CHAPTER IV

AN ASSESSMENT OF THE CURRENT STATE OF READINESS CAPABILITY OF FEDERAL,

STATE, AND LOCAL GOVERNMENTS FOR EARTHQUAKE RESPONSE

A. INTRODUCTION

An earthquake of catastrophic magnitude, with or without credible

warning, happens suddenly. The potential for disaster, however, does

not occur suddenly. The degree of preparedness and commitment to

comprehensive planning and mitigation programs for the inevitable

event will largely determine the degree of hardship to be experienced

through loss of life, human suffering, property destruction, and the

other related economic, social, and psychological aspects of

disruption to day-to-day community activities. The impacts can be

reduced substantially from current expected levels through the

development and implementation of improved and more widely practiced

earthquake hazards reduction measures. These include _coordinated

emergency preparedness plans and procedures_, _earthquake prediction

and warning systems_, _improved construction techniques_, and

_effective public education and information programs_.

The State of California Office of Emergency Services (OES) and FEMA

conducted an analysis of the readiness capability for potential

catastrophic earthquakes in California at the Federal, State, and

local government levels. The planning of 22 counties and 38 cities, of

34 State agencies, and of 17 Federal organizations were reviewed with

the following objectives: (a) identify opportunities for improvement;

(b) provide a basis for making decisions that would strengthen program

direction and planning efforts; and (c) specify resource needs and

potential legislative initiatives. Annex 2 summarizes current Federal

and California earthquake planning.

The environment in which preparedness planning in California occurs is

characterized by the following observations of public expectations and

attitudes:

» There is widespread public support for government

action.

» Most people have some ideas as to what government should

be doing.

» There is understanding of the need for hazard reduction

as well as emergency response planning.

» People are willing, in the abstract, to have government

funds spent for hazard mitigation.

» The public is not very satisfied with what government

officials have done.

» Public officials perceive that current preparedness

plans and response are inadequate at best.

As discussed below, the review indicates that all is not well in

earthquake plans and preparedness. Current plans and preparedness are

judged to be adequate for the "moderate" earthquakes most likely to

occur frequently in California. By moderate it is meant an event

causing property damage on the order of $1 to $2 billion. Such an

event, however, will severely tax existing resources and provide a

major test of management relationship among different governmental

jurisdictions and levels. For a catastrophic earthquake, current plans

and preparedness are clearly inadequate, leading to a high likelihood

that Federal, State, and local response activities would become

disorganized and largely fail to perform effectively for an extended

period of time.

B. STATE AND LOCAL RESPONSE

Although there are widely differing approaches, local emergency

planning in California generally consists of a basic plan and a series

of contingency plans. The basic plan establishes the authority, sets

forth references, addresses hazard vulnerability, states the planning

assumptions, establishes an emergency services organization, assigns

tasks, formulates a mutual aid system, and directs the development of

specific support annexes. For those hazards identified in the basic

plan, a separate contingency plan is then developed to address the

unique nature of the hazardous event. The contingency plan contains

service support plans for each of the functional operations, including

detailed standard operating procedures. The planning efforts of local

jurisdictions are coordinated with adjacent jurisdictions and the

California OES for consistency.

A plan is not considered complete without the support annexes which

make the plan operational. The survey undertaken for this assessment

disclosed that approximately 93 percent of the jurisdictions examined

have existing, basic plans; 50 percent have completed annexes; 28

percent of the basic plans addressed an earthquake hazard

vulnerability; 35 percent have planned for earthquake contingency; and

only 1 percent (one city) has a plan to respond to an earthquake

prediction.

At the State level, the California OES, as an integral part of the

Governor's Office, functions as his immediate staff and coordinating

organization in carrying out the State's emergency responsibilities.

Specific emergency assignments have been made to 34 State agencies by

the OES Director through a series of Administrative Orders. During

emergencies the activities of these agencies and departments are

coordinated by the California OES.

The State OES is also responsible for maintaining and updating the

California Emergency Plan (CEP) and associated readiness plans. As in

the case of local plans, the basic document is supported by

operational annexes as listed below:

CONTINGENCY MUTUAL AID

Earthquake Fire and Rescue

Earthquake Prediction Law Enforcement

Oil Spill Medical

Nuclear Blackmail Utilities

Reactor Accident Military Support

Radioactive Material Incident

Flood

SUPPORTING SYSTEMS EMERGENCY RESOURCES

MANAGEMENT

Warning Construction and Housing

Emergency Broadcast System Economic Stabilization

Emergency Public Information Food

Intelligence Operations Health

Radiological Defense Industrial Production

Manpower

Petroleum

Telecommunications

Transportation

Utilities

Based on this planning concept, the review assessed quantitatively the

preparedness activities of the 34 State agencies that have

preparedness responsibilities in accordance with the CEP. The

quantitative data are listed in the following table.

TABLE 4

QUANTITATIVE ASSESSMENT OF STATE PREPAREDNESS ACTIVITIES

-----------------------------------------------------------------

Number of Percent of

Preparedness Element Agencies 34 Agencies

-----------------------------------------------------------------

Existence of Plan 22 65

Conduct of Exercises 27 79

Public Education Activities 10 29

Public Information Activities 9 26

Operational Capability 32 94

-----------------------------------------------------------------

The quality of the plans, activities, and operational capabilities

were then evaluated on a scale of 1 (expected to fail/inadequate) to 5

(expected to succeed well/adequate). The qualitative results are shown

below.

TABLE 5

QUALITATIVE ASSESSMENT OF STATE PREPAREDNESS ACTIVITIES

----------------------------------------------------------

Preparedness Element Capability Rating

----------------------------------------------------------

Planning 2.67

Exercises 2.64

Public Education 1.44

Public Information 1.50

Operational Capability 2.91

----------------------------------------------------------

It should be emphasized that these ratings apply to the State's

_present_ level of planning and preparedness for response to a major

destructive earthquake (magnitude 8), not a moderate (San

Fernando-type) event.

C. FEDERAL RESPONSE

At the Federal level the principal capability to respond to a

catastrophic earthquake in California resides in FEMA, the agency

responsible by law to coordinate Federal activities in all

emergencies. FEMA has developed a basic plan for supplemental Federal

assistance for a major earthquake in the San Francisco Bay area. This

plan, however, covers only the emergency phase of response (first few

days of efforts to save lives and protect property). In addition, FEMA

is participating in a broader effort concentrating in Southern

California. This cooperative effort is getting under way with State

and local governments, other Federal departments, voluntary agencies,

practicing professions, business and commercial interests, labor,

educators, and researchers. It is expected to develop an effective

program to respond to an earthquake or a credible earthquake

prediction in that part of the State. The emphasis is being placed on

_public safety, reduction of property damage, self-help on the part of

individuals, socioeconomic impacts, improved response and long-range

recovery planning, mitigation activities, and public participation for

both the post-prediction and immediate post-earthquake periods_. This

pilot effort is expected to be usable in other highly seismic areas of

California as well as in other States.

In the event of a catastrophic earthquake, a substantial number of

Federal agencies would provide support to and be coordinated by FEMA.

Illustrative are the following:

1. Department of Defense (DOD)

Initially, local military commanders may provide necessary

support to save lives, alleviate suffering, or mitigate property

damage. Normally, additional DOD resources would not be committed

until a presidential declaration of an emergency or major disaster.

When this occurs, the Secretary of the Army is DOD Executive Agent for

military support. The Commander, Sixth U.S. Army, at the Presidio, San

Francisco, has been further delegated authority to coordinate disaster

relief operations in the western portion of the United States.

Extensive planning and coordination have taken place between the Sixth

U.S. Army and FEMA Region IX. DOD emergency functions include: _damage

survey_, _search and rescue_, _emergency medical care_,

_identification and disposition of dead_, _emergency debris

clearance_, _emergency roads and bridge construction_, _airfield

repair_, and _identification and demolition of unsafe structures_.

Specific units have been identified to respond to an earthquake in any

of the major population centers of California. For example, at this

time the following units would be prepared for commitment within 8

hours after a disaster is declared by the President:

» Six medical units with a 1,320 bed capacity

» Seven helicopter units with 90 utility helicopters and

36 medium helicopters

» One Infantry brigade of 1,500 personnel

» Two engineer units with 78 pieces of heavy equipment

» Two transportation units with 124 cargo trucks and

trailers

These as well as additional DOD assets could be made available,

contingent on defense priorities.

2. The National Communication System

This Agency's plan, the "National Plan for Communications Support

in Emergencies and Major Disasters," provides for planning and using

national telecommunications assets and resources during presidentially

declared emergencies and major disasters. The plan, which has been

exercised repeatedly in past disasters, provides the management

structure and the communications staff to support FEMA. Restoration

priorities have been assigned to all critical circuits.

3. Department of Transportation (DOT)

DOT has established an Office of Emergency Transportation. This

office has developed and maintains comprehensive emergency plans and

procedural manuals for natural disasters and other civil crises. It

constantly monitors the civil transportation system for indications of

potential adverse impacts from all hazards. It conducts scheduled

periodic training and readiness exercises for DOT emergency personnel

and maintains quick response cells and emergency operating facilities

at DOT headquarters and in the field to provide an immediate reaction

capability. The system has been activated several times in the recent

past (e.g., Three Mile Island, 1979 Energy/Fuel Crisis, Independent

Truckers' Strike, and the Mt. St. Helens eruption).

D. CONSIDERATIONS FOR IMPROVING RESPONSE CAPABILITY

Earthquake prediction has not been incorporated into existing plans.

Response to predictions in the current environment, if given, would be

_ad hoc_. The State of California has only a rudimentary plan and the

Federal Government none. The City of Los Angeles has examined the

problem extensively, but only considers its own jurisdiction and has

not produced an actionable plan. Current planning for the recovery

period is incomplete, uncoordinated, and not functional. State and

local governments have done little to plan for the recovery period

when, following the emergency lifesaving phase, efforts and resources

are concentrated on restoring the functioning of the community. They

presume that the Federal Government will "step in" after a

presidential declaration. The Federal Government has an untested draft

plan for the San Francisco area that is not fully coordinated with the

State plans. Current Federal plans are geared to the provision of

assistance on the order of a few hundred million dollars. Thus, there

is little confidence that they would function under the requirements

for tens-of-billions-of-dollars and concomitant service demands.

Both Federal and State agencies need to commit the financial resources

and assignment of personnel to maintain and enhance earthquake plans

and preparedness. Earthquake preparedness, although responding to high

damage expectation, is still based upon a relatively low probability

occurrence. When it is in competition with pressing social needs for a

portion of limited resources, social needs tend to prevail at all

levels of government. Without a clear commitment, future development

of earthquake preparedness, as in the past, is problematic and its

implementation is in considerable doubt. The Federal earthquake

preparedness effort needs to focus on a high state of readiness.

History in the area of natural hazard mitigation suggests that

assignment of responsibility, even by the President, when not followed

by leadership and regular oversight over the allocation of financial

resources, seldom leads to programs which can be expected to function.

The same weakness is evidenced at the State and local government

levels with few exceptions. The stresses likely to occur in emergency

response programs after a catastrophic earthquake will be such that

effective response will require a cooperative, integrated effort among

different jurisdictions and levels of government.

Experience in other areas of planning and preparedness, particularly

for civil defense, indicates that damage to existing programs occurs

when the Federal Government raises expectations of the public and of

other levels of government and then fails to follow through with

implementation and funding. It is better to maintain the _status quo_

with minor changes at the margin than to announce substantial program

initiatives and not meet their requirements.

An Assessment of the Consequences and Preparations for a Catastrophic California Earthquake: Findings and Actions Taken · 第 4 / 6 章