There is another and more positive method by which a perfectly steady

load can be maintained upon one machine of several running in parallel.

This may be carried out as follows: Suppose, in a station having a total

capacity of 20,000 kilowatts, there are three machines, two of 6000

kilowatts each, and one of 8000 kilowatts, and it is desired to carry

out a steady full-load test upon one of the 6000 kilowatts units.

Assuming that the test is to be of six hours' duration, and that the

conditions of load fluctuations upon the station are well known, the

first step to take is to select a period for the test during which the

total load upon all machines is not likely to fall below, say, 8000

kilowatts. The tension upon the governor spring of the turbine to be

tested must then be adjusted so that the machine on each peak load is

taxed to its utmost normal capacity; and even when the station load

falls to its minimum, the load from the particular machine shall not be

released sufficiently to allow it to fall below 6000 kilowatts. Under

these conditions, then, it may be assumed that although the load on the

test machine will vary, it cannot fall below 6000 kilowatts. Therefore,

all that remains to be done to insure a perfectly steady load equal to

the normal full load of the machine, or 6000 kilowatts, is to fix the

main throttle or governing valve in such a position that the steam

passing through at constant pressure is just capable of sustaining full

speed under the load required. When this method is adopted, it is

desirable to fix a simple hight-adjusting and locking mechanism to the

governing-valve spindle. The load as read on the indicating wattmeter

can then be very accurately varied until correct, and farther varied, if

necessary, should any change occur in the general conditions which might

either directly or indirectly bring about a change of load.

Preparing the Turbine for Testing

All preliminary labors connected with a test being satisfactorily

disposed of, it only remains to place the turbines under the required

conditions, and to then proceed with the test. For the benefit of those

inexperienced in the operation of large turbines, we will assume that

such a machine is about to be started for the purpose outlined.

It is always advisable to make a strict practice of getting all the

auxiliary plant under way before starting up the turbine. In handling a

turbine plant the several operations might be carried through in the

following order:

(1) Circulating oil through all bearings and oil chambers.[5]

(2) Starting of condenser circulating-water pumps, and continuous

circulation of circulating water through the tubes of condenser.

(3) Starting of pump delivering condensed steam from the condenser

hot-well to weighing tanks.

(4) Starting of air pump, vacuum being raised as high as possible within

condenser.

(5) Sealing of turbine glands, whether of liquid or steam type, no

adjustment of the quantity of sealing fluid being necessary, however, at

this point.

(6) Adjustment of valves on and leading to the water-weighing tanks.

(7) Opening of main exhaust valve or valves between turbine and

condenser.

(8) Starting up of turbine and slowly running to speed.

(9) Application of load, and adjustment of gland-sealing steam.

[5] In a self-contained system, where the oil pump is usually driven

from the turbine spindle, this would of course be impossible. In the

gravity and allied systems, however, it should always be the first

operation performed. The tests for oil consumption, described

previously, having been carried out, it is assumed that suitable means

have been adopted to restrict the total oil flow through the bearings to

a minimum quantity.

The running to speed of large turbo-alternators requires considerable

care, and should always be done slowly; that is to say the rate of

acceleration should be slow. It is well known that the vibration of a

heavy unit is accompanied by a synchronous or non-synchronous vibration

of the foundation upon which it rests. The nearest approach to perfect

synchronism between unit and foundation is obtained by a gradual rise in

speed. A machine run up to speed too quickly might, after passing the

critical speed, settle down with little visible vibration, but at a

later time, even hours after, suddenly begin vibrating violently from no

apparent cause. The chances of this occurring are minimized by slow and

careful running to speed.

Whether the machine being tested is one of a number running in parallel,

or a single unit running on a steady water load, the latter should in

all cases be thrown on gradually until full load is reached. A

preliminary run of two or three hours--whenever possible--should then be

made, during which ample opportunity is afforded for regulating the

conditions in accordance with test requirements. The tester will do well

during the last hour of this trial run to station his recorders at their

several posts and, for a short time at least, to have a complete set of

readings taken at the correct test intervals. This more particularly

applies to the electrical water, superheat and vacuum readings. In the

case of a turbo-alternator the steadiness obtainable in the electrical

load may determine the frequency of readings taken, both electrical and

otherwise. On a perfectly steady water-tank load, for example, it may

be sufficiently adequate to read all wattmeters, voltmeters, and

ammeters from standard instruments at from one- to two-minute intervals.

Readings at half-minute intervals, however, should be taken with a

varying load, even when the variation is only slight.

The water-measurement readings may of course be taken at any suitable

intervals, the time being to an extent determined by the size of the

measuring tanks or the capacity of the weighing machine or machines.

When designing the measuring apparatus, the object should be to

minimize, within economical and practical range, the total number of

weighings or measurements necessary. Consequently, no strict time of

interval between individual weighings or measurements can be given in

this case. It may be said, however, that it is not desirable to take

these at anything less than five-minute intervals. Under ordinary

circumstances a three- to five-minute interval is sufficient in the case

of all steam-pressure, vacuum--including mercurial columns and

barometer--superheat and temperature readings.

Gland and Hot-Well Regulation

There are two highly important features requiring more or less constant

attention throughout a test, namely the gland and hot-well regulation.

For the present purpose we may assume that the glands are supplied with

either steam or water for sealing them. All steam supplied to the

turbine obviously goes to swell the hot-well contents, and to thus

increase the total steam consumption. The ordinary steam gland is in

reality a pressure gland. At both ends of the turbine casing is an

annular chamber, surrounding the turbine spindle at the point where it

projects through the casing. A number of brass rings on either side of

this chamber encircle the spindle, with only a very fine running

clearance between the latter and themselves. Steam enters the gland

chamber at a slight pressure, and, when a vacuum exists inside the

turbine casing, tends to flow inward. The pressure, however, inside the

gland is increased until it exceeds that of the atmosphere outside, and

by maintaining it at this pressure it is obvious that no air can

possibly enter the turbine through the glands, to destroy the vacuum.

The above principle must be borne in mind during a test upon a turbine

having steam-fed glands. Perhaps the best course to follow--in view of

the economy of gland steam consumption necessary--is as follows:

During the preliminary non-test run, full steam is turned into both

glands while the vacuum is being raised, and maintained until full load

has been on the turbine for some little time. The vacuum will by this

time have probably reached its maximum, and perhaps fallen to a point

slightly lower, at which hight it may be expected to remain, other

conditions also remaining constant. The gland steam must now be

gradually turned off until the amount of steam vapor issuing from the

glands is almost imperceptible. This should not lower the vacuum in the

slightest degree. By gradual degrees the gland steam can be still

farther cut down, until no steam vapor at all can be discerned issuing

from the gland boxes. This reduction should be continued until a point

is reached at which the vacuum is affected, when it must be stopped and

the amount of steam flowing to the gland again increased very slightly,

just enough to bring the vacuum again to its original hight. The steam

now passing into the glands is the minimum required under the

conditions, and should be maintained as nearly constant as possible

throughout the test. Practically all steam entering the glands is drawn

into the turbine, and thence to the condenser, and under the

circumstances it may be assumed the increase in steam consumption

arising from this source is also a minimum.

There is one mechanical feature which has an important bearing upon the

foregoing question, and which it is one of the tester's duties to

investigate. This is illustrated in Fig. 71, which shows a turbine

spindle projecting through the casing. The gland box is let into the

casing as shown. Brass rings A calked into the gland box encircle the

shaft on either side of the annular steam space S. As the clearance

between the turbine spindle and the rings A is in a measure instrumental

in determining the amount of steam required to maintain a required

pressure inside the chamber, it is obvious that this clearance should be

minimum. An unnecessarily large clearance means a proportionally large

increase in gland steam consumption and _vice versa_.

[Illustration: FIG. 71]

When the turbine glands are sealed with water, all water leakage which

takes place into the turbine, and ultimately to the condenser hot-well,

must be measured and subtracted from the hot-well contents at the end of

a test.

The foregoing remarks would not apply to those cases in which the gland

supply is drawn from and returned to the hot-well, or a pipe leading

from the hot-well. Then no correction would be necessary, as all water

used for gland purposes might be assumed as being taken from the

measuring tanks and returned again in time for same or next weighing or

measurement.

General Considerations

There are a few principal elementary points which it is necessary always

to keep in mind during the conduct of a test. Among these are the

effects of variation in vacuum, superheat, initial steam pressure, and,

as already indicated, in load. There exist many rules for determining

the corrections necessitated by this variation. For example, it is often

assumed that 9 degrees Fahrenheit, excess or otherwise, above or below

that specified, represents an increase or reduction in efficiency of

about 1 per cent. It is probable that the percentage increase or

decrease in steam consumption, in the case of superheat, can be more

reliably calculated than in other cases, as, for example, vacuum; but

the increase cannot be said to be due solely to the variation in

superheat. In other words, the individuality of the particular turbine

being tested always contributes something, however small this something

may be, to the results obtained.

These remarks are particularly applicable where vacuum is concerned.

Here again rules exist, one of these being that every additional inch of

vacuum increases the economy of the turbine by something slightly under

half a pound of steam per kilowatt-hour. But a moment's consideration

convinces one of the utter unreliability of such rules for general

application. It is, for instance, well known that many machines, when

under test, have demonstrated that the total increase in the water rate

is very far from constant. A machine tested, for example, gave

approximately the following results, the object of the test being to

discover the total increase in the water rate per inch decrease in

vacuum:

From 27 inches to 26 inches, 4.5 per cent.

From 26.2 inches to 24.5 inches, 2.5 per cent.

This illustrates to what an extent the ratio of increase can vary, and

it must be borne in mind that it is very probable that the variation is

different in different types and sizes of machines.

There can exist, therefore, no empirical rules of a reliable nature upon

which the tester can base his deductions. The only way calculated to

give satisfaction is to conduct a series of preliminary tests upon the

turbine undergoing observation, and from these to deduce all information

of the nature required, which can be permanently recorded in a set of

curves for reference during the final official tests.

In conclusion, it must be admitted that many published tests outlining

the performances of certain makes of turbine are unreliable. To

determine honestly the capabilities of any machine in the direction of

steam economy is an operation requiring time, and unbiased and accurate

supervision. By means of such assets as "floating quantities," short

tests during exceptionally favorable conditions, and disregard of the

vital necessity of running a test under the proper specified conditions,

it is comparatively easy to obtain results apparently highly

satisfactory, but which under other conditions might be just the

reverse. These considerations are, however, unworthy of the tester

proper.

VII. AUXILIARIES FOR STEAM TURBINES[6]

[6] Contributed to _Power_ by Thomas Franklin.

The Jet Condenser

The jet condenser illustrated in Fig. 72 is singularly well adapted for

the turbine installation. As the type has not been so widely adopted as

the more common forms of jet condenser and the surface types, it may

prove of interest to describe briefly its general construction and a few

of its special features in relation to tests.

[Illustration: FIG. 72]

Referring to the figure, C is the main condenser body. Exhaust steam

enters at the left-hand side through the pipe E, condensing water

issuing through the pipe D at the opposite side. Passing through the

short conical pipe P, the condensing water enters the cylindrical

chamber W and falls directly upon the spraying cone S. The hight of this

spraying cone is determined by the tension upon the spring T, below the

piston R, the latter being connected to the cone by a spindle L. An

increase of the water pressure inside the chamber W will thus compress

the spring, and the spraying cone being consequently lowered increases

the aperture between it and the sloping lower wall of the chamber W,

allowing a greater volume of water to be sprayed. The piston R

incidentally prevents water entering the top vapor chamber V. From the

foregoing it can be seen that this condenser is of the contra-flow type,

the entering steam coming immediately into contact with the sprayed

water. The perforated diaphragm plate F allows the vapor to rise into

the chamber V, from which it is drawn through the pipe A to the air

pump. A relief valve U prevents an excessive accumulation of pressure

in the vapor chamber, this valve being obviously of delicate

construction, capable of opening upon a very slight increase of the

internal pressure over that of the atmosphere. Condensed steam and

circulating water are together carried down the pipe B to the well Z,

from which a portion may be carried off as feed water, and the remainder

cooled and passed through the condenser again. Under any circumstances,

whether the air pump is working or not, a certain percentage of the

vapor in the condenser is always carried down the pipe B, and this

action alone creates a partial vacuum, thus rendering the work of the

air pump easier. As a matter of fact, a fairly high vacuum can be

maintained with the air pump closed down, and only the indirect pumping

action of the falling water operating to rarify the contents of the

condenser body. It is customary to place the condenser forty or more

feet above the circulating-water pump, the latter usually being a few

feet below the turbine.

Features Demanding Attention

When operating a condenser of this type, the most important features

requiring preliminary inspection and regulation while running are:

(a) Circulating-water regulation.

(b) Freedom of all mechanical parts of spraying mechanism.

(c) Relief-valve regulation.

(d) Water-cooling arrangements.

The tester will, however, devote his attention to a practical survey of

the condenser and its auxiliaries, before running operations commence.

A preliminary vacuum test ought to be conducted upon the condenser body,

and the exhaust piping between the condenser and turbine. To accomplish

this the circulating-water pipe D can be filled with water to the

condenser level. The relief valve should also be water-sealed. Any

existing leakage can thus be located and stopped.

Having made the condenser as tight as possible within practical limits,

vacuum might be again raised and, with the same parts sealed, allowed to

fall slowly for, say, ten minutes. A similar test over an equal period

may then be conducted with the relief valve not water-sealed. A

comparison of the times taken for an equal fall of vacuum in inches,

under the different conditions, during the above two tests, will reveal

the extent of the leakage taking place through the relief valve. It

seems superfluous to add that the fall of vacuum in both the foregoing

tests must not be accelerated in any way, but must be a result simply of

the slight inevitable leakage which is to be found in every system.

On a comparatively steady load, and with consequently only small

fluctuation in the volume of steam to be condensed, the conditions are

most favorable for regulating the amount of circulating water necessary.

Naturally, an excess of water above the required minimum will not affect

the pressure conditions inside the condenser. It does, however, increase

the quantity of water to be handled from the hot-well, and incidentally

lowers the temperature there, which, whether the feed-water pass through

economizers or otherwise, is not advisable from an economical

standpoint. Thus there is an economical minimum of circulating water to

be aimed at, and, as previously stated, it can best be arrived at by

running the turbine under normal load and adjusting the flow of the

circulating water by regulating the main valve and the tension upon the

spring T. Under abnormal conditions, the breakdown of an air pump, or

the sudden springing of a bad leak, for instance, the amount of

circulating water can be increased by a farther opening of the main

valve if necessary, and a relaxation of the spring tension by hand; or,

the spring tension might be automatically changed immediately upon the

vacuum falling.

The absolute freedom of all moving parts of the spraying mechanism

should be one of the tester's first assurances. To facilitate this, it

is customary to construct the parts, with the exception of the springs,

of brass or some other non-corrosive metal. The spraying cone must be

thoroughly clean in every channel, to insure a well-distributed stream

of water. Nor is it less important that careful attention be given to

the setting and operation of the relief valve, as will be seen later.

The obvious object of such a valve is to prevent the internal condenser

pressure ever being maintained much higher than the atmospheric

pressure. A number of carefully designed rubber flap valves, or one

large one, have been found to act successfully for this purpose,

although a balanced valve of more substantial construction would appear

to be more desirable.

Importance of Relief Valves

The question of relief valves in turbine installations is an important

one, and it seems desirable at this point to draw attention to another

necessary relief valve and its function, namely the turbine atmospheric

valve. As generally understood, this is placed between the turbine and

condenser, and, should the pressure in the latter, owing to any cause,

rise above that of the atmosphere, it opens automatically and allows the

exhaust steam to flow through it into the atmosphere, or into another

condenser.

A general diagrammatic arrangement of a steam turbine, condenser, and

exhaust piping is shown in Fig. 73. Connected to the exhaust pipe B,

near to the condenser, is the automatic atmospheric valve D, from which

leads the exhaust piping E to the atmosphere. The turbine relief valve

is shown at F, and the condenser relief valve at G. The main exhaust

valve between turbine and condenser is seen at H. We have here three

separate relief valves: one, F, to prevent excessive pressure in the

turbine: the second, D, an atmospheric valve opening a path to the air,

and, in addition to preventing excessive pressure accumulating, also

helping to keep the temperature of the condenser body and tubes low; the

third, the condenser relief valve G, which in itself ought to be capable

of exhausting all steam from the turbine, should occasion demand it.

[Illustration: FIG. 73]

Assuming a plant of this description to be operating favorably, the

conditions would of necessity be as follows: The valves F, D, and G, all

closed; the valve H open. Suppose that, owing to sudden loss of

circulating water, the vacuum fell to zero. The condenser would at once

fill with steam, a slight pressure would be set up, and whichever of the

three valves happened to be set to blow off at the lowest pressure would

do so. Now it is desirable that the first valve to open under such

circumstances should be the atmospheric valve D. This being so, the

condenser would remain full of steam at atmospheric pressure until the

attendant had had time to close the main hand-or motor-operated exhaust

valve H, which he would naturally do before attempting to regain the

circulation of the condensing water. Again, assume the installation to

be running under the initial conditions, with the atmospheric valve D

and all remaining valves except H closed.

Suppose the vacuum again fell to zero from a similar cause, and,

further, suppose the atmospheric valve D failed to operate

automatically. The only valves now capable of passing the exhaust steam

are the turbine and condenser relief valves F and G. Inasmuch as the

pressures at exhaust in the turbine proper, on varying load, vary over a

considerably greater range than the small fairly constant absolute

pressures inside the condenser, it is obviously necessary to allow for

this factor in the respective setting of these two relief valves. In

other words, the obvious deduction is to set the turbine relief valve to

blow off at a higher pressure than the condenser relief valve, even

when considering the question with respect to condensing conditions

only. In this second hypothetical case, then, with a closed and disabled

atmospheric valve, the exhaust must take place through the condenser,

until the turbine can be shut down, or the circulating water regained

without the former course being found necessary.

There is one other remote case which may be assumed, namely, the

simultaneous refusal of both atmospheric and condenser relief valves to

open, upon the vacuum inside the condenser being entirely lost. The

exhaust would then be blown through the turbine relief valve F, until

the plant could be closed down.

Although the conditions just cited are highly improbable in actual

practice, it can at once be seen that to insure the safety of the

condenser, absolutely, the turbine relief valve must be set to open at a

comparatively low pressure, say 40 pounds by gage, or thereabouts. To

set it much lower than this would create a possibility of its leaking

when the turbine was making a non-condensing run, and when the pressure

at the turbine exhaust end is often above that of the atmosphere. From

every point of view, therefore, it is advisable to make a minute

examination of all relief valves in a system, and before a test to

insure that these valves are all set to open at their correct relative

pressures.

It must be admitted that the practice of placing a large relief valve

upon a condenser in addition to the atmospheric exhausting valve is by

no means common. The latter valve, where surface condensing is adopted,

is often thought sufficient, working in conjunction with a quickly

operated main exhaust valve. Similarly, with a barometric condenser as

that illustrated in Fig. 72, the atmospheric exhaust valve D (seen in

Fig. 73) is sometimes dispensed with. This course is, however,

objectionable, for upon a loss of vacuum in the turbine, all exhaust

steam must pass through the condenser body, or the entire plant be

closed down until the vacuum is regained. The simple construction of the

barometric condenser, however, is in such an event much to its

advantage, and the passage of the hot steam right through it is not

likely to seriously warp or strain any of its parts, as might probably

happen in the case of a surface condenser.

Steam Turbines A Book of Instruction for the Adjustment and Operation of the Principal Types of this Class of Prime Movers · 第 6 / 8 段