Allied to the oil system of a turbine plant is the water service, of

comparatively little importance in connection with single self-contained

units of small capacity, where the entire service simply consists of a

few coils and pipes, but of the first consideration in large

installations having numerous separate units supplied by oil and water

from an exterior source. The largest turbine units are often supplied

with water for cooling the bearings and other parts liable to attain

high temperature. Although the water used for cooling the bearings

indirectly supplements the action taking place in the separate oil

coolers, it is of necessity a separate auxiliary service in itself, and

the complexity of the system is thus added to. A carefully constructed

water service, however, is hardly likely to give trouble of a mechanical

nature. The more serious deficiencies usually arise from conditions

inherent to the design, and as such must be approached.

Special Turbine Features to be Inquired into

Before leaving the prime mover itself, and proceeding to the auxiliary

plant inspection, it may be well to instance a few special features

relating to the general conduct of a turbine, which it is the duty of a

tester to inquire into. There are certain specified qualifications which

a machine must hold when running under its commercial conditions, among

these being lack of vibration of both turbine and machinery driven, be

it generator or fan, the satisfactory running of auxiliary turbine parts

directly driven from the turbine spindle, minimum friction between the

driving mediums, such as worm-wheels, pumps, fans, etc., slight

irregularities of construction, often resulting in heated parts and

excessive friction and wear, and must therefore be detected and righted

before the final test. Furthermore, those features of design--and they

are not infrequent in many machines of recent development--which, in

practice, do not fulfil theoretical expectations, must be re-designed

upon lines of practical consistency. The experienced tester's opinion is

often at this point invaluable. To illustrate the foregoing, Figs. 66,

67, and 68 are given, representing, respectively, three distinct phases

in the evolution of a turbine part, namely, the coupling. Briefly, an

ordinary coupling connecting a driving and a driven shaft becomes

obstinate when the two separate spindles which it connects are not truly

alined. The desire of turbine manufacturers has consequently been to

design a flexible coupling, capable of accommodating a certain want of

alinement between the two spindles without in any way affecting the

smooth running of the whole unit.

[Illustration: FIG. 66]

[Illustration: FIG. 67]

In Fig. 66 A is the turbine spindle end and B the generator spindle end,

which it is required to drive. It will be seen from the cross-sectional

end view that both spindle ends are squared, the coupling C, with a

square hole running through it, fitting accurately over both spindle

ends as shown. Obviously the fit between the coupling and spindle in

this case must be close, otherwise considerable wear would take place;

and equally obvious is the fact than any want of alinement between the

two spindles A and B will be accompanied by a severe strain upon the

coupling, and incidentally by many other troubles of operation of which

this inability of the coupling to accommodate itself to a little want

of alinement is the inherent cause.

Looking at the coupling illustrated in Fig. 67, it will be seen that

something here is much better adapted to dealing with troubles of

alinement. The turbine and generator spindles A and B, respectively, are

coned at the ends, and upon these tapered portions are shrunk circular

heads C and D having teeth upon their outer circumferences. Made in

halves, and fitting over the heads, is a sleeve-piece, with teeth cut

into its inner bored face. The teeth of the heads and sleeve are

proportioned correctly to withstand, without strain, the greatest

pressure liable to be thrown upon them. There is practically no play

between the teeth, but there exists a small annular clearance between

the periphery of the heads and the inside bore of the sleeve, which

allows a slight lack of alinement to exist between the two spindles,

without any strain whatever being felt by the coupling sleeve E. The

nuts F and G prevent any lateral movement of the coupling heads C and D.

For all practical requirements this type of coupling is satisfactory, as

the clearances allowed between sliding sleeve and coupling heads can

always be made sufficient to accommodate a considerable want of

alinement, far beyond anything which is likely to occur in actual

practice. Perhaps the only feature against it is its lack of simplicity

of construction and corresponding costliness.

[Illustration: FIG. 68]

The type illustrated in Fig. 68 is a distinct advance upon either of the

two previous examples, because, theoretically at least, it is capable of

successfully accommodating almost any amount of spindle movement. The

turbine and generator spindle ends, A and B, have toothed heads C and D

shrunk upon them, the heads being secured by the nuts E and F. The

teeth in this case are cut in the enlarged ends as shown. A sleeve G,

made in halves, fits over the heads, and the teeth cut in each half

engage with those of their respective heads. All the teeth and teeth

faces are cut radially, and a little side play is allowed.

The Condenser

To some extent, as previously remarked, the condenser and condensing

arrangements are instrumental in determining the lines upon which a test

ought to be carried out. In general, the local features of a plant

restrict the tester more or less in the application of his general

methods. A thorough inspection, including some preliminary tests if

necessary, is as essential to the good conduct of the condensing plant

as to the turbine above it. It may be interesting to outline the usual

course this inspection takes, and to draw attention to a few of the

special features of different plants. For this purpose a type of

vertical condenser is depicted in Fig. 69. Its general principle will be

gathered from the following description:

Exhaust steam from the turbine flows down the pipe T and enters the

condenser at the top as shown, where it at once comes into contact with

the water tubes in W. These tubes fill an annular area, the central

un-tubed portion below the baffle cap B forming the vapor chamber. The

condensed steam falls upon the bottom tube-plate P and is carried away

by the pipe S leading to the water pump H. The Y pipe E terminating

above the level of the water in the condenser enters the dry-air pump

section pipe A. Cold circulating water enters the condenser at the

bottom, through the pipe I, and entering the water chamber X proceeds

upward through the tubes into the top-water chamber Y, and from there

out of the condenser through the exit pipe. It will be observed that the

vapor extracted through the plate P passes on its journey out of the

condenser through the cooling chamber D surrounded by the cold

circulating water. This, of course, is a very advantageous feature. At R

is the condenser relief, at U the relief valve for the water chambers.

[Illustration: FIG. 69]

A new condenser, especially if it embody new and untried features,

generally requires a little time and patience ere the best results can

be obtained from it. Perhaps the quickest and most satisfactory method

of getting at the weak points of this portion of a plant is to test the

various elements individually before applying a strict load test. Thus,

in dealing with a condenser similar to that illustrated in Fig. 69, the

careful tester would probably make, in addition to a thorough mechanical

examination, three or four individual vacuum and water tests. A brief

description of these will be given. The water test, the purpose of which

is to discover any leakage from the tubes, tube-plates, water pipes,

etc., into portions of the steam or air chambers, should be made first.

Water Tests of Condenser

The condenser is first thoroughly dried out, particular care being given

to the outside of the tubes and the bottom tube-plate P. Water is then

circulated through the tubes and chambers for an hour or two, after

which the pumps are stopped, all water is allowed to drain out and a

careful examination is made inside. Any water leaking from the tubes

above the bottom baffle-plate will ultimately be deposited upon that

plate. It is essential to stop this leakage if there be any, otherwise

the condensed steam measured during the consumption test will be

increased to the extent of the leakage. A slight leakage in a large

condenser will obviously not affect the results to any serious extent.

The safest course to adopt when a leak is discovered and it is found

inopportune to effect immediate repair is to measure the actual volume

of leakage over a specified period, and the quantity then being known it

can be subtracted from the volume of the condensed steam at the end of

the consumption test.

It is equally essential that no leakage shall occur between the bottom

tube-plate P and the tube ends. The soundness of the tube joints, and

the joint at the periphery of the tube-plate can be tested by well

covering the plate with water, the water chamber W and cooling chamber

having been previously emptied, and observing the under side of the

plate. It must be admitted that the practice of measuring the extent of

a water leak over a period, and afterward with this knowledge adjusting

the obtained quantities, is not always satisfactory. On no account

should any test be made with considerable water leakage inside the

condenser. The above method, however, is perhaps the most reliable to be

followed, if during its conduct the conditions of temperature in the

condenser are made as near to the normal test temperature as possible.

There are many condensers using salt water in their tubes, and in these

cases it would seem natural to turn to some analytical method of

detecting the amount of saline and foreign matter leaking into the

condensed steam. Unless, however, only approximate results are required,

such methods are not advocated. There are many reasons why they cannot

be relied upon for accurate results, among these being the variation in

the percentage of saline matter in the sea-water, the varying

temperature of the condenser tubes through which the water flows, and

the uncertainty of such analysis, especially where the percentage

leakage of pure saline matter is comparatively small.

The Vacuum Test

Having convinced himself of the satisfactory conduct of the condenser

under the foregoing simple preparatory water tests, the tester may

safely pass to considerations of vacuum. There exists a good

old-fashioned method of discovering the points of leakage in a vacuum

chamber, namely, that of applying the flame of a candle to all seams and

other vulnerable spots, which in the location of big leaks is extremely

valuable. Assuming that the turbine joints and glands have been found

capable of preventing any inleak of air, with only a small absolute

pressure of steam or air inside it, and, further, an extremely important

condition, with the turbine casing at high and low temperatures,

separately, a vacuum test can be conducted on the condenser alone.

This test consists of three operations. In the first place a high vacuum

is obtained by means of the air pump, upon the attainment of which

communication with everything else is closed, and results noted. The

second operation consists in repeating the above with the water

circulating through the condenser tubes, the results in this case also

being carefully tabulated. Before conducting the third test, the

condensers must be thoroughly warmed throughout, by running the turbine

for a short time if necessary, and after closing communication with

everything, allowing the vacuum to slowly fall.

A careful consideration and comparison of the foregoing tests will

reveal the capabilities of the condenser in the aspect in which it is

being considered, and will suggest where necessary the desirable steps

to be taken.

VI. TESTING A STEAM TURBINE[4]

[4] Contributed to _Power_ by Thomas Franklin.

Special Auxiliary Plant for Consumption Test

There are one or two points of importance in the conduct of a test on a

turbine and these will be briefly touched upon. Fig. 70 illustrates the

general arrangement of the special auxiliary plant necessary for

carrying through a consumption test, when the turbine exhaust passes

through a surface condenser. The condensed steam, after leaving the

condenser, passes along the pipe A to the pump, and is then forced along

the pipe B (leading under ordinary circumstances to the hot-well),

through the main water valve C directly to the measuring tanks. To enter

these the water has to pass through the valves D and E, while the valves

F and G are for quickly emptying the tanks when necessary, being of a

larger bore than the inlet valves. The inlet pipes H I are placed

directly above the outlet valves, and thus, when required, before any

measurements are taken, the water can flow directly through the outlet

valves, the pipes terminating only a short distance above them, away to

an auxiliary tank or directly to the hot-well. Levers K and L fulcrumed

at J and J are connected to the valve spindles by auxiliary levers. The

valve arrangement is such that by pulling down the lever K the inlet

valve D is opened and the inlet valve E is closed. Again, by pulling

down the lever L the outlet valve F is closed, while the outlet valve G

is also simultaneously closed.

[Illustration: FIG. 70]

During a consumption test the valves are operated in the following

manner: The lever K is pulled down, which opens the inlet valve to the

first tank and closes that to the second. The bottom lever L, however,

is lifted, which for the time being opens the outlet valve F, and

incidentally opens the valve G; the latter valve can; however, for the

moment be neglected. When the turbine is started, and the condensed

steam begins to accumulate in the condenser, the water is pumped along

the pipes and, both the inlet and outlet valves on the first tank being

open, passes through, without any being deposited in the tank, to the

drain. This may be continued until all conditions are right for a

consumption test and, the time being carefully noted, lever L is quickly

pulled down and the valves F and G closed. The first tank now gradually

fills, and after a definite period, say fifteen minutes, the lever K is

pushed up, thus diverting the flow into the second tank. While the

latter is filling, the water in the first tank is measured, and the tank

emptied by a large sluice valve, not shown.

The operation of alternately filling, measuring, and emptying the two

measuring tanks is thus carried on until the predetermined time of

duration of test has expired, when the total water as measured in the

tanks, and representing the amount of steam condensed during that time,

is easily found by adding together the quantities given at each

individual measurement.

All that are necessary to insure successful results from a plant similar

to this are care and accuracy in its operation and construction.

Undoubtedly in most cases it is preferable to weigh the condensed steam

instead of measuring the volume passed, and from that to calculate the

weight. If dependence is being placed upon the volumetric method, it is

advisable to lengthen the duration of the test considerably, and if

possible to measure the feed-water evaporated at the same time. Such a

course, however, would necessitate little change, and none of a radical

nature, from the arrangement described. Where, however, the measuring

method is adopted, the all-important feature, requiring on the tester's

part careful personal investigation, is the graduation of the tanks. It

facilitates this operation very considerably when the receptacles are

graduated upon a weight scale. That is to say, whether or not a vertical

scale showing the actual hight of water be placed inside the tank, it is

advisable to have a separate scale indicating at once to the attendant

the actual contents, by weight, of the tank at any time. It is the

tester's duty to himself to check the graduation of this latter scale by

weighing the water with which he performs the operation of checking.

Apart from the foregoing, there is little to be said about the measuring

apparatus. As has been stated, accuracy of result depends in this

connection, as in all others, upon careful supervision and sound and

accurate construction, and this the tester can only positively insure by

exhaustive inspection in the one case and careful deliberation in the

conduct of the other.

It will be readily understood that the procedure--and this implies some

limitations--of a test is to an extent controlled by the conditions, or

particular environment of the moment. This is strictly true, and as a

consequence it is often impossible, in a maker's works, for example, to

obtain every condition, coinciding with those specified, which are to be

had on the site of final operation only. For this reason it would

appear best to reserve the final and crucial test of a machine, which

test usually in the operating sense restricts a prime mover in certain

directions with regard to its auxiliary plant, etc., until the machine

has been finally erected on its site. Obviously, unless a machine had

become more or less standardized, a preliminary consumption test would

be necessary, but once this primary qualification respecting consumption

had been satisfactorily settled, there appears to be no reason why

exhaustive tests in other directions should not all be carried out upon

the site, where the conditions for them are so much more favorable.

When the steam consumption of a steam turbine is so much higher than the

guaranteed quantity, it usually takes little less than a reconstruction

to put things right. The minor qualifications of a machine, however,

which can be examined into and tested with greater ease, and usually at

considerably less expense, upon the site, and consequently under

specified conditions, may be advantageously left over until that site is

reached, where it is obvious that any shortcomings and general

deficiency in performance will be more quickly detected and diagnosed.

Test Loads from the Tester's View-point

Before proceeding to describe the points of actual interest in the

consumption test, a few considerations respecting test loads will be

dealt with from the tester's point of view. Here again we often find

ourselves restricted, to an extent, by the surrounding conditions. The

very first considerations, when undertaking to carry out a consumption

test, should be devoted to obtaining the steadiest possible lead

[Transcriber: load?]. It may be, and is in many cases, that

circumstances are such as to allow a steady electrical load to be

obtained at almost any time. On the other hand an electrical load of any

description is sometimes not procurable at all, without the installation

of a special plant for the purpose. In such cases a mechanical friction

load, as, for example, that obtained by the water brake, is sometimes

available, or can easily be procured. Whereas, however, this type of

load may be satisfactory for small machines, it is usually quite

impossible for use with large units, of, say, 5000 kilowatts and upward.

It is seldom, however, that turbines are made in large sizes for

directly driving anything but electrical plants, although there is every

possibility of direct mechanical driving between large steam turbines

and plants of various descriptions, shortly coming into vogue, so that

usually there exist some facilities for obtaining an electrical load at

both the maker's works and upon the site of operation.

One consideration of importance is worth inquiring into, and this has

relation to the largest turbo-generators supplied for power-station and

like purposes. Obviously, the testing of, say, a 7000-kilowatt

alternator by any standard electrical-testing method must entail

considerable expense, if such a test is to be carried out in the maker's

works. Nor would this expense be materially decreased by transferring

the operations to the power-station, and there erecting the necessary

electrical plant for obtaining a water load, or any other installation

of sufficient capacity to carry the required load according to the rated

full capacity of the machine.

Assuming, then, that there exist no permanent facilities at either end,

namely the maker's works and the power station, for adequately procuring

a steady electrical-testing load of sufficient capacity, there still

remains, in this instance, an alternative source of power which is

usually sufficiently elastic to serve all purposes, and this is of

course the total variable load procurable from the station bus-bars. It

is conceivable that one out of a number of machines running in parallel

might carry a perfectly steady load, the latter being a fraction of a

total varying quantity, leaving the remaining machines to receive and

deal with all fluctuations which might occur. Even in the event of there

being only two machines, it is possible to maintain the load on one of

them comparatively steady, though the percentage variation in load on

either side of the normal would in the latter case be greater than in

the previous one. This is accomplished by governor regulation after the

machines have been paralleled. For example, assuming three

turbo-alternators of similar make and capacity to be running in

parallel, each machine carrying exactly one-third of the total

distributed load, it is fair to regard the governor condition, allowing

for slight mechanical disparities of construction, of all three machines

as being similar; and even in the case of three machines of different

capacity and construction, the governor conditions when the machines

are paralleled are more or less relatively and permanently fixed in

relation to one another. In other words, while the variation in load on

each machine is the same, the relative variation in the governor

condition must be constant.

By a previously mentioned system of governor regulation, however, it is

possible, considering again for a moment the case of three machines in

parallel, by decreasing the sensitiveness of one governor only, to

accommodate nearly all the total variation in load by means of the two

remaining machines, the unresponsiveness of the one governor to change

in speed maintaining the load on that machine fairly constant. By this

method, at any rate, the variation in load on any one machine can be

minimized down to, say, 3 per cent, either side of the normal full load.