THE OTIS SYSTEM

The curvature of the Tower's legs imposed a problem unique in elevator

design, and it caused great annoyance to Eiffel, the fair's Commission,

and all others concerned. Since a vertical shaftway anywhere within the

open area beneath the first platform was esthetically unthinkable, the

elevators could be placed only in the inclined legs. The problem of

reaching the first platform was not serious. The legs were wide enough and

their curvature so slight in this lower portion as to permit them to

contain a straight run of track, and the service could have been designed

along the lines of an ordinary inclined railway. It was estimated that the

great majority of visitors would go only to this level, attracted by the

several international restaurants, bars and other features located there.

Two elevators to operate only that far were contracted for with no

difficulty--one to be placed in the east leg and one in the west.

To transport people to the second platform was an altogether different

problem. Since there was to be a single run from the ground, it would have

been necessary to form the elevator guides either with a constant

curvature, approximating that of the legs, or with a series of straight

chords connected by short segmental curves of small radius. Eiffel planned

initially to use the first method, but the second was adopted ultimately,

probably as being the simpler because only two straight lengths of run

were found to be necessary.

Bids were invited for two elevators on this basis--one each for the north

and south legs. Here the unprecedented character of the matter became

evident--there was not a firm in France willing to undertake the work. The

American Elevator Company, the European branch of Otis Brothers & Company,

did submit a proposal through its Paris office, Otis Ascenseur Cie., but

the Commission was compelled to reject it because a clause in the fair's

charter prohibited the use of any foreign material in the construction of

the Tower. Furthermore, there was a strong prejudice against foreign

contractors, which, because of the general background of disfavor

surrounding the project during its early stages, was an element worth

serious consideration by the Commission. The bidding time was extended,

and many attempts were made to attract a native design but none was

forthcoming.

As time grew short, it became imperative to resolve the matter, and the

Commission, in desperation, awarded the contract to Otis in July 1887 for

the amount of $22,500.[10] A curious footnote to the affair appeared much

later in the form of a published interview[11] with W. Frank Hall, Otis'

Paris representative:

"Yes," said Mr. Hall, "this is the first elevator of its kind. Our

people for thirty-eight years have been doing this work, and have

constructed thousands of elevators vertically, and many on an

incline, but never one to strike a radius of 160 feet for a distance

of over 50 feet. It has required a great amount of preparatory study

and we have worked on it for three years."

"That was before you got the contract?"

"Quite so, but we knew that, although the French authorities were

very reluctant to give away this piece of work, they would be bound

to come to us, and so we were preparing for them."

Such supreme confidence must have rapidly evaporated as events progressed.

Despite the invaluable advertising to be derived from an installation of

such distinction, the Otises would probably have defaulted had they

foreseen the difficulties which preceded completion of the work.

[Illustration: Figure 24.--General arrangement of Otis elevator system in

Eiffel Tower. (From _The Engineer_ (London), July 19, 1889, vol. 68, p.

58.)]

The proposed system (fig. 24) was based fundamentally upon Otis' standard

hydraulic elevator, but it was recognizable only in basic operating

principle (fig. 25). Tracks of regular rail section replaced the guides

because of the incline, and the double-decked cabin (fig. 29) ran on small

flanged wheels. This much of the apparatus was really not unlike that of

an ordinary inclined railway. Motive power was provided by the customary

hydraulic cylinder (fig. 26), set on an angle roughly equal to the incline

of the lower section of run. Balancing the cabin's dead weight was a

counterpoise carriage (fig. 27) loaded with pig iron that traveled on a

second set of rails beneath the main track. Like the driving system, the

counterweight was rope-geared, 3 to 1, so that its travel was about 125

feet to the cabin's 377 feet.

[Illustration: Figure 25.--Schematic diagram of the rigging of the Otis

system. (Adapted from Gustave Eiffel, _La Tour de Trois Cents Metres_,

Paris, 1900, p. 127.)]

Everything about the system was on a scale far heavier than found in the

normal elevator of the type. The cylinder, of 38-inch bore, was 36 feet

long. Rather than a simple nest of pulleys, the piston rods pulled a large

guided carriage or "chariot" bearing six movable sheaves (fig. 28).

Corresponding were five stationary sheaves, the whole reeved to form an

immense 12-purchase tackle. The car, attached to the free ends of the

cables, was hauled up as the piston drew the two sheave assemblies apart.

In examining the system, it is difficult to determine what single element

in its design might have caused such a problem as to have been beyond the

engineering ability of a French firm, and to have caused such concern to a

large, well-established American organization of Otis' wide elevator and

inclined railway experience. Indeed, when the French system--which served

the first platform from the east and west legs--is examined, it appears

curious that a national technology capable of producing a machine at such

a level of complexity should have been unable to deal easily with the

entire matter. This can be plausibly explained only on the basis of

Europe's previously mentioned lack of experience with rope-geared and

other cable-hung elevator systems. The difficulty attending Otis' work,

usually true in the case of all innovations, lay unquestionably in the

multitudes of details--many of them, of course, invisible when only the

successfully working end product is observed.

More than a matter of detail was the Commission's demand for perfect

safety, which precipitated a situation typical of many confronting Otis

during the entire work. Otis had wished to coordinate the entire design

process through Mr. Hall, with technical matters handled by mail.

Nevertheless, at Eiffel's insistence, and with some inconvenience, in 1888

the company dispatched the project's engineer, Thomas E. Brown, Jr., to

Paris for a direct consultation. Mild conflict over minor details ensued,

but a gross difference of opinion arose ultimately between the American

and French engineers over the safety of the system. The disagreement

threatened to halt the entire project. In common with all elevators in

which the car hangs by cables, the prime consideration here was a means of

arresting the cabin should the cables fail. As originally presented to

Eiffel, the plans indicated an elaborate modification of the standard Otis

safety device--itself a direct derivative of E. G. Otis' original.

If any one of the six hoisting cables broke or stretched unduly, or if

their tension slackened for any reason, powerful leaf springs were

released causing brake shoes to grip the rails. The essential feature of

the design was the car's arrest by friction between its grippers and the

rails so that the stopping action was gradual, not sudden as in the

elevator safety. During proof trials of the safety, made prior to the

fair's opening by cutting away a set of temporary hoisting cables, the

cabin would fall about 10 feet before being halted.

[Illustration: Figure 26.--Section through the Otis power cylinder.

(Adapted from Gustave Eiffel, _La Tour de Trois Cents Metres_, Paris,

1900, pl. 22.)]

[Illustration: Figure 27.--Details of the counterweight carriage in the

Otis system. (From Gustave Eiffel, _La Tour de Trois Cents Metres_, Paris,

1900, pl. 22{4}.)]

Although highly efficient and of unquestionable security, this safety

device was considered an insufficient safeguard by Eiffel, who, speaking

in the name of the Commission, demanded the application of a device known

as the rack and pinion safety that was used to some extent on European cog

railways. The commissioners not only considered this system more reliable

but felt that one of its features was a necessity: a device that

permitted the car to be lowered by hand, even after failure of all the

hoisting cables. The serious shortcomings of the rack and pinion were its

great noisiness and the limitation it imposed on hoisting speed. Both

disadvantages were due to the constant engagement of a pinion on the car

with a continuous rack set between the rails. The meeting ended in an

impasse, with Brown unwilling to approve the objectionable apparatus and

able only to return to New York and lay the matter before his company.

While Eiffel's attitude in the matter may appear highly unreasonable, it

must be said that during a subsequent meeting between Brown and

Koechlin, the French engineer implied that a mutual antagonism had

arisen between the Tower's creator and the Commission. Thus, since his own

judgment must have had little influence with the commissioners at that

time, Eiffel was compelled to specify what he well knew were excessive

safety provisions.

This decision placed Otis Brothers in a decidedly uncomfortable position,

at the mercy of the Commission. W. E. Hale, promoter of the water balance

elevator--who by then had a strong voice in Otis' affairs--expressed the

seriousness of the matter in a letter to the company's president, Charles

R. Otis, following receipt of Brown's report on the Paris conference.

Referring to the controversial cogwheel, Hale wrote

... if this must be arranged so that the car is effected [sic] in its

operation by constant contact with the rack and pinion ... so as to

communicate the noise and jar, and unpleasant motion which such an

arrangement always produces, I should favor giving up the whole

matter rather than allying ourselves with any such abortion.... we

would be the laughing stock of the world, for putting up such a

contrivance.

This difficult situation apparently was the product of a somewhat general

contract phrased in terms of service to be provided rather than of

specific equipment to be used. This is not unusual, but it did leave open

to later dispute such ambiguous clauses as "adequate safety devices are to

be provided."

Although faced with the loss not only of all previously expended design

work but also of an advertisement of international consequence, the

company apparently concurred with Hale and so advised Paris.

Unfortunately, there are no Otis records to reveal the subsequent

transactions, but we may assume that Otis' threat of withdrawal prevailed,

coupled as it was with Eiffel's confidence in the American equipment. The

system went into operation as originally designed, free of the odious rack

and pinion.

That, unfortunately, was not the final disagreement. Before the fair's

opening in May 1889, the relationship was strained so drastically that a

mutually satisfactory conclusion to the project must indeed have seemed

hopeless. The numerous minor structural modifications of the Tower legs

found necessary as construction progressed had necessitated certain

equivalent alteration to the Otis design insofar as its dependency upon

the framework was affected. Consequently, work on the machinery was set

back by some months. Eiffel was informed that although everything was

guaranteed to be in full operation by opening day on May 1, the

contractual deadline of January 1 could not possibly be met. Eiffel, now

unquestionably acting on his own volition, responded by cable, refusing

all payment. Charles Otis' reply, a classic of indignation, disclosed to

Eiffel the jeopardy in which his impetuosity had placed the success of the

entire project:

After all else we have borne and suffered and achieved in your

behalf, we regard this as a trifle too much; and we do not hesitate

to declare, in the strongest terms possible to the English language,

that we will not put up with it ... and, if there is to be War, under

the existing circumstances, propose that at least part of it shall be

fought on American ground. If Mr. Eiffel shall, on the contrary,

treat us as we believe we are entitled to be treated, under the

circumstances, and his confidence in our integrity to serve him well

shall be restored in season to admit of the completion of this work

at the time wanted, well and good; but it must be done at once ...

otherwise we shall ship no more work from this side, and Mr. Eiffel

must charge to himself the consequences of his own acts.

This message apparently had the desired effect and the matter was somehow

resolved, as the machinery was in full operation when the Exposition

opened. The installation must have had immense promotional value for Otis

Brothers, particularly in its contrast to the somewhat anomalous French

system. This contrast evidently was visible to the technically

unsophisticated as well as to visiting engineers. Several newspapers

reported that the Otis elevators were one of the best American exhibits at

the fair.

In spite of their large over-all scale and the complication of the basic

pattern imposed by the unique situation, the Otis elevators performed well

and justified the original judgment and confidence which had prompted

Eiffel to fight for their installation. Aside from the obvious advantage

of simplicity when compared to the French machines, their operation was

relatively quiet, and fast.

The double car, traveling at 400 feet per minute, carried 40 persons, all

seated because of the change of inclination. The main valve or distributor

that controlled the flow of water to and from the driving cylinder was

operated from the car by cables. The hydraulic head necessary to produce

pressure within the cylinder was obtained from a large open reservoir on

the second platform. After being exhausted from the cylinder, the water

was pumped back up by two Girard pumps (fig. 31) in the engine room at

the base of the Tower's south leg.

Elevator Systems of the Eiffel Tower, 1889 · 第 16 / 27 题