CHAPTER III

POWER HOUSE BUILDING

The power house is situated adjacent to the North River on the block

bounded by West 58th Street, West 59th Street, Eleventh Avenue, and

Twelfth Avenue. The plans were adopted after a thorough study by the

engineers of Interborough Rapid Transit Company of all the large power

houses already completed and of the designs of the large power houses

in process of construction in America and abroad. The building is

large, and when fully equipped it will be capable of producing more

power than any electrical plant ever built, and the study of the

designs of other power houses throughout the world was pursued with

the principal object of reducing to a minimum the possibility of

interruption of service in a plant producing the great power required.

The type of power house adopted provides for a single row of large

engines and electric generators, contained within an operating room

placed beside a boiler house, with a capacity of producing,

approximately, not less than 100,000 horse power when the machinery is

being operated at normal rating.

[Sidenote: _Location

and General

Plan of

Power House_]

The work of preparing the detailed plans of the power house structure

was, in the main, completed early in 1902, and resulted in the present

plan, which may briefly be described as follows: The structure is

divided into two main parts--an operating room and a boiler house,

with a partition wall between the two sections. The face of the

structure on Eleventh Avenue is 200 feet wide, of which width the

boiler house takes 83 feet and the operating section 117 feet. The

operating room occupies the northerly side of the structure and the

boiler house the southerly side. The designers were enabled to employ

a contour of roof and wall section for the northerly side that was

identical with the roof and wall contour of the southerly side, so

that the building, when viewed from either end, presents a symmetrical

appearance with both sides of the building alike in form and design.

The operating room section is practically symmetrical in its

structure, with respect to its center; it consists of a central area,

with a truss roof over same along with galleries at both sides. The

galleries along the northerly side are primarily for the electrical

apparatus, while those along the southerly side are given up chiefly

to the steam-pipe equipment. The boiler room section is also

practically symmetrical with respect to its center.

A sectional scheme of the power house arrangement was determined on,

by which the structure was to consist of five generating sections,

each similar to the others in all its mechanical details; but, at a

later date, a sixth section was added, with space on the lot for a

seventh section. Each section embraces one chimney along with the

following generating equipment:--twelve boilers, two engines, each

direct connected to a 5,000 kilowatt alternator; two condensing

equipments, two boiler-feed pumps, two smoke-flue systems, and detail

apparatus necessary to make each section complete in itself. The only

variation is the turbine plant hereafter referred to. In addition to

the space occupied by the sections, an area was set aside, at the

Eleventh Avenue end of the structure, for the passage of the railway

spur from the New York Central tracks. The total length of the

original five-section power house was 585 feet 9-1/2 inches, but the

additional section afterwards added makes the over all length of the

structure 693 feet 9-3/4 inches. In the fourth section it was decided

to omit a regular engine with its 5,000 kilowatt generator, and in its

place substitute a 5,000 kilowatt lighting and exciter outfit.

Arrangements were made, however, so that this outfit can afterward be

replaced by a regular 5,000 kilowatt traction generator.

[Illustration: CROSS SECTION OF POWER HOUSE IN PERSPECTIVE]

The plan of the power station included a method of supporting the

chimneys on steel columns, instead of erecting them through the

building, which modification allowed for the disposal of boilers in

spaces which would otherwise be occupied by the chimney bases. By this

arrangement it was possible to place all the boilers on one floor

level. The economizers were placed above the boilers, instead of

behind them, which made a material saving in the width of the boiler

room. This saving permitted the setting aside of the aforementioned

gallery at the side of the operating room, closed off from both boiler

and engine rooms, for the reception of the main-pipe systems and for a

pumping equipment below it.

The advantages of the plan can be enumerated briefly as follows: The

main engines, combined with their alternators, lie in a single row

along the center line of the operating room with the steam or

operating end of each engine facing the boiler house and the opposite

end toward the electrical switching and controlling apparatus arranged

along the outside wall. Within the area between the boiler house and

operating room there is placed, for each engine, its respective

complement of pumping apparatus, all controlled by and under the

operating jurisdiction of the engineer for that engine. Each engineer

has thus full control of the pumping machinery required for his unit.

Symmetrically arranged with respect to the center line of each engine

are the six boilers in the boiler room, and the piping from these six

boilers forms a short connection between the nozzles on the boilers

and the throttles on the engine. The arrangement of piping is alike

for each engine, which results in a piping system of maximum

simplicity that can be controlled, in the event of difficulty, with a

degree of certainty not possible with a more complicated system. The

main parts of the steam-pipe system can be controlled from outside

this area.

The single tier of boilers makes it possible to secure a high and well

ventilated boiler room with ventilation into a story constructed above

it, aside from that afforded by the windows themselves. The boiler

room will therefore be cool in warm weather and light, and all

difficulties from escaping steam will be minimized. In this respect

the boiler room will be superior to corresponding rooms in plants of

older construction, where they are low, dark, and often very hot

during the summer season. The placing of the economizers, with their

auxiliary smoke flue connections, in the economizer room, all

symmetrically arranged with respect to each chimney, removes from the

boiler room an element of disturbance and makes it possible to pass

directly from the boiler house to the operating room at convenient

points along the length of the power house structure. The location of

each chimney in the center of the boiler house between sets of six

boilers divides the coal bunker construction into separate pockets by

which trouble from spontaneous combustion can be localized, and, as

described later, the divided coal bunkers can provide for the storage

of different grades of coal. The unit basis on which the economizer

and flue system is constructed will allow making repairs to any one

section without shutting off the portions not connected directly to

the section needing repair.

The floor of the power house between the column bases is a continuous

mass of concrete nowhere less than two feet thick. The massive

concrete foundations for the reciprocating engines contain each 1,400

yards of concrete above mean high water level, and in some cases have

twice as much below that point. The total amount of concrete in the

foundations of the finished power house is about 80,000 yards.

[Illustration: CROSS-SECTION OF POWER HOUSE]

Water for condensing purposes is drawn from the river and discharged

into it through two monolithic concrete tunnels parallel to the axis

of the building. The intake conduit has an oval interior, 10 x 8-1/2

feet in size, and a rectangular exterior cross-section; the outflow

tunnel has a horseshoe-shape cross-section and is built on top of the

intake tunnel. These tunnels were built throughout in open trench,

which, at the shore end, was excavated in solid rock. At the river end

the excavation was, at some places, almost entirely through the fill

and mud and was made in a cofferdam composed chiefly of sheet piles.

As it was impossible to drive these piles across the old timber crib

which formed the old dock front, the latter was cut through by a

pneumatic caisson of wooden-stave construction, which formed part of

one side of the cofferdam. At the river end of the cofferdam the rock

was so deep that the concrete could not be carried down to its

surface, and the tunnel section was built on a foundation of piles

driven to the rock and cut off by a steam saw 19-1/2 feet below mean

hightide. This section of the tunnel was built in a 65 x 48-foot

floating caisson 24 feet deep. The concrete was rammed in it around

the moulds and the sides were braced as it sunk. After the tunnel

sections were completed, the caisson was sunk, by water ballast, to a

bearing on the pile foundation.

Adjacent to the condensing water conduits is the 10 x 15-foot

rectangular concrete tunnel, through which the underground coal

conveyor is installed between the shore end of the pier and the power

house.

[Sidenote: _Steel Work_]

The steel structure of the power house is independent of the walls,

the latter being self-supporting and used as bearing walls only for a

few of the beams in the first floor. Although structurally a single

building, in arrangement it is essentially two, lying side by side and

separated by a brick division wall.

There are 58 transverse and 9 longitudinal rows of main columns, the

longitudinal spacing being 18 feet and 36 feet for different rows,

with special bracing in the boiler house to accommodate the

arrangement of boilers. The columns are mainly of box section, made up

of rolled or built channels and cover plates. They are supported by

cast-iron bases, resting on the granite capstones of the concrete

foundation piers.

Both the boiler house and the engine house have five tiers of floor

framing below the flat portion of the roof, the three upper tiers of

the engine house forming galleries on each side of the operating room,

which is clear for the full height of the building.

The boiler house floors are, in general, framed with transverse plate

girders and longitudinal rolled beams, arranged to suit the particular

requirements of the imposed loads of the boilers, economizers, coal,

etc., while the engine-room floors and pipe and switchboard galleries

are in general framed with longitudinal plate girders and transverse

beams.

There are seven coal bunkers in the boiler house, of which five are 77

feet and two 41 feet in length by 60 feet in width at the top, the

combined maximum capacity being 18,000 tons. The bunkers are separated

from each other by the six chimneys spaced along the center line of

the boiler house. The bottom of the bunkers are at the fifth floor, at

an elevation of about 66 feet above the basement. The bunkers are

constructed with double, transverse, plate girder frames at each line

of columns, combined with struts and ties, which balance the outward

thrust of the coal against the sides. The frames form the outline of

the bunkers with slides sloping at 45 degrees, and carry longitudinal

I-beams, between which are built concrete arches, reinforced with

expanded metal, the whole surface being filled with concrete over the

tops of the beams and given a two-inch granolithic finish.

[Illustration: 58TH ST. POWER HOUSE--GENERAL PLAN OF COAL BUNKERS AND

ECONOMIZERS.]

[Illustration: 58TH ST. POWER HOUSE--GENERAL PLAN OF MAIN OPERATING

FLOOR.]

The six chimneys, spaced 108 feet apart, and occupying the space

between the ends of the adjacent coal bunkers, are supported on

plate-girder platforms in the fifth floor, leaving the space below

clear for a symmetrical arrangement of the boilers and economizers

from end to end of the building. The platforms are framed of

single-web girders 8 feet deep, thoroughly braced and carrying on

their top flanges a grillage of 20-inch I-beam. A system of bracing

for both the chimney platforms and coal bunkers is carried down to the

foundations in traverse planes about 30 feet apart.

The sixth tier of beams constitute a flat roof over a portion of the

building at the center and sides. In the engine room, at this level,

which is 64 feet above the engine-room floor, are provided the two

longitudinal lines of crane runway girders upon which are operated the

engine-room cranes. Runways for 10-ton hand cranes are also provided

for the full length of the boiler room, and for nearly the full length

of the north panel in the engine room.

Some of the loads carried by the steel structure are as follows: In

the engine house, operating on the longitudinal runways as mentioned,

are one 60-ton and one 25-ton electric traveling crane of 75 feet

span. The imposed loads of the steam-pipe galleries on the south side

and the switchboard galleries on the north side are somewhat

irregularly distributed, but are equivalent to uniform loads of 250 to

400 pounds per square foot. In the boiler house the weight of coal

carried is about 45 tons per longitudinal foot of the building; the

weight of the brick chimneys is 1,200 tons each; economizers, with

brick setting, about 4-1/2 tons per longitudinal foot; suspended

weight of the boilers 96 tons each, and the weight of the boiler

setting, carried on the first floor framing, 160 tons each. The weight

of structural steel used in the completed building is about 11,000

tons.

[Sidenote: _Power House

Superstructure_]

The design of the facework of the power house received the personal

attention of the directors of the company, and its character and the

class of materials to be employed were carefully considered. The

influence of the design on the future value of the property and the

condition of the environment in general were studied, together with

the factors relating to the future ownership of the plant by the city.

Several plans were taken up looking to the construction of a power

house of massive and simple design, but it was finally decided to

adopt an ornate style of treatment by which the structure would be

rendered architecturally attractive and in harmony with the recent

tendencies of municipal and city improvements from an architectural

standpoint. At the initial stage of the power house design Mr.

Stanford White, of the firm of McKim, Mead & White, of New York,

volunteered his services to the company as an adviser on the matter of

the design of the facework, and, as his offer was accepted, his

connection with the work has resulted in the development of the

present exterior design and the selection of the materials used.

The Eleventh Avenue façade is the most elaborately treated, but the

scheme of the main façade is carried along both the 58th and 59th

Street fronts. The westerly end of the structure, facing the river,

may ultimately be removed in case the power house is extended to the

Twelfth Avenue building line for the reception of fourteen generating

equipments; and for this reason this wall is designed plainly of less

costly material.

The general style of the facework is what may be called French

Renaissance, and the color scheme has, therefore, been made rather

light in character. The base of the exterior walls has been finished

with cut granite up to the water table, above which they have been

laid up with a light colored buff pressed brick. This brick has been

enriched by the use of similarly colored terra-cotta, which appears in

the pilasters, about the windows, in the several entablatures, and in

the cornice and parapet work. The Eleventh Avenue façade is further

enriched by marble medallions, framed with terra-cotta, and by a title

panel directly over the front of the structure.

The main entrance to the structure is situated at its northeast

corner, and, as the railroad track passes along just inside the

building, the entrance proper is the doorway immediately beyond the

track, and opens into the entrance lobby. The doorway is trimmed with

cut granite and the lobby is finished with a marble wainscoting.

The interior of the operating room is faced with a light,

cream-colored pressed brick with an enameled brick wainscoting, eight

feet high, extending around the entire operating area; the wainscoting

is white except for a brown border and base. The offices, the toilets

and locker rooms are finished and fitted with materials in harmony

with the high-class character of the building. The masonry-floor

construction consists of concrete reinforced with expanded metal, and

except where iron or other floor plates are used, or where tile or

special flooring is laid, the floor is covered with a hard cement

granolithic finish.

In the design of the interior arrangements, the value of a generous

supply of stairways was appreciated, in order that all parts of the

structure might be made readily accessible, especially in the boiler

house section. In the boiler house and machinery portion of the plant

the stairways, railings, and accessories are plainly but strongly

constructed. The main stairways are, however, of somewhat ornate

design, with marble and other trim work, and the railings of the main

gallery construction are likewise of ornate treatment. All exterior

doors and trim are of metal and all interior carpenter work is done

with Kalomein iron protection, so that the building, in its strictest

sense, will contain no combustible material.

[Sidenote: _Chimneys_]

The complete 12-unit power house will have six chimneys, spaced 108

feet apart on the longitudinal center line of the boiler room, each

chimney being 15 feet in inside diameter at the top, which is 225 feet

above the grate bars. Each will serve the twelve boilers included in

the section of which it is the center, these boilers having an

aggregate of 72,000 square feet of heating surface. By these

dimensions each chimney has a fair surplus capacity, and it is

calculated that, with economizers in the path of the furnace gases,

there will be sufficient draft to meet a demand slightly above the

normal rating of the boilers. To provide for overload capacity, as may

be demanded by future conditions, a forced draft system will be

supplied, as described later.

As previously stated, the chimneys are all supported upon the steel

structure of the building at an elevation of 76 feet above the

basement floor and 63 feet above the grates. The supporting platforms

are, in each case, carried on six of the building columns (the three

front columns of two groups of boilers on opposite sides of the center

aisle of the boiler room), and each platform is composed of single-web

plate girders, well braced and surmounted by a grillage of 20-inch

I-beams. The grillage is filled solidly with concrete and flushed

smooth on top to receive the brickwork of the chimney.

Each chimney is 162 feet in total height of brickwork above the top of

the supporting platform, and each chimney is 23 feet square in the

outside dimension at the base, changing to an octagonal form at a

point 14 feet 3 inches above the base. This octagonal form is carried

to a height of 32 feet 6 inches above the base, at which point the

circular section of radial brick begins.

The octagonal base of the chimney is of hard-burned red brick three

feet in thickness between the side of the octagon and the interior

circular section. The brick work is started from the top of the

grillage platform with a steel channel curb, three feet in depth,

through which two lines of steel rods are run in each direction, thus

binding together the first three feet of brickwork, and designed to

prevent any flaking at the outside. At a level of three feet above the

bottom of the brickwork, a layer of water-proofing is placed over the

interior area and covered with two courses of brick, upon which are

built diagonal brick walls, 4 inches thick, 12 inches apart, and about

18 inches in height. These walls are themselves perforated at

intervals, and the whole is covered with hand-burned terra-cotta

blocks, thus forming a cellular air space, which communicates with the

exterior air and serves as an insulation against heat for the

steelwork beneath. A single layer of firebrick completes the flooring

of the interior area, which is also flush with the bottom of the flue

openings.

There are two flue openings, diametrically opposite, and 6 feet wide

by 17 feet high to the crown of the arched top. They are lined with

fire brick, which joins the fire-brick lining of the interior of the

shaft, this latter being bonded to the red-brick walls to a point 6

feet below the top of the octagon, and extended above for a height of

14 feet within the circular shaft, as an inner shell. The usual baffle

wall is provided of fire brick, 13 inches thick, extending diagonally

across the chimney, and 4 feet above the tops of the flue openings.

Where the chimney passes through the roof of the boiler house, a steel

plate and angle curb, which clears the chimney by 6 inches at all

points, is provided in connection with the roof framing. This is

covered by a hood flashed into the brickwork, so that the roof has no

connection with or bearing upon the chimney.

At a point 4 feet 6 inches below the cap of the chimney the brickwork

is corbeled out for several courses, forming a ledge, around the

outside of which is placed a wrought-iron railing, thus forming a

walkway around the circumference of the chimney top. The cap is of

cast iron, surmounted by eight 3 x 1-inch wrought-iron ribs, bent over

the outlet and with pointed ends gathered together at the center. The

lightning conductors are carried down the outside of the shaft to the

roof and thence to the ground outside of the building. Galvanized iron

ladder rungs were built in the brickwork, for ladders both inside and

outside the shaft.

The chimneys, except for the octagonal red-brick base, are constructed

of the radial perforated bricks. The lightning rods are tipped with

pointed platinum points about 18 inches long.

[Sidenote: _North River

Pier_]

Exceptional facilities have been provided for the unloading of coal

from vessels, or barges, which can be brought to the northerly side of

the recently constructed pier at the foot of West 58th Street. The

pier was specially built by the Department of Docks and Ferries and is

700 feet long and 60 feet wide.

The pier construction includes a special river wall across 58th Street

at the bulkhead line through which the condensing water will be taken

from and returned to the river. Immediately outside the river wall and

beneath the deck of the pier, there is a system of screens through

which the intake water is passed. On each side where the water enters

the screen chamber, is a heavy steel grillage; inside this is a system

of fine screens arranged so that the several screens can be raised, by

a special machine, for the purpose of cleaning. The advantages of a

well-designed screening outfit has been appreciated, and considerable

care has been exercised to make it as reliable and effective as

possible.

At each side of the center of the pier, just below the deck, there are

two discharge water conduits constructed of heavy timber, to conduct

the warm water from the condensers away from the cold water intakes at

the screens. Two water conduits are employed, in order that one may be

repaired or renewed while using the other; in fact, the entire pier is

constructed with the view of renewal without interference in the

operation for which it was provided.