CHAPTER III.

COST OF CONDUCTORS FOR ELECTRIC-POWER TRANSMISSION.

Electrical transmission of energy involves problems quite distinct from

its development. A great water-power, or a location where fuel is cheap,

may offer opportunity to generate electrical energy at an exceptionally

low cost. This energy may be used so close to the point of its

development that the cost of transmission is too small for separate

consideration.

An example of conditions where the important problems of transmission

are absent exists in the numerous factories grouped about the great

water-power plants at Niagara and drawing electrical energy from it. In

such a case energy flows directly from the dynamos, driven by

water-power, to the lamps, motors, chemical vats, and electric heaters

of consumers through the medium, perhaps, of local transformers. Here

the costs and losses of transmitting or distributing equipments are

minor matters, compared with the development of the energy.

If, now, energy from the water-power is to be transmitted over a

distance of many miles, a new set of costs is to be met. In the first

place, it will be necessary to raise the voltage of the transmitted

energy much above the pressure at the dynamos in order to save in the

weight and cost of conductors for the transmission line. This increase

of voltage requires transformers with capacity equal to the maximum rate

at which energy is to be delivered to the line. These transformers will

add to the cost of the energy that they deliver in two ways: by the

absorption of some energy to form heat, and by the sum of annual

interest, maintenance, and depreciation charges on the price paid for

them. Other additions to the cost of energy delivered by the

transmission line must be made to cover the annual interest,

maintenance, and depreciation charges on the amount of the line

investment, and to pay for the energy changed to heat in the line.

Near the points where the energy is to be used, the transmission line

must end in transformers to reduce the voltage to a safe figure for

local distribution. This second set of transformers will further add to

the cost of the delivered energy in the same ways as the former set.

From these facts it is evident that, to warrant an electrical

transmission, the value of energy at the point of distribution should at

least equal the value at the generating plant plus the cost of the

transmission. Knowing the cost of energy at one end of the transmission

line and its value at the other, the difference between these two

represents the maximum cost at which the transmission will pay.

Three main factors are concerned in the cost of electric power

transmission, namely, the transformers, the pole line, and the wire or

conductors. These factors enter into the cost of transmitted energy in

very different degrees, according to the circumstances of each case. The

maximum and average rates of energy transmission, the total voltage, the

percentage of line loss, and the length of the line mainly determine the

relative importance of the transformers, pole line, and conductors in

the total cost of delivered energy.

First cost of transformers varies directly with the maximum rate of

transmission, and is nearly independent of the voltage, the length of

the transmission, and the percentage of line loss. A pole line changes

in first cost with the length of the transmission, but is nearly

independent of the other factors. Line conductors, for a fixed maximum

percentage of loss, vary in first cost directly with the square of the

length of the transmission and with the rate of the transmission; but

their first cost decreases as the percentage of line loss increases and

as the square of the voltage of transmission increases.

If a given amount of power is to be transmitted, at a certain percentage

of loss in the line and at a fixed voltage, over distances of 50, 100,

and 200 miles, respectively, the foregoing principles lead to the

following conclusions: The capacity of transformers, being fixed by the

rate of transmission, will be the same for either distance, and their

cost is therefore constant. Transformer losses, interest, depreciation,

and repairs are also constant. The cost of pole line, depending on its

length, will be twice as great at 100 and four times as great at 200 as

at 50 miles. Interest, depreciation, and repairs will also go up

directly with the length of the pole lines.

Line conductors will cost four times as much for the 100- as for the

50-mile transmission, because their weight will be four times as great,

and the annual interest and depreciation will go up at the same rate.

For the transmission of 200 miles the cost of line conductors and their

weight will be sixteen times as great as the cost at 50 miles. It

follows that interest, depreciation, and maintenance will be increased

sixteen times with the 200-mile transmission over what they were at 50

miles, if voltage and line loss are constant.

A concrete example of the cost of electric power transmission over a

given distance will illustrate the practical application of these

principles. Let the problem be to deliver electrical energy in a city

distant 100 miles from the generating plant. Transformers with

approximately twice the capacity corresponding to the maximum rate of

transmission must be provided, because one set is required at the

generating and another at the delivery station. The cost of these

transformers will be approximately $7.50 per horse-power for any large

capacity.

Reliability is of the utmost importance in a great power transmission,

and this requires a pole line of the most substantial construction. Such

a line in a locality where wooden poles can be had at a moderate price

will cost, with conductors in position, about $700 per mile, exclusive

of the cost of the conductors themselves or of the right of way but

including the cost of erecting the conductors. The 100 miles of pole

line in the present case should, therefore, be set down at a cost of

$70,000.

A large delivery of power must be made to warrant the construction of so

long and expensive a line, and 10,000 horse-power may be taken as the

maximum rate of delivery. On the basis of two horse-power of transformer

capacity for each horse-power of the maximum delivery rate, transformers

with a capacity of 20,000 horse-power are necessary for the present

transmission. At $7.50 per horse-power capacity, the first cost of these

transformers is $150,000.

Before the weight and cost of line conductors can be determined, the

voltage at which the transmission shall be carried out and the

percentage of the energy to be lost in the conductors at periods of

maximum load must be decided on. The voltage to be used is a matter of

engineering judgment, based in large part on experience, and cannot be

determined by calculation. In a transmission of 100 miles the cost of

conductors is certain to be a very heavy item, and, as this cost

decreases as the square of the voltage goes up, it is desirable to push

the voltage as high as the requirements for reliable service permit.

A transmission line 142 miles long, from the mountains to Oakland, Cal.,

has been in constant and successful use for several years with 40,000

volts pressure. This line passes through wet as well as dry climate. It

seems safer to conclude, therefore, that 40,000 volts may be used in

most places with good results.

Having decided on the amount of power and the voltage and length of the

transmission, the required weight of conductors will vary inversely as

the percentage of energy lost as heat in the line. The best percentage

of loss depends on the number of factors, some of which, such as the

cost of energy at the generating plant, are peculiar to each case.

As a provisional figure, based in part on the practice elsewhere, the

loss on the line here considered may be taken at 10 per cent. when

transmitting the full load of 10,000 horse-power. If the line is

constructed on this basis the percentage of loss will be proportionately

less for any smaller load. Thus, when the line is transmitting only

5,000 horse-power, the loss will amount to 5 per cent. During the

greater portion of each day the demand for power is certain to be less

than the maximum figure, so that a maximum loss of 10 per cent will

correspond to an average loss on all the power delivered to the line of

probably less than 7 per cent.

In order to deliver 10,000 horse-power by the transformers at a

receiving station from a generating plant 100 miles distant where the

pressure is 40,000 volts, the copper conductors must have a weight of

about 1,500,000 pounds, if the loss of energy in them is 10 per cent of

the energy delivered to the line. Taking these conductors at a medium

price of 15 cents per pound, their cost amounts to $225,000.

The combined cost of the transformers, pole line, and line conductors,

as now estimated, amounts to $445,000. No account is taken of the

right-of-way for the pole line, because in many cases this would cost

nothing, the public roads being used for the purpose; in other cases the

cost might vary greatly with local conditions.

The efficiency of the transmission is measured by the ratio of the

energy delivered by the transformers at the receiving station for local

distribution to the energy delivered by the generating plant to the

transformers that supply energy to the line for transmission. If worked

at full capacity the large transformers here considered would have an

efficiency of nearly 98 per cent; but as they must work, to some extent,

on partial loads, the actual efficiency will hardly exceed 96 per cent.

The efficiency of the line conductors rises on partial loads, and may be

safely taken at 93 per cent for all of the energy transmitted, though it

is only 90 per cent on the maximum load. The combined efficiencies of

the two sets of transformers and the line give the efficiency of the

transmission, which equals the product of 0.96 × 0.93 × 0.96, or almost

exactly 85.7 per cent. In other words, the transformers at the

water-power station absorb 1.17 times as much energy as the transformers

at the receiving station deliver to distribution lines in the place of

use.

Interest, maintenance, and depreciation of this complete transmission

system are sufficiently provided for by an allowance of 15 per cent

yearly on its entire first cost. As the total first cost of the

transmission system was found to be $445,000, the annual expense of

interest, depreciation, and repairs at 15 per cent of this sum amounts

to $66,750.

In order to find the bearings of this annual charge on the cost of power

transmission the total amount of energy transmitted annually must be

determined. The 10,000 horse-power delivered by the system at the

sub-station is simply the maximum rate at which energy may be supplied,

and the element of time must be introduced in order to compute the

amount of transmitted energy. If the system could be kept at work during

twenty-four hours a day at full capacity, the delivered energy would be

represented by the product of the numbers which stand for the capacity

and for the total number of hours yearly.

Unfortunately, however, the demands for electric light and power vary

through a wide range in the course of each twenty-four hours, and the

period of maximum demand extends over only a small part of each day. The

problem is, therefore, to find what relation the average load that may

be had during the twenty-four hours bears to the capacity required to

carry this maximum load. As the answer to this question depends on the

power requirements of various classes of consumers, it can be obtained

only by experience. It has been found that some electric stations,

working twenty-four hours daily on mixed loads of lamps and stationary

motors, can deliver energy to an amount represented by the necessary

maximum capacity during about 3,000 hours per year. Applying this rule

to the present case, the transformers at the sub-station, if loaded to

their maximum capacity of 10,000 horse-power by the heaviest demands of

consumers, may be expected to deliver energy to the amount of 3,000 ×

10,000 = 30,000,000 horse-power hours yearly.

The total cost of operation for this transmission system was found above

to be $66,750 per annum, exclusive of the cost of energy at the

generating plant. This sum, divided by 30,000,000, shows the cost of

energy transmission to be 0.222 cent per horse-power hour, exclusive of

the first cost of the energy. To obtain the total cost of transmission,

the figures just given must be increased by the value of the energy lost

in transformers and in the line conductors. In order to find this value,

the cost of energy at the generating plant must be known.

The cost of electrical energy at the switchboard in a water-power

station is subject to wide variations, owing to the different

investments necessary in the hydraulic work per unit of power developed.

With large powers, such as are here considered, a horse-power hour of

electrical energy may be developed for materially less than 0.5 cent in

some plants. As the average efficiency of the present transmission has

been found to be 85.7 per cent of the energy delivered by the

generators, it is evident that 1.17 horse-power hours must be drawn from

the generators for every horse-power hour supplied by the transformers

at the sub-station for distribution. In other words, 0.17 horse-power

hour is wasted for each horse-power hour delivered.

The cost of 0.17 of a horse-power hour, or say not more than 0.5 × 0.17

= 0.085 cent, must thus be added to the figures for transmission cost

already found, that is, 0.222 cent per horse-power hour, to obtain the

total cost of transmission. The sum of these two items of cost amounts

to 0.307 cent per horse-power hour, as the entire transmission expense.

It may now be asked how the cost of transmission just found will

increase if the distance be extended. As an illustration, assume the

length of the transmission to be 150 instead of 100 miles. Let the

amount of energy delivered by the sub-station, the loss in line

conductors, and the energy drawn from the generating plant remain the

same as before. Evidently the cost of the pole line will be increased 50

per cent, that is, from $70,000 to $105,000. Transformers, having the

same capacity, will not be changed from the previous estimate of

$150,000. If the voltage of the transmission remain constant, as well as

the line loss at maximum load, the weight and cost of copper conductors

must increase with the square of the distances of transmission. For 150

miles the weight of copper will thus be 2.25 times the weight required

for the 100-mile transmission.

Instead of an increase in the weight of conductors a higher voltage may

be adopted. The transformers for the two great transmission systems that

extend over a distance of about 150 miles, from the Sierra Nevada

Mountains to San Francisco Bay, in California, are designed to deliver

energy to the line at either 40,000 or 60,000 volts, as desired. Though

the regular operation at first was at the lower pressure, the voltage

has been raised to 60,000.

The lower valleys of the Sacramento and the San Joaquin rivers, which

are crossed by these California systems, as well as the shores of San

Francisco Bay, have as much annual precipitation and as moist an

atmosphere as most parts of the United States and Canada. Therefore

there seems to be no good reason to prevent the use of 60,000 volts

elsewhere.

The distance over which energy may be transmitted at a given rate, with

a fixed percentage of loss and a constant weight of copper, goes up

directly with the voltage employed. This rule follows because, while the

weight of conductors to transmit energy at a given rate, with a certain

percentage of loss and constant voltage, increases as the square of the

distance, the weight of conductors decreases as the square of the

voltage when all the other factors are constant.

Applying these principles to the 150-mile transmission, it is evident

that an increase of the voltage to 60,000 will allow the weight of

conductors to remain exactly where it was for the transmission of 100

miles, the rate of working and the line loss being equal for the two

cases.

The only additional item of expense in the 150-mile transmission, on the

basis of 60,000 volts, is the $35,000 for pole line. Allowing 15 per

cent on the $35,000 to cover interest, depreciation, and maintenance, as

before, makes a total yearly increase in the costs of transmission of

$5,250 over that found for the transmission of 100 miles. This last sum

amounts to 0.0175 cent per horse-power hour of the delivered energy.

The cost of transmission is thus raised to 0.307 + 0.0175 = 0.324 cent

per horse-power hour of delivered energy on the 150-mile system with

60,000 volts.

Existing transmission lines not only illustrate the relations of the

factors named above to the cost and weight of conductors, but also show

marked variations of practice, corresponding to the opinions of

different engineers. In order to bring out the facts on these points,

the data of a number of transmission lines are here presented. On these

lines the distance of transmission varies between 5 and 142 miles, the

voltage from 5,000 to 50,000, and the maximum rate of work from a few

hundred to some thousands of horse-power. For each transmission the

single length and total weight of conductors, the voltage, and the

capacity of the generating equipment that supplies the line is recorded.

From these data the volts per mile of line, weight and cost of

conductors per kilowatt capacity of generating equipment, and the weight

of conductors per mile for each kilowatt of capacity in the generating

equipment are calculated. In each case the length of line given is the

distance from the generating to the receiving station. The capacity

given for generating equipment in each case is that of the main dynamos,

where their entire output goes to the transmission line in question, but

where the dynamos supply energy for other purposes also, the rating of

the transformers that feed only the particular transmission line is

given as the capacity of generating equipment.

DISTANCE AND VOLTAGE OF ELECTRICAL TRANSMISSION.

+------------------------------------+-----------+--------+---------+

| |Distance in| Volts. |Volts per|

| | Miles. | | Mile. |

+------------------------------------+-----------+--------+---------+

|Colgate to Oakland, Cal. | 142 | 60,000 | 422 |

|Cañon Ferry to Butte, Mont. | 65 | 50,000 | 769 |

|Santa Ana River to Los Angeles | 83 | 33,000 | 397 |

|Ogden to Salt Lake City, Utah | 36.5 | 16,000 | 438 |

|Madrid to Bland, N. M. | 32 | 20,000 | 625 |

|Welland Canal to Hamilton, Can. | { 35 | 22,500 | 643 |

| | { 37 | | |

|San Gabriel Cañon to Los Angeles | 23 | 16,000 | 695 |

|Cañon City to Cripple Creek, Colo. | 23.5 | 20,000 | 851 |

|Apple River to St. Paul, Minn. | 25 | 25,000 | 1,000 |

|Yadkin River to Salem, N. C. | 14.5 | 12,000 | 827 |

|Into Victor, Colo. | 8 | 12,600 | 1,575 |

|Montmorency Falls to Quebec | 7 | 5,500 | 785 |

|Farmington River to Hartford | 11 | 10,000 | 909 |

|Sewall’s Falls to R.R. shops Concord| 5.5 | 10,000 | 1,818 |

|Wilbraham to Ludlow Mills | 4.5 | 11,500 | 2,555 |

|To Dales, Ore. | 27 | 22,000 | 814 |

+------------------------------------+-----------+--------+---------+

The transmission systems here considered have been selected because it

was possible to obtain the desired data as to each, and it may be

presumed that they fairly illustrate present practice. It may be noted

at once that in general the line voltage is increased with the length of

the transmission. Thus, the transmission for the Ludlow Mills over a

distance of 4.5 miles is carried out at 11,500 volts. On the other hand,

the transmission between Cañon Ferry and Butte, a distance of 65 miles,

employs 50,000 volts and represents recent practice. The system from

Colgate to Oakland, a distance of 142 miles, the longest here

considered, now has 60,000 volts on its lines. In spite of the general

resort to high pressures with greater distances of transmission, the

rise in voltage has not kept pace with the increasing length of line.

For the Wilbraham-Ludlow transmission the total pressure amounts to

2,555 volts per mile, while the line from Colgate to Oakland with 31.5

times the length of the former operates at an average of only 422 volts

per mile. Of the fifteen transmissions considered, six are over

distances of less than 15 miles, and for four of the six the voltage is

more than 900 per mile. Eight transmissions range from 23 to 83 miles in

length, with voltages that average between 1,000 volts per mile at 25

miles and only 397 per mile on the 83-mile line. The volts per mile are

6 times as great in the Ludlow as in the Oakland transmission.

CAPACITY OF GENERATING STATIONS AND WEIGHT OF CONDUCTORS.

+---------------------------------+-----------+------------+------------+

| | Kilowatt |Total Weight| Pounds of |

| |Capacity at| of | Conductors |

| Location of Transmission. |Generators.|Conductors. |per Kilowatt|

| | | | Capacity. |

+---------------------------------+-----------+------------+------------+

|Wilbraham to Ludlow | 4,600 | 17,820 | 3.7[A] |

|Sewall’s Falls to railroad shops | 50 | 6,914 | 15 |

|Into Victor, Colo. | 1,600 | 15,960 | 10 |

|To Dales, Ore. | 1,000 | 33,939 | 34 |

|Apple River to St. Paul | 3,000 | 159,600 | 53 |

|Farmington River to Hartford | 1,500 | 54,054 | 36 |

|Cañon City to Cripple Creek | 1,500 | 59,079 | 39 |

|Yadkin River to Salem | 1,500 | 58,073 | 39 |

|Montmorency Falls to Quebec | 2,400 | 189,056 | 79 |

|Cañon Ferry to Butte | 5,700 | 658,320 | 115 |

|San Gabriel Cañon to Los Angeles | 1,200 | 73,002 | 61 |

|Welland Canal to Hamilton | 6,000 | 376,494 | 63 |

|Madrid to Bland, N. M. | 600 | 127,680 | 212 |

|Ogden to Salt Lake City | 2,250 | 292,365 | 129 |

|Santa Ana River to Los Angeles | 2,250 | 664,830 | 295 |

|Colgate to Oakland | 11,250 | {906,954 | 81 |

| | | {446,627 | 40[A] |

+---------------------------------+-----------+------------+------------+

[A] Aluminum.

These wide variations in the volts per mile on transmission lines and in

length of lines lead to different weights of conductors per kilowatt of

generator capacity. All other factors remaining constant, the weight of

conductors per kilowatt of generator capacity would be the same whatever

the length of the transmission, provided that the volts per mile were

uniform for all cases. One important factor, the percentage of loss for

which the line conductors are designed at full load, is sure to vary in

different cases, and lead to corresponding variations in the weights of

conductors per kilowatt of generator capacity. In conductors of equal

length one pound of aluminum has nearly the same electrical resistance

as two pounds of copper, and this ratio must be allowed for when copper

and aluminum lines are compared.

From the table it may be seen that the weight of conductors per kilowatt

of generator capacity for the transmission from Santa Ana River is 29.5

times as great as the like weight for the line into Victor. But the

volts per mile are four times as great on the Victor as they are on the

Santa Ana River line. The extreme range of the cases presented is that

between the Ludlow plant, with the equivalent of 7.4 pounds, and the

Santa Ana River system with 295 pounds of copper conductors per kilowatt

of generator capacity. Three transmissions with 1,575 to 2,555 volts

per mile have the equivalent of 7.4 to 15 pounds of copper each, per

kilowatt of generator capacity.

WEIGHT AND COST OF CONDUCTORS.

+--------------------------------+----------+-----------+

| |Pounds per|Dollars per|

| | Kilowatt | Generator |

| | Mile. | Kilowatt. |

+--------------------------------+----------+-----------+

|Wilbraham to Ludlow | 0.86[A] | 1.11 |

|Sewall’s Falls to railroad shops| 2.7 | 2.25 |

|Into Victor, Colo. | 0.9 | 1.50 |

|To Dales, Ore. | 1.2 | 5.10 |

|Apple River to St. Paul | 2.1 | 7.95 |

|Farmington River to Hartford | 3.2 | 10.80 |

|Cañon City to Cripple Creek | 1.6 | 5.85 |

|Yadkin River to Salem | 2.6 | 5.85 |

|Montmorency Falls to Quebec | 11.2 | 11.85 |

|Cañon Ferry to Butte | 1.7 | 17.25 |

|San Gabriel Cañon to Los Angeles| 2.6 | 9.85 |

|Welland Canal to Hamilton | 1.7 | 9.45 |

|Madrid to Bland, N. M. | 6.6 | 31.80 |

|Ogden to Salt Lake City | 3.5 | 19.35 |

|Santa Ana River to Los Angeles | 3.5 | 44.25 |

|Colgate to Oakland | { .56 | 24.15 |

| | { .27[A] | |

+--------------------------------+----------+-----------+

[A] Aluminum.

Of the seven transmissions using between 36 and 79 pounds of copper for

each kilowatt of generator capacity, four have voltages ranging from 827

to 1,000 per mile, and on only one is the pressure as low as 643 volts

per mile. Five transmission lines vary between 115 and 295 pounds of

copper, or its equivalent, per kilowatt of generator capacity, and their

voltages per mile are as high as 769 in one case and down to 281 in

another. Allowing for some variations in the percentages of loss in

transmission lines at full load, the fifteen plants plainly illustrate

the advantage of a high voltage per mile, as to the weight of

conductors. This advantage is especially clear if the differences due to

the lengths of the transmissions are eliminated by dividing the weight

of conductors per kilowatt of generator capacity in each case by the

length of the transmission in miles. This division gives the weight of

conductors per kilowatt of generators for each mile of the line, which

may be called the weight per kilowatt mile. For the Ludlow transmission

this weight is only 0.86 pound of aluminum, the equivalent of 1.72

pounds of copper, while the like weight for the line into Quebec is 11.2

pounds of copper, or 6.5 times that for the former line. But the

voltage per mile on the Ludlow is 3.2 times as great as the like voltage

on the Quebec line.

The weight of conductor per kilowatt mile in the Victor line is only 0.9

pound, and the like weight for the line between Madrid and Bland is 6.6

pounds, or 7.3 times as great. On the Victor line the voltage per mile

is 2.5 times as great as the voltage for each mile of the Bland line.

Comparing systems with nearly equal voltages per mile, it appears in

most cases that only such difference exists in their pounds of

conductors per kilowatt mile as may readily be accounted for by designs

for various percentages of loss at full load. Though the transmission

line into Butte is nearly twice as long as the one entering Hamilton,

the weight of conductors for each is 1.7 pounds per kilowatt mile. The

line from Santa Ana River is more than twice as long as the one entering

Salt Lake City, but its voltage per mile is only nine per cent less, and

there are 3.5 pounds of copper in each line per kilowatt mile.

The final, practical questions as to conductors in electrical

transmission relate to their cost per kilowatt of maximum working

capacity, and per kilowatt hour of delivered energy. If the cost of

conductors per kilowatt of generator capacity is greater than that of

all the remaining equipment, it is doubtful whether the transmission

will pay. If fixed charges on the conductors more than offset the

difference in the cost of energy per kilowatt hour at the points of

development and delivery, it is certain that the generating plant should

be located where the power is wanted. The great cost of conductors is

often put forward as a most serious impediment to long-distance

transmission, and the examples here cited will indicate the weight of

this argument. In order to find the approximate cost of conductors per

kilowatt of generator capacity for each of the transmission lines here

considered, the price of bare copper wire is taken at 15 cents, and the

price of bare aluminum wire at 30 cents per pound. In each case the

weight of copper or aluminum conductor per kilowatt of generator

capacity is used to determine their costs per kilowatt of this capacity

at the prices just named. This process when carried out for the 15

transmission lines shows that their cost of conductors per kilowatt of

generator capacity varies between $1.11 for the 4.5 mile line into

Ludlow and $44.25 for the line of 83 miles from the Santa Ana River. It

should be noted that the former of these lines operates at 2,555 and the

latter at 397 volts per mile. The line into Madrid shows an investment

in conductors of $31.80 per kilowatt of generator capacity with 625

volts per mile. That a long transmission does not necessarily require a

large investment in conductors per kilowatt of generator capacity is

shown by the line 65 miles long into Butte, for which the cost is

$17.25 per kilowatt, with 769 volts per mile. For the transmission to

St. Paul, a distance of 25 miles, at 1,000 volts per mile, the cost of

conductors is $7.95 per kilowatt of generator capacity. The seven-mile

line into Quebec shows an investment of $11.85 per kilowatt of generator

capacity.

Electric Transmission of Water Power · 第 3 / 23 章