CHAPTER IV

Condition of Navy after Civil War—Admiral Case’s Fleet—“Virginius’s”

Scare—“Huron,” “Alert,” and “Ranger”—Secretary Hunt—First Advisory

Board—Secretary Chandler—“Puritan” Class—Finished—Steel—Hon. J. B.

McCreary and Appropriation Bill for New Navy—Members of Second Naval

Advisory Board—Standard for Steel for New Ships, “Chicago,” “Boston,”

“Atlanta,” and “Dolphin”—Secretary Whitney—Beginning of New Navy, by

Charles H. Cramp—“Baltimore,” “Charleston,” and “Yorktown”—Purchase of

Drawings by Navy Department—Commodore Walker—Premium System—Mr.

Whitney’s Views—Premiums Paid—Attack on System—Secretary Tracy—War

College Paper—Classifying Bids.

AFTER the Civil War the navy was neglected, being, so far as its

cruising vessels were concerned, a wooden navy of not only obsolete

types, but decayed or decaying vessels, which gradually became a

reproach to the country and a laughing-stock for other maritime powers.

At the time of the “Virginius’s” difficulty with Spain, which occurred

about five years after the close of the Civil War, a “grand fleet” was

assembled at Key West under the command of Rear-Admiral Case. This fleet

consisted of a large number of wooden cruising steamers of various types

and classes, all obsolete, many of them unseaworthy, and all incapable

of meeting an up-to-date ship of that period (1874-75) with any chance

of success whatever. To these wooden hulks were added the

double-turreted monitors “Terror,” “Amphitrite,” and “Monadnock,” which

were built at the navy-yards of wood, and a batch of old worn-out

single-turreted monitors. The bottoms of the wooden monitors were so

weakened structurally that, whenever an effort was made to wedge up the

spindles so that the turrets could revolve, the bottom went down instead

of the turret going up, the latter necessarily remaining immovable.

Unquestionably any one, or at most any two, of our first-class modern

battleships at this writing, 1903, could have annihilated and sunk the

entire fleet in two or three hours, although it consisted, all types and

classes taken together, of over forty vessels. This was an object

lesson, and it to some extent aroused the sensibilities of the country;

but the then existing administration of the Navy Department was under

the absolute control of the navy-yard rings, and all naval work of every

description was done in navy-yards. The “Spanish Scare,” as it was

called, did, however, have the effect of spurring Congress to provide

for the construction of eight (8) new vessels, the first provided for

since the Civil War. Of these, three were given out to be built by

contract; two, the “Huron” and “Alert,” small iron sloops-of-war or

gun-vessels, were given to John Roach and built at his works at Chester;

and another of the same class, the “Ranger,” was given to Harlan &

Hollingsworth, of Wilmington, and built there. The other five were built

in navy-yards, and were completed at different periods between 1875 and

1879.

[Illustration: BATTLESHIP ALABAMA]

With this exception, nothing whatever was done toward increase or

betterment of our naval force from 1865 until 1883. However, in 1881,

General Garfield, having been elected President the preceding year and

inaugurated the 4th of March, 1881, appointed Judge William H. Hunt, of

Louisiana, Secretary of the Navy. General Garfield understood the naval

needs of the country, referred to the subject vigorously in his

inaugural, and quite early in his administration, or about a month

before he was assassinated, prompted his Secretary of the Navy to take

measures looking to the modernization of our national marine. The result

of this was the convening of a board early in the summer of 1881, of

which Admiral John Rodgers was President. The instructions of this board

were to investigate the existing state of foreign navies, to inquire

into the immediate needs of our own, and to formulate a ship-building

programme on modern lines, to be carried out as soon as the resources of

the country would permit. On the 7th of November, 1881, this board,

which is commonly known to history as the “First Naval Advisory Board,”

reported in accordance with its instructions. It is not necessary here

to go into detail with regard to the ship-building programme which they

recommended. Suffice to say, that not one of the ships or types of ships

which they recommended was ever actually built; but their deliberations

and report attracted general public attention, caused the subject to be

widely and patriotically, although not very intelligently, discussed in

the newspapers, so that, while the action of this first Naval Advisory

Board did not produce any actual or visible results, it at least served

to popularize the subject of the “New Navy.”

[Illustration: BATTLESHIP MAINE]

In 1882, Mr. Hunt was appointed Minister to Russia, and was succeeded in

the Secretaryship of the Navy by William E. Chandler, of New Hampshire.

Mr. Chandler was a vigorous, active man, and lost no time in taking

advantage of the public interest which had been aroused. The result of

the further investigations and reports which he caused to be made, and

his communications to the President, and through the President to

Congress based thereon, resulted in an act, approved March 3, 1883,

providing for the construction of four new cruising vessels, and the

launching and engining of the four double-turreted monitors “Puritan,”

“Terror,” “Amphitrite,” and “Monadnock,” which at that time had been on

the stocks about eight years. These were built of iron, and took the

places in the Navy Register of the worthless wooden monitors of the same

names.

On the first lot of new vessels and engines, the bids were all

considerably below the cost estimated by the Advisory Board and the

Bureaus, and the contracts were let as follows: For the four vessels,

and the engines of the “Puritan,” monitor, to Mr. John Roach; for the

engines of the “Terror,” monitor, to William Cramp & Sons; and for the

“Amphitrite,” monitor, to the Harlan & Hollingsworth Company, of

Wilmington, Delaware. Work under all these contracts proceeded with

commendable alacrity.

Considerable difficulty was at first experienced in procuring material

for the new steel ships. The standard established by law was very high,

and the methods of test devised by the board, to say the least, did

nothing to ameliorate the rigors of the statute. The steel-makers,

however, bravely persevered, and finally overcame their difficulties in

the main, though a historical _résumé_ of the progress of the new navy

would be incomplete without the statement that none of the contractors,

under the Act of March 2, 1883, made any money, and some of them

suffered serious loss; and this statement applies equally to the

manufacturers who made the steel for the pioneer ships,—at least one old

and well established concern being wrecked by the difficulties

encountered, while others were embarrassed.

The year 1884 was signalized by a Presidential campaign of unusual

bitterness, and, notwithstanding the cordiality with which all parties

had joined hands in the inception of the new navy, the first session of

the Forty-eighth Congress developed what for a time threatened to be at

least a temporary hiatus. But wiser counsels at length prevailed, and,

though no additions were made to the list of new ships authorized,

sufficient appropriations were made to prevent stoppage of work on those

already under contract.

The results of the year 1884 were chiefly interesting because they

demonstrated, after much bitter debate and heated discussion, that the

cause of the new navy had acquired impetus sufficient to vanquish the

party passions of even so violent a Presidential campaign as that which

marked that year. That campaign over, the Forty-eighth Congress, at its

second session, took up with zeal the promotion of the new navy, and the

act approved March 3, 1885, authorized four additional vessels, toward

the construction of which $1,895,000 was appropriated with practical

unanimity. The Act of March 3, 1885, marked an epoch in the history of

the new navy. Prior to that time, the legislative practice had been to

require separate enactment to authorize the construction of new vessels

for the navy. In this case the authorization appeared in the body of the

regular Naval Appropriation Bill, and that practice has been followed

ever since. This innovation was debated in Committee of the Whole, and a

point of order made to strike out the proposed authorization. The point

of order was overruled by Hon. James B. McCreary, a Democratic member

from Kentucky, with the approval of Speaker John G. Carlisle; Mr.

McCreary being Chairman of the Committee of the Whole on the Naval Bill.

Mr. McCreary ruled: 1st. That legislation in pursuance of any settled or

established policy was germane in the annual appropriation bill which

dealt with that subject matter. 2d. That the increase of the navy was

clearly a settled and established policy, to which all branches of the

government were committed. 3d. That in view of that fact the

authorization of additional vessels of war could not be considered new

legislation in the meaning of the rules, but must be regarded as

progressive legislation in a direction previously sanctioned by

Congress; that therefore the authorization of new ships was germane to

the regular naval appropriation bill for each year, and was in order.

It is hard to overestimate the value of this ruling to the interests of

the new navy. Every one familiar with legislative processes knows the

advantage which appertains to the “right of way” enjoyed by a regular

appropriation bill as compared with the average chances of an

independent measure. These advantages are so marked, that it is quite

proper to say that Mr. McCreary’s rule on this point was of greater

importance than any other single incident in the legislative history of

naval reconstruction. In the Act of March 3, 1885, appeared another

clause prohibiting the repair of any existing wooden vessel when the

cost of such repair should exceed 20 per cent. upon the whole cost of

such vessel entirely new. This clause was adopted upon the

recommendation of Secretary Chandler, made in the previous year; its

obvious object being to render impossible the perpetuation of the old

and obsolete wooden ships. Its effect soon became apparent in a rapid

elimination of old wooden vessels from the navy, until by 1890 only

sixteen of them remained on the active list, and nearly, if not quite,

every one of these was then in her last commission. It is impossible to

overestimate the salutary effects of this clause. 1st. It “cleared the

decks” of a lot of obsolete lumber. 2d. It stimulated public opinion to

demand prompt production of new and modern ships to take the places of

the old and obsolete. 3d. It put an end to a policy of makeshifts which

was always extravagant, often wasteful, and sometimes corrupt.

The building of the four pioneer ships involved several new departures.

The Congress that authorized their construction and made an

appropriation toward it, also made provision for creating what was

termed a second “Naval Advisory Board,” which was to have charge of the

details of their building. By this expedient Congress hoped to avert the

evils of the Bureau system on the one hand, and to limit the one-man

power of the Secretary on the other. This board consisted of five

members, three naval officers and two civilians, to be selected by the

Secretary of the Navy. Of the two civilians, one was a ship-builder, the

other a mechanical engineer. The ship-builder was Henry Steers. This

gentleman was a nephew of George Steers, a somewhat celebrated naval

architect in his time, whose principal achievement was the design of the

yacht “America,” which won the cup which the English have struggled ever

since to recapture. The famous steam-frigate “Niagara,” built a short

time before the war, though constructed in a navy-yard, was designed by

Henry Steers. During the paralysis of American ship-building which

followed the Civil War, Mr. Steers became discouraged at the outlook

and, having a considerable fortune, went into the banking business.

The other civilian member, the mechanical engineer, was Miers Coryell,

of New York. This gentleman was connected in his professional capacity

with the Cromwell Line of steamships plying between New York and New

Orleans. He had shortly before the time under consideration designed an

engine for the “Louisiana” of that line, which Mr. Roach built,

involving an entirely new departure in sea-going engine construction.

Perhaps the most concise way to describe this engine would be to say

that it represented an effort to introduce the walking-beam of a

side-wheel river steamboat into the engine compartment of a screw

steamship. The advantage claimed for it was that it permitted the use of

vertical cylinders within a deck-height not sufficient to admit the

regular type of vertical inverted cylinders. This it undoubtedly did;

but there its merit stopped. For the rest it was cumbrous, complicated,

and of weight exceedingly disproportionate to its power. This

unspeakable device Mr. Coryell offered to the Advisory Board, and, to

the speechless amazement of the engineering world, it was adopted as the

propelling machinery of the most important ship then authorized for the

navy. It is worthy of remark here that these beam-engines were

subsequently taken out of the “Chicago,” and a pair of vertical inverted

or slightly inclined engines of the usual type substituted. And it might

also be observed that this work, with some alterations in the hull, was

done in the New York Navy-Yard at a cost of $1,300,000 as against an

original contract price of $889,000 for the whole ship new; or, in other

words, the cost of re-engining and overhauling the “Chicago” in a

navy-yard was 40 per cent. more than the first cost of the new ship

under contract in a private shipyard!

The Navy Bureaus were not slow to discern what the creation of the

Advisory Board meant for them. At first they tried to defeat it. Finding

that impossible, two of the Bureau chiefs besought the Naval Committees

of the Senate and House to provide that at least one of the four ships

be built in a navy-yard. No member of the Senate committee favored this

proposition, and but two members of the House committee, both of whom,

it is hardly necessary to say, represented navy-yard districts and

danced to the music of labor agitators. Thus, at the inception of the

new navy the navy-yard snake was “scotched,” if not killed.

When the contracts and specifications were drawn up in form, two facts

became evident: One was that the knowledge of the new conditions of

naval construction possessed by the authorities of the navy itself was

altogether academic; and the other was that neither naval authorities

nor civilians interested had any adequate idea of what the requirement

of the law in regard to material actually signified. The law said that

the ships must be built of “steel, of domestic manufacture, having a

tensile strength of 60,000 pounds to the square inch, and an elongation

of 25 per cent. in eight inches.”

Verbally, this was the English Admiralty standard for mild steel plates

and shapes. But the English had an elastic system of inspection which

left much to be determined by the judgment and knowledge of the

inspector. The system adopted by our earlier inspectors of material was

rigid as a rock and inelastic as cast-iron. The letter of the law, not

the spirit of it, was their guide. These requirements and the mode of

enforcing them would have been drastic had the mild-steel industry been

in a flourishing condition. But as a matter of fact it had not been

developed at all in this country; so they were formulating crucial

requirements for the product of an industry which did not exist. The

production of mild steel, or at least its use in naval construction, was

still in the experimental stage then, even in England, its native home.

The “Iris” and “Mercury,” the first all-steel ships built in England,

had not been in commission more than two years, when the requirements

for our new ships were formulated by the naval authorities and embodied

in an Act of Congress.

Bessemer steel was produced in large quantities here at the time for

making rails and tank-plates. But Bessemer could not stand the navy

tests. Nothing but open-hearth steel could do it, and at the time when

bids were asked for the first four ships there was not an open-hearth

mill in the country that could make the ingots required for the plates

and shapes of the sizes and qualities demanded. Still, American

steel-makers were found willing to undertake the task, though the sequel

soon proved that their conceptions of what confronted them were quite

vague. When one surveys the open-hearth steel industry as it exists in

the United States to-day (1901), largely exceeding that of Great

Britain, and greater than that of all the rest of the world, exclusive

of the United Kingdom, put together, it seems impossible to realize that

it is all the growth of a score of years. As late as 1887 there was no

forging-mill in this country that could forge a three-throw crank-shaft

in one piece, and the “Baltimore’s” crank-shafts of that description had

to be imported from Whitworth’s works in England.

Such were the conditions which confronted the ship-builders who made

estimates and offered bids for the construction of the four pioneer

steel ships of the new navy. When the bids were opened early in July,

1883, it became apparent that the views of bidders as to the character

of the task they proposed to undertake were quite divergent. To avoid

prolixity, we will deal only with the “Chicago,” which was, in fact, the

representative ship. For that vessel there were but two bidders worth

considering,—Mr. Cramp and Mr. Roach. Mr. Roach bid $889,000 for the

hull and machinery. Mr. Cramp bid a little over $1,000,000, or about 14

per cent. in excess of his competitor. As the sequel proved, Mr. Cramp,

conservative as his bid was, or as it appeared to be, underwent no

misfortune in failing to get the “Chicago” at $1,025,000. Whether Mr.

Cramp could have been more successful than Mr. Roach was in creating the

new open-hearth steel industry required to produce the material demanded

by the law and the specifications need not be discussed. It may,

however, be said that the excess of his bid over that of Mr. Roach was

due wholly to his misgivings on this point; because on all other points

involved, such as experience, skill, and efficiency of organization, he

had some advantage.

Mr. Roach got all the ships. The contracts were signed July 26, 1883.

The keel of the “Chicago” was laid December 5, 1883; she was launched

December 5, 1885, only fifty-two days before the contract date for

completion, which was January 26, 1886. Meantime the first of the ships,

the despatch-boat “Dolphin,” had been completed, put on trial, and had

failed to meet the requirements of the law. Here the evils of the

inflexible, inelastic, or “cast-iron” form of contract became instantly

evident. The Navy Department could not accept the ship under those

conditions without violating the law. Mr. Roach thereupon threw up his

hands, and the government, as provided in the contract, had to take

possession of the ships as they stood in his shipyard and complete them

with its own resources, at the risk and expense of Mr. Roach and his

bondsmen. This action on his part is hard to understand or explain. He

was perfectly solvent. Although, as the law and the contract stood, the

Navy Department could not accept the “Dolphin,” in view of her

deficiency in performance, Congress was soon to assemble, and Secretary

Whitney was ready to ask for an amendment or modification of the law

which would enable him to accept the ship with an equitable penalty for

her deficiency, which, by the way, was not great. It was said at the

time that Mr. Roach acted upon the advice of certain political friends

holding high rank; that a certain group of Republican politicians

believed that their party needed a martyr just at that juncture, and

they thought Mr. Roach would make a good one. Be this as it may, the

government finished all the ships in the Roach yard, and the “Chicago,”

contracted for July 26, 1883, was ready for her first commission the

middle of April, 1889,—five years and nearly nine months building. We

have dwelt with some prolixity on this branch of the subject for two

reasons: first, because it was the beginning of the most important epoch

in our naval history; and, second, because the errors, miscalculations,

and consequent disasters it developed became themselves of very great

value as object lessons for guidance or warning in subsequent

transactions.

When Mr. Whitney became Secretary in March, 1885, he found ready to his

hand authorization for four more ships, the designs of which had been

partially worked out by the Bureaus during the previous winter. He,

however, proceeded slowly; so deliberately, that the contract for the

first of the four ships built under the authorization of March 3, 1885,

and August 3, 1886, was not signed until December 17, 1886, a year and

nine months after he assumed the office. This delay was due to a variety

of causes, the most important of which are interestingly and

instructively described by Mr. Cramp himself in an account of his

personal connection with the transactions. It may be premised that when

Mr. Whitney became Secretary of the Navy, he very soon sought to avail

himself of Mr. Cramp’s experience, professional ability, and practical

knowledge. Mr. Cramp responded in the same spirit of frankness and

candor as that in which the Secretary invited him. There was no mincing

of matters in any direction. Mr. Cramp hewed to the line on all the

abuses and shortcomings of the old régime, and he also pointed out

methods by which they could be overcome or, at least, compelled to get

out of the way. Mr. Whitney was a thorough business man and an able

lawyer. Far removed both by character and by fortune from any possible

temptation, Mr. Whitney’s sole object in taking the navy portfolio was

to promote the public welfare, and thereby add lustre to his name.

But let Mr. Cramp tell his own story in his own way.

THE BEGINNING OF THE NEW NAVY.

“The practical beginning of the new navy occurred under the

Administration of Mr. Chandler, and while he was Secretary of the

Navy the ‘Chicago,’ ‘Boston,’ ‘Atlanta,’ and ‘Dolphin’ were

constructed.

“The hulls of these vessels had been designed by the Advisory Board,

and were about equal to any vessels constructed abroad at that time

so far, I might say, as the models and general designs were

concerned. Their outfit and guns were not fairly up to the

prevailing practice abroad, and their engines were very inefficient

and commonplace. They were not designed by the board, but were

principally the designs of the contractor. The ‘Chicago’ had engines

of quite a fantastic design, suggested by one of the members in the

board. The models and designs of the hulls, as compared with what

had preceded them in the Navy Department after the end of the Civil

War, were great achievements over the ridiculous specimens of the

ship-building art that we were loaded with during that time. They

were the production principally of Messrs. Steers and Fernald,

assisted by Mr. Bowles, and were up to most of the requirements of

the time.

“When the vessels were tried under the following Administration,

that is, during the Secretaryship of Mr. Whitney, it was found that

the power of the engines and the consequent speed developed were not

up to the requirements of the law, although it might be said that

they were up to the requirements of the contract.

“There was some considerable delay on the part of the Secretary, Mr.

Whitney, in receiving the ships from the contractors on that

particular account, a decision having been made by the

Attorney-General that vessels contracted for and subsequently not

coming up to the requirements and not in full accordance with the

law were worthless, and would not be accepted.

“A violent uproar pervaded the entire country at that time on

account of what they called the hesitating attitude of Mr. Whitney.

“The political administration of the government having changed, it

was asserted that it was on account of the politics of the

contractor that the vessels had not been accepted. Among the people

who argued thus, all considerations of contract requirements of law

were entirely ignored, and Mr. Whitney received untold denunciations

from these sources; but he was one of those men whom adverse

criticisms as to what he had done never disturb in the slightest

degree.

“Mr. Whitney finally accepted the vessels conditionally, after more

or less contention which consumed some little time. But no more

unfair denunciation or criticism of the actions and efforts of any

man ever occurred than fell to his lot at that time.

“The second lot of vessels was given out by Mr. Whitney, who

succeeded Mr. Chandler. Two of these vessels were built on plans

provided by Mr. Whitney, and two were on modified plans of Mr.

Chandler.

“In compliance with the provisions of the act which authorized the

‘Secretary to prepare drawings,’ Mr. Whitney purchased from

Armstrong the drawings that had been prepared for the Spanish

government, and the drawings of the ‘Naniwa Khan,’ which ship they

had built for Japan. These two vessels became the ‘Baltimore’ and

‘Charleston.’ Cruiser No. 1 of Mr. Chandler’s plans was not given

out; as the bids were above the limitation price, the smaller

cruiser was given out under modified conditions. This vessel became

the ‘Yorktown.’

“Before the advertisement was printed, Mr. Whitney invited all of

the expectant bidders to examine the plans and specifications which

he had purchased, and without exception all recorded their

indorsement, and some in extravagant terms. After Mr. Whitney’s

retirement, the contractor who had indorsed them in the most

extravagant manner was the first and only one to find fault.

“We bid on all the vessels and in accordance with the conditions of

the advertisement with the exception of that of the ‘Yorktown.’ On

that vessel we bid on the government designs, and designs of our own

which embodied a proposition to install the first triple-expansion

engines in the navy. Our bid for the ‘Newark’ being higher than the

government allowance, we did not get her. As I said before, she was

not awarded.

“When it was found that Mr. Whitney had purchased abroad the

drawings that I have already referred to,—the drawings of the

vessels that ultimately came to be the ‘Baltimore’ and

‘Charleston,’—he was fiercely assailed by certain parties in the

Navy Department, while certain others indorsed his action; but the

Bureau of Construction and Repair and the Bureau of Steam

Engineering were conspicuous in their opposition. The most

conspicuous in support of the Secretary was Commodore Walker. We

received our share of adverse criticism because we had indorsed the

steps he had taken.

“The design of the ‘Baltimore’ and the ‘Charleston’ represented the

best types of vessels that were constructed up to that time. They

were far in advance of any other war-ships of that period, and in

fact they really formed the basis of future constructions in the

world’s navies.

“It was more by good luck than by good management that Mr. Whitney

secured those particular drawings which proved to be of such

superior character. They were offered to our Naval Attaché, who

happened to be abroad in England at that time, by the Armstrong

Company. They had designed the two vessels which subsequently became

the ‘Baltimore’ and ‘Charleston’ of our navy. The design of the

‘Baltimore’ was made in competition with Thompson for the Spanish

government. For certain reasons, which I need not mention here, the

designs of Thompson were accepted and the contract for the

construction of the ship was awarded to them. She was known as the

‘Reina Regente.’ It was at this point that the Armstrongs presented

their rejected drawing and the drawings for the ‘Naniwa Khan’ for

sale to our Naval Attaché there. They had already built two vessels

like the ‘Naniwa Khan’ for the Japanese navy. These vessels were

looked upon by the experts of the naval world as being the two best

specimens of their type that had ever been built up to that time.

“At the time the sale was made, the Armstrongs, knowing nothing of

the capabilities of this country and having, like most British

ship-builders and many Americans at that time, a very mean and very

poor opinion of every ship-builder in this country, they suggested

that, in awarding the contract, a condition should be inserted

providing for the payment of superintendents whom they should send

over from their works to superintend the building, and designing of

the engines, and operating them after their completion. Considering

what to them appeared a barbarian incapacity on our part, they were

loath to risk their reputation without protection.

“We accepted the condition at the time, anxious to get the

contracts, feeling sure that it would never be needed, and that we

could prevail upon Mr. Whitney and the naval people as to the

impropriety of it.

“After the contract was awarded and the work was started, Mr.

Whitney concluded that, notwithstanding the provision was there, he

would never use it, and never require it of us.

“In fact, we made a great many improvements in the boilers of the

‘Baltimore,’ and some improvements in the engines. These

improvements in the boilers of the ‘Baltimore’ formed the basis and

the standard of construction of all the Scotch boilers that have

been built for the navy since that time.

“At the beginning of our work on these ships we did not get much

co-operation on the part of some of the Bureaus, in view of the

foreign character of most of the work, and in view, too, of the fact

that some of it was of our own, both being equally obnoxious, as

they originated outside of the Bureaus. We met with a great deal of

opposition at the beginning in getting up the specifications and

plans.

“Certain subsequent changes in the _personnel_ that were made in the

Bureau of Steam Engineering—Mr. Melville having been placed at the

head of it—modified the situation, and he joined the Secretary in

his efforts with his usual vigor. A part of the trouble I refer to

in getting a start on the work was owing to lack of experience and

knowledge of contract and specification requirements which were

placed in the Law Department of the navy for the first time.

“The Law Department of the navy at that time was beginning to make a

show, and to them, under some mistake, was delegated the getting up

of the contracts and specifications. It was here where my trouble

commenced. The Law Department endeavored to provide for everything

that could possibly occur, or everything that they thought would

occur, and for many matters that could not be considered at all; and

the specifications soon began to assume enormous proportions, being

filled with impossible requirements.

“I got over most of these difficulties and minor details which they

intended to lug into the contract by having introduced at the

termination of certain paragraphs of the specifications, where

explanations were unsatisfactory, misleading, and inadequate, a

clause using the words: ‘As the Department may determine.’

“My previous experience with the Navy Department and naval officials

generally led me to believe that I could always make out my case

when it was right.

“At the beginning of the work, Mr. Whitney notified us that he

considered himself and all the naval officials as partners and

associates of the contractor, each mutually interested and

determined to get the best vessel they could for the navy. He

considered that the government ought to co-operate with the

contractors, and that the contractors should in turn co-operate with

the government; that the inspector was not an enemy, and never once

considered him so. He considered it was his duty to afford all

encouragement possible in aiding the contractors to carry out the

plans. During the close of a conversation which I had with Mr.

Whitney at one time during that period, he said to me: ‘I want you

to inform me of what you see going wrong, no matter where the fault

originated; and I will hold you personally responsible in every case

where you neglect to inform me whenever anything is not going right

or not being done right, whether it be your own fault or that of the

government.’

“Coming back to the ships and referring to the purchasing of the

drawings abroad: At the time that Mr. Whitney bought those drawings,

it occurred to us that the triple-expansion engine which was being

developed by Kirk was a marked advance over the plain compound of

Elder; and I suggested to Mr. Whitney the propriety of buying plans

of triple-expansion engines from us for the smaller ship which

afterward was the ‘Yorktown.’ Of course this was before the ships

were given out. He told us to go ahead. We went to work and made the

drawings, which we thought were much in advance of anything of that

kind in existence, and we fully expected that they would be bought

by Mr. Whitney, as he had purchased the foreign drawings. When the

drawings were finished, I took them down to Washington and showed

them to him. He was at this time so disgusted with and tired of the

great uproar that had been made about purchasing drawings abroad,

that he did not say much about it. He did not decline, however, to

buy them; but, finding that he was not enthusiastic, I accepted

promptly the situation, and simply exhibited them to him as

something we had gotten up. I then returned home and threw them

aside, and prepared for the coming opening of the bids which had

been advertised for in the papers. The day before the bids were to

be opened, I suddenly conceived the idea of giving the

triple-expansion plans another chance by making an alternative bid

on the ‘Yorktown,’ embodying engines of the triple-expansion type.

So I rushed back to Philadelphia, got the drawings that we had

previously prepared, and returned to Washington in time to put them

in with our other bid for the ‘Yorktown.’ As we were responsible for

the horse-power, weight, etc., we felt that we could get it a great

deal better, and more satisfactory results all around, with

triple-expansion engines than with uncertain and unknown performance

of the Bureau drawings. Our bid being lowest on triple-expansion

engines, being the only one, the contract was awarded to us.

“The success of these engines in the ‘Yorktown’ was of a highly

marked character, and it emboldened us to introduce them in our bids

for the new lot of construction that had been advertised for.

“It was at this time the _New York Herald_ published in large type a

paper of mine on the triple-expansion engine, and Commodore Walker

had it printed in the Reports of the Information Bureau. Walker was

always in the front when a good thing was to be promoted, and was

conspicuous in his co-operation with Mr. Whitney.

“When the ships that followed the ‘Baltimore’ were given out, we

secured the contracts for the construction of the ‘Philadelphia’ and

‘Newark.’ We bid on the ‘Newark’ a second time. A great deal of

unpleasant feeling was manifested on the part of the Bureau of

Construction when we failed to bid within the limitation price at

the time she was first advertised. We introduced in her, however,

the triple-expansion engine in place of the Department’s. We also

bid on ‘Philadelphia’ with hull duplicate of the ‘Baltimore,’ with

triple-expansion engines of the same type as the ‘Yorktown.’

“What ultimately became the ‘San Francisco’ was given to Mr. Scott,

who bid on the basis of ‘Baltimore’s’ plans of hull with the

‘Baltimore’s’ engines. After the contract was awarded to him, he

agreed to substitute the ‘Newark’s’ hull plans in place of the

‘Baltimore’ type with a design of engine that the Bureau of Steam

Engineering had made at our shipyard by some of their officers who

were on duty there and certain of our draughtsmen,—a type of engine

that they considered to be an improvement over the ‘Baltimore’s’

engines. The Department granted this substitution.

“The Bureaus that had denounced Mr. Whitney for buying foreign

drawings had been spending money very lavishly for some years in

_securing plans abroad_. The Bureau of Steam Engineering and the

Bureau of Construction were spending about $100,000 a year in the

purchase of drawings.

“The hull of the ‘Yorktown,’ which was designed by the Bureau, was

based on the design of the ‘Archer’ class.

“The ‘Newark,’ which was also designed by the Bureau at that time,

was based on the design of the ‘Mersey’ class as to specifications

and general construction, while the model was not of that class.

[Illustration: BATTLESHIP RETVIZAN—RUSSIAN]

“The Bureau of Engineering, which had been laboring for some years

with a view to a consolidation of all of the constructive

departments of the navy,—hulls, engines, guns,—under their Bureau,

bought abroad entire plans of ships, hulls, and engines combined. I

saw a complete set of plans and drawings of the ‘Polyphemus,’ which

was designed as a sort of ram by the British government, and also

the two vessels ‘Warspite’ and ‘Impérieuse,’ rather of a fantastic

design, which the British government was building. These vessels

were somewhat of a departure from previous vessels constructed in

the British navy and were very crude. They were designed by some one

in England who was not up to the capabilities of his

fellow-constructors there. They were not duplicated. They are the

poorest specimens of ships in the British navy.

“Mr. Whitney was exceedingly fortunate in the officer whom he found

at the head of the most important Bureau. This was Commodore John G.

Walker, then Chief of the Bureau of Navigation, and unquestionably

the ablest and most forceful man of his time in the navy. American

naval officers, as a rule, are able men in the professional sense;

but Walker, while equal to the very best and superior to most of

them in that regard, possessed an additional fund of tact,

equipment, and energy in purely administrative directions seldom

equalled and never surpassed in the history of our navy. He had

enjoyed, also, considerable experience in civic responsibility,

having been for a considerable period identified with the management

of an important railway corporation prior to his appointment as

Chief of the Bureau in 1881. His term of four years was about to

expire when Mr. Whitney assumed office, but at the instance of the

latter he was immediately reappointed, and served through the entire

term until 1889. Commodore Walker was exactly the man for the place,

which was that of chief adviser to the Secretary. To a perfect

acquaintance with the _personnel_ of the service, he joined a

freedom from narrow predilections and selfish aims seldom found in

any veteran regular officer of any branch, and his sense of the

material needs of the navy was broad, keen, and practical. Moreover,

in mental character and manly temperament he was congenial to Mr.

Whitney. For these reasons, and imbued with a common purpose,

Commodore Walker and the Secretary coalesced from the first day of

their association, and remained in the most perfect accord

throughout the four most important years in the history of the new

navy. On some occasions it happened that Walker sustained the

Secretary and helped him carry out most important reforms and

policies of progress against powerful opposition in the navy itself

and in the Department.

“Commodore Walker’s influence among Senators and Representatives in

Congress, built up during his first four years in the Bureau, was

superior to that of any other officer, and occasionally it proved

equal to that of a considerable majority of them combined. His

powers were uniformly exerted in behalf of the readiest and most

practical methods of increasing the navy in number, excellence, and

force of its ships and in organization and training of its

_personnel_. Against all efforts to perpetuate the obsolete,

cumbrous, and abnormal navy-yard system of construction he set his

face with all the strength and resolution he possessed. For detailed

discussion of the questions involved in this phase of the subject,

neither the limitations of space nor the patience of scientific

readers offer opportunity. Suffice it to say, that the antique,

red-tape-ridden and muddle-brained policy of trying to build new

ships of the modern type under military methods was in the main

abandoned.

“Commodore Walker also ably supported Mr. Whitney’s policy of

purchasing modern designs and plans of hulls and machinery abroad, a

policy which a large and influential group of naval officers

vehemently opposed. On the whole, it is not too much to say that, in

the all-round importance of his usefulness to the new navy,

Commodore Walker fairly divided honors with Mr. Whitney himself.

“That Walker’s all-round ability and energy were understood and

appreciated by others besides Secretary Whitney is abundantly

attested by the fact that upon his retirement in 1897, at the age of

sixty-two, he was appointed chairman or president of the Isthmian

Canal Commission, which he still holds at this writing (1903), in

his seventieth year. Taking his career altogether from graduation at

the Naval Academy in 1856; then through the Civil War, in which he

played a distinguished part; then for some time in the civic

pursuits already mentioned; then as Chief of Bureau and principal

adviser to the Secretary for eight years; then as Admiral in command

of the ‘White Squadron’; and, finally, as president of the Canal

Commission, it is safe to say that few officers in our navy have

done more important public service than John G. Walker.”

The most important matter adjusted in the conferences of Mr. Cramp with

Mr. Whitney was the arrangement of the form of contract so that it might

be, within a narrow margin, flexible or elastic. The operation of other

contracts had clearly shown the need of such modification, and a

solution was reached without difficulty, though not without much

deliberation.

The matter under immediate consideration was the form of contract for

the “Baltimore.” The guarantee to be required was that her engines

should develop a mean of 9000 collective indicated horse-power for four

consecutive hours, a lower or minimum limit being also prescribed. They

had before them the form of contract for the Roach ships.

Mr. Cramp remarked that the guarantee for the “Baltimore” was 9000

indicated horse-power.

“Suppose, Mr. Secretary,” he said, “that we should use that form of

contract, and the engines of the ‘Baltimore’ should develop only 8999

indicated horse-power, what could you do?”

“Well, Mr. Cramp, under this form of contract, construed according to

law, I could not accept her. There ought to be a way of averting such a

possibility. What can you suggest?”

Mr. Cramp then proposed to apply to our naval contracts the principle

often recognized in agreements for construction of merchant steamships

and also in the naval contracts of foreign governments, namely, a

sliding scale of penalties for deficiency in performance, with a minimum

limit; and, in case the ship should prove unable to reach the minimum

limit after a fair number of trials, the owner (if a merchant vessel) or

the government (if a naval ship) might at will either reject her

altogether or accept her under a supplemental agreement. Mr. Cramp also

explained the usual basis upon which penalties for deficiency were

computed and imposed in our own merchant practice and in foreign navies.

The Secretary assented to this suggestion, and pronounced it the only

business-like plan for solution of the difficulty he had heard. But he

said that, in order to make the arrangement perfectly equitable, there

should be a premium for excess over and above guaranteed performance,

corresponding to or commensurate with the penalty for deficiency.

These discussions led to the adoption of what became known as the

premium system. Some time afterward, when Mr. Whitney was before the

Naval Committee, the subject came up, and one member referred to it as

“a bonus to contractors.”

“If you use the word ‘bonus’ in the sense of a gift,” said the

Secretary, “it is a misapprehension. It is part of an equitable

transaction. Performance is a prime element of value in a ship-of-war.

We stipulate in our contracts for a specific performance. We consider

the guaranteed performance as representing the normal value of the ship.

If upon trial the performance falls below the normal, it reduces the

value of the ship to that extent, and we meet it with proportionate

penalties deducted from the contract price. But if upon trial the

performance exceeds the normal, the value of the ship is increased, and

we propose to meet such cases with premium proportionate to the excess

of guaranteed performance. In either case we simply pay for as good a

ship as we get, be it above or below the normal. It is a poor rule that

won’t work both ways.”

Mr. Whitney’s terse observations embodied the whole logic of the penalty

and premium system, and his argument was so conclusive that no further

discussion seemed to be desired. The system remained in effect nearly

ten years, and was applied to every vessel built for the new navy up to

and including the “Iowa” and “Brooklyn.” Every ship built by Mr. Cramp

earned a premium for excess of either indicated horse-power or speed.

None of his ships exhibited deficiency. The list is rather interesting,

because it exhibits more graphically than any other method could do the

actual extent to which the contract requirement was exceeded in each

case.

“Yorktown” (horse-power) $39,825.00

“Baltimore” (horse-power) 106,441.00

“Newark” (horse-power) 36,857.00

“Philadelphia” (speed) 100,000.00

“New York” (speed) 200,000.00

“Columbia” (speed) 300,000.00

“Minneapolis” (speed) 414,600.00

“Indiana” (speed) 50,000.00

“Massachusetts” (speed) 100,000.00

“Iowa” (speed) 217,420.00

“Brooklyn” (speed) 350,000.00

–––––––––––

$1,915,143.00

When the administration of Mr. Whitney ended in March, 1889, he left

over to his successor the most important work in the way of new

departure yet attempted. Of his successor, General B. F. Tracy, of New

York, Mr. Cramp, speaking of the man and the task before him, says:

“Secretary Tracy entered the Navy Department under very favorable

auspices. He was himself free from entanglements, political or

personal. His previous public life, aside from service as a colonel

and brigadier-general in the Civil War, had been confined to legal

and judicial positions, his highest post having been that of Justice

of the New York Court of Appeals, the Court of last resort. To the

affairs of the Navy Department in general he applied the judicial

habits formed on the Bench. In technical matters, he enjoyed at the

outset of his administration the continuing services of

Commodore—now become Rear-Admiral—Walker, whose term extended till

December, 1889; and who, by the way, had the honor, after eight

years of service as Chief of Bureau, to command the first American

squadron of modern war-ships known to history as ‘the White

Squadron.’

“With regard to the task of rebuilding the navy, which was then, and

still is, the chief responsibility of a Secretary, Mr. Tracy had but

to carry on a programme already well begun. He was not, however,

content with following simply the lines laid out before him. He at

once proceeded to lengthen them and to widen their scope. Under his

administration was begun and carried out the ‘battle-ship and

armored cruiser programme’ which gave to the navy the fleet that

made our success in the Spanish War so swift and so easy.

“The distinguishing traits of Tracy’s administration were the

unbroken co-operation between the executive and legislative branches

of the government in everything pertaining to the new navy, and the

remarkable progress made in size, power, speed, and other prime

qualities of war-ships, together with the almost incredible

development of all contributory industries. In this connection

should also be mentioned the constant and powerful support which

President Harrison gave to the Secretary of the Navy in every

possible manner, from first to last.

“In his methods of considering propositions laid before him, Mr.

Tracy was always deliberate and cautious; but in executing a

programme once resolved upon, he was equally prompt and peremptory.

He never determined to begin anything until he could foresee the end

of it, and when he had reached a conclusion on that basis he was

wont to push practical operations with untiring energy. In some

respects, when giving preliminary consideration to subjects, he may

have been less self-reliant or more disposed to feel the influence

of his military subordinates than Mr. Whitney was; but in energy of

execution he had no superior. As a general consequence, Mr. Tracy’s

four years in the Navy Department made a history that compares

favorably with that of any predecessor from the foundation of the

Department itself in 1797 to his own time.

“One of the first and most important matters that came before

Secretary Tracy was the design of the armored cruiser ‘New York,’

the appropriation for its construction having been one of the last

acts of the Congress that went out with Mr. Whitney. This ship was

intended to be an echo to the ‘Blake’ and ‘Blenheim’ type of

protected cruisers, and they were the largest heretofore

constructed. The question was asked by the Secretary of the head of

one of the Bureaus, during the discussion of the details of the

ship, if there could not be an improvement in the salient features

of the design over the ‘Blake,’ as merely copying her was obnoxious

to him. He had heard of the ‘Dupuy de Lome,’ the first of the

armored cruisers, and he conceived the idea of adding vertical armor

on the sides of the ship in addition to the sloping armor of the

protected deck as an additional protection, and of sufficient

importance to warrant its adoption in the new design. He argued that

no projectile could penetrate the outer plates and strike the

sloping plate at the same angle in both, etc.

“Strong objections were urged by the head of the Bureau who had been

consulted about it, and the legend of weights of the ‘Blake’ as

published and the distribution of them in the ‘Blake’ were shown

with the assertion that nothing could be done. The Secretary became

more persistent as the opposition increased, and the wires between

the Department and the British Admiralty became hot from the number

of messages that passed as to the ‘Blake’ and ‘Blenheim.’

“While the Secretary was perplexed with the opposition of officers

who should have aided rather than opposed him, we happened to meet,

and he asked if I could duplicate the ‘Blake’ and her performance if

side armor of moderate thickness were added, and also asked my views

of the ‘Dupuy de Lome’ and other ships of the same kind.

“I promptly stated that I could do it, and explained the idea of

‘Dupuy de Lome,’ also giving him the names of three other armored

cruisers the French had under way. I went into the Secretary’s room

at 3 P.M. and discussed the whole subject with him till 8 P.M.; then

left, and promised to return promptly with additional information.

“At the next interview I furnished the Secretary with a complete

detail of what would be required to make an armored cruiser on the

‘Blake’s’ dimensions and performance, and stated that I would like

to bid in Class II on an alternative design with side armor.

“The Secretary handed my details and allotment of weights to the

proper officer, and the Department proceeded to get up the plans and

specifications. Frequent interviews with the Secretary occurred as

the work progressed, and I felt sure that under Class II, permitting

alternative designs, the contract would be awarded. Before the time

for awarding the contract had arrived, I found that the plans were

being developed under the conditions that I had given the Secretary;

but when the plans were exhibited before bids were sent in, it

transpired that the boilers had been placed three abreast in the

government plans, bringing them within a few feet of the side of the

ship.

“I then designed a plan for arranging the six boilers in pairs,

making the coal-bunkers on the sides of the ship. This arrangement

of coal-bunkers facilitated the prompt coaling of the ship and the

handling of it. It also permitted a liberal amount of ‘coal

protection’ for the boilers and engines, which was considered of

important value at that time, and, what was of more weight than any

other consideration, the introduction of two longitudinal bulkheads

that extended the entire length of the engine and boiler spaces on

each side of the ship. With three boilers abreast, the ship was

liable to be sunk at any time by a collision with a coal-barge or

passing schooner; any penetration of the side abreast of boiler,

besides resulting in a speedy foundering, would certainly unship the

side boiler, adding thereby an explosion to the other damage.

“With the boilers in pairs, it would be necessary for a ramming

vessel to penetrate the side and two bulkheads and enter ten feet to

do any damage, so the chances of being destroyed by ramming would be

reduced to a minimum. I also lengthened the vessel over the

Department’s plan, but kept all the conditions of specifications

intact, except as to dimensions.

“After the bids were opened, it was found that ours was the lowest

in Class II, and lower than any other bid, taking the competition as

a whole. The Secretary then called a conference, at which all the

bidders and the Chief Constructor were present, and, after thorough

discussion of all the points involved, awarded the contract to the

Cramp Company under the bid in Class II on the modified plan I had

suggested and offered as to boiler arrangement and other details

conformable to it.

“The ship was named the ‘New York,’ and on trial trip she largely

exceeded her contract speed and requirements of coal endurance and

in all other respects; while the ‘Blake’ on trial was a failure; her

engines had to be practically rebuilt, and then did not come within

the scope of reasonable competition.

“Mr. Tracy can fairly claim credit for the design of the ‘New York,’

and the project for the construction of the ‘Indiana,’

‘Massachusetts,’ and the ‘Oregon’ class of battleships was also due

to his foresight.”

It is not within the scope of this Memoir to trace the progress of the

new navy ship by ship, or even by naval programmes from year to year.

For the purpose of this work, it suffices to say that, of the total

number of battleships, armored cruisers, and first-class protected

cruisers actually in service at this writing (1903), Mr. Cramp has built

about a majority as against all other American ship-builders combined.

There are ten battleships in commission, of which Mr. Cramp has built

five; two armored cruisers, both built by him; ten protected cruisers of

the first class, of which five hail from Cramps’ shipyard: that is to

say, a total of twenty-two vessels, all first-class in their respective

types, of which Mr. Cramp has built twelve as against ten by all other

American ship-builders put together, navy-yards included.

[Illustration: BATTLESHIP RETVIZAN—DOCKING WITH SUBMARINE]

Of course, we exclude from this reckoning the two show-ships built by

Armstrong for a South American government and foolishly bought by our

Navy Department in the paroxysmal flurry incident to the outbreak of the

Spanish War. The main excuse for buying them was that, if we did not,

Spain would. So be it. Better to have let Spain buy them, if they could

not have strengthened her navy more than they did ours. At any rate, had

Spain bought them, we might have captured or destroyed them, as we did

nearly all her ships. They would probably have been worth capture or

destruction, but they were never worth buying.

Since 1887, a period of sixteen years, Mr. Cramp has completed fifteen

ships for the navy (including the “Vesuvius” and “Terror”), and is

building three more at this writing. In every case these ships embody in

plan and design more or less of his own knowledge, skill, and

experience. In some cases the designs are altogether his own. In others

the machinery is his, with important modifications of the Department’s

hull. In no case has he built a ship wholly upon the plans of the

Department. While this has redounded to the benefit of the navy, it

would be idle to say that it has been in the long run advantageous to

Mr. Cramp. On the other hand, its tendency has been otherwise: A certain

class of naval officers have chosen to consider Mr. Cramp’s constantly

recurring propositions to modify and improve their designs as having the

force and effect of criticisms, and, to say the least, they have not

been grateful to him for his pains. On the contrary, no little jealousy

and some resentment have been the results, and he has been made to feel

their consequences more than once. The chief misfortune of this state of

affairs is that it precludes the cordial co-operation which should exist

between officers of the Navy Department and a contractor engaged in

building naval vessels, and creates in its stead a sense of antagonism

which tends to augment the difficulties of naval construction, which are

great and perplexing enough at the best.

But Mr. Cramp has not concerned himself with the building of naval ships

alone. He has delved into the problems presented by the uses to which

the ships are put when completed. The results of his observations in

this direction were embodied in an address to the Naval War College read

before that institution, June 18, 1897, by invitation of the Commandant,

a little less than a year before the Spanish War. The experience of that

struggle, brief as it was, and decided almost wholly by sea power, made

this paper little short of prophetic.

Some extracts from it will serve to exhibit the trend of Mr. Cramp’s

thought in the direction of the practical uses and needs of ships-of-war

after they leave the ship-builder’s hands. Among other things he said:

“The accomplishment of the objects of sea-warfare will depend partly

upon the character of the armaments and partly on the wisdom with

which their operations are directed; nor can any one gainsay that

the wisdom of direction will depend on the conversancy of officers

with the nature and necessities of the material units of which the

armaments are composed.

“These propositions being taken for granted, it becomes clear that

there can be no effective system of teaching the art of naval

warfare which does not embrace exhaustive study of and consequent

close familiarity with the instruments by which the principles of

the art are to be carried into force and effect.

“From this point of view it must be admitted that questions within

the province of the naval architect and problems which he is best

qualified to solve form an essential part of such a curriculum in

its largest and most comprehensive aspects.

“The unvarying tendency of naval progress is to exalt the importance

of the naval architect and to augment the value of the constructor

as a factor in the sum-total of sea power.

“The naval armament of to-day is a mechanism. If we view it as a

single ship, it is a mechanical unit whose warlike value depends on

its excellence as a fighting machine. If we view it as a fleet, it

is an assembly of mechanical units, the warlike value of which will

depend alike on the excellence of each unit as a fighting machine,

and on the adaptation of each unit to its consorts to produce the

most symmetrical efficiency of the group as a whole.

“For this reason, the word seamanship, in the old-fashioned or

conventional sense, has ceased to cover adequately the requirements

of knowledge, skill, and aptness which the modern conditions of

naval warfare impose upon the officer in command or subordinate.

“By this I mean not to depreciate seamanship pure and simple, but to

point out that modern conditions require an enlargement of the

meaning of the term and a broadening of its scope of function far

beyond the exactions of any former period.

“In the old days there was no essential difference in ships except

in size. Experience in a sloop-of-war qualified an officer to

assume, at once and in full efficiency, equivalent duties in a

frigate, a seventy-four, or a three-decker. Familiarity with one

ship, irrespective of rate, was familiarity with all ships. Tactical

lessons learned in manœuvring one fleet were alike applicable to the

manœuvring of all fleets. Even the application of steam as a

propulsive auxiliary in its earlier stages did not radically alter

the old conditions. At all events, it did not practically erase

them, as the present development has done.

“This growth of complexity and elaboration, and this almost infinite

multiplication of parts and devices in modern ships, have entailed

upon the naval architect and constructor demands and difficulties

never dreamed of in the earlier days. The staff required to design

and construct an ‘Iowa’ is multiplied in number, and the complexity

of its organization augmented, as compared with that required for

the design and construction of the ‘New Ironsides,’ almost

infinitely.

“Similar conditions apply to command and management; so that, while

the building of a modern battleship entails enormous work and

responsibility on the naval architect, constructor, and staff, the

effective use of her as a tool in the trade of war presents an equal

variety and intricacy of problems to students of the art of naval

warfare in this college.

“Such questions and such problems cannot be relegated to the

category of details. Even if we consider the art of naval warfare in

the aspects only of strategy and tactics, both will be affected for

better or for worse by the behavior and performance of the units

composing the force in operation. This being admitted, it follows

that the behavior and performance of the units will be as the

knowledge and capacity of captains and their staffs, and that no

extent of skill and capacity in the admiral directing the whole can

overcome or evade the consequences of incapacity and failure on the

part of a captain commanding a part.

“As the speed of any fleet is that of its slowest ship, so will its

manœuvring power be limited by the capacity of its poorest captain.

As it might easily happen that the slowest or least handy ship and

the poorest captain would be joined, the quality of the other ships

and the ability of the other officers would go for nothing.

“In view of the complex character of the ships themselves, and the

difficulty and danger of manœuvring them under the most favorable

conditions, as pointed out, the experience of the first general

action will demonstrate the necessity of having all the battleships

in a fleet as nearly alike as possible in size, type, and capacity

of performance. Such provision would not equalize the personal

factor of different commanding officers, but it would at least give

them all an equal chance at the start.

“For this reason I have always considered it unwise to multiply

types or to modify seriously those which the best judgment we are

able to form approves.

“These considerations seem conclusive against multiplication of

types, and in favor of adhering to one that plainly meets the

requirements of our national situation and policy.

“The composition of a battleship fleet under such conditions would

minimize the tactical dangers and difficulties referred to earlier,

but they would still remain very great, and nothing can mitigate

them except frequent and arduous drill in squadron of evolution, so

that our captains may become familiar with their weapons before

being called upon to use them in actual battle. There will be scant

opportunity to drill a battleship squadron after the outbreak of

war.

“In my judgment, it is hardly possible to overvalue the importance

of homogeneity in fleet organizations, and I am sure that the very

first and perhaps greatest lesson taught by an encounter between

fleets of modern battleships will be the advantage of similarity of

type and equality of performance in the units of action.

“To this element of the art of naval warfare, then, I would invite

your most earnest and penetrating attention and study.

“Assuming this problem to be satisfactorily solved and the material

of the fleet in the most effective possible condition, so far as

relation of units to each other and to the sum-total is concerned,

we have still left for consideration the difference between men, the

lack of uniformity in _personnel_. Homogeneity of material may be

attained by adherence to a wise programme of design and

construction; but homogeneity of _personnel_, in the sense of

uniform capacity and efficiency among individuals, is beyond human

art or science to produce, because the difference between men is the

decree of a higher power. The existence of this college is itself a

devout recognition of that great fact, because its whole objective

is to mitigate or minify as much as possible this inherent human

frailty, by exhausting the resources of training and study, of

precept and example.

“I do not by any means argue that the commander of a ship should be

a naval architect or constructor. But, having familiarized himself

with the principles of that art which touch directly and immediately

his function of handling his ship under sea conditions of common

occurrence, and having gained sufficient knowledge of her traits, he

should be able to form an instant and correct judgment as to her

point of best behavior in any sea-way. It goes without saying that

sea experience is the only school in which these problems can be

worked out.

“Knowledge of that character cannot be acquired by study of the

experience of others. Close and earnest attention to this course of,

at best partial, information cannot serve as a substitute for

experience of one’s own. At most it can only provide a sound basis

on which to take quick advantage of one’s own experience, when

confronted with an actual situation.

“This brings me to the proposition that the modern battleship, with

all its complexities, weights, and peculiarities of design and

model, entails upon commanding officers a new requirement which I

can find no better terms to describe than ‘battleship seamanship.’

It is a development of the seafaring art which, as events have

proved, is by no means yet mastered in the greatest and most

actively exercised navy of the world; therefore it would be too much

to expect its mastery in navies of far less magnitude and, hence,

less means for distribution of opportunities to gain experience.

“It therefore follows indisputably that navies of the lesser

magnitude should constantly exhaust their means of enabling officers

to gain sea experience by keeping all their large ships in active

evolution all the time.

“Having thus viewed the modern battleship as a mechanical unit

herself, we may profitably pass to brief consideration of the great

number and variety of mechanisms composing her. In the strict

professional or technical sense, these mechanisms concern mainly the

engineer and the electrician. But as the foundation of all warlike

efficiency in _personnel_ is discipline, and as the foundation of

all discipline is the inevitable principle of a single head, one

commander, who is to all intents and purposes an absolute monarch,

it should follow that ‘the king can do no wrong.’

“I have already remarked that the captain need not be a naval

architect or constructor to comprehend and be able to apply the

group of principles of that art which touch his functions directly

in managing his ship as a whole; likewise, I would say here that he

need not be engineer or electrician in his relation to the numerous

and diverse mechanisms whose proper operation and control are

essential to the efficiency of his command.

“But, if he really commands, he must know enough about the

instruments that do his work to know when they are doing it well and

when not; to know whether his subordinates immediately in charge of

the several devices are operating them properly or not; to know when

defects exist and when they have been made good. If he does not know

or cannot learn these things, he must depend wholly on subordinates

immediately in charge; and their reports will be law to him, or if

not law, at least decisions from which he has no appeal. Manifestly

such a situation is utterly incompatible with the independent and

self-relying autocracy which is the essential and fundamental

principle of naval command, without which discipline must sooner or

later vanish into mere empty form or conventional myth. These facts,

even more than any other considerations, argue for uniformity of

type, previously touched upon, so that in learning the traits of one

battleship the officer acquires experience and knowledge applicable

at once to the discharge of his duties in another.

“The foregoing discussion is limited to matters affecting the unit

of action, the single ship, and the captain. Passing to

consideration of the unit of operation, the fleet and the admiral,

we find another array of problems equally within the scope of this

paper.

“Let us assume that the composition of the fleet has been made as

nearly homogeneous as possible, by carrying out the principles

previously stated for ships and their captains, and that the admiral

finds himself in command of an ideal fleet as to material and

_personnel_. Actual differences in efficiency among the several

units of action will still remain, and it will become the first duty

of the admiral to ascertain and locate these diversities with

unerring judgment and unsparing perception. He should know to a

nicety the personal equation of every captain and the effective

individuality of every ship.

“Among the captains he should be able to differentiate the traits of

relative quickness of perception, promptness of action, readiness of

responsibility, and boldness of execution.”

Among the most important services of Mr. Cramp to the new navy was his

instrumentality in bringing about the system of classifying bids. Prior

to 1885, whenever contract construction was to be done, the plans of the

Department, pure and simple, were the standard. If any bidder proposed

to deviate from them in any way,—no matter how palpable the

improvement,—his bid would be held irregular and thrown out. The issue

came on the machinery of the ships authorized by the Act of March 3,

1885. Of these four ships, the “Baltimore’s” plans had been purchased

abroad, hull and machinery, and were accepted practically without

change. But the Department’s design involved the then nearly, if not

quite, obsolete compound engine for the other three, “Newark,”

“Yorktown,” and “Petrel.” Mr. Cramp, desiring to bid on the “Newark” and

“Yorktown,” was doubtful whether he could develop the indicated

horse-power, which the form of contract required him to guarantee, with

the Department’s compound engines. He was, however, confident that he

could do it with triple-expansion engines of his own design.

To overcome the difficulty, he suggested to Secretary Whitney that, in

issuing the circular asking for proposals, a classification of bids be

provided for. This suggestion was at once adopted, and bids were

authorized to be offered in three classes: Class I, the Department’s

plans pure and simple; Class II, the Department’s plans modified by the

bidder as to hull or machinery or both; and Class III, the bidder’s

plans wholly. This arrangement broke up the embargo of the Bureaus, and

admitted the results of the study, experience, and skill of practical

ship-builders. Some of the Bureaus fought the plan with all their

energy, but the contest they made had no other result than to convince

them that Mr. Whitney was the _de facto_ as well as the _de jure_ head

of the Department,—a quite novel experience for them! Some time

afterward Classes II and III were merged, so that all departures from

the Department’s plans, whether modifications of them or complete

substitution of bidder’s plans for them, were grouped under Class II,

which has become the established practice in inviting proposals. Mr.

Cramp’s bids have usually been in Class II; involving in most cases more

or less extensive modifications of the Department’s plans, and in two

cases, the “Philadelphia” and the “Maine,” his own plans complete. The

value of this new departure lay in the fact that it gave the Navy

Department the benefit of all the progress of the country in the

ship-building art as actually practised by men who were building ships

for a living, and emancipated it from the dominion of the cloister. It

has become a part of the permanent policy of the government.

[Illustration: CRUISER VARIAG—RUSSIAN]

The history of Mr. Cramp’s contributions to the new navy must, at this

writing, be left an unfinished chapter. Having built and delivered to

the government five first-class battleships, two first-rate armored

cruisers, five first-class protected cruisers, together with a

double-turreted monitor, a gunboat and a torpedo vessel, he is yet

building three armored cruisers of the largest dimensions and most

approved type. His contributions to the literature of the subject,

ranging over a score of years, have been in their way of hardly less

importance and interest than his achievements in producing its warlike

material. Their full test, in all forms and through all

channels,—hearings before committees, communications to the Navy

Department and its Bureaus, newspaper interviews and magazine

papers,—would, if reproduced in extenso, fill two volumes larger than

this one. Suffice it to say here that there is no practical subject

pertaining to naval art or science, from the design and construction of

ships-of-war to their management in service, which he has not from time

to time discussed as opportunity offered or occasion required. If he has

at times shown a spirit approaching intolerance when dealing with

invasions of his profession by inexperienced, untrained, or incapable

men, it may be explained by the logic of a favorite quotation of his

own, “Fools rush in where angels fear to tread!” Be this as it may, it

is yet to be said that, if not always charitable in his criticisms and

not always liberal in the standard of competency which he has set so

high and maintained so vigorously, his professional motives have always

been worthy and his efforts sincere and earnest. Whatever may be the

future growth or achievements of the modern American navy, the name of

Charles H. Cramp will ever be found indelibly stamped upon its

historical origin and primary development. The ships he has built have

won battles, gained campaigns, and vanquished the enemies of the country

in war. They have held the lead in renewing the one-time waning naval

prestige of our flag, and in restoring the sea power of the United

States to its rightful rank among the nations.

------------------------------------------------------------------------

The Memoirs of Charles H. Cramp · 第 4 / 5 章