Introduction

With few exceptions, civil engineering is a field in which the ultimate

goal is the assemblage of materials into a useful structural form

according to a scientifically derived plan which is based on various

natural and man-imposed conditions. This is true whether the result be,

for example, a dam, a building, a bridge, or even the fixed plant of a

railroad. However, one principal branch of the field is based upon an

entirely different concept. In the engineering of tunnels the utility of

the "structure" is derived not from the bringing together of elements

but from the separation of one portion of naturally existing material

from another to permit passage through a former barrier.

In tunneling hard, firm rock, this is practically the entire compass

of the work: breaking away the rock from the mother mass, and,

coincidently, removing it from the workings. The opposite extreme in

conditions is met in the soft-ground tunnel, driven through material

incapable of supporting itself above the tunnel opening. Here, the

excavation of the tunneled substance is of relatively small concern,

eclipsed by the problem of preventing the surrounding material from

collapsing into the bore.

[Illustration: Figure 2.--HOOSAC TUNNEL. METHOD OF WORKING EARLY

SECTIONS of the project; blast holes drilled by hand jacking.

MHT model--1/2" scale. (Smithsonian photo 49260-L.)]

In one other principal respect does tunnel engineering differ widely

from its collateral branches of civil engineering. Few other physical

undertakings are approached with anything like the uncertainty

attending a tunnel work. This is even more true in mountain tunnels,

for which test borings frequently cannot be made to determine the

nature of the material and the geologic conditions which will be

encountered.

The course of tunnel work is not subject to an overall preliminary

survey; the engineer is faced with not only the inability to

anticipate general contingencies common to all engineering work, but

with the peculiar and often overwhelming unpredictability of the very

basis of his work.

Subaqueous and soft-ground work on the other hand, while still subject

to many indeterminates, is now far more predictable than during its

early history, simply because the nature of the adverse condition

prevailing eventually was understood to be quite predictable. The

steady pressures of earth and water to refill the excavated area are

today overcome with relative ease and consistency by the tunneler.

In tunneling as in no other branch of civil engineering did empiricism

so long resist the advance of scientific theory; in no other did the

"practical engineer" remain to such an extent the key figure in

establishing the success or failure of a project. The Hoosac Tunnel,

after 25 years of legislative, financial, and technical difficulties,

in 1875 was finally driven to successful completion only by the

efforts of a group who, while in the majority were trained civil

engineers, were to an even greater extent men of vast practical

ability, more at home in field than office.

DeWitt C. Haskin (see p. 234), during the inquest that followed the

death of a number of men in a blowout of his pneumatically driven

Hudson River Tunnel in 1880, stated in his own defense: "I am not a

scientific engineer, but a practical one ... I know nothing of

mathematics; in my experience I have grasped such matters as a whole;

I believe that the study of mathematics in that kind of work

[tunneling] has a tendency to dwarf the mind rather than enlighten

it...." An extreme attitude perhaps, and one which by no means adds to

Haskin's stature, but a not unusual one in tunnel work at the time. It

would not of course be fair to imply that such men as Herman Haupt,

Brunel the elder, and Greathead were not accomplished theoretical

engineers. But it was their innate ability to evaluate and control the

overlying physical conditions of the site and work that made possible

their significant contributions to the development of tunnel

engineering.

Tunneling remained largely independent of the realm of mathematical

analysis long after the time when all but the most insignificant

engineering works were designed by that means. Thus, as structural

engineering has advanced as the result of a flow of new theoretical

concepts, new, improved, and strengthened materials, and new methods

of fastening, the progress of tunnel engineering has been due more to

the continual refinement of constructional techniques.

Smithsonian Institution - United States National Museum - Bulletin 240 Contributions From the Museum of History and Technology Papers 34-44 on Science and Technology · 第 206 / 318 题