CHAPTER XVII

GAS FITTING, PIPE AND FITTINGS, THREADING, MEASURING, AND TESTING

GAS AND ITS USE IN BUILDINGS

Gas is in common use in all classes of buildings today. Dwellings

use it for cooking and illuminating, factories, office buildings,

and public buildings for power. In some parts of the country

natural gas is found. In these places it is used freely for heating

fuel. The actual making of gas is something that every plumber

should understand. If space permitted I would describe a gas plant

with all of its by-products. However, we shall deal only with the

actual installation of gas piping in buildings. Gas mains are run

through the streets the same as water mains are run. Branches are

taken off these mains and extended into the buildings requiring

gas. The gas company generally installs the gas service pipe inside

of the basement wall and places a stop cock on it free of charge.

This stop that is placed on the pipe is a plug core type, the

handle for turning it off is square, and a wrench is required to

turn it. The square top has a lug on it. There is also a lug

corresponding to it on the body of the valve. When the valve is

shut off, these two lugs are together. Each lug has a hole in it

large enough for a padlock ring to pass through. This gives the gas

company absolute control of the gas in the building.

SETTING OF THE METER.--Every building that is supplied with gas has

a meter that registers the amount of gas consumed. This meter is

placed on the service pipe on the house side of the above-mentioned

stop cock. This meter is furnished free of charge with a trivial

charge made for setting up. The actual setting of this meter is not

made until the piping throughout the building has had a thorough

and satisfactory test and is found free from all leaks. The meter

must be set level on a substantial bracket and in a place, if

possible, where it will not require an artificial light to read its

dial. The dry meter is usually used in dwellings. The interesting

construction and mechanism of this meter cannot be discussed here.

[Illustration: FIG. 77.--Gas-meter dials.]

The reading of the dials on a gas meter comes in the province of

the plumber and he should be able to read them. The sketch shows

the dial plate of a meter. The ordinary house meter has only three

recording dials. Large meters have five or more. To read the amount

of gas consumed according to the meter we will read the dials as

they are indicated on Fig. 77. We will call the four dials No. 1,

No. 2, No. 3 and No. 4. In each of these dials a complete

revolution of the index hand denotes 1,000, 10,000, 100,000 and

1,000,000, cubic feet respectively. The index hands on No. 1 and

No. 3 revolve in the same direction, while No. 2 and No. 4 revolve

in the opposite direction. Two ciphers are added to the figures

that are indicated on the dials and the statement of the meter will

be had. To tell just how much gas has been consumed in a given

time, the statement of the meter is taken at the beginning of this

given time and at the end of the time. The difference in the

figures indicates the number of cubic feet of gas that have been

consumed. A gas cock should be placed on the house side of the

meter. The dials of meter read 658,800 cubic feet. The dial having

the highest number is read first No. 4 dial points to 6, this

indicates that No. 3 dial has revolved 6 times. Dial No. 3 reads 5,

therefore the reading of dial No. 3 and No. 4 is 65. Dial No. 2

reads 8 making the readings of the three dials 658. Dial No. 1

reads 8 making the readings of the four dials 6588 add two ciphers

to this figure and 658,800 is the correct reading.

[Illustration: FIG. 78.]

[Illustration: FIG. 79.]

PIPE AND FITTINGS.--The pipe used in gas fitting is wrought iron or

steel. In special places, rubber hose is used. Brass pipe is

occasionally used to advantage. The fittings used in iron pipe gas

work should be galvanized. No plain fittings should be allowed. The

plain fittings very often have sand holes in them and a leak will

result. Sometimes this leak does not appear until after the piping

has been in use some time and the expense of replacing the fitting

can only be guessed at. By using galvanized fittings, this trouble

will be eliminated. All fittings used should be of the beaded type.

The fitting and measurement of this work is practically the same as

described under iron pipe work. To have the beginner get a clearer

idea of gas-piping a building, the piping of the small building

sketched will be gone over in detail and studied. One of the first

important steps that a gas fitter is confronted with is the

locating of the various lights and openings. With these located as

shown on the plan, Figs. 78, 79 and 80, we will proceed to work

out the piping. The first floor rise will be 1-inch, the second

floor will be 1-inch. The horizontal pipe supplying the first floor

outlets will be 3/4-inch pipe. The horizontal pipe on the second

floor will be 3/4-inch. The balance of the pipe will be 3/8- or

1/2-inch. At this point your attention is called to the sketch of

piping, sizes, and measurements. This sketch should be studied and

understood in detail. The good mechanic will employ a sketch of

this kind when installing any piping. The poor mechanic will take

two or three measurements and get them out, put them in, and then

get some more. This method is extremely costly and unworkmanlike.

There is no reason, except the ability of the workman, why he

cannot take a building like the sketch and get all the piping

measurements for the job, then get them out, go to the job and put

them in. The amount of time saved in this way is so great that a

workman should not consider himself a full-fledged mechanic until

he can get the measurements this way, and get them accurately. With

a tape line, gimlet, and plumb-bob, a mechanic is fully equipped

with tools to get his measurements. If the measurements are taken

with a tape line, the same tape line should be used when measuring

the pipe and cutting it. When laying out the piping, never allow a

joist to be cut except within 6 inches of its bearing. It is good

policy never to cut timber unless absolutely necessary and then

only after consulting with the carpenter. When joists have to be

notched they should be cut only on the top side. The pipe as it is

put in place should be braced rigidly. Wherever there is an outlet

pipe extending through the wall, the pipe should be braced from

all sides so that when the fixture is screwed in it will be

perfectly rigid.

[Illustration: FIG. 80.]

[Illustration: FIG. 81.--Pipe sketch.]

The measurements on the piping sketch, Fig. 81, are taken from the

accompanying sketch of a dwelling, and if they were to be actually

put in, they would fit. The reader would do well to copy this

sketch and follow the piping and check the measurements according

to the plan, and note how the different risers, drops, etc., are

drawn. It is not necessary in a sketch of this kind to draw to a

scale. After the different measurements are the letters _C.C._,

_E.C._, _E.E._, _C.B._ and _E.B._, meaning center to center, end to

center, end to end, center to back, and end to back, respectively.

Offsetting pipe is a very convenient way of getting the pipe or

fittings back to the wall for support. To offset pipe properly and

with little trouble, take a piece of scantling 2 by 4 and brace it

between the floor and ceiling. Bore a few different-sized holes

through it and you will have a very handy device for offsetting

pipe. There is a little trick in offsetting pipe that one will have

to practice to obtain. The pipe must be held firmly in the place

where the pipe is to be bent. Large offsets and bends should not be

made; 2 to 4 inches is as large as should be used. Larger offsets

that are required should be made with fittings. Always make the

offsets true and have the ends perfectly straight. Before putting a

piece of pipe permanently in place, always look or blow through it,

to ascertain if its bore is obstructed or not. Sometimes dirt or

slag will collect and cause stoppage.

READING THE PIPE SKETCH.--Vertical lines represent vertical pipes

(see Fig. 81). Horizontal lines represent horizontal pipes running

parallel to the front. Diagonal lines represent horizontal pipes

running from back to front. Any line that is drawn perpendicular to

any other line stands for a horizontal pipe. A diagonal line

separating a vertical line or horizontal line or set of lines

represents a different horizontal plane. With this explanation the

sketch will be made clear to one after drawing it. The reader

should now take each measurement and check it on the plan. This is

easily done by using a scale rule. The height of the ceiling is

8-1/2 feet on the first floor, the second floor is 8 feet. The

first floor joists are 10 inches, the second floor joists are 9

inches. An outlet is indicated by a small circle. In the piping

sketch, this circle is connected with the riser or drop by a

horizontal line. At the junction of these two lines a short

perpendicular line is drawn, and indicates the direction of the

outlet.

Let me again emphasize the need to understand thoroughly this

piping sketch, and to become so familiar with it that it can

readily be put to use. The value of a mechanic is determined by the

quality and the quantity of work that he can turn out; and a

mechanic who can lay out his work and see it completed before he

starts, and then proceeds to install his work, is by far of more

value to his employer than the man who can see only far enough

ahead to cut out two or three measurements and spends most of his

time walking between the vise and place of installing the pipe.

TESTING.--The system of gas piping must be tested before the pipes

have been covered by the advance of building operations. If the job

is of considerable size, the job can be tested in sections, and if

found tight the sections can be covered. The necessity of having

the piping rigidily secured can be appropriately explained here. If

the test has been made and the system found tight and some pipe

that is not securely anchored is accidentally or otherwise pushed

out of place and bent by some of the mechanics working about the

building, a leak may be caused and yet not discovered until the

final test is made after the plastering is finished. The expense

and trouble thus caused is considerable and could have been avoided

by simply putting in the proper supports for the pipe.

To test the piping, an air pump and a gage connected with the pipes

are placed in a convenient position. The job should now be

thoroughly gone over, making sure that all plugs and caps are on

and that no outlet is open, also that all pipe that is to be put in

has been installed. After this has been attended to, the pump is

operated until 10 pounds is registered on the gage. The connection

leading to the pump and the piping is now shut off. If the gage

drops rapidly, there is a bad leak in the system. This leak should

be found without difficulty and repaired. If the gage drops slowly,

it denotes a very small leak, such as a sand hole or a bad thread.

This kind of leak is more troublesome to find. When it has been

found, the pipe or fitting causing the leak should be taken out and

replaced. If black caps have been used to cap the outlets, the

chances are that a sand hole will be found in one of them. Nothing

but galvanized fittings should be used. In case the small leak

mentioned above cannot be found by going over the pipe once, there

are other means of locating the leak. Two of the methods used, I

will explain. If the job is small, each fitting is painted with

soap suds until the fitting is found that causes the leak. If the

leak is not in the fittings, then the pipe can be gone over in the

same way. As soon as the soap suds strikes the leak, a large bubble

is made and the leak discovered. It is possible that there are more

leaks, so the gage is noted and if it still drops, the search

should be continued. The pump should be operated to keep the

pressure up to 10 pounds while the search is being made for the

leak. When the gage stands at 10 pounds without dropping, the job

is then tight. The pump and gage fitting should be gone over first

to ascertain if they leak. The other method employed to discover

leaks is to force a little ether or oil of peppermint (not essence)

into the system by means of the pump. A leak can readily be noted

by the odor. To make this method successful, the ether or

peppermint should not be handled by the men who are to hunt for the

leak. The bottle containing the fluid should not be opened in the

building except to pour some into the piping, otherwise the odor

will get into the building and as the odor comes out of the leak it

will not be noted. For the benefit of the gas fitter, the piping

should be tested again after the plastering is completed. The next

test is made when the fixtures are put on, and as the piping is

tight any leak that develops in this test indicates that the

fixtures leak. There are in common use various methods to stop

leaks in gas pipe when they are found. If a piece of piping or a

fitting is defective, it should be taken out and replaced. This

should be remembered so that while the piping is being installed

any defects should be noted and the defective fitting or pipe

thrown out. Before the gas job is accepted, the gas company will

inspect it and look for traps and sags in the pipe. Therefore, the

piping should be installed without any traps and it should be

arranged to pitch toward the meter, or toward a convenient place

from which any condensation can be taken out. If provision is not

made for this condensation, it will accumulate and stop the flow of

gas.

SHOWER-BATH CONNECTIONS

[Illustration: FIG. 82.--Shower stall with lead pan extending

outside of stall.]

The sketches show clearly the methods employed to make a

shower-bath waste and stall water-tight. The shower bath, as a

separate fixture, is in use and the demand for it as a separate

fixture is increasing rapidly. This demand comes from the owners of

private houses. The plumber must therefore devise some way to make

these connections tight and prevent any leak from showing in the

room below. This fixture is so constructed that all waste pipes

and trap come under the floor level with no way of getting to them

from below. Therefore the piping for this fixture must be of a

permanent nature. No pipe or trap made of material that is liable

to give out in a short time should be allowed under a shower-bath

fixture or stall. The two sketches, Figs. 82 and 83 illustrate two

methods of connecting and making tight a shower stall. A plumber

should always consider it his special duty to make his work

complete and free from all objections. He should always prepare for

any emergency that may occur in the future. This is rather a big

task, yet the plumber when accepting all of his responsibilities

has a big task. I state this to the beginner and emphasize the

all-important fact that he must learn to perform and think deeply

of the elements of plumbing to be able later on to handle

successfully the problems that present themselves in the plumbing

trade.

[Illustration: FIG. 83.--Shower stall with lead pan extending six

inches beyond strainer.]

The heavy brass trap shown in the sketch has proved itself very

satisfactory and can be made to fit almost any condition of piping

or building construction. A flashing of sheet lead is soldered on

the trap and carried out to the outside edge of the stall where it

is turned up 1 inch, or to the floor level. When the flashing is

carried out for only a foot on each side of the trap, the

possibilities of a leak are greater.