SHOWING PROPOSED PERMANENT MEAN WATER LEVEL AND TIDAL SECTIONS.]

[Illustration: THE THAMES FROM LONDON TO GRAVESEND.]

[Illustration: THE THAMES ESTUARY.]

The tunnel will be constructed in the foundation of the dam, and the road

formed on the top of the dam, and provided with opening bridges across

the locks.

A glance at a railway map will at once show the strategic value of the

railway route thus opened up between the Midlands and the North, and

Dover and the South Coast, avoiding the conjested London lines; also for

national and military direct traffic between the Government arsenals and

the Colchester and northern routes and depots. All the northern lines

will thus have access by the Tilbury line to the continental routes.

[Illustration: Fig. 5.]

_National and Military Aspect of the Scheme._

The Port of London above the barrage will be the finest and safest

harbour we possess for the fleet, having an immense deep-water

protected area. The barrage can be fortified, and will constitute the

most effective prevention against any foreign invasion by way of the

Thames estuary. The tunnel and roadway will be of great service in this

connection also.

_The Depletion of the Thames Basin._

This, which has been increasing for many years, is becoming a serious

matter, and has attracted much comment. One of the advantages that will

be obtained from the barrage will be the raising of the underground

water-levels in the chalk and other strata of the Thames basin. In this

way a permanent improvement in the water supply by wells throughout this

large area will result.

_Minor Advantages._

Among these may be mentioned:—No further scouring of bridge or other

foundations. No backing up of the foul waters of the small tributaries,

such as the Lea, Barking Creek and others. Improved living conditions

and reduction of disease, especially in the neighbourhood of the river,

resulting from the cessation of ebb and flow, of smells and exposure of

mud banks. Increased value of properties bordering the river. Fixed piers

for passenger steamers.

_Works and Construction._

Fig. 7 is a general plan showing the barrage in relation to Tilbury and

Gravesend shores.

Fig. 5 is a cross section of the river showing the vertical dimensions

and contours.

Fig. 6 shows a section and details of construction.

Generally it is proposed to form the barrage of mass concrete, faced with

granite on all exposed faces. The tunnel will be formed in the solid

monolith as the work proceeds, and afterwards connected north and south

with the existing railways. The foundation is in the chalk. The method

of construction will be by cofferdam, to enclose an area sufficient for

the walls and locks, which, when completed, can be opened for the up and

down traffic of the river while the construction of the weirs and sluices

is proceeded with. The sluices will be left open for the free passage of

the tides until the closing of the barrage, which will take place at high

water of a Spring tide.

[Illustration: Fig. 6.

The Great Thames Barrage · 第 10 / 11 题