CHAPTER V.

TIMBER PILES. PILE-DRIVING.

General Consideration.

"Now, as promised, I will tell you of a little bit of free trade with

some timber pilework."

"That's it. I am waiting for it."

"Well, they let me have 400 feet run of pile-driving. Double row of 16

to 12 inch piles, and there were some fine sticks nearly 55 feet long,

and that is a long length for a sound pile, and you have to pay for

them."

"Before you begin to tell me how you scamped it, give me a hint or two

about piling, and say what you have learned from experience."

"All right. First, when a pile is some distance below the bottom

waling, which should be fixed as low as possible, a lot must be taken

for granted, and it cannot be controlled much. I know this from drawing

many piles; hundreds, I may say. After they are down about 5 or 6 feet

they begin to do as they like, and take to irregular habits, and you

cannot be certain the points are straight unless the ground is the same

throughout, and it hardly ever is. In fact, the resistance they meet

with varies, and then they accommodate themselves to circumstances; and

even when the ground is very soft they turn to the line of least

resistance, and if they have to be driven through several feet of soft

earth to reach the solid, they may play tricks and bend about in the

soft soil in go-as-you-please style, yet seem to be driving nicely; or

they may stick between boulders and can't be driven further and appear

to be firm as a rock, and so they may be as long as the boulders do not

move, but they often do after a time, should the ground become wet, and

sometimes when the next pile is being driven.

"Always be careful to see that the shoe has as large a bearing as

possible for the end of the pile, and is long in the point, and more

pointed as the soil is harder. Take a 12-inch pile with a 4-inch or so

seat in the shoe for the stick. Well, 12 by 12 is 144, and 4 by 4 is

16, and therefore the pile end has a bearing area upon the pile shoe of

one-ninth of the area of the pile. No wonder the bottom often becomes

ragged and the pile shifts. The shoe should have a good hold of the

timber, and be put on true to a hair, so that the point is in the exact

centre line of the pile, or look out for squalls. Now high falls and

light monkeys are out of fashion, and short falls and heavy monkeys are

the thing, not so many piles are injured. Pushing them down is better

than breaking them to bits. You should have the monkey so that its

centre falls upon the centre line of the pile. The average centre of

the pile should be marked on as exact as possible, and the end of the

pile be cut to a template, so as to make it fit tightly to the shoe, or

it may not drive straightly. I always take a lot of trouble that way

and seldom have to draw a ragged one, and believe they used to drive

straight. I mean from start to finish about the same number of blows

and to the same depth and vertically.

"When hand-driving in soft earth--it's slow business at the

best--weight the pile when the monkey is being lifted so as to stop the

quivering and press it down and keep it from springing. Provided the

work was of importance, and I was the Caesar of it, before any pile was

pitched ready for driving it should be inspected, its dimensions taken,

it should be numbered, numbers be burnt in, and every foot from top to

bottom should be marked on by a brand; and perhaps the numbers should

begin at the bottom and work up, as there is not so much chance to

tamper with two figures as with one, &c.

"Pile-driving is fickle work, for sometimes the piles stick because the

points can't pierce the earth, and at others because they are held by

friction on the surface of the piles. I have known the shoe to be cast,

and the pile end look like a bass broom, and to be all in shreds. When

piles split a great deal and they must be driven, the best thing to do

is to get harder wood, lessen the fall and increase the weight of the

monkey; same as in tunnel lining, when stock bricks are crushed, blue

bricks have to be put in. The nature of the ground should govern the

hardness of the wood for piles. I always pick out darkish even-coloured

wood, and sniff for the resin, and the more in it the better for me.

You don't catch me driving many white wood piles, for they become dry

and break off short, and are not the timber for piles. Once a bother

arose about some piles. There was a layer of hard gravel, and by the

way the piles were driving I knew they would split, so I gave the word

that Memel piles were not hard enough for such gravel; and I worked it

humble like, and said to the engineer, 'I think you will agree, sir,

you can't expect me to be answerable for smashing them until we get

into the soft ground again. It wants rock elm or as strong timber for

this soil.' After smashing a few to shreds, they supplied us with rock

elm piles, and then we managed. It is true to say in the same soil the

harder the pile the better it will drive, and therefore with less

trouble and expense. The monkey should have an even widened-out base

where it touches the pile head, so as to get the weight as near the

head of the pile as possible; it also falls straighter than the long

thin rams of nearly the same width throughout. Grease the ways well,

and take care they are as straight as a die, and exactly vertical if it

is upright pile-driving, and you'll save money. Make the blows quickly

in fine-grained soil, so that it has not time to settle round the pile.

In clay there is no occasion for such quick-driving, but take care to

prevent the piles rebounding. Remember the same system does not do for

every soil, for quick driving in hard soil sometimes smashes the piles;

perhaps the earth has not had time to become displaced nicely and

settle before being jammed again, and then the pile point turns and

quivers and soon shreds, and cannot be driven down properly. Anyone

that says piles make the ground itself firmer when they are driven into

it, and so cause it to support a heavier load, will have to prove it

before that can be swallowed. It is the friction on the sides of the

piles that principally sustains them and not the bearing of the points.

In hard soils drive slowly, for it is like chipping up a stone with a

hammer. You must do it gently, or it will break the tool; and as you

can't clear out the hole in driving piles, it seems to me time is

required instead, so that the pressed out soil may settle away and take

a bearing. I tricked a chap once pile-driving from a barge."

"How did you do it?"

"Well, it was bound to be driving from a barge or nothing, and there

were three pile-drivers for us, almost as many as we could work, as the

driving had to be done by degrees. Some of the work was let to a chap I

did not like too much, and the rest to me. They gave me the choice of

plant, so I said to the engineer, 'May I have two of the pile-drivers

upon my barge, as Faggitts'--that was the other chap's name--'only

wants one.' I got the two. Now Faggitts knew about driving piles on

land, but had never done any driving from a barge, so I had a bit in

hand of him. If you take any pile-driving and it has to be done from a

barge, have more than one pile-driver on it if you have the chance; but

don't place them close together, make one steady the other, and have as

many as you can conveniently work at once; because, in my experience,

the more you have the less the swaying, and the piles drive more

regularly and the barge is steadier, and you don't have so much bother

with the moorings. Of course, if the monkey does not fall flat upon the

pile head the pile does not receive the full force of the blow in the

right direction, the pile may be driven slightly crooked and it does

not get properly treated and won't penetrate so easily, and therefore

you lose money. Old Faggitts found that out in the soft soil we were

driving them into. I said nothing to him, but he did to me. I never

told him.

"I have read somewhere that it is wearying work going into details, but

when you have to do the work yourself, unless you take care of the

details you'll find they will make it hot for you; and after all, any

one can speak generally, but when they have to explain in detail what

they think they mean, and have to do the work themselves, they will

soon find out that unless you know the details and attend to them

carefully, that you won't make a profit nor anyone else. Anybody can

talk tallish after about a fortnight's training, but then they have to

pull up or they will fall at the next fence, which I label 'details

wanted.' That's by the way, and I may have made it too strong, but it

is as well to sound your engineer. No general is successful unless he

knows the strength of his enemy and as much more about him as he can,

and acts accordingly, and chooses his own time and place for a battle.

"Driving piles in groups, especially if the ground is soft, and not

singly, is good. They go down more regularly and fit tighter, and they

seem to drive quicker. I have driven cheap fir piles between elm piles

that way, and a good many of the soft ones split when we had to drive

them singly. Have as few key piles as possible, because they are liable

to be jammed before they are down to the right depth, and then, if it

is a cofferdam, it is probable a leak will occur under the key pile,

because it is the easiest place for the water to soak through, and the

other piles being down below it, stop the flow, and it soon finds out

the short-driven key pile. When I notice a spot in a cofferdam at which

water leaks through the bottom, unless it is an old stream bed, it

occurs to me that the piles have not gone down properly, have got

bruised, bent, turned up, or broken off, and I have found out that was

the case on drawing them when the cofferdam was of no further use. Once

I was ordered to drive some three-cornered piles at the turns in a

cofferdam on a river front, but said, 'Square or circular shall be

driven, but any other shape I will try to get down properly, provided

they are carefully fitted and bevelled, but you really can't expect me

to be answerable.' They deducted a fixed amount if after the piles were

pitched there were more than a certain number visibly damaged or

smashed, so you may depend I had a good look at the sticks before they

were driven.

"I have driven piles 60 feet in length, kind of giant sticks, but 45 to

50 feet is long enough for good sound piles. Socket pile driving

piecework I avoid, for the joints are ticklish business; and if a pile

of ordinary length will not do, I throw out a mild hint whether the

better system to use would not be Indian brick or concrete wells, or to

spread out the foundations so as to get a sufficiently large bearing,

or have a fascine platform, and sink it till it is firm, and test its

stability properly by a load.

"There is a great deal in starting the driving correctly. I always am

very careful at the start, and experiment and watch how the piles

drive, and vary the fall a little until the best is known. Few

considerable stretches of ground are of the same kind, and to fix a

certain fall throughout is not the thing, it generally wants varying. I

have easily driven piles in fine sand by having two small pipes, one

each back and front, reaching a few inches below the point of the pile,

and sending water down them under pressure, and by keeping the pipes on

the move so that they can't be gripped. I worked out with the pipes the

place where the pile had to be pitched and made a profit that way,

because not only did the piles go down much quicker, and a lot of blows

were therefore saved, but the piles were easier to start right. I used

to call my two pipes the two bobbies, because they steered straight for

their station, and these two did the same office for the piles.

"Now a word as to systems of driving; the method must suit the ground.

I knew a man that believed in nothing but driving by gunpowder; he must

have been going in strong for gunpowder tea, or have been in the

militia, for the soil he had to do with was not homogeneous, and had

boulders and other hard obstructions in it. It was not like soft sand

and clay, consequently many of the piles were broken. The noise also

was a nuisance in the dock, and cattle that had to be unshipped from

the steamers were so unruly that they had to stop the gunpowder

pile-drivers; besides, to do much good with them, a large charge is

required, or it costs too much. The power necessary to work the

machines is better obtained by other means, and can be without so much

noise or shock.

"I have used all sorts and sizes of monkeys, from half a hundredweight

to four tons, but heavy rams and short falls are the best, and steam

for the power if the contract is considerable and will pay for such

plant; otherwise hand, unless the piles are large and have to be driven

a long way. A sixteen hundredweight monkey is about heavy enough to

work nicely by hand, but it is not sufficiently heavy for a 12-inch

pile, except in soft ground. For sheet piles a hand machine is good

enough, for it can be moved easily, and six to eight tons weight, being

about that of a steam pile-driver, costs something to shift, unless

there are rails and tackle handy. Of course the blows are quicker with

a steam pile-driver, and in sand that is a great point as the ground

has no time to settle round a pile; but should the soil vary and be

hard and soft, it is well to slow down the machine at first to lessen

the fear of smashing the piles and shaking them till they tremble to

destruction. I have worked a lot of different kinds of plant, and

driven many piles at once, and the power was obtained from one engine

giving the motion by driving bands, and in another case with drums

fixed on the engine shafts, the chains being carried over sheaves to

the different pile engines.

"This is my idea of pile-driving:--

"1. Steam driving. 2. Hand driving, if the piles must be driven very

slowly, and there are not many to drive. 3. Never use gunpowder

pile-drivers, always prefer steam, hydraulic, atmospheric, or some

other motive power.

"Gunpowder is more for blowing up than anything else, in my opinion,

and I know the pile shoes often shed in driving with it; that is, they

loose their hold of the piles and become detached.

"A pile should penetrate regularly, and after the first few blows drive

less and less, as then you have a good idea it is all right and

uninjured. Uneven penetration is a proof that piles are not all right,

and when they sink suddenly there is almost sure to be something wrong,

and they are most likely being over-driven, shredded, frayed,

shoe-cast, or split up. The rate of descent should be noted. It may be

considered they are driving properly if they sink about a foot at a

blow for the first one or more, and then 8 or 6 inches, and when they

get down to one-eighth, one-fourth, or half-an-inch a blow for some

successive blows it is time to stop and consider. I have driven piles

with as few as ten blows in sand with the aid of two water pipes at

work fore and aft, as mentioned before, and have had to give a pile as

many as 300 blows, and when they want as many as that, with all due

deference to everyone, the ground is firm enough to build upon for

permanent foundations without piles. My experience goes to show that

piles are often driven further than they need be, if only for use as a

cofferdam, and that back struts and counterforts are better than extra

depth in the ground, provided leakage is prevented. 8 to 10 feet down

for solid clay, 10 to 12 feet in gravel, and about 15 feet for ordinary

soils, and more care taken to ascertain the piles are where they should

be, and that they are sound and whole, and not turned aside, bulged,

and injured, would be my practice. In boulder ground, in my opinion,

piles should not be adopted; for broken, crushed, and twisted fibre

bass-broom shreds are not piles; they are out of place and should be

used for clearing leaves from garden walks. The longer the piles the

softer should be the ground they have to be driven into, or they shake

so much, and cost more to drive.

"Unless always well buried and at such a depth that neither the

moistness nor condition of the earth vary, I scarcely believe in timber

pile foundations at all, except in very peculiar cases, and as a kind

of aid to the main support or to help to prevent the toe of a wall from

being thrust forward, but for cofferdams, jetties, piers, and such

structures, of course they are useful. In hard and most gravelly soil

avoid them, and also in sharp sand, if you cannot use the

previously-mentioned water-pipe arrangement fore and aft; and although

in ordinary clays they drive nicely, and you make a bigger profit than

in sand, it puzzles me to discern what is the use of them for permanent

foundations, except to help to prevent a wall sliding forward, because

when a pile is driven into most clays the clay becomes tempered and

softer, and a layer of concrete put in a proper distance down is better

and much more certain, and distributes the load more equally. Elastic

soil is bad in which to drive piles, for it yields and then rebounds. A

pile will sometimes spring back almost as much as it is driven, and in

such a case it is well to let the ram or monkey rest on the pile

immediately after the blow is given, if you are hand-driving, or have

an arrangement so that it is weighted directly each blow is delivered,

and perhaps the best way is to hang heavy weights on the pile. In

driving in firm sand the ground at the surface becomes considerably

displaced, in clay about half as much as in sand.

"Pile-driving is different to masonry, and I always read the

specification for pile work, and then judge whether and how a bit

'extra' is to be obtained, and guess as to the knowledge of those I

have to deal with, and act accordingly. Sometimes a specification

simply says all the piles are to be driven to the same depth or as

shown on the drawings. That may be right should the ground have been

tested by experimental driving, or the nature of it be known; but if

not, I don't take much notice of the specification, because I hate

waste, and can't afford the luxury; and it stands to reason that simply

because a lot of piles are driven to the same depth they are not

equally firm, nor will they support the same load unless the soil is

exactly the same, and they drive well and regularly to the same depth

and all nearly alike inches by inches, and this seldom occurs. Often

'extra' profit is to be had, as you will soon hear described, for when

piles will not drive further than half or a quarter of an inch a blow

they satisfy me they are tight enough for the purpose intended if they

are at a fair depth and not wedged by boulders; but between ourselves,

should a building of any kind have to be erected on piles, and anyone I

really cared about had to live in it, I should always weight the piles

for as long a time as possible after finishing the driving and

reasonably more than the permanent load, watch the effects, and act

accordingly, particularly in elastic soil.

"Remember a pile sinks less after it has rested than if it be driven

continuously, therefore always take note of the set when the driving is

proceeding, and not just at the start, or after an interval, although

one does that for one's own benefit, and with a view to 'extras'; and

no one wants to drive a pile an inch more than can be helped--at least

I don't, nor have I, and it is certain never shall.

"You want to know when to stop driving. The time has arrived when a

pile penetrates very little, and nearly equal for several successive

blows of the heaviest ram by which it has been driven at the usual

fall.

"A word as to tie and sheet piles before referring to the way I have

worked piles for 'extra' profit. It is difficult to make a main pile

and a tie act together, one or the other is nearly sure to have to bear

more than its proper strain, and the tie rod becomes eaten by rust,

bent, and loose in the piles. In taking down old banks and quays you

will generally find the main pile and the tie pile are not held tightly

by the tie rod, the tie pile is loose or pulled over, perhaps when

first strained, and then becomes disengaged when the main pile has set

to the strain. The tie rods want to be very carefully and frequently

adjusted, if possible, and big washers and cleats on them are required.

They hold best in firm sand, not so well in clay, and in large light

loose soil, such as ashes, they are not much good. It is an impotent

arrangement and it is always uncertain whether they will act together.

Don't undertake to tighten up the rods. Fix the piles, and let the

engineer see to the tightening up, as you may injure the piles.

"When I have to drive a lot of sheet piles, of course the piles are

supplied to me, and I only take the driving. You may be sure the timber

is right, and that the edges are sawn square so as to drive tightly

together, and that the point is in order. I find it always pays well to

temporarily place a baulk at the ground line like a waling, but not

fixed to the sheet piling, as it guides the piles, lessens the shaking,

and they drive easier and better. It appears to me piles cannot vibrate

without force, and that is not where it is wanted, so it is wasted

motion. Agitation when drawing piles is all right, but when you are

driving you want it in the ground itself, and not in the piles. Once

when I had to drive some thin sheet piles, I made a movable guide

frame, the side against the sheet piling being planed and greased. It

was like one bay of a timber-lattice bridge, and it well paid for

itself as it steadied the piles.

"In taking a contract for drawing piles always find out how long the

piles have been driven, for if they have been down many years they will

be much harder to draw than if they have only been fixed a few months.

They can be drawn by lever, hydraulic jack, and chains, and pontoons in

a tide way."

Scamping Tricks and Odd Knowledge Occasionally Practised upon Public Works · 第 5 / 15 章