1. CLEARING OUT THE DÉBRIS

The débris now filling up the interior is to be removed down to the

floor level, or the original ground level. The débris covering an area

measuring 10 feet from the exterior walls of the building in every

direction is also to be removed. This work is to be carried on in

conjunction with the underpinning of the walls, and is to be dependent

upon the progress of the latter, the work being done as required by the

person holding the contract for the underpinning. All proper precautions

must be observed during the progress of the work to prevent any injury

to the building, the walls being properly braced and supported before

excavation is commenced. The contractor will be held responsible for any

injury to the building. Any objects found of archeologic or other value

properly belong to the United States and must be deposited in the

National Museum. The material removed from the building and from the

area about it is to be removed to a proper distance, not less than 100

yards from the building. Proper drainage channels must be provided to

keep the excavated area permanently clear of water.

The Repair of Casa Grande Ruin, Arizona, in 1891 Fifteenth Annual Report of the Bureau of Ethnology to the Secretary of the Smithsonian Institution, 1893-94, Government Printing Office, Washington, 1897, pages 315-348 · 第 21 / 42 题