------------------------------------------------+--------------+-------------

| Produced to--

Firm. +--------------+-------------

|Nov. 11, 1918.| Mar. 1,

| | 1919.

------------------------------------------------+--------------+-------------

McKeen Motor Car Co., Omaha, Nebr. | 23 | 35

Chris D. Schramm & Son, Philadelphia, Pa. | 20 | 20

Jas. Cunningham & Sons Co., Rochester, N. Y. | 5 | 35

N. C. L. Engineering Corporation, Providence, R.| 1 | 37

I. | |

Deloies Hoisting Co., New York | 1 | 1

+--------------+-------------

Total manufactured | 50 | 128

Total shipped to camps and depots | | 124

Total shipped to ports | |

------------------------------------------------+--------------+-------------

CABLE.

------------------------------------------------+--------------+-------------

| _Feet._ | _Feet._

John A. Roeblings Sons Co., Trenton, N. J. | 476,700 | 860,700

American Steel & Wire Co., Worcester, Mass. | 744,882 |

------------------------------------------------+--------------+-------------

Total manufactured | 1,221,582 | 860,700

Total shipped to ports | 486,000 |

Total shipped to camps and depots | | 1,119,582

------------------------------------------------+--------------+-------------

HYDROGEN GAS.

------------------------------------------------+--------------+-------------

|_Cubic feet._ |_Cubic feet._

| |

Oxygen Gas Co., Kansas City, Mo. | 2,715,845 | 3,568,600

Southern Oxygen Co., South Washington, Va. | 945,412 | 1,608,778

International Oxygen Co., New York | 2,166,668 | 2,166,668

Walker Refining Co., Austin, Tex. | 496,000 | 595,783

Tarrifville Oxygen & Chemical Co., | |

Tarrifville, Con. | 1,072,590 | 1,072,590

Louisiana Oxygen Co., New Orleans | 477,500 | 904,576

Kentucky Oxygen Co., Louisville, Ky. | 276,779 | 540,752

Burdett Oxygen Co., Chicago | 9,532,559 | 11,347,999

+--------------+-------------

Total produced | 17,683,353 | 21,805,746

Total shipped overseas | 7,349,578 |

Total shipped to camps | | 14,456,168

------------------------------------------------+--------------+-------------

HYDROGEN CYLINDERS.

------------------------------------------------+--------------+-------------

National Tube Co., McKeesport, Pa. | 35,800 | 43,300

Harrisburg Pipe & Pipe Bending Co., | |

Harrisburg, Pa. | 38,425 | 65,500

Tindel-Morris Co., North Eddystone, Pa. | 15,000 | 15,000

+--------------+-------------

Total manufactured | 80,225 | 123,800

Total to ports | 30,000 |

Total to camps and warehouses | | 95,800

------------------------------------------------+--------------+-------------

BOOK III.

THE ENGINEER CORPS.

CHAPTER I.

THE ENGINEERS IN FRANCE.

In describing the activities of the Engineers, we are carried to the

front itself, into the zone beaten by enemy fire, where machine-gun

bullet, bursting shell, and deadly gases have brought sudden death

and painful wounds to many members of the technical services. A large

proportion of the Engineers are combatant troops, constituting in the

American Expeditionary Forces about 8 per cent of the total combatant

troops engaged. These troops, trained and equipped to march and fight

as Infantry, demonstrated their fighting qualities during the war

on numerous occasions, both when used as Infantry to increase the

rifle strength of that arm and when fighting as Engineers to obtain

possession of terrain as a preliminary to the exercise of their

technical art in its organization.

From the day the first sector was taken over by American troops in

November, 1917, until the Meuse River was passed and the enemy, in

flight, sought an armistice to save his armies from destruction, the

combatant Engineers--the "sappeurs" of French soldier lore and song---

fought and bled in a manner never to be forgotten. Railroad engineers,

nominally considered noncombatant, at Cambrai dropped their tools

to take arms and stand stubbornly shoulder to shoulder with their

British brothers with whom they were learning to work under the special

conditions of the front. From Cantigny to Chateau Thierry, Engineer

troops fought as well as worked, and often not only advanced with the

Infantry under or through the barrage, but actually led the first

wave, to demolish or remove the obstacles placed in its path. Through

the days when from March 21, 1918, until July 18, 1918, the German

army made its rapid plunges toward Paris until checked and thrown back

across the Marne at Chateau Thierry, the sapper troops fought and

worked with the Infantry of their divisions, enduring the same dangers,

privations, and hardships, and winning equal honors and commendation.

In the drive at St. Mihiel and through the Argonne, the combatant

Engineers played a conspicuous part. Advancing with the tanks, they

made possible the passage of many difficult points for these lumbering

monsters, against which was directed a particularly destructive

fire. Using elongated torpedoes of high explosive, known as Bangalore

torpedoes, they prepared passages for the Infantry through the broad

barbed-wire entanglements, echeloned in depth by numerous separate

lines, each to be breached and passed before the objective could be

gained. In this work the Engineers reduced the machine-gun nests that

hindered their operation, cleaned up the strong points that delayed

the advance of the tanks they were assisting, and threw extemporized

footbridges across the streams which barred the further advance of the

Infantry.

The combatant Engineers did their part in the winning of the

reconquered ground as well as the lion's share of its organization for

the defense and the maintenance of the communications behind it. In

this last respect alone, the Engineers, as combatant troops, opened

across No Man's Land the first communications practicable for the light

field artillery, which pressed forward immediately behind the Infantry

troops to their support and protection.

Filling in trenches, removing wire entanglements, building trestles

across wide mine craters, searching for and rendering inoperative

treacherous mines and traps of extreme ingenuity and destructiveness,

the sapper found a wide field for the exercise of his functions.

Shattered and obliterated by four years of shelling and mining,

trenching, and countermining, the "roads" across No Man's Land existed

only on the map; and as they retreated the Germans demolished and

obstructed the highways behind the old front from which they had been

driven, with the thoroughness and attention to detail for which they

are noted. As our Infantry advanced, upon their heels, literally

speaking, came our Engineers, to attack the problem of providing

for the Artillery and supply trains a means of following. From the

standpoint of the road builder in civil life, their methods were crude

in the extreme, but for the military purpose and the pressing immediate

needs, their road building achievement was adequate. The Engineers

sometimes reopened abandoned quarries, and sometimes started them where

none had existed before, to obtain a supply of road metal, which supply

was sometimes supplemented and in some cases replaced by the use of

debris from ruined villages and shattered farmhouses. From demolished

structures many useful materials were extracted and adapted to the

military purpose by the Engineers. Where bridge and trestle timbers

were lacking, deserted buildings--in one case the tower of a ruined

church--filled the need. Where shell hole or crater yawned a remnant of

a stable wall might be pulled down by ropes and man power, and broken

up to fill the void.

Through the dense woods the soft forest floor offered no support even

to the light artillery, and miles of corduroy and brush path were

built to permit the guns to advance to the reinforcement of the attack.

In many places the tactical situation admitted of insufficient time

to build even the crudest paths, and then the Engineers fell to and

assisted artillery and supply wagons to get through and over the bad

spots, replacing guns on the road where they had run into the ditch,

righting and reloading combat wagons when they had turned over in shell

holes or deep ruts.

While thus engaged the sapper troops were subjected to the fire of

enemy artillery seeking to prevent the advance of the supporting guns,

and, further, they were working within the zone of combat of enemy

aviators, the rattle of whose deadly machine guns, as they plunged at

low altitude toward a busy working party, was as much to be dreaded as

the high-explosive bombs which they dropped.

Behind the combatant Engineer troops, extending through the service of

supply to the base ports and across the ocean to the United States was

an organization of technical noncombatant supply and administration.

The work of these production, construction, and supply departments

of the Engineer service in France was organized in the American

Expeditionary Forces under the administration of three divisions of

the office of the Chief Engineer. These were the division of military

engineering and engineering supplies, the division of construction and

forestry, and the division of light railways and roads.

ENGINEERING SUPPLIES.

The division of military engineering and engineering supplies was

charged with the procurement, standardization, and distribution of

all classes of supplies used by Engineer troops. During the 19 months

of warfare this division handled 3,225,121 tons of supplies, storing

them and distributing them from immense depots aggregating 25 acres of

covered storage and over 756 acres of open storage. This service was

further charged with the current investigations into new developments

of the art of military engineering, and with the development,

operation, and administration of certain technical branches of the

American Expeditionary Forces, such as electrical and mechanical

troops, water-supply troops, searchlight regiments, etc.

At its seven storage depots in the base, intermediate, and advance

sections, this division had in service 23 locomotive cranes, mostly of

15 tons capacity and capable of handling an enormous amount of freight

and material at warehouses and cars. The following table of principal

items of engineer material shows the kinds and quantities of supplies

which were received in France for issue through this division up to

December 15, 1918:

_Table of engineer supplies received in France._

FROM THE UNITED STATES.

--------------------------------------+----------

Item. | Tonnage.

--------------------------------------+----------

General machinery | 45,454

Iron and steel products | 242,226

Hardware and hand tools | 26,780

Railway rolling stock | 343,888

Railway motive power | 144,066

Lumber | 39,086

Track materials and fastenings | 488,793

Automotive transportation, etc. | 22,127

Horse-drawn transportation | 7,967

Building materials and supplies | 98,671

Liquids | 7,067

Explosives and accessories | 952

Unit accountability | 7

Engineer supplies | 52,106

Miscellaneous office supplies | 2,239

Floating equipment and accessories | 10,093

Material and tools for locomotive and |

car repair and erection shops | 10,407

+----------

Total United States | 1,541,929

--------------------------------------+----------

FROM EUROPEAN SOURCES.

--------------------------------------+----------

Tools and equipment | 462,027

Machinery | 13,146

Office supplies and equipment | 1,781

Auto and track supplies | 464

Track and ties | 115,438

Locomotives and cars | 8,649

Water supply, machinery | 6,210

Water supply, supplies | 48,416

Electric service, machinery | 2,342

Electric service, supplies | 4,083

Construction materials | 188,830

Boats and barges | 5,940

Motorcycles and bicycles | 12

General engineer supplies | 581,149

Cement from American |

Expeditionary Forces mills | 54,860

Barracks | 263,590

Bunks | 9,892

Latrines | 2,143

Miscellaneous | 49,200

+----------

Total European sources | 1,818,172

+==========

Total United States and |

European sources | 3,360,101

--------------------------------------+----------

To facilitate the procurement of supplies in the existing world

markets, this division established in Paris a purchasing board, having

branches in England, Switzerland, and Spain. When the war ended this

board had accomplished the tremendous task of buying over 1,800,000

tons of engineer supplies, with a total value of $205,242,728. In

addition to this material, our own country furnished over 1,500,000

tons, with a value of $248,993,322. France sold to us through this

board 1,234,968 tons, valued at $134,393,870, and England 396,000 tons,

valued at $56,145,818. In Switzerland, purchases consisting principally

of sectional barracks and technical equipment, totaled 96,867 tons,

with a value of $14,643,410. Purchases from Spain amounted to only 797

tons, with a value of $59,630.

Much work was done in standardizing supplies of all classes, so that

quantity-production methods could be used in their fabrication, thus

promoting economy and stimulating the rapidity of supply.

In the procurement of cement for the use of the American Expeditionary

Forces, the Engineers dealt successfully with a problem of large

magnitude and importance. By contract with English and French mills,

by direct purchase for specific jobs from local mills, and by their

own manufacturing operations, the Engineers secured enough cement to

supply the demands for construction both at the front and in the S. O.

S., as the service of supply was generally known. Three large cement

mills were leased from the French owners and operated by special

troops organized in the United States. To certain other French mills

the Engineers furnished labor and materials in return for a certain

proportion of their output. It is estimated that about 215,000 tons

of cement were thus procured, representing a total cost of about

$7,000,000.

[Illustration: ENGINEERS, ASSISTED BY INFANTRY, BUILDING A ROAD OVER

WHAT WAS NO MAN'S LAND ONE WEEK BEFORE.

The stones from tottering walls of buildings are broken into small

pieces and laid on the road bed, making a good military road. Fay on

Haye, France.]

[Illustration: WAREHOUSES AND DOCKS FROM THE RIVER. BASSENS DOCKS,

BORDEAUX, FRANCE.]

[Illustration: NORTHERN VIEW OF THE AMERICAN DOCKS AT OLD BASSENS,

BORDEAUX, FRANCE.]

The Engineers operated shops at various points near the front in which

were manufactured standard material for dugout, trench, and emplacement

construction, such as concrete beams, concrete slabs for overhead

protection against high-angle shell fire, trench frames, revetment

material, trench duck boards, mine and gallery timbers, knockdown bunk

sets, etc.

CONSTRUCTION AND FORESTRY.

The division of construction and forestry was charged with all

construction work in the service of supply, and also with the procuring

of forest products for the American Expeditionary Forces. At the

signing of the armistice its organization totaled 150,823 men, of

whom about 127,000 were constantly engaged in production work. Using

standardized building plans, this force performed a huge amount of

construction work in France.

It was assumed that one-third of the American troops in France

would have to be housed in new buildings erected specially for the

purpose. Thus accommodations for about 750,000 men had to be built

at the rate of 16 barracks, each 20 by 100 feet in size, for every

1,000 men. Contracts were let to British and French contractors for

23,000 demountable barracks, this order being based on the ultimate

probable size of the Expeditionary Forces. During August, September,

and October, 1918, these barracks were being received at the rate of

1,000 per month. To supplement a supply of even such magnitude, our own

type of barrack was developed to be built with lumber furnished by the

American forestry forces in France. One cantonment project involved

the construction of 500 barracks, accommodating 55,000 men. A total

of 11,862 barracks were erected for the American Expeditionary Forces

in France, representing 225 miles of length, if all the barracks were

placed singly end to end.

It was the policy of the American Expeditionary Forces to provide

hospital room sufficient to give beds, if necessary, to 15 of every

100 American soldiers in France. On this basis the Engineers set out

to provide hospitals with a total of 280,000 beds. Of these, 139,000

beds were in hospitals taken over from the French, 25,000 beds being

added to this capacity by new construction. In entirely new base, camp,

evacuation, and convalescent hospitals, 116,000 beds were ultimately

made available for the casualties of the American Expeditionary Forces,

requiring the erection of 7,700 hospital barracks of special type, all

of which would have totaled 127 miles in length if placed singly end

to end. As to the progress of this construction, on November 14, 1918,

there were 190,356 beds occupied in American hospitals in France, but

all 280,000 beds originally specified were ready and available.

The base hospital plants were complete municipalities in themselves,

and had capacities varying from 1,000 to 6,000 beds. These units

were built where nothing had existed before but little French rural

communities, devoid of the improvements and modern conveniences with

which we in this country are so familiar. To establish a modern

military hospital, capable of caring for the varied casualties and

illness arising from action and abnormal living conditions, it required

the construction of roads, sidings, unloading platforms, sorting

and classification buildings, operating rooms, surgical and medical

wards, dormitories, morgues, cemeteries, complete water supplies, fire

protection systems, sewage and garbage disposal plants, recreation

buildings, electric light plants, and all that goes to make complete

a modern installation for the care of the wounded and sick. Many of

the camp and evacuation hospitals required construction of the same

character, but differing in magnitude.

The Engineers developed port faculties at St. Nazaire, Bordeaux, La

Pallice, Marseilles, Brest, and at less important harbors. In general,

at these places the existing facilities were expanded to meet the

needs for the debarkation of troops and the unloading and shipment of

supplies. Originally 23 ship berths were placed at our disposal by the

French. The Engineers expanded this equipment to a total of 89 berths,

with authorized projects for 160 berths by June, 1919. Our overseas

shipments grew from 20,000 tons in July, 1917, to 1,000,000 tons in

October, 1918, but the port expansion kept abreast of this development.

Fifty-eight 300-ton lighters were built by Engineer troops with French

timber, and twenty-six 500-ton lighters with American timber. The

Engineers constructed seven derrick barges with lifting capacities

ranging from 30 to 100 tons.

The existing French railroads running from the base ports to the

advanced zone were quite inadequate, so that it was necessary to

supplement their facilities with many miles of new track and other

construction, including important storage, classification, arrival, and

departure yards, warehouse tracks, engine terminals, water points, and

repair shops. At Bassens, St. Sulpice, Miramas, and Montoir, enormous

storage depots were constructed to handle the supplies entering France

for our forces. The American-built railroad yards at these points

were comparable in magnitude and completeness to the important yard

developments undertaken in this country in recent years by the large

railroad systems, the yards at St. Sulpice having a trackage totaling

147 miles of single track. Those at Bassens and St. Sulpice were

virtually completed during the war, while the construction at Miramas

was well under way at the signing of the armistice. At St. Sulpice the

project was designed on the basis of receiving, storing, and forwarding

the supplies for 1,000,000 men for 30 days. The others were of like

magnitude.

[Illustration: INTERIOR OF SUBSISTENCE WAREHOUSE AT NEVERS, FRANCE,

MARCH, 1918 SHOWING FRENCH WOMEN TRUCKING RATIONS.]

[Illustration: INTERIOR VIEW OF ONE OF THE LARGE WAREHOUSES AT BASSENS

DOCKS, BORDEAUX, FRANCE.

Picture taken in April, 1918.]

[Illustration: ICE PLANT, BUILT FOR THE AMERICAN EXPEDITIONARY FORCES

AT GIEVRES, FRANCE. IT IS THE THIRD LARGEST PLANT IN THE WORLD.]

[Illustration: INTERIOR OF FREEZING ROOM OF ICE PLANT AT GIEVRES.]

At Nevers, in the intermediate section, a condition existed requiring

the construction of six miles of new double-track line, with a bridge

over the Loire River 2,190 feet long. This piece of construction is

known as the "Nevers Cut Off." It relieved the railroad congestion at

this important point.

At Is-sur-Tille, in the advance section, was built a regulating station

at which train loads of supplies and troops were dispatched to points

where needed. Still farther toward the front, at Liffol-le-Grand, was

another and smaller regulating station, controlling troop movements and

the distribution of munitions and subsistence. Both of these projects

were entirely new and were in useful operation when the war terminated.

In addition to the above projects, many storage yards, hospital tracks,

ordnance depot yards, aviation center tracks, and construction tracks

were laid out and built. In all 937 miles of single track were laid,

thus fulfilling in the equivalent the prediction that to supply an

American Army at the front we should have to build a double-track

railroad from the French coast to the trenches.

Storage depots, remount depots, and veterinary hospitals erected by

the Engineers proved entirely adequate for the needs of the American

Expeditionary Forces at all times. A grand total of 536 acres of

covered storage was built or acquired, of which about 482 acres was

new construction. Space was provided in remount depots for 29,000

animals, and it was projected to accommodate 48,700 animals had it

been necessary. Veterinary hospital space was provided for 17,250 sick

animals. Each veterinary hospital required much special construction,

such as concrete dipping tanks for the treatment of mange, operating

rooms, exercising paddocks, hay sheds, living quarters for attendants

and veterinary surgeons, and administration buildings.

At Gievres, in connection with the important storage depot built there,

was constructed the third largest refrigerating plant in the world.

This plant, built by the Engineers from plans prepared by experts, was

capable of caring for 5,200 tons of meat at once, and of producing 250

tons of ice per day. Another similar plant at Bassens had a capacity

for 4,000 tons of meat.

Miscellaneous construction work in France covered many fields of

activity. The question of adequate water supply was ever present, and

in most places where hospitals, depots, shops, or warehousing plants

were built, a water supply development was incidentally necessary. Many

systems were installed complete from the collection of the water at

its source to its distribution to the points of consumption, while in

some other cases only extensions and ameliorations of existing systems

were undertaken. Water supply in the service of supply was placed

under as fine and complete a system of bacteriological inspection and

examination as is customary under more normal conditions. At Tours,

Vierzon, St. Nazaire, and Dijon, where unfavorable bacteriological

conditions existed, arrangements were entered into with these

municipalities whereby the existing water supplies were chlorinated by

the American water supply service.

At Is-sur-Tille was built a mechanical bakery at which 500,000 pounds

of bread, fresh for immediate shipment to the troops at the front,

could be produced in one day. Another such plant was built and put

into service at Neufchateau, and at Liffol-le-Grand it was proposed,

and plans had been prepared, to construct a third plant for 400,000

pounds of bread per day, but this project was canceled just after the

armistice. In addition to these plants, bakery capacity for 240,000

pounds per day was provided at the base ports.

Oil storage was provided for 175,000 barrels of oil and gasoline. The

large plants, with tanks having a capacity of 25,000 barrels each,

built with enduring concrete foundations and equipped with connections

and pumping plant for the loading of tank cars destined for the front,

rivaled in size the installations at large refineries of this country.

For the operation of these many plants numerous power developments were

undertaken, and a total of 5,000 kilowatts of new power, being provided

for at the time of the armistice, was canceled. Plants of the capacity

of 750 kilowatts each, providing 3,500 kilowatts of electric power in

all, were in operation when the armistice was signed, not to mention

numerous smaller units installed at various points where needed.

Ordnance repair shops were erected, as were also assembling plants

for ordnance material, and heavy gun-mounting plants. Repair shops

of enormous extent were established near the front, equipped with

machine-tool equipment for the repair and maintenance of tank and motor

transport material. Schools for the line and staff were constructed,

the first and largest being at Gondrecourt and Longres. Laundry plants,

salvage depots, aviation assembly plants, sewage disposal plants,

refuse incinerators, mechanical repair shops, locomotive assembly

plants and locomotive round-houses were placed at convenient points.

At Chalmdray and at Colombey-les-Belles, both within a short day's

automobile ride of the front, were the tank and air-service repair

depots, each one covering many acres of ground and each provided with

full equipment for any job of manufacture or repair in their respective

fields.

[Illustration:

AMERICAN ENGINEERS QUARRYING STONE TO REPAIR MILITARY ROADS

DESTROYED BY GERMAN SHELL NEAR MENIL-LA-TOUR, FRANCE.]

[Illustration: SAWMILL AT LARGEST LUMBER CAMP IN FRANCE. TWENTIETH

ENGINEERS NEAR ECLARON, FRANCE.]

[Illustration: HAULING LOGS BY MOTOR TRUCK, CAMP KELLOG, BORDEAUX,

FRANCE.]

[Illustration: STORAGE DAM AT SAVENAY, FRANCE, AND THE LAND THAT WILL

BE INUNDATED WHEN IT IS COMPLETED.]

The forestry work of the American Expeditionary Forces was developed

to meet the heavy demands of our armies for forest products of all

kinds. The first move in this direction was the dispatch to France of

the Tenth Engineers, a forestry regiment of two battalions. This was

in September, 1917. By the spring of 1918 we had recruited and trained

the Twentieth Engineers, a forestry regiment of 10 battalions. Later

additional forestry troops were sent across. Shortly before hostilities

ceased all these troops were consolidated into a single regiment of

13,000 men, known as the Twentieth Engineers. To this force were added

negro service troops to the number of 9,000, making 22,000 men engaged

exclusively in the work of cutting down French forests and turning them

into lumber required by our forces.

At first we had difficulty in supplying the necessary machinery. Until

the sawmills came the forestry troops were engaged in building camps

and hewing out railroad ties. In January, 1918, the machine equipment

began to arrive. In February our troops cut about 3,500,000 feet of

lumber; while in October the cut for the single month had reached

the enormous figure of 50,000,000 feet. When the war ended we were

expanding our forestry operations in France to produce 1,000,000,000

feet of lumber in a year.

The lumber produced by our sawmills in France up to November 30,

1918, would build completely enough barrack buildings 20 feet wide to

stretch out to a distance of 600 miles if placed end to end, quarters

enough for 3,107,600 men. In addition to this output the railroad ties

produced would build 1,091 miles of standard-gauge railway and the

small ties for the 24-inch track would build a double-track railroad

behind 185 miles of trenches.

Just the posts and poles produced, if all cut into 6-foot posts, would

be sufficient to support a wire fence, with posts one rod apart,

reaching one-third of the distance around the earth. The piling, if

stood end to end, would make a flagpole 362 miles high. The cord-wood

produced would make a rack 1 yard wide, 1 yard high, and 600 miles long.

The sawmill machinery installed to accomplish such a production

comprised 30 mills of 20,000 feet per day capacity, 56 mills of 10,000

feet per day capacity, and 92 smaller mills capable of producing ties

and rough timber.

In the base and intermediate sections a large amount of work was

necessary in the maintenance of the existing roads and highways,

and in the construction of new roads in the vicinity of the various

new projects. Experienced road engineers, drawn from civil life and

commissioned as officers of the Army, were put in charge of this work,

and specialist engineer troops and labor battalions were assigned

to them. Quarrying the rock, grading the road, surfacing it, and

maintaining it in good condition thereafter--all these duties fell

within the province of the engineers.

LIGHT RAILWAYS AND ROADS.

The light railway and road regiments of engineers attached to the

armies at the front, while their duties did not carry them so far or so

much into the zone of enemy fire, may be considered as combatant units,

since they operated with and in support of combatant troops in the

field. To the light railway regiments were assigned the construction,

operation, and maintenance of the light railroads of 60-centimeter

gauge (about 24-inch gauge). A great quantity of such trackage was

used during the war. These narrow-gauge railroads, capable of being

operated under extreme conditions of grade and curvature, and powered

with light steam and gasoline locomotives, were essential to the proper

supply of a stabilized sector. They were the lines of communication

between the railheads of the broad-gauge system and the dumps and

depots within the front sectors. At the very front, sometimes within

a few hundred meters of the German lines, these light railroads were

operated by hand or animal traction, while further back the gasoline

locomotive, less conspicuous than the steam engine, came well within

range of the enemy's light field pieces. In periods of activity and

during an advance these railroads did a tremendous service, not only in

transporting troops, munitions, materials, and subsistence stores, but

in affording a means of bringing up rapidly a certain class of railway

artillery adapted for use upon 60-centimeter gauge trucks. Built of

light rail and steel ties assembled in portable sections, this track

was easily destroyed by shell fire, and such was often its fate, yet it

was but short work for the engineers to replace broken sections with

new material, a work frequently done under heavy fire. Engineer troops

suffered many casualties in this service.

In cooperation with the Engineer Department in the United States, a

practical, efficient, and standard type of narrow-gauge motive power

and rolling stock was developed by American manufacturers. This

material was shipped to France knocked down, and was assembled and set

upon the rails at Gondrecourt, where a plant for this purpose had been

established. Up to November 30, 1918, there had been built and placed

in operation 538 miles of 60-centimeter track, with 347 steam and

gasoline locomotives furnishing motive power for the operation of 3,281

cars of different types.

[Illustration: TYPE-PRINTING, BASE PRINTING PLANT, 29TH ENGINEERS, A.

E. F.]

[Illustration: LITHOGRAPHIC PRESSROOM, BASE PRINTING PLANT, 29TH

ENGINEERS, A. E. F.]

[Illustration: BINDING DEPARTMENT OF THE PRINTING PLANT OF THE SOCIÉTÉ

PUBLICATIONS PERIODIQUES.

The new pay books were manufactured at this plant and were

turned out at the rate of 100,000 a day, using 36 tons of

print paper, 16 tons of parchment cover, 15 tons of paper for

envelopes, 6 tons of paste, 10,000 rolls of moleskin. Paris,

France.]

The road-building regiments in the zone of the armies built and

maintained the roads immediately behind the front. Equipped with modern

road-building machinery and motor trucks, these regiments maintained

the roads in shape to handle the abnormally dense and heavy traffic

incidental to operations at the front. The Army road troops were

recruited from among men accustomed in civil life to road building,

quarrying, and construction operations. They usually worked well within

sound of the enemy guns, and frequently under their direct fire.

During the advances made from the stabilized line of June, 1918, these

regiments improved and perfected the hasty roads thrown across No

Man's Land by the sapper regiments of the fighting divisions, so that

transport of supplies and troops could be maintained to the advancing

armies. To furnish materials for this construction many quarries were

opened or taken over from the French road service. A total of 42,000

cubic meters of rock was quarried and prepared for use in quarries

operated exclusively by American engineers, while in quarries jointly

operated with French forces 75,000 cubic meters were produced.

MAP MAKING AND PRINTING.

A vitally important part of the work of Engineer troops was the making

and reproduction of the many maps required for the conduct of tactical

and strategic operations by the American Expeditionary Forces. A highly

specialized regiment was organized to conduct the topographic surveying

operations, map reproduction, and printing work in France. Many of the

officers of this regiment had been formerly connected with the American

Coast and Geodetic Survey and the Geological Survey, and they were

well qualified for the work of war-map making. At Chateau Thierry a

portion of this organization rapidly mapped to a large scale the new

region in which the theater of operations suddenly found itself, thus

supplementing the excellent small-scale map which was in existence

for the whole of France, but which was not sufficiently precise for

the conduct of our artillery fire. This work was done under pressure,

but it contributed its share to the later American successes in that

locality. These troops also were charged with furnishing to the

Artillery the mathematical azimuths and coordinates, on the basis of

which artillery indirect fire was executed.

The maps in use even on stabilized fronts were in a constant process

of revision and change. The data and information on which these

changes and revisions were based were constantly pouring in from the

photographic branch of the air service, from the intelligence service,

the Artillery, and from the sapper regiments at the front. Consequently

new maps had to be prepared continually and furnished to all the

organizations and officers concerned with their use. Then, too, an Army

as large as ours required an impressive amount of field printing in

order to distribute its orders and information.

As soon as our forces reached France it was apparent that the French

map-production plant could not take care of our needs. The Chief of

Engineers in the United States thereupon ordered the purchase of

equipment for a base printing plant large enough to take care of all

the map printing for an army of 1,000,000 men. The special machinery

ordered in the United States for this plant did not arrive in France

during 1917, and so the American Expeditionary Forces purchased abroad

five large rotary lithographic presses, several type presses, and a

number of linotype machines and other printing equipment.

The base printing plant was established at Langres, France. In the

spring of 1918 the American equipment arrived, and thereafter the base

printing plant was able to print not only the current maps required but

also the base maps which the French had been supplying. In addition,

during the heavy fighting in July and August, 1918, our printing plant

supplied to the Seventh and Eighth French Armies the base maps of their

fronts.

The demands for maps and printing steadily increased until the base

printing plant grew to have a working force of 35 officers and 750 men.

From July 15 until September 15, 1918, the plant worked continuously 24

hours a day to turn out the work required. By this time the shop had

10 rotary lithographic presses, 4 linotype machines, and several job

presses, printing each month an average of over 1,200,000 lithographic

impressions and 500,000 sheets of printed matter. In November the plant

turned out 1,900,000 lithographic impressions and over 1,000,000 sheets

of type work.

To supplement the base printing plant we had at each army headquarters

an advanced printing shop to supply maps when they were needed within

a few hours. At the base printing plant we had a department for making

relief maps, which work had been done for us previously by the French

Government.

The equipment for military map making was enriched during this period

by an invention of Maj. James N. Bagley, United States Engineers,

called the aerial cartograph, or map camera. The Bagley camera's

three lenses at the height of 5,000 feet could photograph a strip of

territory 3½ miles wide.

MILITARY BRIDGES.

The science of building military bridges is an old one. When war with

Germany was declared the United States had developed its heavy ponton

equipment, which was standard in design and yet which had changed but

little since the Civil War. As soon as we formally took the step to

send troops against Germany the Engineers ordered great quantities of

this equipment and by the latter part of 1917 had plenty of it ready to

go overseas. Our deliveries to France, however, were hindered by the

shortage in ocean tonnage, particularly after we had begun to use every

available ship for the transport of men.

[Illustration: TRUCKS LOADED WITH PILING EN ROUTE TO FRENCH RAILWAY

YARDS NEAR BRUYERS, FRANCE.]

[Illustration: PILE DRIVING FOR FOOTBRIDGE BY ENGINEERS IN FRANCE.]

[Illustration: FOOTBRIDGE BUILT BY ENGINEERS ACROSS CANAL DE L'EST NEAR

THE VILLAGE OF BRIEULLES, FRANCE.

This bridge was constructed under heavy fire from enemy guns.]

Meanwhile the efforts of the Engineers were being directed to the

development of standard ponton equipment strong enough to carry tanks

and the ponderous artillery of the present day. The old ponton bridge

was first strengthened to carry loads of 5 tons on each of two axles

spaced 10 feet or more apart. The standard prewar equipment would

support only 3 tons similarly spaced.

The next step was to develop a bridge that would hold up axle loads of

10 tons with a distance of 12 feet or more between axles, although in

actual use this bridge showed itself capable of supporting a load of 15

tons concentrated on one axle. As soon as these developments were made,

the plans were mailed to the American Expeditionary Forces, so that the

Engineer Corps abroad could provide the beams and metal parts at its

own mills and shops in France. When the fighting ceased, the Engineers

were designing a raft capable of transporting the heaviest portable

ordnance then under manufacture in the United States.

In 1917 the Engineer Department made designs for a standard sectional

steel bridge, consisting of short latticed steel truss sections capable

of being assembled to form trusses varying by increments of 11 feet up

to a maximum span of about 90 feet. Two of these trusses with the span

mentioned were capable of supporting a load of 30 tons, and they could

be erected in a matter of hours over abutments prepared in advance or

extemporized from the ruins of a demolished structure. These bridges

had been manufactured in quantity in this country and were ready for

shipment when the armistice was signed.

In the Argonne push Army bridge troops repaired and replaced the

bridges destroyed by the retreating enemy as fast as material and labor

could be provided at the points needed. For this work much heavy timber

was utilized, and, in general, trestle structures were erected as best

meeting the conditions of relatively soft crossings and soft river

bottoms.

The fighting in the French terrain with its numerous narrow but deep

streams and canals indicated to us the desirability of a portable

floating footbridge. Such a bridge was designed and produced by the

Engineers in France. Many of the crossings of the Meuse River and

near-by canals under machine-gun and artillery fire from the high hills

on the eastern side were made possible by the use of these bridges.

CAMOUFLAGE.

While camouflage has existed in nature since the beginning of time,

its application to warfare on a grand, scientific scale was almost

solely a development of the great war. Camouflage, due to the great

developments of aerial observation and aerophotography, as well as of

air bombing and indirect artillery fire, became a vital necessity for

every branch of the service, far back in the rear as well as at the

front. Any matériel or personnel the position of which was observed was

at the mercy of the enemy, but, further, such observation might betray

strategic plans. The need for camouflage became universal.

Camouflage organization was carefully developed for both the field

and the factory, while one of the most important duties, that of

instruction, was carried out in Army and corps schools and artillery

camps, where thousands of officers and men were taught both the

necessity and the methods of camouflage.

Our undertakings in this direction were based largely upon the methods

developed by the French and British. In one respect camouflage was a

matter of quantity production. This was in the manufacture of material

used for concealing guns, roads, and other strategic locations which

fall under the eyes of enemy observers on the ground or in the air.

In this work the British did nothing without the most careful

scientific investigation, including the aerial photography of all

their materials used, while the French relied more on their innate

artistic sense of color and form. The camouflage material produced in

quantity by the British consisted principally of burlap cut in strips

about 1 inch wide and 12 inches long, colored in the desired hues with

oil-emulsion paint. For artillery cover this was knotted in fish nets

and chicken wire. The French for this purpose used raffia, a common

product of Madagascar, whose natives use it largely for making their

fantastic garments. The raffia was dyed and then knotted on nets and

wire in the French camouflage factories.

After a careful study we adopted the British system and used burlap.

Our Engineers made this decision because of the impossibility

of finding permanent dyes for raffia and because raffia is more

inflammable than burlap and scarcer and higher in price.

The first demand for camouflage material which we received embraced

coverings for guns, sniper's suits, dummy heads, silhouettes, and some

airplane hangar covers. In order to supply this material at the outset

the engineering forces abroad leased a factory building in Paris and

turned out a sufficient quantity with a working force of 30 enlisted

soldiers and 100 French women.

But, as the American troops at the front increased in number, the

demands for camouflage material became rapidly heavier. Battery

positions of some types required about 4,000 square yards of camouflage

cover. Aviation hangar covers were demanded in large numbers, and

each one was a special order due to the varying conditions of terrain

encountered. It became evident that we needed a vast increase in our

camouflage-factory space.

In January, 1918, the Engineers secured about 20 acres of ground in

Dijon, Haute Marne, a city on the main supply line north through the

regulating station at Is-sur-Tille. They started to erect buildings

immediately, and within 20 days this plant began turning out material.

By November the Dijon factory numbered about 40 buildings, including

blacksmith and machine shop, a sewing shop, a paint shop, laboratory,

and a toy shop where dummies and silhouettes were made. The factory

turned out artillery cover at the rate of 50,000 square yards per day.

The total output of camouflage cover for all purposes required about

3,000,000 square yards of burlap per month. When the fighting stopped

the American Expeditionary Forces were using camouflage materials to

the value of $1,500,000 monthly.

By new methods of manufacture, we succeeded in reducing the weight

of fish-net covers. We designed two important field devices, one

being an improved frame and set for mobile artillery protection, this

equipment being later adopted by the British, and the other an umbrella

machine-gun cover having special advantages. The central camouflage

works of the American Expeditionary Forces at Dijon was declared by

unprejudiced observers to be the best equipped and most efficient of

any on the western front.

When the Dijon camouflage plant was projected it was expected that

the American forces would require great quantities of camouflaged

observation posts, silhouettes, dummy heads, snipers' suits, and other

concealing devices. It was for this production that the toy shop at

Dijon was erected, this shop being a kind of studio for the painters

and sculptors connected with the Fortieth Engineers, which was the

camouflage regiment. These various devices for deceiving the enemy,

however, were used principally in the stagnant action of the trench

warfare deadlock. By the time American forces came into the war in

large numbers the struggle had become one of movement in which the

trenches were left far behind. Also, American troops found themselves

largely in sectors which were well wooded and therefore provided plenty

of secure observation. The result was that there was never a great use

on the part of American troops of these clever and interesting exploits

in camouflage with which the public is familiar.

One of the best observation posts was the imitation of a tree trunk

made of armor plate and set up in advanced positions during the night.

Both the British and the French made considerable use of these. The

British tree consisted of an oval shell of manganese steel. This was

covered with tin, crimped in imitation of bark, and further camouflaged

with paint and plaster and natural bark.

When it was desired to set up such a post a camouflage artist would

surreptitiously make a faithful sketch of the tree trunk to be

duplicated in armor plate. This sketch was then taken back to the

workshop, where the spurious tree was built in exact duplication. The

metal tree was built to rest on a base with hinges holding it down on

one side. During the night two saps, or trenches, would be dug to the

natural tree selected. Workers in one of these trenches would fell the

branchless stub and carry it back out of the way. The armor plate tree

would be drawn up in the other trench. The base would be set in place,

and then the whole tree was raised on its hinges by means of ropes

until it was upright and as life-like as artistry could make it. Inside

the tree was a flight of iron steps leading to a seat in the upper part

of the trunk. At this seat were peepholes and a stand for the phone

which was connected up with the exchange at the adjoining trench. The

sap, covered over, served as the gallery leading back to the trench.

The American camouflage force built only a single one of these trees,

using it as a training device. Such objects were useless in an

advancing movement, since, under such circumstances, they would play

an important part only a short while and would then be left far in the

rear.

The Dijon factory, however, turned out a number of small observation

posts for use at the edges of shell holes. These were known to our

troops as beehives and to the English soldiers as domes. Each one was

built of light metal and covered with chicken wire and plaster. It was

camouflaged with paint and bits of grass to simulate the appearance of

the surrounding terrain, often being studded with tin cans or old shoes

to make it appear to be an accumulation of rubbish. The favorite way of

making the peephole for a beehive was to cover with gauze a hole cut in

the bottom of an old shoe, which was then fastened to the observation

post.

Another device built by the Dijon factory was the trench periscope.

This was built and set up to look like an ordinary stick, thrown down

casually upon the ground. For periscopes, too, we also used imitation

stakes placed naturally in the barbed-wire entanglements. The British

on occasions used imitation trench telephone poles to mask their

periscopes.

The Dijon shop turned out large numbers of silhouettes and dummies.

They were drawn from life by artists at Dijon and then cut out from

ordinary wall board. Soldiers of the Fortieth Regiment posed as models

for these silhouettes. All sorts of postures were employed, but nearly

all of them represented soldiers in the act of climbing out of a trench

or running, gun in hand, towards the enemy. The uniforms were painted

in neutral shades, but the faces and hands were highly colored to be

visible at considerable distances during the gray and mist of dawn,

when silhouettes were usually employed.

The object of these dummy heads and silhouettes was to draw the fire

of the enemy so as to make him reveal his strength and positions. The

usual method of use was to place a number of silhouettes, possibly

several dozen of them, in shell holes out in front of the trenches.

The silhouettes were mounted so that they could be made to stand

erect instantly whenever the ropes were pulled from the trenches. At

the appointed moment the ropes would all be pulled at once, and the

appearance to the enemy would be that of a raiding party starting out

at top speed.

The British troops called this operation the Chinese attack. The

Germans made no extensive employment of it. The silhouettes nearly

always fooled the enemy, as indeed they would deceive anybody in such

light and under such circumstances. The British were often amused to

read in the German communiques that these Chinese attacks were regarded

by the enemy as the real thing. More than one such "repulse" of

silhouettes has gone down into the German records as a local success.

On one occasion the Germans took a Chinese attack so seriously that

they concentrated troops against it with the result that the British

were able to gain considerable ground at the points weakened on both

sides of the pseudo attack.

The Dijon factory made a thousand or so silhouettes, as well as a

large number of dummy heads, these latter devices to draw the fire

of snipers. These simulacra, however, had their principal use at the

training schools in France, since they were peculiarly adapted to

trench warfare, and by the time the American forces reached the front

in strength the war of movement was in progress.

Several thousand sniper suits were turned out at Dijon. These suits

were made of burlap, resembling in appearance the teddy-bear pajamas

which little children wear. They were colored to match the terrain,

either painted to resemble rocks or fitted with a grasslike covering.

An adjunct to this suit was the cloth cover for the sniper's rifle.

Sniper suits were so deceptive that they would protect a man from

observation even at short distances, and if exceptional care were used

in the making of one, a man could conceal himself so effectually that

an observer might step on him before seeing him. An American camouflage

officer upon his return from France brought a sniper's suit with him

and found a novel but practical use for it when he was invited to go

duck hunting with a party of sportsmen. The other hunters stayed in

their blinds, but the officer in the sniper suit went out in the open

and shot more ducks than all the other gunners together were able to

bring down.

The Dijon camouflage factory also turned out a large number of covers

for the so-called Bessenaux hangars for airplanes. These hangars were

large tents set up at aviation fields near the front. It was soon found

to be impracticable to attempt to camouflage such tents by day, as

they gave plenty of indication of their position in spite of the best

efforts at concealment on the American and allied sides. However, the

great danger at aviation fields came at night when the German bombing

planes were abroad. Even on a dark night a white tent proved to be a

good mark for the hostile airmen. Consequently the attempt was made to

camouflage Bessenaux hangars at night only. It was found impracticable

to paint the tents themselves, since the waterproof canvas would not

take the paint readily. The solution was a large cover of burlap. This

was painted in broken patches of color, much as artillery was painted

in camouflage. At the factory such covers were spread out on the ground

and painted with floor brushes dipped into water color.

All machinery at Dijon, with the exception of two lathes, two drill

presses, and a shearing machine, was designed and built at the plant

itself. The work of providing camouflage cover required enormous

quantities of burlap to be cut up into strips. The English camouflage

shops used stationary knives and a machine operated by a crank.

American Engineers at Dijon designed a power-driven cutting machine

with a large number of circular, whirling knife blades. The invention

of this machine increases the production of burlap strips 900 per cent

with the same force. The engineers at the plant also designed paint

tanks and special machinery that would mix 4,000 gallons of color in a

day.

There were about 1,000 French women employed in this plant. The

executives paid great attention to their welfare. A special nursery,

the "Creche," was built for their children. American Red Cross nurses

cared for the babies during the time their mothers were at work. Many

of the women employed were refugees driven from once comfortable homes.

Their children fattened up with the good food provided by the army

mess, and the mothers were correspondingly happy. Entertainments were

frequently provided for the operators of the factories. The artists at

the shop worked during their leisure moments and eventually produced

the scenery and equipment for a genuine Yankee circus, animals and all,

the menagerie, however, being made principally of papier-mâché with

human operatives inside the beasts. The first performance of the circus

was given on Thanksgiving Day, 1918, and the audience was so delighted

that it demanded a repetition. After three encores of this sort it was

suggested that performances be given in Dijon, a city of upward of

50,000 population, with admittance charged. This advice was followed,

and the circus made such a hit that the Engineers were able to turn

over to the French orphan fund a considerable sum of money.

CONCLUSION.

The foregoing account gives in a broad way an idea of the scope of

activities and the achievements of the Engineers during the 19 months

of actual warfare in France. To furnish the organization of technical

troops and specialists which made all this possible, the original

Engineer Arm of the United States Army was increased to 131.5 times

its prewar strength, and the proportion of Engineer troops relative to

the total forces was increased from 1.6 per cent to 10.8 per cent. To

accomplish this, a heavy demand was made upon the technical professions

and upon the industries of this country. In filling this demand most

necessary assistance was given by the engineer societies and the

engineering journals, whose patriotic work demands the highest praise.

In situations requiring special knowledge almost always there could

be found some specialist capable of adapting himself and his work to

the military needs. Engineer officers for the combatant regiments were

younger members of the technical professions, who were sent to the

training camps provided for the purpose and there given the essentials

of strictly military knowledge. This training was later supplemented by

courses in Engineer and line schools located in France. The training

officers of the regiments were supplied from the Corps of Engineers,

these men having both the military and technical knowledge fitting

them for the command. The diversity of education and experience

necessary in all branches of the Engineer service may be understood by

a consideration of the duties of the different units sent to France

during the war--specialist units, in addition to the strictly combatant

divisional regiments, who also numbered among their commissioned and

enlisted personnel many technical specialists of high attainment.

We had, for instance, seven railway construction regiments, two

railway construction battalions, one regiment and five battalions

for railway maintenance of way, two battalions for maintenance of

railway equipment, four regiments and one battalion to operate our

main military railways in France, three regiments to operate the

light railways in France and their repair shops, two regiments for

operating the regular railway shops, two regiments and six battalions

for constructing buildings and other general construction work, two

regiments for storing and transporting Engineer supplies, a forestry

regiment, a light railway construction regiment, a regiment for

building roads, a water supply regiment, a mining regiment, a quarrying

regiment, a technical regiment for handling surveying, sound ranging,

and location of enemy positions by means of special apparatus, three

survey and printing battalions, two railway transportation battalions,

an electrical and mechanical regiment, several companies to operate

cranes, a camouflage service, five inland waterway companies, five

ponton trains, a ponton park, a railway transportation and stores

battalion, and a searchlight regiment.

Utilizing and applying the new knowledge and scientific achievements

of recent years, drawing upon the fund of experience acquired by the

Regular Army in its theoretical studies and past wars, making available

the vast amount of technical skill which has assisted this Nation to

its present commercial and industrial status, the Engineers of the

United States Army worked and fought, planned, and accomplished in

France a work which in magnitude exceeds any similar undertaking

recorded in American history. From base port to first waves of an

assault upon the enemy's position, Engineer troops have been constantly

in action first to last and have "carried on" always with the high

ideals of the profession and with the motto of the Corps of Engineers,

"_Essayons_," before them.

CHAPTER II.

MILITARY RAILWAYS.

In establishing contact between our great bases of supply on the

French coast and interior points, as well as with the fighters in the

various fields of operations, the Department of Military Railways of

the Engineer Corps found it necessary to provide thousands of miles

of railway track ranging from the standard gauge down to the narrow

60-centimeter type built right up to the border of No Man's Land,

to construct and ship across seas thousands of almost every kind of

freight cars, to build hundreds of locomotives and transport them to

Europe, to provide in addition fabricated track that could be laid

under heavy shell fire, and hospital trains that could care for our

wounded.

It was on July 10, 1917, that Gen. Pershing cabled stating that the

French had asked for 300 locomotives and 2,000 kilometers of track, in

addition to numerous items of accessories that go with an order of this

size. Delivery of the locomotives was requested by October 15, 1917,

and of the track by December 31, 1917.

It was ascertained that the American Locomotive Works had built

consolidation engines for France of an entirely satisfactory type, and

that similar locomotives for the use of British forces on French soil

had been turned out by the Baldwin Locomotive Works. After the decision

to adopt the consolidation type of locomotive, which is generally used

in freight service in the United States, arrangements were made at once

with these two concerns to build 150 locomotives each.

The consolidation locomotive weighs 166,400 pounds, and is about the

heaviest that can be used in France. It has one pair of engine truck

wheels and four pairs of drivers. The engine is just as large as it is

possible to use within the French tunnel and platform clearances. The

type sent to France was, however, not nearly so large nor so heavy as

the general run of freight engines used here.

The order for 150 engines was placed with the Baldwin concern on July

19, 1917, and the first locomotive of this order was ready for shipment

on August 10, 1917, just 20 working days elapsing between the date

of the placing of the order and the day when the first engine was

completed and all set up ready for shipment.

This is believed to have established a new record for locomotive

construction in the United States and probably in the world for an

engine of this size. All the other locomotives in this order were

delivered promptly--36 of the Baldwin engines being freighted from the

factory in August, 71 in September, and the final 43 in October. Of

the locomotives ordered from the American Locomotive Works, 133 were

freighted in October and the remaining 17 in November.

On account of differences in the details of construction the original

price fixed for the locomotives turned out by the American Locomotive

Works was $51,000 each and for those of the Baldwin Works $46,000

apiece. Advance payments on these engines reduced the price by $1,000

each.

Changes in the painting and other small details resulted in a saving of

$60 additional on each locomotive built by the Baldwin Works and $400

on each engine turned out by the American Works, so that the net cost

of each Baldwin locomotive was $44,940, and of each American locomotive

$49,600.

After much consideration, and after this initial order had been

disposed of, it was determined that the Baldwin type of engine should

be made the standard, and all subsequent orders for engines went to the

Baldwin Works.

As orders were placed from time to time with the Baldwin people,

reductions were made in price, so that the last engines of the total of

3,340 ordered from this concern were obtained for $37,000 each. Orders

for 1,500 of these engines eventually were canceled without cost to

the United States Government. The saving effected by the reduction in

price on the engines ordered, using the original price as a basis of

comparison, was $22,989,385.

There were shipped in all to the American Expeditionary Forces 1,303

locomotives, of which 908 had been put into service by November 11,

1918.

During the severe winter weather of 1917-18 and the simultaneous

shortage of motive power on American railways, 142 of these

consolidation engines built for the American Expeditionary Forces were

turned over to the American railways to help out a critical situation

in this country. It was possible to use these engines here by making

changes in the couplers and some other slight additions to meet the

requirements of our safety appliance laws.

At the time these engines were turned over to the Railway

Administration we were producing locomotives for France much more

rapidly than it was possible to provide tonnage to transport

them overseas. These locomotives were in service helping out the

transportation facilities in this country an average of 6 months

and 28 days each before being recalled for shipment to France. They

earned profits for the Government while in service for the Railroad

Administration at the rate of 32.3 per cent a year.

[Illustration: STANDARD GAUGE 10-WHEEL CONSOLIDATION (BALDWIN)

LOCOMOTIVE. CYLINDER, 21 INCHES × 28 INCHES.

Driving wheels, 56 inches; wheel base, engine, 23 feet 8 inches; wheel

base, engine and tender, 57 feet 4½ inches; weight in working order,

engine 166,400 pounds, tender 112,000 pounds; tractive power 35,600

pounds; capacity, water 5,400 gallons, fuel 9 tons.]

[Illustration: RATION TRAIN NEAR MENIL-LA-TOUR, FRANCE.]

It might also be noted that the Director General of Military Railways

was appointed custodian of undelivered locomotives ordered by the

Russian government from the Baldwin and American Works. In January,

1918, a total of 200 of these Russian locomotives was purchased,

and the engines were converted to meet American requirements by a

change in the gauge from 5 feet to 4 feet, 8½ inches, and a change

in the coupling system to meet our standard. The price of these was

$55,000 each. The Baldwin Works turned its 100 over to the Railroad

Administration between February 3 and May 20, 1918, and the American

Works made its deliveries between February 19 and May 30, 1918.

The combined cost of these locomotives was $11,000,000 and their total

rental revenue from the railroads was $2,585,475 up to December 31,

1918, or 23.5 per cent of the cost price, or at the rental rate of 29.8

per cent per annum.

Orders for 90,103 freight cars to be used by the American Expeditionary

Forces were also placed with American contractors. Of these the orders

for nearly half--40,915 cars, in exact figures--had been placed just

before the armistice, and these contracts were canceled at slight cost

to the Government. Up to the end of the year 1918 a total of 18,313

freight cars had been shipped overseas, nearly all of these cars being

of the 60,000-pound size. Close bargaining in the purchase of these

cars resulted in a saving of $15,737,633 under the prices originally

quoted.

For the first time in history American locomotives were shipped

across the Atlantic stacked in ships on their own wheels. In our

normal foreign trade, and even in the early locomotive shipments to

the American Expeditionary Forces, both engines and cars had been

disassembled at the seaboard and their parts put up in packages

for convenient and economical loading on ships. Each of the first

locomotives sent to France was crated in 19 packages, while the parts

for an ordinary box car were put up in 26 packages.

On October 29, 1917, however, Gen. Atterbury called attention to the

fact that the English were shipping locomotives across the Channel

on their own wheels and stated that it would result in very great

economies of time, money, and man power if such an arrangement could

be made for shipments from the United States. Manufacturers of the

locomotives, however, advised against this. So did our own embarkation

people and the Shipping Control Committee. Efforts were unsuccessful to

get car ferries from the Key West and Habana line and from Quebec for

the transport of locomotives on their own wheels over the ocean.

Finally, however, after numerous efforts to get ships with large

hatches the ore steamer _Feltore_ was loaded with 33 locomotives on

their own wheels, packed in baled hay. This steamer sailed May 18,

1918, and its arrival in France resulted in the following cable from

Gen. Pershing:

Shipment of erected locomotives transmitted on the _Feltore_

very satisfactory. Boat completely discharged of locomotives

and cargoes in 13 days with saving of 15 ship's days in

unloading the 33 locomotives erected as compared with same

number of locomotives not erected and further saving of 14 days

of erecting forces. Observations of Capt. Byron, who came with

these locomotives, show that by loading locomotives in double

tiers, placing cab parts and tools, now in separate packages,

within tender space and fire boxes, 40 to 45 locomotives can be

loaded.

Subsequently the steamers _Cubore_, _Firmore_, and _Santore_ were

assigned to the task of carrying these engines over on their own

wheels. The total number of locomotives that went abroad in this

manner was 533. After the signing of the armistice we sold the French

Government 485 locomotives, of which 142 had been shipped up to January

1, 1919.

Efforts were likewise made to ship over freight cars already set up

but this was also met with much objection. Finally, 1,000 cars were

built to go over complete but the signing of the armistice stopped the

shipment. The saving in the cost of shipping locomotives on their own

wheels amounted to $775 for each one, and an average of $20 a car would

have been saved by sending the cars over on their own wheels. But, in

addition to this, the cost of erection on the other side, amounting to

$800 for each locomotive, should also be added to the saving.

The number of cars actually shipped overseas for the American

Expeditionary Forces, if made into one solid train, would be 140 miles

long.

In August, 1918, there came a call from abroad to produce locomotives

at the rate of 300 a month and freight cars at the rate of 8,200

monthly. Machinery for getting this production was started at once

and was so effectual that during the months of September and October

and up to the signing of the armistice engines were actually being

produced and shipped from the Baldwin Locomotive Works at this rate.

This company was turning out the greatest number of locomotives ever

produced by any one company in the same length of time.

Arrangements for increasing production of freight cars to meet every

possibility of tonnage facilities on the ocean were also made, and had

the armistice not been signed we had planned to produce during the

month of December 11,000 complete freight cars and to maintain this

production rate until we had filled all orders from Gen. Pershing.

[Illustration: LOADING RAILWAY LOCOMOTIVES, COMPLETE, ABOARD SHIP.]

[Illustration: 60-CENTIMETER GAUGE TANK CAR.

Capacity in gallons 2,500. In pounds 22,000. Length over end sills 22

feet 1¼ inches; width over side sills, 5 feet 7 inches; weight, 12,000

pounds.]

[Illustration: 60-CENTIMETER GAUGE V-SHAPED DUMP CARS.

Capacity, 27 cubic feet. Length over couplers, 6 feet 9 inches. Width

of body, 48-5/8 inches.]

[Illustration: RAILROAD LOCOMOTIVES PACKED WITH BALED HAY IN THE HOLD

OF A SHIP.]

On our first purchase of rails, amounting to 102,000 tons, the price

paid was $38 a ton for Bessemer steel and $40 a ton for open-hearth

steel, as against a price of $59 a ton that the Russians were paying

and prices between $54.36 and $61.87 that were being paid by the

French. There was a saving in this item of approximately $2,040,000

as compared with the prices paid by the Russians and of $1,938,000

compared with the prices paid by the French.

In connection with our first purchase of this steel rail, it should

be stated that the Lackawanna Steel Co. and the United States Steel

Products Co. agreed to sell us rail on this basis. Orders were placed

with these companies, but not with two other companies--the Cambria

Steel Co. and the Bethlehem Steel Co.--who declined to accept the price

offered.

All subsequent orders for steel rail were on the basis of $55 and $57

a ton for Bessemer and open hearth, respectively, which figure was

established by the War Industries Board pursuant to the Government

policy to stabilize industry by establishing fixed prices alike for all

purchasers--the Government itself, the allies, and the public.

A total of 937 miles of standard-gauge railway track was laid in France

with material shipped from this country.

A big money saving was effected by changing the design of the freight

cars asked for by our overseas forces. Their original call was for

17,000 four-wheel cars of the French type, these varying from 10 to

20 tons capacity per car. Our investigations here convinced us that

the American type of car with 30-ton capacity could be used on the

French railroads. Consequently we recommended that 6,000 of the 30-ton

American-type cars be sent abroad instead of smaller-capacity French

cars. Our recommendation was approved by officers abroad, and as a

result there was a saving of $12,640,000 in the cost of this initial

order of cars. From that time all cars shipped from the United States

were of the American 8-wheel type, a fact which resulted in a saving of

approximately $189,600,000 over what it would have cost to build and

ship the lighter French cars.

Had the light French type of cars, as originally suggested, been

adopted, 270,309 cars would have been required instead of 90,103

cars, and probably twice as much tonnage would have been necessary to

transport these cars overseas.

Most of the steel rails were purchased from the Cambria Steel Co.,

the Lackawanna Steel Co., the Bethlehem Steel Co., the United States

Steel Products Co., and the Sweets Steel Co. Raised pier, gantry, and

locomotive cranes were turned out by the several crane builders in

proportion to their ability to produce. The Standard Steel Car Co. made

millions of dollars' worth of metallic parts for freight cars, and

the Colorado Fuel & Iron Co. produced rails and bars. As previously

mentioned, the Baldwin Locomotive Works got the bulk of the orders for

locomotives, although the American Locomotive Co., the Vulcan Co.,

the H. E. Porter Co., and the Davenport Locomotive Works also made

locomotives for our Expeditionary Forces.

HOSPITAL TRAINS.

Ambulance trains were called for by Gen. Pershing in his cablegram

of July 15, 1917. It was stated in this message that plans for these

ambulance trains would be furnished by the Surgeon General of the Army.

To build these ambulance trains, with their complicated designs and

specialized equipment, in this country would have entailed lengthy

delay and very heavy expense, as after they had been constructed it

would have been necessary to knock them down for shipment. With this

fact in mind our officers here took up the question with Sir Francis

Dent, of the British railway commission, who was in this country at

the time. He stated that ambulance trains built by the London & North

Western Railway, which had proved wholly satisfactory in three years of

service, could be turned out by that same concern there quickly if the

English design were adopted for our Army.

After considerable discussion and consideration the English design

was followed, and orders for our ambulance trains were placed abroad.

Up to December 7, 1918, there had been completed for our Army 19 of

these trains, with a total of 304 cars, and there were in the course of

completion at that time or under order 29 additional ambulance trains.

Information from England shows that it was indeed the part of wisdom

to order these ambulance trains abroad, as figures from England stated

that the first 14 of these trains were produced at a cost to us of

£3,845 per car, including repair parts. This means that at the present

rate of exchange the cost of each coach was $18,302.20, while to have

built these cars in this country, knocked them down, and shipped them

overseas would have cost $40,000 each.

NARROW-GAUGE RAILWAY EQUIPMENT--FABRICATED STEEL TRACK.

The urgent necessity for narrow-gauge railway equipment for our armed

forces in Europe was first brought home to us when Gen. Pershing cabled

on July 15, 1917. In this message he asked for large quantities of

60-centimeter locomotives, cars, and track. The types requested were

entirely new in this country.

Specifically, there were required 195 60-centimeter steam locomotives

with a low center of gravity and with a maximum of 3½ tons axle load;

126 40-horsepower gasoline locomotives; 63 20-horsepower gasoline

locomotives; and 3,332 freight cars of various types, including box

cars and flat cars of 10-ton capacity, tank cars, and dump cars. To

aid in the building of this new equipment many photographs and designs

brought over from France were used. It was decided to build the 10-ton

cars fitted with small 4-wheel trucks at each end, rather than to make

them of the 4-wheeled type, as with this construction they would be

better adapted for the rounding of short curves.

[Illustration:

60-CENTIMETER GAUGE STEAM LOCOMOTIVE; TRACTIVE POWER, 6,225

POUNDS. CYLINDERS, 9 × 12, DRIVING WHEELS 23½ INCHES, WHEEL

BASE 5 FEET 10 INCHES; WEIGHT IN WORKING ORDER 34,500

POUNDS; CAPACITY: WATER 476 GALLONS, FUEL 1,700 POUNDS.]

[Illustration:

60-CENTIMETER GAUGE STEAM LOCOMOTIVE; 50 HORSEPOWER. CYLINDERS

5½ × 7, DRIVING WHEELS 30 INCHES, WHEEL BASE 4 FEET; WEIGHT

IN WORKING ORDER 14,000 POUNDS; FUEL CAPACITY, 30 GALLONS.]

[Illustration: ARMORED RAILWAY MOTOR CAR. HALL-SCOTT GASOLINE ENGINE;

LENGTH 62 FEET 9 INCHES, WIDTH 9 FEET 11 INCHES, TRUCK CENTERS 46 FEET.]

[Illustration: ARMORED MOTOR CAR, OIL-ELECTRIC ENGINE.]

[Illustration: ARMORED CAR EQUIPPED WITH 3-INCH GUN AND SEARCHLIGHT ON

CAR ATTACHED.]

In turning out the different kinds of locomotives for the 60-centimeter

railways new designs were made in order to produce locomotives that

would run with equal facility in either direction. For the gasoline

locomotives, designs of types similar to standard-gauge engines, a few

of which had been in the service in this country, were made, and orders

were placed with the Baldwin Locomotive Works for the first lot.

The first steam locomotives were delivered by the builders on October

3, 1917, and the first gas locomotives on November 7, 1917.

Orders for the freight cars for these narrow-gauge railways were placed

with a number of the larger car-building companies of the country. The

first of these cars were delivered November 24, 1917.

When the armistice was signed a total of 1,841 locomotives and 11,229

cars of the narrow-gauge type had been ordered and 427 locomotives and

6,134 cars completed. Up to the 11th of November 361 of the locomotives

and 5,691 of the cars had been shipped overseas.

Of the 361 locomotives sent to France, 191 were steam engines, 108

had 50-horsepower gasoline engines, and 62 had 35-horsepower gasoline

engines. Of the 5,691 cars that went to the Expeditionary Forces prior

to the signing of the armistice, 600 were box cars, 166 were tank cars,

500 were flat cars, 1,555 were 8-wheeled gondola cars, 330 were dump

cars, 100 were artillery truck cars, 970 were motor cars, 180 were

inspection cars, 300 were hand cars, and 990 were push cars.

For the construction of the narrow-gauge railroad used in the combat

areas behind the front line trenches a special type of fabricated track

was designed. This consisted of short sections of rail bolted to steel

crossties. The American narrow-gauge railway was so arranged that it

could be packed in knockdown shape to save shipping space. Most of

this track was in 5-meter lengths, although many shorter sections were

used. All, however, were in multiples of 1¼ meters, accurately sawed

so as to insure absolute fit of intermediate sections when shell fire

made replacement necessary. Vast quantities of curved track, as well as

innumerable switches and turnouts, also were built.

In all about 605 miles of fabricated, narrow-gauge steel track were

purchased and 460 miles shipped to France. All but 192 miles of the

fabricated track was built at the Lakewood Engineering Co., near

Cleveland. The balance was obtained through the United States Steel

Products Co. The cost of the straight track was about $7,400 a mile,

while the cost of the curved sections was $8,000 a mile.

Much of this narrow-gauge track that went to France was manufactured at

the rate of between 5 and 6 miles of completed track a day.

Great quantities of the fabricated track produced by the Lakewood

Engineering Co. were loaded upon camouflaged steamers in Cleveland in

May, 1918, and sent direct to France, via Lake Erie, the Welland Canal,

and the St. Lawrence River.

CHAPTER III.

ENGINEER ACTIVITIES AT HOME.

A vast quantity of motorized or portable equipment was required by

the Engineer units of the American Expeditionary Forces and this had

in the main to be furnished under the supervision of the Engineers in

this country. The extent to which this material was produced is shown

by such items as 6,923 trucks of all kinds, 2,082 portable buildings,

124 portable shop and material trucks, 51 portable pile drivers, 90

electric storage trucks, 6,006 boilers, and 3,504 dump cars. Two-thirds

of this equipment was shipped overseas before the armistice was signed.

The development of mobile shops was one of the most interesting phases

of this branch of engineering work. Quite early in the war, when we

began the construction of the great base shops in France, we developed

these portable machine shops, blacksmith shops, carpenter shops, and

storeroom shops in demountable truck bodies, to be used for general

service in the field. The shops were so constructed that they could

be entirely closed up when the unit was in motion; but when the shop

was ready for use the sides and ends of the inclosing structure were

lowered, forming work tables when the shop was left on the truck

chassis. If the shop were entirely demounted, these sides and ends,

let down, formed extensions of the floor. With this arrangement a wide

range of general repair and construction work could be handled on the

spot on short notice. If it were necessary for the shop to stay in one

place for several days or weeks, the body could be demounted, and the

truck chassis was then used for transporting materials to and from the

shop.

Each portable shop contained about 800 different items of tools and

equipment. Each was mounted on a 5½ ton truck. The portable machine

shop contained a workbench, a drill press, a portable electric drill, a

grinder, and a 14-inch lathe, these being operated by an electric power

plant carried on the truck; and it also had an equipment of necessary

small tools and supplies, including an oxyacetylene welding outfit.

The portable blacksmith, plumbing, and tin shops each contained a

workbench, forges, hoists, pipe-fitting machines, a shear and punch,

vises, and a welding and cutting outfit, together with a power plant

and switchboard and the necessary small tools and supplies. The

portable carpenter shop contained boring machines, a drill press, a

bench grinder, a workbench, a saw bench, a winch, power plant and

switchboard, small tools and supplies.

A complete machine shop on wheels cost the Government about $8,500. The

carpenter shop cost $7,600. As supply units for the portable shops, the

Government built 30 material trucks, each containing about 600 items of

tools and supplies. These material trucks cost $6,100 apiece.

Another successful development of this nature was the portable

photolithographic press truck, already referred to in the account

of the American Expeditionary Forces' lithographic equipment. These

automobile presses, which were at our front soon after our troops went

into the trenches, were able to print and distribute lithographic

sketches and maps within 12 hours after the original sketches were

submitted for reproduction. The French and British armies also had

mobile photolithographic units which were much less portable than ours

and much slower in operation. The best time made by the French and

British outfits was four days for the same work.

We also supplied to the Engineering forces abroad special water

sterilizers and water tanks, mounted on trucks. The Engineers put small

job-printing shops on trucks and photographic dark rooms on trucks for

use in the field.

They equipped trucks with derricks, capstans, and wrecking machinery.

They furnished automotive road sprinklers and oilers, as well as trucks

with special dump bodies for highway work.

They developed a light, portable pile driver unlike anything used

theretofore in commercial work. This machine was constructed of

structural steel and had a total weight of 4 tons. It was mounted on a

truck drawn by horses or mules, and the pile driver itself was operated

by a 25-horsepower gasoline engine. The pile driver could be used

within 16 minutes after its arrival at any point.

One development of this sort, the mobile clam-shell derrick, is worth

noting. This unique piece of machinery was built by the Winther Motor

Truck Co., of Kenosha, Wis. When the American Expeditionary Forces

issued a requisition for 120 clam-shell derricks mounted on motor

trucks, no such piece of equipment was in existence anywhere on

earth. The Winther Co. volunteered to attempt to produce the machine.

By giving a wider tread of rear axle to the Winther motor truck,

the company could provide a suitable vehicle, but, search as they

might, they could not find a derrick of sufficient power to operate a

half-yard clam shell and also light enough to mount on a 7-ton truck.

No such derrick existed. The company, therefore, without knowing

anything about the manufacture of derricks, put its engineering force

to work to produce a design. This design was developed in two weeks,

and the derrick built from it was less than half the weight of any

derrick of equal capacity. After being perfected, the mobile derrick in

tests showed that it could move 350 cubic yards of sand or gravel per

day or 500 or 600 tons of coal. One man could operate it and the motive

power was a 4-cylinder gasoline engine.

[Illustration: ENGINEERS' TOOL WAGON.]

[Illustration: ENGINEERS' BLACKSMITH SHOP, CLOSED.]

[Illustration: ONE OF THE ENGINEERS' PORTABLE MACHINE SHOPS.]

The Engineering Department approved this design and ordered 32 such

clam-shell units. Nine of these were delivered before the armistice was

signed. The company has continued production of these derricks with a

view of selling them to road builders and excavators in civil life.

For use of the various Engineer units we manufactured 1,610 tool wagons

and shipped most of them to France. Because of the rough nature of the

shell-torn ground over which these wagons must be used, we designed

each to be uncoupled and operated as two 2-wheeled carts.

The development of mobile industrial units mounted on motor trucks is

likely to have a profound effect on American industry in the future.

For instance, the special derrick or crane trucks which we built

are almost certain to be adopted in commercial use. The locomotive

crane has always been a useful machine, but its chief use has been in

handling heavy materials which were being loaded on or off railway

cars. A crane which can be moved rapidly to places where railway tracks

are not located should be of almost equal importance. An accompanying

illustration shows in operation one of the derrick trucks which we

built for overseas use.

In the same way the mobile pile drivers designed by the Engineer Corps

should be of great future service in road building in this country.

The various machine shops which were built for war purposes will, in

their duplications and adaptations, undoubtedly serve a useful purpose

in future commercial activities in this country. The increased use of

motive power on farms has created a demand for machine repairs. The day

may come when the traveling machine shop will be a familiar sight on

our rural highways.

The Engineer troops required a great quantity of hoisting machinery.

Our purchases in this respect amounted to 700 cranes, mostly of

the locomotive type, and 886 hoisting engines, at a total cost of

$4,996,000. About two-thirds of this equipment was sent to France and

installed at the ports of debarkation and at depots. The rest was used

at the shipping points in this country. This machinery was of great aid

in the rapid handling of materials at tidewater.

A vast amount of small tools and construction material was required.

Some 21,000 tons of barbed wire, shipped abroad to be used principally

in the construction of entanglements in front of American battle

positions, were manufactured principally by the United States Steel

Products Co., Jones & Laughlin, the Gulf States Steel Co., and the

Colorado Fuel & Iron Co., although several other firms also supplied

barbed wire.

The Engineering Department ordered in the United States, during the

fighting, equipment and supplies which cost approximately $754,201,407.

We furnished in all 85,120 steel shelters of various sizes, of which

38,320 were of the individual type which could be carried by one man.

The steel used in these individual shelters was about one-eighth of an

inch thick.

There may be expected to be great incidental benefit to future American

industry from improvements and inventions brought out by American

military engineering in 1917 and 1918.

One important work, for instance, which the Engineer Department

undertook was that of standardizing the requirements for paints and

varnishes. At the outset our Army needs ran into 29 shades of color in

315 different paint and varnish mixtures. Without affecting any of our

camouflage projects or other important undertakings, we reduced the

number of shades required from 29 to 16 and brought the total number

of commodities down from 315 to 99. This reduction in the range of

commodities will be of great use to the paint and varnish industry in

the future.

At the beginning of the war the mechanical rubber industry had but few

standard specifications. The Engineers, after considerable research,

developed 30 standard specifications for mechanical rubber goods,

which class included such materials as hose, packing, and sleeves.

The representatives of the rubber industry verbally stated that the

Engineer Department in this short time did more good to the trade than

it had been able to accomplish for itself in the previous three or four

years of effort. Immediately after hostilities stopped rubber concerns

began asking the Engineer Department for its standard specifications.

In the manufacture of hardware and kitchen utensils there was also

considerable standardization done, and changes in manufacturing methods

were recommended which were put into effect by the producers. All spun

goods were eliminated, and the industry confined itself to straight

stamping, which meant a reduction in labor. A standard cobalt coating

for enamelware was developed by which the industry conserved about

30 tons of nitre per month and made a more durable and satisfactory

enamel coating, with the result that to-day the Army is purchasing

its vast quantities of enamelware subject to certain tests, whereas,

in the past, practically all this material was bought purely upon the

manufacturers' statements. The shortage of tin was of considerable

importance. Upon the recommendation of an Engineer officer enormous

quantities of cafeteria trays were coated with zinc and large amounts

of tin thereby conserved. The finished tray was entirely satisfactory

and gave essentially the same service as that plated with tin.

Horseshoe nails, formerly a variable product, were standardized and

tested, and methods were devised by which the Army was enabled to

control their quality.

Before the war there was no standard rating for internal-combustion

engines, each manufacturer rating his motors according to his own

ideas. Our studies of small engines of the type used for driving

pumps or operating woodworking and metal-working machines resulted in

many improvements, which have been adopted by the manufacturers of

internal-combustion engines. Out of these studies came the so-called

army rating, a standard which is bound to result in the more careful

rating of commercial engines.

The Engineer Department brought out a modification of the design of

the existing line of gasoline-driven shovels by applying caterpillar

traction to the larger sizes, thus doing away with the labor required

to plank up and block shovels that move on wheels.

When we entered the war, the explosive trinitrotoluol was standard for

our Army for mining and demolition purposes. The Bureau of Mines, in

cooperation with the Engineer Department, developed an explosive which

is cheaper than T. N. T. and promises to replace it for engineering

operations.

We also improved the devices commercially used in electrical detonation

of distributed charges, our improved detonators being more certain and

reliable than anything in use.

Commercial machines for detonating as many as 250 standard No. 8 caps

were developed for the Panama Canal, but the machines in common use had

seen little improvement for 25 years. As a result of the development

by the Engineer Corps, a machine capable of detonating 120 caps was

obtained, weighing no more than the 30-cap commercial blasting machine

and costing slightly less.

A second machine was developed, capable of exploding 500 caps, at a

price not greatly above the price of a 30-cap commercial machine.

Mining engineers who saw this development stated that it would have

a high commercial value, as these improved machines would make

electric blasting more positive and dependable than any other form of

detonation, as well as making it possible to set off a large series of

charges simultaneously. The Panama Canal machine weighed 35 pounds and

cost $126. Our 500-cap machine weighed 30 pounds and cost $35. The du

Pont 30-cap machine weighed 25 pounds and cost $25. Our small machine

weighed 20 pounds, cost $22.50, and would fire 120 caps.

In addition to this there might be mentioned other projects developed

primarily for war purposes but which will be available for the

industrial uses of peace. These included portable well-drilling outfits

of a new type, alcohol stills of a small size for the utilization of

waste products in small units, sound reducers on the exhaust pipes of

gasoline engines, air strainers to minimize the chances of dust and

grit entering gasoline engines. When the war ended we were working

on the problem of hastening the setting of concrete and were also

studying the production in this country of photographic colors and tone

chemicals formerly secured only from Germany.

In general, mention should be made of the exhaustive tests in many

industries conducted by the Engineer depot and by special detachments

of Engineers. Tests were made of hundreds of pieces of apparatus,

and these tests led to many improvements in American manufacture.

Illustrating how these tests were regarded by individual concerns,

the Cleveland Tractor Co., after a test of its equipment conducted

by Army Engineers, stated: "Our people consider this test to be the

most valuable ever undertaken by this company." This is indicative of

benefits scattered throughout American industry by the engineering war

tests.

While practically all of the research work which resulted in the

developments and improvements noted was conducted by Engineer officers

while on duty at the General Engineer Depot in Washington, since the

transfer of the functions of the General Engineer Depot to the Division

of Purchase, Storage and Traffic, November 1, 1918, much of this

research work has been and still is being carried on by the latter

division.

For handling Engineer materials there were established the General

Engineer Depot at Washington, D. C, embarkation depots at South

Kearney, N. J., and Norfolk, Va., and shipping depots at Baltimore,

Md., Philadelphia, Pa., Jacksonville, Fla., New Orleans, La., and

Mobile, Ala. In addition, subdepots were organized at all of the

divisional camps and cantonments.

The war demanded the production in America of quantities of precision

instruments. These were required not only by the Ordnance Department

for the equipment of artillery with sights and indirect fire-control

apparatus but also by the Engineer Corps, the Signal Corps, the Bureau

of Aircraft Production, and the Medical Department. These instruments

were such things as aneroid barometers, pocket compasses, measuring

tapes, surveyors' equipment generally, map-drawing outfits, draftsmen's

supplies, and so on. For a large period of the war the procurement

of precision instruments was in the hands of the General Engineer

Depot. Later, when the War Department's supply activities were being

consolidated, the purchasing of precision instruments, except the

highly technical sound-ranging devices, was taken over by the Director

of Purchase and Storage, the organization of the General Engineer Depot

going along in the transfer. The development and the production of

searchlights and sound-ranging apparatus remained in the hands of the

Engineer Corps.

In April, 1917, there were probably not more than a dozen recognized

American manufacturers of high-grade precision instruments. As an

indication of the expansion of manufacturing capacity required by the

war, one concern, the Taylor Instrument Cos., of Rochester, N. Y.,

which had manufactured in peace times watch-pocket compasses at the

rate of 15,000 a year, were called upon to turn them out at the rate

of 10,000 weekly to fill an order for 200,000 of them. In order to

handle this contract the Taylor Instrument Cos. built a new factory

building in 20 days. A certain type of aneroid barometer required by

the exigencies had never before been produced in America. The Taylor

Instrument Cos. succeeded in producing 1,240 of these barometers.

The Lufkin Rule Co., of Saginaw, Mich., was called upon to manufacture

700 band chain measuring tapes for surveying, graduated throughout

according to the metric system, and also 1,240 special outfits for

repairing such tape. These band tapes when broken are fastened together

by tiny rivets, which are produced by special machinery. Because of

the inability of the machine-tool industry, swamped as it was with war

demands, to produce the special rivet-making machines, it was necessary

to reduce in the specifications for repair outfits the quantity of

metal rivets for each kit from 4 ounces of rivets to 2 ounces.

Field artillery required a precision instrument known as the miniature

telescopic alidade of the Gale type. It is unlikely that 150 of these

instruments had been made in the United States during 10 years, yet

the Artillery demands called for the production of 1,110 of them.

The W. & L. E. Gurley Co., of Troy, N. Y., not only manufactured

half of this order, but, in order that the Government might obtain a

sufficient supply of these instruments, it turned over to a competing

firm, the Eugene Dietzgen Co., of Chicago, the lenses, prisms,

hermetically-sealed bubbles, and other parts for 555 instruments.

The Army required large numbers of hand tally registers to be used by

checkers and observers. The Benton Manufacturing Co., of New York, had

been making less than 15,000 registers of this sort in a year, yet it

increased its facilities and turned out 62,000 of them for the Army

within two months.

The Army required 35,000 complete sketching outfits for the use of

military observers. The contents of these outfits were manufactured by

a dozen different concerns.

Drawing instrument sets were produced by the Eugene Dietzgen Co.

Each set included a pair of proportional dividers. Our draftsmen had

always obtained their dividers from Europe. The divider, which nearly

everyone has seen, appears to be a simple device, yet it must be made

with the utmost precision, or else it is valueless. In manufacture it

goes through more than 100 distinct factory operations.

Marching compasses for troops were made by the Sperry Gyroscope Co.,

of Brooklyn, N. Y., the quantity in manufacture being over 200,000

instruments.

Many other delicate instruments of most difficult manufacture, whose

description is too technical to be set down here, were produced

successfully in America during the war period.

[Illustration: DERRICK TRUCK FOR OVERSEAS USE.]

[Illustration: LIGHT MICROPHONE SET.]

[Illustration: GEOPHONE SOUND RANGING SET.]

[Illustration: AMERICAN T-M SURFACE SOUND-RANGING SET.]

CHAPTER IV.

SOUND AND FLASH RANGING AND SEARCHLIGHTS.

In childhood we were enthralled by the tales of those magic persons

whose keen hearing could detect even the whisper of the growing grass.

As camouflage developed, modern warfare yearned for such supernatural

gifts of sense that troops might detect the unseen presence of the

enemy. Accordingly Science, the fairy godmother of today's soldiers,

raised her wand, and lo, the Army was equipped with the wonderful ears

of the fairy tale, uncanny no longer, but a concrete manufacturing

proposition.

Artillery practice nowadays abhors the wasted shot. The time when

cannon fired in the general direction of the enemy, and hoped to hit

something, passed when the long-range rifles and howitzers, with their

marvelously accurate sighting instruments, came into existence. Whole

books have been written on the subject of pointing a modern cannon in

the modern way. A great proportion of our industrial effort in the

recent conflict was devoted to the sole end that we might aim our

artillery accurately.

For instance, to this end almost exclusively was devoted the

enormous production of aircraft material. The observer in the

airplane or balloon trusted not to his eyes but to the finer sight

of the photographic camera; and this again occasioned a large war

industry--the production of cameras and their operation in the field,

which included the production of finished photography in the field

dark rooms. But, as the airplane and aerial camera were perfected,

camouflage was undertaken as a protection from discovery from aloft;

and so might be brought in another chapter--the production of

camouflage material and the work of camouflage experts in the field.

Presently camouflage succeeded in baffling the camera to a great

extent, and this made necessary the development of instruments that

could detect the location of the enemy by sound. Since the unaided ear

was not keen enough to supply the desired information, applied science

came to the rescue with the various devices embraced in the general

classification of sound-ranging equipment. The production of this

equipment was under the direction of the Engineer Department of the

Army.

In three classes of military work we needed hearing refined to the

razor-edge. With keen enough ears we could detect those subterranean

operations of the enemy known as mining; with ears of that sort we

could detect and locate the positions of hostile cannon; and still

again we could employ such sensitiveness of hearing to find in the

darkest sky at night the hostile raiding airplane.

One of these long-distance ear drums which man invented for himself as

an aid to his military operations was known as the geophone. The first

geophone used by the western powers in the war was invented by the

French. It was a simple mechanism. The device or drum which received

the sound waves and magnified them consisted of a small closed box with

a confined air space. This box was weighted with a leaden disk to give

it the required inertia. The geophone was placed upon the ground and

the vibrations of the earth were communicated through the medium of the

confined air space. The sounds then reached the listener's ears via a

rubber tube and an ordinary stethoscope horn. By means of this device

the slightest vibrations of the ground were rendered audible.

The geophone was used to detect enemy mining operations. The listener

placed the weighted box on the floor of an underground gallery or on

solid earth or rock. If the enemy were burrowing in the ground anywhere

within a distance of 75 yards the geophone would tell about it. In

order to enable the listener to know in what direction the sounds

came, two geophone boxes were provided, one connected with each ear.

By placing the boxes a small distance apart from each other and them

moving them until the vibrations in both ear horns were equalized, the

listener could tell approximately in what direction the enemy mining

operation was located.

Geophones were used by both sides, and so effective did they prove to

be that it is reported that they were largely instrumental in stopping

mining operations altogether. If an enemy mine were located by one of

these devices, a counter mine could be started at once and carried

through, usually with disastrous results to the hostile miners.

As our first step in the production of geophones, we adopted the

French device; but later on we developed an instrument with nearly

one-third greater range than the French geophone had. This improvement

was developed by the Engineers and bureau specialists at the Bureau

of Standards in Washington with money provided by the Engineering

Department. We produced the improved model in sufficient quantities to

meet the requirements of the American Expeditionary Forces.

We also developed an electromechanical geophone that could be connected

up by wire to a central listening station some distance back from

an exposed location. The sound-receiving boxes or microphones were

placed out in No Man's Land and hidden under trash or earth. They

were so sensitive that they would not only record any subterranean

activities of the enemy within their range, but at night would

betray enemy raiding parties attempting to cross to our positions,

the sensitive boxes picking up the vibrations of their speech or

footsteps. The central listener could locate approximately the position

of hostile operations by observing which boxes were receiving the

sounds in greatest intensity. The boxes could also pick up and send

to the central listening stations conversations carried on by the

enemy parties even in low tones, the apparatus thus acting as the

dictatorship of the war.

But by far the most important work done by listening instruments was in

locating the positions of enemy gun batteries. This was one scientific

instrument, at any rate, which the Germans were never able to produce

successfully for themselves. During the final months of the war more

enemy guns were located by listening instruments than by any other

means. An American instrument with the Army spotted 117 German gun

positions in a single day by surface sound ranging. This was the high

American record set in the war, but at all times our sound-detecting

equipment had an uncanny accuracy. Up to the end of the fighting,

no way had been discovered to conceal the location of a gun from

sound-ranging instruments suitably placed and properly operated.

The instruments used for locating gun positions were of such a highly

complicated and technical nature that no one but designers and

mechanics skilled in the production of complex electrical equipment

could build them at all. The recording instruments, or microphones,

were of a sort so delicate that their use theretofore had never been

considered outside of laboratories. Yet they were required to operate

successfully amid the din and concussion of heavy bombardments. All

useless sounds and jars were filtered out so that only the sought-for

vibrations could come to the central recording mechanism.

Studies of gunfire showed that when a cannon fires an explosive shell

of high velocity there are three distinct concussions. One of these is

the sharp crack produced in the air when the shell, dragging a short

vacuum trail behind it, passes over the head of the observer. As the

air rushes into this vacuum and collides with itself, it produces

a crack that is similar in origin to ordinary thunder. The second

concussion to be heard is that produced at the muzzle of the gun by

the expanding gases that propel the shell. There is still a third, the

break, or explosion. In order to locate a battery or gun exactly only

one of these concussions--the explosion at the muzzle of the gun--must

be picked up by the microphone. The first and third shocks, and all

other sounds not useful to the work should be damped out and excluded.

A number of these microphones would be placed in scattered positions,

usually in a trench, and then connected with the central recording

mechanism. When a microphone picked up a hostile gun explosion the

disturbance was instantly transmitted through several miles of wire. An

ingenious and complicated mechanism actuated an electromagnetic needle,

which instantly recorded this disturbance on a tape of photographic

paper, calibrated to show fifths of seconds in time. Each microphone

on outpost duty was represented on this tape by a parallel line; and,

as six microphones were usually used, the tape was striped with six

parallel lines. As the other microphones at the front picked up the

concussion of the gun, their records were made on their respective

lines; and the observers at the central station, by noting the

difference in time between the reports of the various microphones,

and by making calculations based on the rate at which sound travels,

could locate the gun that set up the disturbances by means of ordinary

surveyor's triangulations. So accurately would this mechanism do the

work that a gun position could be determined within 50 or 60 feet.

Incidentally, it is interesting to note that the practice of our Army

was to secure in advance, by means of surface sound ranging and other

methods, the positions of all the enemy's guns that could be learned.

Then, often after intervals of hours or even days, the fire began

simultaneously upon all these gun positions just as our attack started.

In this country we had two experimental stations for the development

of sound-ranging apparatus. We began experiments in this work in

June, 1917. Before we had perfected any satisfactory instruments, the

British had met with great success with the Bull-Tucker system; and we

adopted that type for the use of the American Expeditionary Forces.

From plans and models sent to this country we produced an American

Bull-Tucker machine, utilizing standard American electrical equipment

wherever we could. At the close of the war we had in operation along

the American front 12 complete American outfits. The six microphones of

each recording machine in action were set about 5,000 feet apart along

the front, so that each sound-ranging section covered a frontage of

approximately 5 miles. The 12 outfits in use were sufficient to locate

the guns of the enemy on a 60-mile front.

About a month before the fighting stopped we sent to France a new model

sound-ranging set which had been developed with the cooperation of

the Bureau of Standards. The reports from the American Expeditionary

Forces indicated that this American development was superior in several

important particulars to anything else in use when the war came to an

end. The American instruments were lighter, easier to carry about,

easier to install, and much cheaper than those of the British type,

and would operate under more adverse weather conditions. The impulses

received by the microphone in this equipment were recorded on a running

tape smoked by an acetylene flame.

Sound ranging for the detection of airplanes at night requires an

equipment which consists fundamentally of a sound-gathering device and

a listening mechanism, the combination enabling the observer to tell

the direction from which the sound is coming. When a bombing plane

approaches at night the hum of the motor can be heard at a distance

from 1 to 3 miles, or even more, depending upon conditions. But the

direction of this sound is elusive to the unaided ear, as anyone can

testify who has heard an airplane in broad daylight but could not

locate it with his eyes. Before the invention of aerial sound ranging

the searchlights hunting for the hostile airplane were obliged to sweep

the sky aimlessly in an endeavor to locate it; and the pilot of the

plane could often maneuver to keep out of the light. But by use of the

sound detectors not only can the approach of the airplane be detected

at a distance beyond the hearing range of the unaided ear, but, what

is more important, its direction can be determined within an angle of

3°. The use of these sound detectors greatly increased the chances of

locating airplanes at night by searchlight.

The Engineer Department conducted extensive experiments in the

development of aerial sound detectors. One form developed consisted

of a set of long horns with listening tubes attached to the small

ends and leading to receivers on the observer's head set. These horns

were mounted on a turntable which the observer could revolve, so that

the horns could be turned in the general direction of the sound. Four

horns were used in this mechanism--two to indicate the direction of

the airplane on a horizontal circle (in azimuth), and the other pair

to indicate the direction on the vertical arc (in elevation). Under

favorable conditions the sensitiveness of this device was three times

that of the unaided ear, and the airplane could be located within an

angle of 1°. The horn detector, however, was large and cumbersome and

not satisfactory for a mobile unit.

For field sound ranging, when the listener may wish to move from

place to place, the parabloid sound reflector was developed. This

hemispherical object, like a huge fountain basin in shape, was made of

material similar to building board and shaped in parabolic lines. Such

a sound collector echoed or reflected the sound from every point of its

surface to a focal point where the listening instrument was located.

The observer turned the parabloid on its universal mount until the

sound was equalized in his ears, and then the exact direction of the

airplane would be indicated by the azimuth and elevation pointers on

the machine. The paraboloids developed by our Engineering Department

had a sensitiveness three times that of the unaided ear and could

locate sound within 3° of arc.

We were not pioneers in developing the parabloid, however, the French

having built them ahead of us; but our apparatus possessed marked

advantages over that of the French. In the first place, the French

collecting device weighed 3½ tons and was so heavy and cumbersome that

it could scarcely be moved at all. The total weight of the American

collecting device was only 1,300 pounds. The American instrument was

thus much lighter and more portable. It was so simple that it could be

set up in about one-sixth the time that it took to erect the French

device. The cost of our machine was only about two-fifths that of the

French mechanism.

Although valuable work in detecting gun positions was done by sound

ranging, yet both sides located guns by watching their flashes. We

improved flash-ranging sets of the allies. These were simple in

principle. A number of observers at posts commanding good views were

equipped with observation telescopes mounted on tripods to watch for

the flashes of enemy guns. Whenever two or more of them observed the

same flash and reported its direction, the position of the gun could be

determined by ordinary triangulation.

However, in operation the system was not so simple, because of the fact

that the observers reporting might not have turned their instruments

upon the same flash. This difficulty was met by furnishing each

observer with an outpost switch set. As soon as he observed the flash

through his telescope he closed the switch, and that action turned on a

small electric light at the headquarters station, which might be miles

away. Then, as soon as he could, he telephoned in the direction of the

flash observed. If the operator at the switchboard saw two or three of

the lights flash simultaneously, he knew the observers at the front

had probably caught the same flash. Lights that came on a little ahead

or a little behind the simultaneous lights were disregarded when the

observers telephoned reports.

In developing the telescope for this system considerable difficulty

was experienced on account of the shortage of the proper optical glass

in this country. We were, therefore, obliged to buy our telescopes

in France until our supply would be available. These telescopes were

expensive mechanisms, and in some of the work of the flash-ranging

sections two of them were originally required at each observing

station--one to determine the position of a shell burst in elevation

and the other its position on the horizontal circle in azimuth. Since

the declaration of the armistice an American Engineer officer has

designed a telescope eyepiece which enables this work to be done by

observing through a single instrument, thus effecting a marked saving

in the number of telescopes which might be required in the future.

[Illustration: AMERICAN PARABLOID TYPE ACOUSTIC DETECTOR.]

[Illustration: 60-INCH OPEN TYPE PORTABLE SEARCHLIGHT.]

[Illustration: 60-INCH HIGH INTENSITY SEACOAST TYPE SEARCHLIGHT.]

America's Munitions 1917-1918 · 第 17 / 22 章