SECTION OF BARRAGE.]

The locks will be worked electrically from a power-house built upon the

central pier of the locks; the power to be obtained from dynamos operated

by the fall of part of the water flowing over the dam. A pilot tower will

be fixed from which the river traffic will be signalled and regulated,

and the locks, movable bridges, etc., controlled.

The locks as shown are four in number, each provided with internal gates

in addition to the outer ones, in order that these locks may be worked in

long or short lengths to suit the traffic. The lengths provided in this

way will be 300 ft. 500 ft., 700 ft. and 1000 ft., and the widths 80 ft.

and 100 ft. It is not likely that these dimensions will ever be exceeded

by steamships.

The number of vessels passing up and down the river per day averages 220,

but few of these exceed 300 ft. in length. It will be easy to lock this

number up and down, or three times the number with this series of locks,

one important advantage to the shipping being that, instead of waiting

tides at Gravesend, each vessel as she arrives, at any hour, can be

locked in a few minutes, up or down, without waiting.

Special provision will be made for rapidly and safely passing into and

out of the locks with the use of power capstans and gear. The sluices

will be of steel, sliding in roller guides, balanced and operated each by

its own motor.

At or near low water a large volume of water will be sluiced into

the lower river to scour the approach to the locks as often as found

necessary.

A system of signalling from the Upper Thames to the barrage will be

employed to notify any heavy rainfall or freshet coming down the river,

so that by lowering the sluices water may be rapidly discharged to

maintain the required level in the river, and at certain fixed dates it

may be desirable to let down the water-level for a fixed time to allow of

the repairing of dock entrances, walls, and other river-side works.

_Financial._

The estimated cost of the barrage complete is £3,658,000, including

compensations and other contingencies. A toll of ¾d. per ton on the

shipping passing up and down will pay the interest on this sum. This ¾d.

per ton additional toll will, it is estimated, be many times compensated

for by reductions in the river and dock dues and other expenses, as

below:—

SAVINGS EFFECTED BY DOCKISATION. Per Annum.

£

Dredging in the river 200,000

Repairing banks, campsheds and groynes 10,100

Mudding in all docks 50,000

Cost of operating dock entrances and pumping 70,000

Saving in time of vessels ascending and descending

the river 225,000

Saving in towage 20,000

” barging 185,000

” warping, buoying, lying off, etc. 20,000

” management of river 70,000

--------

Total annual saving £850,100

This is equal to a reduction of 6·8d. per ton on the tonnage of shipping

(30,000,000) entering and leaving the Port, or equal to 7½ times the

interest on the cost of the barrage.

To the credit of the barrage must also be set the removal from the

prospective future of enormous outlays contemplated for:—

£

Purchasing docks, estimated at 30,000,000

Improving ditto and dredging river 7,000,000

Cost of a water supply from Wales or other source 24,000,000

-----------

Total £61,000,000

-----------

_The Port of London Bill, 1903._

This measure is the Government’s attempt to put into law the

recommendations of the Royal Commission on the Port of London, 1902,

but with amendments. It is proposed to purchase the entire docks and

warehouses, leaving the wharves to run on their own resources; to create

a Port Trust to control the entire river and docks; to charge the

loan for purchase, etc., upon the London County Council—_i.e._, about

£35,000,000: and to dredge the river to about 30 ft. at low water up to

the principal dock entrances.

_Dredging the River._

Apart from its cost and the grossly unfair policy of financing and

running the docks against the wharfingers, it is evident that this

scheme is based upon the possibility of dredging the river to the depth

required. Fig. 8 is an actual section of the river, showing the proposed

dredged channel as compared with a dockised river.

It seems incomprehensible that any expert authorities should have advised

the Government that the river can be effectually dredged. The fact is

that it is quite impossible to dredge it to the required depth of about

15 ft. below the present bottom, because experience has shown that with

such a river and scouring current the channel will fill up again nearly

as fast as it is dredged, the material coming from the foreshores and

the estuary. This will give rise to dangerous slipping in of river banks

and walls. The estimates of the cost of this dredging (£2,500,000) are

therefore entirely misleading.

The present bottom is formed and stands at the natural angle of repose

for its present volume, width and currents, and any great interference

with this contour such as is proposed—with slopes of 7 to 1—will not

stand, the general slope of its bottom now being from 20 to 50 to 1. The

Port Trust that undertakes this will find itself spending enormous sums

annually in continuous dredging and repairing banks and in compensating

owners; all, of course, added to the annual cost of maintenance and to

the dues, or charged to the ratepayers.

Glasgow and the Clyde have been instanced as examples of what can be

done by dredging. But the Clyde below Glasgow is not a river comparable

with the Thames below Gravesend, but an estuary with a very moderate

current and tidal range of from about 4 ft. to 10 ft., and the dredging

has merely made and kept open a channel in this estuary. The Thames, on

the other hand, is a narrow river with a strong scouring current and a

range of tide of from 16 ft. to 21 ft. Further than this, Glasgow has

spent seven millions in this work, and has to pay large sums to keep the

channel open, dredging nearly a million cubic yards every year.

But there are other difficulties. When the river has been deepened

as proposed, the tidal volume will be increased about one-third, and

therefore its current strengthened and increased, probably two knots per

hour. What is worse, the tidal range will be increased proportionately,

which means that the high tides will be higher—probably 3 ft. or more—and

the low tides lower, by a similar amount, than now. Spring tides may be

expected to run the river nearly dry at low water above London Bridge.

Results—frequent inundations of waterside districts, more grounding

at low water, and more dangerous navigation. Such results have always

followed increased tidal volume.

[Illustration: Fig. 7.]

[Illustration: Fig. 8.

_Section of the Thames below Blackwall shewing Proposed Dredged Channel

compared with a Dockised Channel._]

But a dredged channel is necessarily a narrow one (see Fig. 8), and ships

will have to negotiate the sharp bends in a narrow channel and against

a stronger tide, and also to swing at anchor, for which a wide area is

necessary.

_Objections against Dockisation._

Although this proposal has been mooted for some time past, scarcely

any valid objection has been brought forward, but such as have been

mentioned are mostly based on misconceptions.

One writer thought the river would become stagnant. As a matter of

fact the sources of stagnation would be carried down the river by the

fresh-water flow continuously, and there is no more reason to anticipate

stagnation in the lower river than the upper river, where it has for ages

been held up in the same way by numerous dams.

Another writer talks of the “cleansing power of the tides,” and it is a

pity to see greater authorities, who ought to know better, speaking also

in this way. It has been abundantly proved that the tides—as far as a

clean river is concerned—are wholly detrimental. They back up twice daily

the natural drainage of the river for five hours, and keep it in solution

and circulation for forty-five days before removing it, the effect being

exactly similar to backing up in a sewer.

[Illustration: THE POOL BELOW TOWER BRIDGE.]

It has also been suggested that the sewage effluents discharged into the

river at Crossness and Barking may cause the river below to become foul.

Here again is misconception. The effluents—after precipitation of the

solids, which is chemically effected, and the carrying out to sea of the

resulting sludge to the amount of two million tons annually—contain very

little impurity (only seven grains per gallon), and it has been proved

by Dr. Dupré that 9/10ths of this becomes oxidised and absorbed in the

large volume of water between the discharge and Gravesend. It is well

known that in the case of “sewage effluents poured into a sufficiently

large volume of otherwise comparatively pure water, the dissolved organic

matter contained in it disappears with remarkable rapidity” (Sir Alex.

Binnie).

Another critic suggests that the lower river will soon silt up under

the new conditions. Most persons—seeing the filthy state of the

water—naturally think there must be a large deposit from it. But it has

been shown that this suspended matter is the result of tidal currents

keeping the mud stirred up everlastingly. An examination of the affluents

of the Thames shows that they contain very little suspended matter, and

therefore when the locked Thames has deposited its charge of suspended

matter any future soilage must come from its affluents—that is, from the

upland waters and the sewage effluents, which latter will only affect it

below the point of their discharge.

A calculation from official data of the quantities actually now passing

into the Thames, from all sources, gives less than 1/10th of an inch

annually over the river bottom; so that in ten years the deposit will

not exceed 1 in., even without any improvement in the prevention of

pollution. It has been estimated by Dibdin that the sewage outfalls could

be removed to Gravesend, below the barrage, for the sum of £4,000,000.

But the condition of these effluents is commonly much exaggerated. The

total annual discharge of suspended matter at 7 grains per gallon (as

given by Dibdin) amounts to 32,000 tons per annum, but much of this

becomes chemically combined with the river water and some remains in

suspension till it passes Gravesend, leaving only a small quantity to

deposit in the river. A single dredger can remove 600 tons per hour;

therefore a few hours’ work will remove the whole quantity.

A more valid objection at first sight is that ships and barges will lose

the motive power of the tides up and down. This would appear, however,

to be a very beneficial loss, because at the same time they will avoid

the tide-waiting and waste of time which add considerably to the cost of

transit. But against this loss must be set the fact that most ships now

have steam power and can make their own destination, while tugs will be

able to handle much larger fleets of barges than is now possible in the

tide-way, and at all hours of the day. Sailing vessels will be able to

sail up and down, which they can only do now with the aid of the tide.

Another suggestion is that when the barrage has closed the river the

tides below it may accumulate to a higher level and overflow the

low-lying lands below Gravesend. This is, however, a mistake, the fact

being that with a reduced tidal volume and momentum in the estuary the

tidal range will be reduced, there being no river to fill up, the high

tides will be lower and the low tides higher than formerly.

Finally, a word or two as to the vague idea that seems to be in the minds

of most people accustomed to tidal rivers—that in some mysterious way the

tides by their continual movements are beneficial, keeping the air in

motion, etc. All this is pure imagination and arises probably from living

on the banks of a tidal river, for most rivers are non-tidal. There

happen to be round our coasts some phenomenal ranges of tide; hence the

resort to docks, which are almost unknown in other countries. The ranges

of their tides being small, docks are not needed, and scarcely any tides

occur in their rivers, which, however, are far cleaner than the Thames.

There are of course some low-lying lands bordering the river the drainage

from which will have to be pumped into the river. This is, in fact,

partially done now, but the matter is a small one.

Prof. Flinders Petrie, in a letter to the _Times_, is strongly in favour

of this proposal, and looks to it to relieve the squalor of the East End,

with its crowded and unhealthy living, by extending the manufacturing

districts down the river banks, providing a belt of factories along

each bank and a belt of garden villages behind them, with fast lines of

railway to Town between.

To carry out the proposals of this article, a committee has been formed

to bring the subject before the notice of Parliament and of the public,

and it is suggested that a Board of Harbour Commissioners should be

formed, somewhat on the lines of the Port of London Bill of last Session.

The new Board would be constituted under the usual Commissioners’ Acts to

control the entire Lower Thames, taking over the powers of the existing

authorities, but without any interference with the docks, the warehouses

or the wharves, the business of which, if the river is rendered properly

navigable, could be carried on without making any demands upon the rates

of London.

A new era of prosperity would then open up for the trade of London, and

its Port would become the finest in the world, with the largest business

attached to it.

The committee will include many influential gentlemen connected with

and interested in the improvement of the Port of London. The scheme

originated with Mr. Jas. Casey, M.I.N.A., and the author is responsible

for the engineering details, as also for the information set forth in the

foregoing article.

[Illustration]

The Great Thames Barrage · 第 11 / 11 题