CHAPTER II

HOUSING THE SOLDIERS AND THEIR SUPPLIES

While the machinery was being devised and set in motion for forming

a great army by means of the selective draft and officers were being

schooled for its training, immense camps had to be provided in which

hundreds of thousands of men could be trained, warehouses had to be

built in which to gather and store the enormous amounts of supplies

necessary for their maintenance and equipment, huge plants had to be

constructed for the making of certain kinds of ordnance, and included

in the vast scheme of construction work, all of it necessary almost at

once, were also flying fields, embarkation depots, port and terminal

facilities.

The work of building the cantonments was, alone, a very great

engineering achievement. It called for an expenditure within three

months of $150,000,000, more than three times that of the largest

year’s work on the Panama Canal, and it demanded the construction of

nearly a score of goodly sized cities, to be ready for occupancy by

the following September. For this huge job, when war was declared,

there was one colonel with four assistants and a few draughtsmen,

clerks and stenographers. Around that lone colonel there was built up,

almost over night, by telegraph and telephone, the organization of the

Government’s Construction Division, that carried through successfully

the whole vast program. For the building of the cantonments, engineers,

town planners and civilians having expert knowledge came to its

assistance, investigating possible sites and studying their water

supply, transportation facilities and availability of construction

materials. Contracts were let for sixteen National Army cantonments

and as many National Guard camps. These were all signed between the

fifteenth and twenty-seventh of June and in three months some of them

were in use, while in six months all the work had been finished, plus

many additions and betterments.

The building of each meant the creation of a city that would house

from forty to eighty thousand people. The ground surface had to be

prepared, hills leveled, valleys filled, trees uprooted, brush cleared

away and roads built. Then began the construction of barracks for the

men, officers’ and nurses’ quarters, hospitals, repair shops, and all

the other buildings necessary for the varied activities of the camp,

amounting to more than 1,400 separate structures in each cantonment.

Sewage systems and steam heating and electric lighting plants were

installed. An ample water supply, with plenty of shower baths, was

provided, allowing fifty gallons per day per capita, which is eighty

per cent more than the average allowance in European army camps. Every

care was used to assure the purity of the water. When taken from rivers

it was filtered and sterilized.

The total cost of the thirty-two cantonments and camps was

$179,607,497. Additions and betterments during the next six months

added $22,000,000. Every camp had its garbage incinerator, coffee

roasting plant, theater, repair shop and other buildings that added

to the comfort and morale of the men and the efficiency of the camp’s

work. Such care was taken in the sanitation of the training camps

and in the assuring of a pure supply of water--sometimes making

necessary the draining of surrounding areas--that the reports of

the Surgeon-General showed the practical elimination of water-borne

diseases among the troops in training.

Almost as rapid as the work on the cantonments and camps was that which

had to provide hospitals, flying fields with all their many buildings

for varied uses, huge storehouses and port and terminal facilities.

At half a dozen of the Atlantic Coast cities port terminals with

warehouses and wharves had been completed or were nearing completion

at the end of hostilities unprecedented in size and completeness of

equipment in our own or any other country. One storage warehouse

provided 3,800,000 feet of storage space and another, for ordnance

supplies, had 4,000,000 square feet of space into which were fitted

seventy-five miles of trackage and 9,000 lineal feet of wharf frontage.

For the production and storage of certain kinds of ordnance great

plants had to be built at the highest speed and, for the most part,

because of their dangerous possibilities, in out of the way places

where the problem was complicated by the necessity of providing housing

not only for the workers who would operate the plant but also for those

engaged in its construction. An instance of one of these, and there

were many others, was a smokeless powder plant the building of which

in eight months transformed farm land along a riverside to a busy

town, containing 3,500 people, into which had gone 100,000,000 feet of

lumber. It had rows of barracks for single men, blocks of cottages,

other blocks of better residences, huge storage houses, laboratories,

manufactories. A pumping and purification plant built among the first

of the structures took from the river 90,000,000 gallons of water per

day and made it fit for use. While the plant was being erected from

200 to 400 cars of freight were unloaded daily. Construction projects

of this class, including plants for the production of gas, nitrate,

picric acid, powder and high explosives, presented complicated problems

and their cost ran from $15,000,000 to $50,000,000 each. And all were

erected and in operation within a few months from the day of the first

work upon them.

Eighteen months of war saw the construction of nearly five hundred

important projects of these various kinds at a cost of over

$750,000,000, all of them rushed to completion at the greatest possible

speed.