THE COMSTOCK SYSTEM OF WATER SUPPLY.

The Virginia City and Gold Hill Water Works.

When silver was first discovered on the Comstock, the flow of water from

natural springs was sufficient to supply all the wants of the small

communities then constituting the towns of Gold Hill and Virginia City.

As the population increased, wells were dug in many places (distant from

springs), and the domestic needs of many families were for a long time

supplied by water-carts that peddled the water of both wells and

springs. Presently the water of several tunnels added to the available

stock, but as mills and hoisting works multiplied, the demand for water

for use in steam boilers became so great that it was impossible to

supply it without creating a water famine among the people of the two

towns, now thousands in number, with hundreds of new arrivals every

week. In this emergency the Virginia City and Gold Hill Water Company

was formed. Outside of mining companies it is the oldest incorporation

on the Comstock Lode. The only available supply of water at that time

was that flowing from a few tunnels that had been run into the mountain

above the city for mining purposes. This was collected by means of

ditches and wooden flumes, and stored in large wooden tanks, whence it

was distributed about the city through iron pipes. When this supply

became insufficient, as it soon did, tunnels were run for the express

purpose of tapping water. As these drained out the hills and failed, new

ones were run in the range both north and south of the city for a

distance of several miles.

Finally every device was exhausted, and the hills above the level of the

city were thoroughly drained. It then became necessary to look to the

main range of the Sierra Nevada Mountains. In those mountains was an

inexhaustible supply of the purest and best water to be found in the

whole world, but between the lakes, creeks, and sparkling fountains of

the Sierras and the range on which stood Virginia City, lay Washoe

Valley, an immense trough nearly 2,000 feet in depth. How to get water

over such a depression was the question. Mr. H. Schussler, an engineer

of great repute, and who had planned the Spring Valley Water Works of

San Francisco, was brought to Nevada to view the situation. He said the

deep valley could be crossed, and in the spring of 1872 surveys were

made and an order given Eastern manufacturers for the construction of a

large wrought-iron pipe. The first section of the big pipe was laid June

11, 1873, and the last on the twenty-fifth day of July of the same year.

The Big Water Pipe.

The total length of the pipe is 7 miles and 134 feet. The pipe has an

interior diameter of 12 inches, and is capable of delivering 2,200,000

gallons of water in twenty-four hours. The inlet of the pipe is on a

spur from the main Sierra Nevada Range, and the outlet is on the crest

of the Virginia Range of mountains. The pipe lies across the valley in

the form of an inverted siphon. At the lowest point, the perpendicular

pressure on the pipe is 1,720 feet, or about 800 pounds to the square

inch. The inlet being 465 feet higher than the outlet, the water is

forced through the pipe under tremendous pressure. The water is brought

to the inlet from the sources of supply in two large covered flumes, and

at the outlet end of the pipe is delivered into two large flumes, which

carry it to Virginia City, a distance of twelve miles.

This pipe was constructed of sheets of wrought iron riveted together.

Each section was fastened with three rows of rivets. At the point of

greatest pressure the iron was five-sixteenths of an inch in thickness,

but near the ends, upon the sides of the two opposite mountains, it

tapered down to one-sixteenth of an inch. In the construction of the

pipe there were used 1,150,000 pounds of rolled iron and 1,000,000

rivets, while 52,000 pounds of lead were used in securing the joints of

the sections. At each joint the sections were inserted into cast iron

sleeves, and it was within these sleeves that the lead was used. The

total weight of the sleeves was 442,500 pounds.

The first flow of water through this pipe reached Gold Hill and Virginia

City on the evening of August 1, 1873, amid the greatest rejoicings of

the people of both towns. Cannons were fired, rockets sent up, and bands

of music paraded the streets. Never before in any part of the world had

water been conveyed under a pressure so great; and it still remains the

greatest. Previous to this, 910 feet was the greatest perpendicular

pressure under which water had ever been carried through an iron pipe.

This had been accomplished by Mr. Schussler, at Cherokee Flat,

California.

Additional Great Pipes.

In 1875 the water company laid alongside the first pipe a second having

an inside diameter of ten inches. This pipe is lap-welded, and, there

being no friction of rivet heads upon the water, the flow through it is

equal to that through the twelve-inch pipe,—2,200,000 gallons every

twenty-four hours.

Before 1875 the supply of water was obtained from creeks on the eastern

slope of the mountains lying east of Lake Tahoe, but in the year named,

the water company pushed their main supply flumes through to Marlette

Lake, which lies inside of the Tahoe basin. To do this it was necessary

to run a tunnel 3,000 feet in length through the dividing ridge, or rim,

of the Tahoe basin. The sheet of water known as Marlette Lake is almost

entirely artificial, and owes its existence to a big dam—is in reality a

large reservoir. The water covers an area of over 300 acres, and in the

middle is about 40 feet deep. The reservoir holds 16,000,000,000 gallons

of water.

The second pipe was laid under the supervision of Capt. J. B. Overton,

Superintendent of the works of the water company, who also extended the

flumes, constructed the tunnel through the mountain ridge, and made all

the other improvements. In 1887 a third iron pipe of twelve inches

inside diameter was laid across the valley alongside the first two. It

was also a welded pipe and delivers much more water than either of the

others. The inlet pressure has been raised on all three pipes, and they

now deliver a total flow of about 10,000,000 gallons in twenty-four

hours. In 1887, also, a branch flume was run to the northward (Marlette

Lake lying to the southward) a distance of nine miles, which taps a

number of creeks tributary to Lake Tahoe on the east and northeast

sides. In the same year a reservoir capable of holding 20,000,000

gallons was constructed on Hobart Creek, on the east side of the

dividing ridge. In and near the city are reservoirs holding from

3,000,000 to 10,000,000 gallons, and a number of tanks along the side of

Mount Davidson of from 60,000 to 80,000 gallons, capacity. The water is

brought a distance of from twenty-five to thirty-seven miles, and the

supply (aided by the several storage reservoirs) is ample for all

present uses. The total cost of the works of the company has been about

$2,500,000. Each of the three pipes has its separate inlet and outlet,

from two flumes and into two flumes. Between the outlet and the city the

water passes through a large storage reservoir.

The Sutro Tunnel.

While there was a scarcity of water on the surface at Virginia City,

there was a superabundance of it, both hot and cold, under-ground in all

the mines. Levels were flooded so suddenly that oftentimes the miners

narrowly escaped being drowned by the vast subterranean reservoirs that

were unexpectedly tapped. Great delays in mining were caused by these

floods, and to pump out the water that filled the lower levels cost

immense amounts of money. Several tunnels from 1,000 to 5,000 feet in

length were run into the mountain, but they were of only temporary

utility, as the shafts of the mines were soon below their level. In

order to overcome these water troubles, Adolph Sutro early conceived the

idea of running an immense drain tunnel under the Comstock Lode from the

lowest possible point. A survey was made by Mr. H. Schussler, and work

was commenced on the great drain tunnel (since known as the Sutro

Tunnel) October 19, 1869. It starts at the edge of the valley of the

Carson River, at a point nearly east of Virginia City, and has a length

of 20,145 feet—nearly 4 miles. It taps the central parts of the Comstock

Lode at a depth of about 1,650 feet. The tunnel is 16 feet wide and 12

feet high. Drain flumes are sunk in the floor and over these are two

tracks for horse-cars. It required nearly eight years to construct the

tunnel, and the total cost was about $4,500,000. Although the leading

mines had their shafts down nearly 3,000 feet before the tunnel was

finished, yet it was of great use, as it saved 1,600 feet of pumping.

From the main tunnel branches were run north and south along the east

side of the vein for a distance of over two miles, with which the

several companies connected by drain drifts from their mines. The flow

of water through the tunnel has at times been over 10,000,000 gallons in

twenty-four hours. Between the mouth of the tunnel and the Carson River

there are 155 feet of fall, but it has never been utilized for driving

reduction works. New connections are still being made with the tunnel

for drainage. Though it never paid anything near what was anticipated by

Mr. Sutro, the tunnel still brings in a snug sum annually. Last year

(the fiscal year that ended February 29, 1888) the receipts for

royalties amounted to $237,258.33. It costs a considerable amount

annually to keep the main tunnel and branches in repair. This great

drain at a depth of 1,600 feet below the surface allows of Pelton water

wheels being set up in the shafts of the several mines and worked under

immense pressure, there being a free discharge from the wheels. At the C

and C shaft of the Consolidated California and Virginia, such wheels

have been put in every 500 feet from the surface down to the Sutro

Tunnel level. The water used on the first wheel on the surface, in the

stamp-mill, is caught up, led to the shaft, and used on the second 500

feet below, and so on down to the tunnel level, the power being brought

from wheel to wheel to the surface by means of a system of steel wire

cables. Thus is transmitted to the surface the power developed by the

whole series of wheels.

The Reduction Works of the Early Days.

In the early days the building of quartz-mills kept pace with the

building up of the towns. As early as October, 1859, Logan & Holmes had

a four-stamp horse-power mill in operation at Dayton, and Hastings &

Woodworth had two water-power arastras at work, which reduced six tons

of ore a day. This ore was not worked as silver ore. It was from the

surface of the Comstock Lode, at Gold Hill, and was worked for gold

only. In the spring of 1860 many mills for working silver ore began to

be erected.

The First Silver Mill.

The first silver-mill that went into operation was the “Pioneer,”

erected by Almarin B. Paul, on Gold Canyon, at the north end of Silver

City, just below the Devil’s Gate. It was a steam mill and contained

twenty-four Howland rotary stamps and twenty-four amalgamating pans. The

work of erecting the mill was commenced May 24, 1860, and it began work

August 13, the same year. Some others have claimed the honor of starting

the first quartz-mill in Nevada, but this was undoubtedly the first

silver-mill. In it were operated the first silver amalgamating pans ever

seen anywhere. The iron amalgamating pans were the result of experiments

made by Almarin B. Paul before he began the erection of his mill. He

thought the German barrel process and Mexican patio too slow, and began

to make experiments with some small iron pans that had been in use at

some of the quartz-mills in California for grinding and working the

sulphurets saved by concentrating machines in working the quartz of the

gold mines. The best of these was found to be the “Knox Improved Pan,”

in which was a false bottom that formed beneath the pan a steam-tight

heating chamber. By the use of this kind of pan, and by treating the

heated pulp with certain quantities of salt, sulphate of copper, and

some other chemicals, before adding quicksilver, it was found that a

charge (whatever amount of crushed silver ore the pan would hold) could

be amalgamated in about three hours. The results obtained with Knox’s

Improved Pan were so satisfactory that Mr. Paul placed pans of that

pattern in his new mill. Soon after a score of pans of different styles

were invented, and to this day pans of new patterns are still being

invented and patented.

The Coover & Harris Mill, Gold Hill, was the first mill in the country

to start up with steam. It blew its steam whistle a day before that of

Paul’s “Pioneer” was heard, but it could not then be called a

silver-mill as it was working gold quartz, the same as was worked, in

October the year before, at Dayton, by Logan & Holmes and Hastings &

Woodworth. The mill had a fifteen horse-power engine that drove an

eight-stamp Howland rotary battery and crushed six tons of ore a day. At

first it was a dry crusher, but soon Paul’s Concentrators and Knox’ pans

were used. The Harris of the firm was Dr. E. B. Harris, now a resident

of Virginia City.

The Many Mills of the Early Days.

Very soon after these first mills went into operation several others

started up. By the spring of 1862 no fewer than eighty-one quartz-mills

were at work, the majority of them on ore from mines situated on the

Comstock Lode. These mills were located in Virginia City, on Six and

Seven-mile Canyons, at Gold Hill, Silver City, Dayton, at Empire City,

and all along the Carson River below that town; two or three near Carson

City (on Clear Creek and Mill Creek), and a dozen or more about Washoe

Valley and down toward Steamboat Valley. Many of these mills were of

small capacity, having only from two to ten stamps, but there were

already a few first-class reduction works, as regards capacity, though

their methods and processes were defective. The reduction works of the

Ophir Company, in Washoe Valley, cost $500,000, contained thirty-six

stamps, were driven by an engine of 100 horse-power, and was capable of

working 100 tons of ore a day. The Gould & Curry Mill then building on

Six-mile Canyon was of still greater capacity, and the Land, Bassett,

Winfield, Empire State, Central, Marysville, Trench, Swansea, Phœnix,

Succor, Rock Point, Merrimac, Vivian, and several other mills, contained

from fifteen to twenty-five stamps each. After the completion of the

Virginia and Truckee Railroad the majority of the outside mills (mills

to which it was necessary to transport ore, wood, and other supplies by

wagon) were pulled down and removed to new mining camps in various parts

of the State. The greater part of the ores of the Comstock were then

reduced in steam mills near the mines or in water mills on the Carson

River on the line of the railroad; and this is still the case.

We now have fewer mills than in the early days, but they are of greater

average capacity, and are in every respect more effective than were

those first erected. More ore is crushed to the stamp, and the time

required for the amalgamation of the pulp has been very materially

reduced. All the present mills are so constructed that there is very

little handling of the ores operated upon, and labor-saving apparatus

has been introduced into nearly every department. Even the old oil lamps

are being thrown out of the mills and the electric light introduced.

A History of the Comstock Silver Lode & Mines Nevada and the Great Basin Region; Lake Tahoe and the High Sierras · 第 18 / 30 题