CHAPTER X.

LASHINGS AND TIES FOR SCAFFOLDING.

Lashings are seizings of rope for heavy work, such as scaffolding;

and the lashing of poles, ledgers, and putlogs may be now considered

with advantage. Heavy scaffolding is best lashed with chain; and it

should be noted that, while a rope lashing is hove taut by the steady

strain of a heaving bar, a chain requires different treatment, and must

be jerked tight with little tugs—an action similar to that used when

shaking out a mat—assisted by an occasional rap with the heaver.

[Illustration: Fig. 171.—Rope Lashing for Poles and Ledgers.]

[Illustration: Fig. 172.—Chain Lashing for Poles and Ledgers.]

[Illustration: Fig. 173.—Rope Lashing for Putlogs.]

The rope used for lashing all parts of scaffolding should be fairly

new, sound, and in size not more than 1½ in. The average length

required will be about six yards, and it must be so put on that each

turn of the lashing takes its share in the support. To this end the

tackle supporting the ledger must not be released until the lashing is

completed, otherwise the first turns will be subjected to undue strain.

Fig. 171 shows the lashing of a ledger to a pole; if chain is used a

different method is necessary, and it is lashed as in Fig. 172.

Putlogs should be square, or at any rate flat on the upper and lower

sides, to prevent any chance of rolling, one end being squared down in

size to enter the building in the place of a header brick, the other

end being lashed down to the ledger as in Fig. 173. The planks forming

the stage are not lashed to the putlogs, and there is great danger in

allowing them to project at one or both ends.

Poles are generally about 30 ft. long, and for high buildings it is

necessary to lengthen them by lashing on an extra pole. The safest plan

is to lash a half pole to the lower part of the first erected; this

resting on the ground will form a footing, upon the upper end of which

the lengthening pole will stand, being kept in position by three plain

lashings (see Fig. 174). Should the lengthening pole be only light, and

a footing not be considered necessary, a chain racking should be put on

besides two rope lashings.

[Illustration: Fig. 174.—Poles Lashed and Wedged, with Footing.]

It is usual to wedge scaffold lashings tight, and, provided the wedges

are well shaped, it is a convenient way of tightening the work after

change of weather. Badly-shaped wedges are apt to cut the rope and

sometimes work out.

[Illustration: Fig. 175.—Slinging Plank for use as Stage.]

Stages for painting, or small repairs on a building, may be quickly

rigged up by slinging each end of a plank on the bight of a rope. For

this make a marlinespike hitch (see Fig. 40, p. 40), and let the end

of the plank take the position there occupied by the marlinespike; the

double part will be below and the single part above the plank (see

Fig. 175). For single-handed work a boatswain’s chair, of which an

illustration is given by Fig. 176, is convenient.

[Illustration: Fig. 176.—Boatswain’s Chair.]