3. With stronger companies this situation is greatly improved.

4. Experience has shown that such neglect produces serious troubles

and financial loss to the manufacturer, and a very decided change for

the better has developed in the last few years. There are, however, a

few small concerns still operating in the producer field on what may

be considered a false basis.

Centralization of Power Development and Distribution.

Central stations for power and lighting are springing up all over the

country. Electric lights are now in general use in towns numbering

their population by hundreds only. Electric transmission for

street-railway service is practically universal and electric power for

shop drive is in great demand. The substitution of the electric

locomotive for the steam locomotive for terminal service and even for

line duty by several leading railway systems is no longer a mere

expectation but is an every-day working reality.

These changes and developments in every section are, to a large

extent, tending to do away with the individual small steam equipment,

whether stationary or locomotive, and are bringing to the front the

central power station, ranging in size from lighting and pumping

plants of less than 100 horsepower in the smaller towns to those of

100,000 horsepower or more required to meet metropolitan demands. 366

European Examples of Advantageous Location.

In the development of central power plants and the reduction of the

cost of power, the producer-gas power plant is an important factor. In

this connection the question of locating such plants directly at the

mines is well worth careful and unbiased attention in the engineering

profession. The advantages to be derived from such a location have

already attracted the commercial interests of Europe. As examples

worthy of thoughtful consideration, the general conditions of

operation of three typical European installations are here described:

Plant A.--This plant, although not situated directly at the mines, is

but a short distance away, and the company owning the plant also owns

the mines from which the fuel is secured. The plant is of the Mond

by-product type and consists of eight pressure producers of 2,500

horsepower each. The fuel used is a run-of-mine bituminous coal said

to contain 8 to 9 per cent ash and 1 to 2 per cent sulphur. This would

indicate that they are utilizing the best grades of coal from their

own mine in the local gas plant and allowing the lower grades to

remain unmined, a fact which I verified before leaving the plant.

The plant is designed for the recovery of the sulphate of ammonia and

for supplying gas to the neighboring towns for both metallurgical and

power purposes. As one unit is always held in reserve, the plant is

called 16,000 horsepower. The main distributing line is 3 feet in

diameter, and at the time of my visit there were 37 miles of main, the

longest single run being 6½ miles. Each producer gasifies, on an

average, 20 tons of coal per twenty-four hours. The report of the

engineer in charge indicates that the plant had been in operation

twenty-four hours a day, seven days a week, for two and one-half 367

years without a shut down.

Plant B.--This plant, which is located in the center of a peat bog,

proved of especial interest. It has a capacity of 300 horsepower only,

and is about 3 miles from the town to which the electric current is

supplied. One-half of the plant (150 horsepower) was installed in 1904

and the remainder in 1906. This is probably the first as well as the

smallest producer-gas installation to be located at the mine and

transmit high-voltage current to a point some distance away. This

installation, in 1909, consisted of two suction producers (special

peat type) rated at 150 horsepower each, and two horizontal twin

single-acting four-cycle gas engines of 150 horsepower each, direct

connected to alternating-current three-phase generators, which were

running splendidly in parallel at the time of my visit. The 3,000-volt

current is transmitted to the town, where it is used during the day

for lighting shops and for shop motors. At night the plant supplies

the lights for the streets and residences. The charge for residence

light is 9 cents per kilowatt hour. Both units are in operation from

5:30 a. m. to 6 p. m., and one continues to 11 p. m. each day.

A 35-horsepower peat machine is used for preparing the fuel. This is

driven by an electric motor supplied with current from the power plant

on the bog. As only 750 tons of dry peat are required per year there

is no attempt to work the plant to its maximum. Local farmers are

employed and they work as little or as much as they please, as there

is no difficulty in getting out all the peat needed for a year during

the working season, which in this locality is from April 15 to

September 1. As a result 14 men are employed more or less of their

time. They receive about 50 cents per day each and get out about 20

tons of peat per day.

Coal at this point in Europe costs $3.75 per ton. The dry peat 368

delivered on the operating platform of the producer plant costs only

80 cents per ton.

Plant C.--This plant is installed at the collieries. At the time of my

visit it was under full operation, using roof slabs that gave little

indication, on casual inspection, of containing any combustible

material. It was claimed that this fuel averaged over 60 per cent

ash--a claim which seemed entirely reasonable. At the time of this

visit (1908) the producers were not only supplying a number of

furnaces with gas, but were also operating a 1,000-horsepower and a

250-horsepower gas engine. A 500-horsepower engine was being added to

the equipment. The engines in use were direct connected to electric

generators. The 10,000-volt current is used for operating the local

mine machinery and also for furnishing lights for neighboring towns

and power for a street railroad. The plant was reported to be using

over 100 tons of this low-grade fuel per day.

Favorable Conditions in the United States.

In the United States cheaper power is constantly sought. The

water-power possibilities of the country are being realized and the

hydro-electric power plant is a wholesome cause of competition. The

supply of fuel of marketable grades is not unlimited. Prices for such

fuel must necessarily increase. The cost of transporting coal from the

mines is high, and the possibility of obtaining a sufficient supply of

cars to handle low-grade fuels is questionable. The power demands of

the country are increasing, and this power must be developed at a

reasonable cost. The time is approaching when the cheapest fuel

obtainable must be used to the best economic advantage in order to

develop power at a unit cost consistent with commercial progress.

Consideration of the conditions indicates that in order to keep the 369

price of power developed from fuel down to a consistent figure--

(a) Grades of fuel which warrant transportation, or which may be

defined as “marketable,” should be used with the greatest possible

practicable economy.

(b) The very large percentage of coal of so-called low grade which

today is left at or in the mine must be utilized.

(c) Advantage must be taken of the large deposits of lignite and peat

which are found in many sections of the country.

It is undoubtedly true that in general, under conditions which do not

require the use of steam for other than power purposes, the

producer-gas power plant meets the requirements of (a).

At present the only method of advantageously handling the fuels

mentioned in (b) and (c) is in the gas producer, and the utilization

of these lower grades of fuel on an extensive scale demands

concentration of the power plants within close proximity to the fuel

supply.

The logical conclusion from a careful study of the producer-gas power

situation is that the time is not distant when financial interests in

power production will be directed toward the centralization of the

producer-gas power plant at the mines and the distribution of the

energy developed either by high-voltage long-distance electrical

transmission or by pipe systems for conveying the gas.

Business Administration: Theory, Practice and Application. [Vol. 1] Business Economics · 第 71 / 172 题