John Day River Bridge

As a part of the improvement of the Columbia River Highway between

Astoria and Svensen, a bridge was constructed over the John Day River

about four miles east of Astoria.

The John Day River is a stream navigable to small boats, so it was

necessary to provide a movable span of 40-foot clear opening. Owing to

the unusually high price of steel it was decided to construct this

bridge of wood. The movable span is of the single leaf bascule type

operated by a windlass. Counter weights are employed to assist the

movement of the span and in order to compensate for the variable pull

required to lift the span at different phases of its movement, the

counter weight cables operate over spiral drums in such manner that

their pull is a maximum when the span is down, and is least when the

span is raised, gradually changing between the two extremes. In order to

guard against failure of the operator to close the gate on the side of

the stream opposite the machinery, an automatic gate was constructed. It

closes when the bridge starts to open and when the bridge closes it

swings back out of the way automatically.

The bridge rests on concrete piers carried on piling, and besides the

lift span there are two 90-foot covered wooden spans. The operating

machinery is completely housed in by means of a tower.

The crossing was designed to carry 20-ton trucks and the covered spans

have laminated wood floors with asphaltic wearing surface.

One of the most serious objections raised against covered wooden bridges

is the lack of light. This was overcome in this case, as in other wooden

bridges on primary roads designed by this Department, by whitewashing

the interior and the addition of open windows at panel points. These are

provided with returns, and with the asphaltic wearing surface on the

floors of such bridges prevent moisture coming in contact with the

structural timbers of the bridge.

This bridge was built by the Portland Bridge Company and the total cost

will be about $25,000.00. The payments on the bridge to November 30,

1918, amounted to $21,051.52. Mr. Leigh M. Huggins was resident engineer

in charge of construction.

Third biennial report of the Oregon State Highway Commission · 第 105 / 292 题