STONE FOR BUILDING,

Next claims our attention: It is of various kinds and qualities, some

about Birstwith is of a strong coarse grit, will bear an immense

pressure, is well adapted for bridges, locks, wiers, &c. but is not to be

had in blocks large enough for pier works. There is another kind of

stone at Dacre-Pasture, of a much finer grit than the last, paler in

colour, and well adapted for finer masonry, such as columns, pediments,

&c. Blocks of this kind may be had of large dimensions. Another kind of

stone is found at Wilsill, in quality similar to that at Birstwith, but

may be risen in much larger blocks. When the Ouse-bridge at York was

building, in 1818, the contractors for, or the inspectors of that work,

got some stone from this neighbourhood for the piers, and by a letter

from Mr. William Craven, one of the inspectors, there is no doubt of its

being fit for any kind of public works, as bridges, locks, &c. The

expense of land carriage from the quarry to Ripon was the sole cause why

a greater quantity was not made use of.

There is another kind of stone found a little way above Pateley-bridge,

well adapted for flags, window heads and soles, staircases, landings,

tomb-stones, and grind-stones; but owing to the beds being thin, it is

not well adapted for general building purposes.

At Fellbeck, near Smelthouse-mill, a slate quarry has lately been opened,

which produces a slate of a darker colour than that of Idle, is very

sound, lays well on, and will probably improve in fineness, if pursued to

a greater depth. A ton of it will cover about ten square yards.

Another Slate-Quarry, at Bouthwaite, near Pateley-Bridge, has recently

been discovered; the produce of which is much superior to that of Idle; a

ton of it will cover about 14 square yards.

All this stone and slate is immediately upon the adopted line, or can be

brought to it for 4.25d. per foot, which, with the expense of carriage to

Bolton-Percy will cost at that place as below:--

Pounds _s._ _d._

Rail-dues 30 0 3 1.5

miles, at

1.25d. per ton

per mile

Waggon-dues, 0 3 1.5

do. do.

0 6 3

Calculating 16 0 0 4.75

feet of this

stone to weigh

one ton, it

appears the

carriage of

each foot will

cost

And the 0 0 4.25

original cost

delivered on

the line

Cost of this 0 0 9

stone at

Bolton-Percy

per foot

Which if necessity requires, may experience a little reduction. At this

time the Bramley-fall stone delivered at Selby, costs 1s. per foot; and

at York during the building of Ouse-bridge it cost from 15d. to 16d.