FOOTNOTES

[1] There are two important secondary techniques for opening

subterranean and subaqueous ways, neither a method truly of

tunneling. One of these, of ancient origin, used mainly in the

construction of shallow subways and utility ways, is the "cut and

cover" system, whereby an open trench is excavated and then roofed

over. The result is, in effect, a tunnel. The concept of the other

method was propounded in the early 19th century but only used

practically in recent years. This is the "trench" method, a sort

of subaqueous equivalent of cut and cover. A trench is dredged in

the bed of a body of water, into which prefabricated sections of

large diameter tube are lowered, in a continuous line. The joints

are then sealed by divers, the trench is backfilled over the tube,

the ends are brought up to dryland portals, the water is pumped

out, and a subterranean passage results. The Chesapeake Bay Bridge

Tunnel (1960-1964) is a recent major work of this character.

[2] In 1952 a successful machine was developed on this plan, with

hardened rollers on a revolving cutting head for disintegrating

the rock. The idea is basically sound, possessing advantages in

certain situations over conventional drilling and blasting

systems.

[3] In 1807 the noted Cornish engineer Trevithick commenced a small

timbered drift beneath the Thames, 5 feet by 3 feet, as an

exploratory passage for a larger vehicular tunnel. Due to the

small frontal area, he was able to successfully probe about 1000

feet, but the river then broke in and halted the work. Mine

tunnels had also reached beneath the Irish Sea and various rivers

in the coal regions of Newcastle, but these were so far below the

surface as to be in perfectly solid ground and can hardly be

considered subaqueous workings.

[4] Unlike the Brunel tunnel, this was driven from both ends

simultaneously, the total overall progress thus being 3 feet per

shift rather than 18 inches. A top speed of 9 feet per day could

be advanced by each shield under ideal conditions.

[5] Ideally, the pressure of air within the work area of a

pneumatically driven tunnel should just balance the hydrostatic

head of the water without, which is a function of its total height

above the opening. If the air pressure is not high enough, water

will, of course, enter, and if very low, there is danger of

complete collapse of the unsupported ground areas. If too high,

the air pressure will overcome that due to the water and the air

will force its way out through the ground, through increasingly

larger openings, until it all rushes out suddenly in a "blowout."

The pressurized atmosphere gone, the water then is able to pour

in through the same opening, flooding the workings.

* * * * *

CONTRIBUTIONS FROM

THE MUSEUM OF HISTORY AND TECHNOLOGY:

Smithsonian Institution - United States National Museum - Bulletin 240 Contributions From the Museum of History and Technology Papers 34-44 on Science and Technology · 第 222 / 318 题