CHAPTER V.

VOLUME OF SEWAGE.

The total quantity of sewage to be dealt with per day can be

ascertained by gauging the flow in those cases where the sewers

are already constructed, but where the scheme is an entirely

new one the quantity must be estimated. If there is a water

supply system the amount of water consumed per day, after

making due allowance for the quantity used for trade purposes

and street watering, will be a useful guide. The average amount

of water used per head per day for domestic purposes only may

be taken as follows:--

DAILY WATER SUPPLY

(Gallons per head per day.)

Dietetic purposes (cooking, drinking, &c.) 1

Cleansing purposes (washing house utensils,

clothes, &c.) 6

If water-closets are in general use, add 3

If baths are in general use, add 5

Total 15

It therefore follows that the quantity of domestic sewage to be

expected will vary from 7 to 15 gallons per head per day,

according to the extent of the sanitary conveniences installed

in the town; but with the advent of an up-to-date sewage

scheme, probably accompanied by a proper water supply, a very

large increase in the number of water-closets and baths may

confidently be anticipated, and it will rarely be advisable to

provide for a less quantity of domestic sewage than 15 gallons

per head per day for each of the resident inhabitants. The

problem is complicated in sea coast towns by the large influx

of visitors during certain short periods of the year, for whom

the sewerage system must be sufficient, and yet it must not be

so large compared with the requirements of the residential

population that it cannot be kept in an efficient state during

that part of the year when the visitors are absent. The

visitors are of two types--the daily trippers and those who

spend several days or weeks in the town. The daily tripper may

not directly contribute much sewage to the sewers, but he does

indirectly through those who cater for his wants. The resident

visitor will spend most of the day out of doors, and therefore

cause less than the average quantity of water to be used for

house-cleansing purposes, in addition to which the bulk of the

soiled linen will not be washed in the town. An allowance of 10

gallons per head per day for the resident visitor and 5 gallons

per head per day for the trippers will usually be found a

sufficient provision.

It is, of course, well known that the flow of sewage varies

from day to day as well as from hour to hour, and while there

is no necessity to consider the daily variation--calculations

being based on the flow of the maximum day--the hourly

variation plays a most important part where storage of the

sewage for any length of time is an integral part of the

scheme. There are many important factors governing this

variation, and even if the most elaborate calculations are made

they are liable to be upset at any time by the unexpected

discharge of large quantities of trade wastes. With a small

population the hourly fluctuation in the quantity of sewage

flowing into the sewers is very great, but it reduces as the

population increases, owing to the diversity of the occupations

and habits of the inhabitants. In all cases where the

residential portions of the district are straggling, and the

outfall works are situated at a long distance from the centre

of the town, the flow becomes steadier, and the inequalities

are not so prominently marked at the outlet end of the sewer.

The rate of flow increases more or less gradually to the

maximum about midday, and falls off in the afternoon in the

same gradual manner. The following table, based on numerous

gaugings, represents approximately the hourly variations in the

dry weather flow of the sewage proper from populations

numbering from 1,000 to 10,000, and is prepared after deducting

all water which may be present in the sewers resulting from the

infiltration of subsoil water through leaky joints in the

pipes, and from defective water supply fittings as ascertained

from the night gaugings. Larger towns have not been included in

the table because the hourly rates of flow are generally

complicated by the discharge of the trade wastes previously

referred to, which must be the subject of special investigation

in each case.

[TABLE NO. 4.

APPROXIMATE HOURLY VARIATION IN THE FLOW OF SEWAGE.

Percentage of Total Flow Passing Off in each Hour.

-----------+------------------------------------------------

| Population.

Hour. +-----+-----+-----+-----+-----+-----+-----+------

|1,000|2,000|3,000|4,000|5,000|6,000|8,000|10,000

-----------+-----+-----+-----+-----+-----+-----+-----+------

Midnight | 1.0 | 1.0 | 1.2 | 1.3 | 1.5 | 1.5 | 1.8 | 2.0

1.0 a.m. | 0.7 | 0.7 | 0.7 | 0.8 | 0.8 | 1.0 | 1.0 | 1.0

2.0 " | nil | nil | nil | nil | 0.2 | 0.2 | 0.3 | 0.5

3.0 " | nil | nil | nil | nil | nil | nil | nil | 0.2

4.0 " | nil | nil | nil | nil | nil | nil | nil | nil

5.0 " | nil | nil | nil | nil | nil | nil | nil | 0.2

6.0 " | 0.2 | 0.2 | 0.3 | 0.5 | 0.6 | 0.5 | 0.7 | 0.8

7.0 " | 0.5 | 0.5 | 1.0 | 1.5 | 1.6 | 1.7 | 2.0 | 2.5

8.0 " | 1.0 | 1.5 | 2.0 | 2.5 | 3.0 | 3.5 | 4.0 | 5.0

9.0 " | 3.5 | 4.5 | 4.5 | 4.8 | 5.5 | 5.8 | 6.0 | 6.5

10.0 " | 6.5 | 6.5 | 6.8 | 7.0 | 7.5 | 7.7 | 8.0 | 8.0

11.0 " |10.5 |11.0 |10.5 |10.0 | 9.6 | 9.3 | 9.0 | 8.8

Noon |11.0 |11.3 |10.8 |10.3 | 9.3 | 9.5 | 9.2 | 9.0

1.0 p.m. | 6.0 | 5.5 | 6.0 | 6.7 | 7.0 | 7.2 | 7.3 | 7.5

2.0 " | 7.0 | 7.3 | 7.0 | 7.0 | 6.5 | 6.5 | 6.2 | 6.0

3.0 " | 6.8 | 6.5 | 6.5 | 6.5 | 6.5 | 6.3 | 6.3 | 6.0

4.0 " | 7.5 | 7.5 | 7.3 | 7.0 | 6.7 | 6.5 | 6.2 | 6.7

5.0 " | 6.5 | 6.5 | 6.5 | 6.3 | 6.0 | 6.0 | 6.0 | 5.8

6.0 " | 4.5 | 4.5 | 4.7 | 4.8 | 5.0 | 5.0 | 5.0 | 5.2

7.0 " | 6.5 | 6.2 | 6.0 | 5.8 | 5.5 | 5.5 | 5.5 | 4.7

8.0 " | 6.2 | 6.0 | 5.8 | 5.5 | 5.5 | 5.3 | 5.0 | 4.8

9.0 " | 5.0 | 4.8 | 4.7 | 4.5 | 4.5 | 4.5 | 4.5 | 4.0

10.0 " | 4.8 | 4.6 | 4.2 | 4.0 | 3.8 | 3.5 | 3.0 | 3.0

11.0 " | 4.3 | 3.5 | 3.5 | 3.2 | 3.2 | 3.0 | 3.0 | 2.8

-----------+-----+-----+-----+-----+-----+-----+-----+------

Total |100.0|100.0|100.0|100.0|100.0|100.0|100.0|100.0

-----------+-----+-----+-----+-----+-----+-----+-----+------

ANALYSIS OF FLOW]

Percentage of total flow passing off during period named.

---------------------+----------------------------------------------------------------+

| Population. |

+-------+-------+-------+-------+-------+-------+-------+--------+

| 1,000 | 2,000 | 3,000 | 4,000 | 5,000 | 6,000 | 8,000 | 10,000 |

---------------------+-------+-------+-------+-------+-------+-------+-------+--------+

7.0 a.m. to 7.0 p.m | 77.3 | 78.8 | 78.6 | 78.7 | 78.5 | 78.8 | 78.7 | 75.2 |

7.0 p.m. to 7.0 a.m | 22.7 | 21.2 | 21.4 | 21.3 | 21.5 | 21.2 | 21.3 | 21.8 |

Maximum 12 hrs. | 84.0 | 83.6 | 82.6 | 81.7 | 81.0 | 80.6 | 79.7 | 78.2 |

" 10 " | 72.8 | 72.8 | 72.1 | 71.4 | 70.0 | 69.8 | 69.2 | 68.5 |

" 9 " | 66.3 | 66.6 | 66.1 | 65.6 | 64.5 | 64.8 | 64.2 | 63.3 |

" 8 " | 61.8 | 62.1 | 61.4 | 60.8 | 59.5 | 59.0 | 58.2 | 57.5 |

" 6 " | 48.8 | 49.1 | 43.1 | 47.5 | 46.8 | 46.5 | 46.0 | 45.8 |

" 3 " | 23.0 | 28.8 | 27.11| 27.3 | 26.8 | 26.5 | 26.2 | 25.8 |

" 2 " | 21.5 | 22.3 | 21.3 | 20.3 | 19.3 | 18.5 | 18.2 | 17.3 |

" 1 " | 11.0 | 11.3 | 10.8 | 10.3 | 9.8 | 9.5 | 9.2 | 9.0 |

Minimum 9 " | 3.4 | 3.9 | 5.2 | 6.6 | 7.5 | 6.9 | 8.8 | 10.0 |

" 10 " | 6.9 | 7.4 | 8.7 | 9.8 | 10.7 | 10.4 | 11.8 | 13.0 |

---------------------+-------+-------+-------+-------+-------+-------+-------+--------+

The data in the foregoing table, so far as they relate to

populations of one, five, and ten thousand respectively, are

reproduced graphically in Fig. 12.

This table and diagram relate only to the flow of sewage--that

is, water which is intentionally fouled; but unfortunately it

is almost invariably found that the flow in the sewers is

greater than is thus indicated, and due allowance must be made

accordingly. The greater the amount of extra liquid flowing in

the sewers as a permanent constant stream, the less marked will

be the hourly variations; and in one set of gaugings which came

under the writer's notice the quantity of extraneous liquid in

the sewers was so greatly in excess of the ordinary sewage flow

that, taken as a percentage of the total daily flow, the hourly

variation was almost imperceptible.

[Illustration: Fig 12 Hourly Variation in Flow of Sewage.]

Provision must be made in the scheme for the leakage from the

water fittings, and for the subsoil water, which will

inevitably find its way into the sewers. The quantity will vary

very considerably, and is difficult of estimation. If the water

is cheap, and the supply plentiful, the water authority may not

seriously attempt to curtail the leakage; but in other cases it

will be reduced to a minimum by frequent house to house

inspection; some authorities going so far as to gratuitously

fix new washers to taps when they are required. Theoretically,

there should be no infiltration of subsoil water, as in nearly

all modern sewerage schemes the pipes are tested and proved to be

watertight before the trenches are filled in; but in practice this

happy state is not obtainable. The pipes may not all be bedded as

solidly as they should be, and when the pressure of the earth comes

upon them settlement takes place and the joints are broken. Joints

may also be broken by careless filling of trenches, or by men

walking upon the pipes before they are sufficiently covered.

Some engineers specify that all sewers shall be tested and

proved to be absolutely water-tight before they are "passed"

and covered in, but make a proviso that if, after the

completion of the works, the leakage into any section exceeds

1/2 cubic foot per minute per mile of sewer, that length shall

be taken up and relaid. Even if the greatest vigilance is

exercised to obtain water-tight sewers, the numerous house

connections are each potential sources of leakage, and when the

scheme is complete there may be a large quantity of

infiltration water to be dealt with. Where there are existing

systems of old sewers the quantity of infiltration water can be

ascertained by gauging the night flow; and if it is proved to

be excessive, a careful examination of the course of the sewers

should be made with a view to locating the places where the

greater part of the leakage occurs, and then to take such steps

as may be practicable to reduce the quantity.