WEIGHTS OF VARIOUS TYPES OF LINING PER LINEAR FOOT OF TUNNEL.

+---------+---------------+--------------+-------------+---------------+

|Reference|Type of Lining.|Weights of |Weights of |Weights of |

|No. | |complete rings|bolts, nuts, |segments and |

| | |(segments |and washers, |bolts in tunnel|

| | |only), in |in pounds. |complete, in |

| | |pounds. | |pounds. |

|---------+---------------+--------------+-------------+---------------|

|1 |Ordinary cast | 9,273.0 | 336.3 | 9,609.6 |

| |iron without | | | |

| |pockets. | | | |

| | | | | |

|2 |Ordinary cast | 9,158.8 | 336.3 | 9,495.2 |

| |iron with | | | |

| |pockets. | | | |

| | | | | |

|3 |Ordinary cast | 10,099.6 | 336.3 | 10,436.0 |

| |steel without | | | |

| |pockets. | | | |

| | | | | |

|4 |Heavy cast iron| 11,594.0 | 533.4 | 12,127.6 |

| |without | | | |

| |pockets. | | | |

+=========+===============+==============+=============+===============+

The weights in Table 18 are calculated by assuming cast iron to weigh

450 lb. per cu. ft., and cast steel 490 lb. In actual practice the

"ordinary" iron was found to weigh a little more than the weights given,

and the "heavy" a little less.

The silt in the sub-river portion averaged about 100 lb. per cu. ft., so

that the weight of the silt displaced by the tunnel was about 41,548 lb.

per lin. ft.

_Taper Rings._--In order to pass around curves (whether horizontal or

vertical), or to correct deviation from line or grade, taper rings were

used; by this is meant rings which when in place in the tunnels were

wider than the standard rings, either at one side (horizontal tapers or

"Liners"), or at the top ("Depressors"), or at the bottom ("Elevators").

In the original design a ½-in. taper was called for, that is, the wide

side of the ring was ½ in. wider than the narrow side, which was of

the standard width of 2 ft. 6 in. As a matter of fact, during

construction, not only ½-in., but ¾-in. and 1-in. tapers were often

used.

These taper rings necessitated each plate having its own unalterable

position in the ring, hence each plate of the taper ring was numbered,

so that no mistake could be made during erection.

The taper rings were made by casting a ring with one circumferential

flange much thicker than usual, and then machining off this flange to

the taper. This was not only much cheaper than making a special pattern

for each plate, but made it possible to see clearly where and what

tapers were used in the tunnel.

Taper rings were provided for all kinds of lining (except the cast

steel), and the lack of taper steel rings was felt when building the

steel-lined parts of the tunnel, as nothing could be done to remedy

deviations from line or grade until the steel section was over and cast

iron could again be used. Table 19 gives the weights of the different

kinds of tapers used.

TABLE 19.--WEIGHTS OF CAST-IRON TAPER RINGS, IN POUNDS PER COMPLETE

RING.

=================================+======================================

Classification. |Weight of cast iron per complete ring,

| in pounds.

---------------------------------+--------------------------------------

Ordinary pocketless ½- in. taper| 23,767.7

" " 1- " " | 24,352.4

" pocket ½- " " | 23,481.7

Heavy pocketless ½- in. taper | 29,564.8

" " ¾- " " | 29,854.7

" " 1- " " | 30,144.6

=================================+=======================================

_Cast-Steel Bore Segments and Accessories._--The following feature of

these tunnels is different from any hitherto built. It was the original

intention to carry the rolling load independent of the tunnel, or to

assist the support of the silt portion of the structure by a single row

of screw-piles, under each tunnel, and extending down to firmer ground

than that through which the tunnels were driven. Therefore, provision

had to be made whereby these piles could be put down through the invert

of the tunnel with no exposure of the ground.

[Illustration: DETAILS OF BORE SEGMENTS AND ACCESSORIES USED IN

SUBAQUEOUS SHIELD DRIVEN TUNNELS FIG. 12.]

This provision was afforded by the "Bore Segments," which are shown in

detail in Fig. 12. There are two segments, called No. 1 and No. 2,

respectively. These two segments are bolted together in the bottom of

two adjacent rings, and thus form a "Pile Bore." As the piles were to be

kept at 15-ft. centers, and as the tunnel rings were 2 ft. 6 in. in

length, it will be seen that, between each pair of bore-segment rings,

there came four "Plain" rings. The plain rings were built up so that the

radial joints broke joint from ring to ring, but with the bore-segment

rings this could not be done, without unnecessarily adding to the types

of segments.

The bore segments were made of cast steel, and were quite complicated

castings, the principle, however, was quite simple. The segments

provided an opening just a little larger than the shaft of the pile, the

orifice being 2 ft. 7 in. in diameter at the smallest (lowest) point,

while the shaft of the pile was to be 2 ft. 5¼ in. In order to allow

of the entry of the screw-blade or helix of the pile, a slot was formed

in the depth of Bore Segment No. 1, so that, when a pile was put in

position above the bore, the blade, when revolved, would enter the slot

and thus pass under the metal lining, although the actual orifice was

only slightly larger than the pile shaft.

The wall of the pile orifice in Segment No. 2 was made lower than that

in No. 1 so as to allow the blade to enter the slot in Segment No. 1.

When the pile is not actually in process of being sunk, this lower

height in No. 2 is made up with the removable "distance piece." This had

a tongue at one end which engaged in a recess cast to take it in Segment

No. 2 and was held in place by a key piece at the other end of the

distance piece. Details of the distance piece and key are shown in Fig.

12.

The flanges around the pile bore were made flat and furnished with

twelve tapped holes, six in Segment No. 1 and six in Segment No. 2, for

the purpose of attaching the permanent arrangements in conjunction with

which the pile was to be attached to the track system, independently of

the tunnel shell, or directly to the tunnel. It was never decided which

of these alternatives would be used, for, before this decision was

reached, it was agreed that, at any rate for the present, it was better

not to put down piles at all.

To close the bore, the "Bore Plug" was used. This is shown on Fig. 12.

It was of cast steel, and was intended to act as a permanent point of

the screw-pile, that is, the blade section was to be attached to the

bore plug, the distance piece and key were to be removed, and the pile

was to be rotated until the blade had cleared the slot; the distance

piece and key were then to be replaced and sinking resumed.

The plug was held in place against the pressure of the silt by the two

"dogs," while the dogs themselves were attached to the tunnel, as shown

in Fig. 12. The ends of the dogs, which rested on the flanges of the

metal lining of the tunnel, were prevented from being knocked off the

flanges (and thus releasing the plug) by steel clips.

It was expected that it might be desirable to keep the lower end of the

piles open during their sinking, so that the bore plugs were not made

permanently closed, but a seating was formed on the inner circumference

of the plug, and on the seating was placed the "Plug Cover," made of

cast iron, 18¾ in. in diameter and 3 in. thick, furnished with a lug

for lifting and a 3-in. tapped hole closed by a screw-plug, through

which any soundings or samples of ground could be taken prior to sinking

the piles. This plug cover was held in place by a heavy steel "Yoke"

under it, which engaged on the under side of the flange, on top of which

the cover was set. The yoke was attached to the cover by a 1¾-in.

tap-bolt, screwed into the yoke and passing through a 2-in. hole bored

in the center of the cover. This rather peculiar mode of attaching the

cover was adopted so that the cover could be removed by taking off the

nut of the yoke, in case it was desired to open the end of the pile

during the process of sinking.

The plug was a fairly close fit at the bottom of the orifice, that is,

at the outside circumference of the tunnel, where the bore was 2 ft. 7

in. in diameter and the plug 2 ft. 6¾ in., but at the top of the

bore-segment there was more clearance, as the plug was cylindrical while

the bore tapered outward. To fill this space, it was intended that steel

wedges should be used while the shield was being driven, so that they

would withstand the crushing action of the thrusting shield, and, when

the shield was far enough ahead, that they should be removed and

replaced by hardwood wedges. This method was only used in the early

weeks of the work; the modification of not using the shield-jacks which

thrust against the bore segments was then introduced, and the wooden

wedges were put in, when the bore plugs were set in place, and driven

down to the stage of splitting.

When it was resolved not to sink the screw-piles, the bores had to be

closed before putting in the concrete lining. This was done by means of

the covers shown in Fig. 13. The bore plug and all its attachments were

removed, and the flat steel cover, 2 in. thick and with stiffening webs

on the under side, was placed over the circular flanges of the pile

bore. The cover was attached to the bore segments by twelve 1½-in.

stud-bolts, 6 in. long, in the bolt holes already mentioned as provided

on these flanges.

When these were in place, with lead grummets under the heads of the

bolts, and the grooves caulked, the bore segments were water-tight,

except in Bore Segment No. 2, at the joint of the distance piece; and,

to keep water from entering here, this segment was filled to the level

of the top of the flanges with 1:1 Portland cement mortar.

[Illustration: SUBAQUEOUS TUNNELS COVER FOR BORE SEGMENTS FIG. 13.]

The weights of the various parts of the bore segments are given in Table

20.

Transactions of the American Society of Civil Engineers, Vol. LXVIII, Sept. 1910 The New York Tunnel Extension of the Pennsylvania Railroad. The North River Tunnels. Paper No. 1155 · 第 23 / 55 题