STONE FOR HIGHWAYS.

This is found in immense quantities at Greenhow-hill, distant from

Pateley-bridge two miles, it resembles a grey flint; the road from

Pateley-bridge to Skipton is principally composed of it; it is hard but

easily broken small, and after a little using almost resembles one entire

stone; its use and extraordinary properties are not known to a great

distance, particularly towards Ripon or Ripley; this may be accounted for

in two ways--first, the hills in either direction are long and steep; and

2dly, other materials are just at hand, of a quality sufficient for a

road where the forbidding ascents deny the frequent passing of heavy

carriages.

This stone has been compared to that at Middleton-Tyas, near Richmond,

and when analysed is found to be exactly of the same quality, although a

little lighter in colour; it was compared to this merely to prove a

corresponding property.

For it is a certain fact, that the Middleton-Tyas stone has been for some

time, and is now, carted from the quarry to Northallerton and Brompton,

distant 14 and 15 miles, for the use of their highways, at an expence of

8s. 2d. per ton to the former, and 9s. to the latter place. This fact is

the more remarkable, since there has been a quarry open for many years,

within 200 yards of Northallerton, but the stone is only of a common

kind. From this circumstance, it is fair to expect, that provided the

stone of Greenhow-hill can be delivered at Bolton-Percy for 6s. 6d. per

ton, and at Cawood, Selby, Booth-Ferry, and Howden for 8s. it will both

become an article of tonnage in a descending direction, and a great

acquisition to that district; but as that neighbourhood has never been in

the habit of paying such a high price for highway materials, it will

probably in the first instance meet with many objections, which may be

replied to in two ways--1st, that whatever is worth doing, is worth well

doing; and that the best materials are the cheapest;--and 2dly, if the

surveyors and overseers of Northallerton and Brompton have, by their

experience, established the above fact, and found this stone cheaper than

that at home, it is reasonable to conclude that the surveyors and

overseers of the highways in the neighbourhood of Cawood, Selby, and

Howden, may do the same; for the soil of that district is equally fertile

and rich as that of Northallerton; and the occupiers of it equally

opulent--hence their ability to do well whatever is worth doing.

The expense of this stone at the before-mentioned places we state

below:--

Pounds _s._ _d._

One ton of 0 1 3

stone delivered

at

Pateley-bridge

33 miles Rail 0 2 9

dues at 1d. per

ton per mile

33 miles waggon 0 2 9

dues, do.

Cost of stone 0 6 9

at Bolton-Percy

per ton

Removing do. 0 0 6

into the boat,

do.

Freight of do. 0 1 0

Selby, Cawood,

or Howden

0 8 3

It is probable the expense of delivering this stone at Pateley-bridge,

might be reduced by the application of a Railway from that place to the

quarry; by this estimate horses are expected to be used; it is also

possible to remove it from the waggon to the boat at less than is stated

above.

The neighbourhood of Pateley-bridge possessing many water-falls on which

more mills might be built, gave rise to an idea of cutting this

last-mentioned stone by water-sawing, into scantlings for fire-places,

hearths, and slabs; but upon an experiment being tried, it was found to

contain what is termed the dry heads, which cause a division of the parts

when brought into service, otherwise it yields a beautiful polish, and

exhibits much of the shell and feather; but notwithstanding this last

attempt hath failed to augment its value, another in reserve still

remains of no small moment, which is that of the most excellent

Report of the Knaresbrough Rail-way Committee · 第 16 / 21 题