GENERAL REQUIREMENTS

All the work upon this ruin is to be carried out in such a manner as to

interfere as little as possible with the present condition and

appearance of the building, and the contractors will be held responsible

for any injury to it.

The work is to be carried on under a supervisor, acting for the United

States, who shall have power to reject any materials it is proposed to

use in the work which are not in his judgment equal to those specified,

and he shall have power to have torn down any work done which he has

reason to suspect is not such as required by the specifications, but if

such work shall prove upon inspection to have been well done the

contractor may make a charge of the amount which would have been allowed

for that part of the work had it passed inspection.

When the work is completed it must pass the final inspection of the

supervisor, or such person as the Secretary of the Interior may

designate for the purpose.

The Repair of Casa Grande Ruin, Arizona, in 1891 Fifteenth Annual Report of the Bureau of Ethnology to the Secretary of the Smithsonian Institution, 1893-94, Government Printing Office, Washington, 1897, pages 315-348 · 第 20 / 42 题