IMPROVEMENTS IN LOCOMOTIVE BUILDING.

During 1831-35 the company's shops were located at Hoboken, N.J., and

during the winter of 1832-33, three locomotives were commenced at

these shops (two completed before March, 1833, the other in April),

the valves, cylinders, pistons, etc., coming from England, the boilers

being made under the direction of Robert L. Stevens. It was his

opinion that the "John Bull" was too heavy, and the new boilers were

built smaller and lighter, so that the engines, when completed,

weighed eight instead of ten tons. With these three engines, which

were delivered to the railroad company at South Amboy, the stone

blocks and other material for the permanent track was delivered along

the line of the road.

Scientific American Supplement, No. 832, December 12, 1891 · 第 31 / 75 题