INTRODUCTION.

The section of the Pennsylvania Railroad Tunnel work described in this

paper is that lying between Tenth Avenue, New York City, and the large

shaft built by the Company at Weehawken, N. J., and thus comprises the

crossing of the North or Hudson River, the barrier which has stood for

such a long time between the railroads and their possession of terminal

stations in New York City. The general plan and section, Plate XXVIII,

shows the work included.

This paper is written from the point of view of those engaged by the

Chief Engineer of the Railroad Company to look after the work of

construction in the field. The history of the undertaking is not

included, the various phases through which many of the designs and plans

passed are not followed, nor are the considerations regarding

foundations under the subaqueous portions of the tunnels and the various

tests made in connection with this subject set out, as all these matters

will be found in other papers on these tunnels.

This paper only aims to describe, as briefly as possible, the actual

designs which were finally adopted, the actual conditions met on the

ground, and the methods of construction adopted by the contractors.

For easy reference, and to keep the descriptions of work of a similar

character together, the subject will be treated under the four main

headings, viz.: Shafts, Plant, Land Tunnels, and River Tunnels.

Transactions of the American Society of Civil Engineers, Vol. LXVIII, Sept. 1910 The New York Tunnel Extension of the Pennsylvania Railroad. The North River Tunnels. Paper No. 1155 · 第 8 / 55 题