore, a lack of milling facilities is being felt. To

meet this demand the Nevada Mill has been enlarged one-third, and the

capacity of other mills will be increased, and perhaps some new mills

will be erected. Processes by means of which low-grade ores may be

profitably worked will no doubt yet be invented or discovered, which

will cause many new works to be erected either on the Carson River or in

the neighborhood of the mines producing large quantities of such ores.

A History of the Comstock Silver Lode & Mines Nevada and the Great Basin Region; Lake Tahoe and the High Sierras · 第 19 / 30 题