PART I

PITTSBURGH

MAIN THOROUGHFARES AND THE

DOWN TOWN DISTRICT

+------------------------------------------------------------------+

| |

| [Illustration: East Ohio Street--a two-line thoroughfare] |

| |

+------------------------------------------------------------------+

| |

| [Illustration: Fifth Avenue--a four-line thoroughfare] |

| |

+------------------------------------------------------------------+

| |

| Of the 530 miles of main thoroughfares within a radius of seven |

| miles of City Hall, less than one and one-half per cent have |

| room for passage between cars and vehicles, slow-moving or |

| standing at curb. See page 31. |

| |

+------------------------------------------------------------------+

| |

| [Illustration: Liberty Avenue--a six-line thoroughfare] |

| |

+------------------------------------------------------------------+

_PITTSBURGH CIVIC COMMISSION_

PITTSBURGH

MAIN THOROUGHFARES AND THE

DOWN TOWN DISTRICT

IMPROVEMENTS NECESSARY TO

MEET THE CITY'S PRESENT AND

FUTURE NEEDS

A Report

BY

FREDERICK LAW OLMSTED

Prepared under the direction of The Committee on City Planning

ADOPTED BY THE COMMISSION

DECEMBER, 1910

324 FOURTH AVENUE FEBRUARY, 1911

_Publication No. 8_

PITTSBURGH CIVIC COMMISSION

H. D. W. ENGLISH President

J. W. KINNEAR First Vice-President

JOHN W. BEATTY Second Vice-President

H. J. HEINZ Third Vice-President

J. J. DONNELL Treasurer

ALLEN T. BURNS General Secretary

O. H. ALLERTON

T. E. BILLQUIST

CHARLES F. CHUBB

WILLIAM L. JONES

MORRIS KNOWLES

H. L. KREUSLER

JOSEPH W. MARSH

MARCUS RAUH

GEORGE R. WALLACE

CHARLES F. WELLER

COMMITTEE ON CITY PLANNING

T. E. BILLQUIST, Chairman

CHARLES F. CHUBB

BENNO JANSSEN

H. J. HEINZ

RICHARD KIEHNEL

E. K. MORSE

Copyright, 1911

By Pittsburgh Civic Commission

Mount Pleasant Press

J. Horace McFarland Company

Harrisburg, Pennsylvania

Dedication

THIS BOOK AND ITS CONTENTS ARE DEDICATED TO THOSE CITIZENS OF

PITTSBURGH WHO, IMBUED WITH CIVIC PRIDE AND THE VISION OF A CITY

USEFUL, CONVENIENT, ECONOMICAL AND HEALTHFUL, AS WELL AS BEAUTIFUL,

WILL, IN THE YEARS TO COME, RESPOND TO THE CALL OF THEIR CITY TO SERVE

IT WITHOUT HOPE OF PERSONAL REWARD, AND WITH PATIENCE, FIDELITY AND

ENTHUSIASM.

PITTSBURGH CIVIC COMMISSION

TABLE OF CONTENTS

PAGE

LETTER OF TRANSMISSAL xi

CITY PLANNING AND THE COST OF LIVING IN PITTSBURGH xiii

INTRODUCTION AND SUMMARY OF URGENT RECOMMENDATIONS 1

PART I. THE DOWN TOWN DISTRICT 5

The Main Arteries 5

Eastward Arteries and Their Improvement 6

A New Traffic Center 9

Sixth Avenue 9

Try Street Grade Crossing 10

Second Avenue Freight Yards 10

The Hump Cut 10

Grant Boulevard Extension 11

A Civic Center 11

Diamond Street Widening 17

Market Street Widening 17

The Market 18

The Water Front 19

The Improvement of The Point 29

PART II. MAIN THOROUGHFARES 31

Width of Thoroughfares 31

Special Types of Thoroughfares 34

Widening Old Streets 37

Unified Procedure for City, County and Borough 43

Specific Recommendations 44

Penn Avenue Artery 44

Forbes Street Artery 47

South Hills Artery 49

Outlying Thoroughfare Improvements (with special indices) 59

PART III. SURVEYS AND A CITY PLAN 93

Pittsburgh's Need for Surveys 93

Objects to be Secured 94

Technical Procedure 95

Maps 96

Management and Cost 98

Sample Maps 98

Data from New York 98

Data from Baltimore 100

PART IV. NOTES ON PARKS AND RECREATION FACILITIES 101

The Bellefield Improvement 101

Grant Boulevard 106

Steep Hillsides 109

General Discussion of Parks 113

Neighborhood Parks 113

Rural Parks 116

Special Park Opportunities 117

PART V. SPECIAL REPORTS 123

The Market 123

The Hump Cut 128

The City and the Allegheny River Bridges 133

_Letter of Transmissal_

November 26, 1910.

MR. T. E. BILLQUIST, Chairman,

Committee on City Planning.

Pittsburgh Civic Commission.

_Dear Sir_:--I have the honor to submit herewith a report upon

desirable improvements in the main thoroughfares and the down town

district of Pittsburgh, prepared in accordance with the instructions of

your Committee and in consultation with its members.

In submitting the report I wish to take the opportunity of expressing

my appreciation of the attitude of your Committee throughout the twelve

months during which the investigations and the preparation of the

report have continued, and of the part which the keen interest of its

members and their helpful criticism have had in making the report a

useful one.

The closeness of the connection between the problems discussed in this

report and those of the Traction System, which have been concurrently

studied by Mr. Bion J. Arnold, has involved frequent conferences with

Mr. Arnold and his assistant, Mr. George A. Damon, as well as with Mr.

John P. Fox, engaged by the Mayor for a study of the same problem; and

the information and suggestions furnished by them have been of great

assistance. In the preparation of the report on the Allegheny River

bridge problems, submitted jointly by Colonel T. W. Symons and myself

and printed in Part V of this report, information furnished by Colonel

H. C. Newcomer, in charge of the local office of U. S. Government

engineers, has been of the utmost value. I am also greatly indebted to

the Flood Commission, and especially to Mr. F. K. Morse, Chairman of

the Engineers' Committee of that Commission, for the use of maps and

other data gathered by them.

It would have been impossible to secure an intelligent basis for the

conclusions and suggestions presented in this report without the great

quantity of detailed information and other help furnished by the Board

of Assessors, the Departments of Public Safety, of Public Works and of

Law, especially through Mr. N. S. Sprague, Superintendent of the Bureau

of Construction, Mr. Chas. A. Finley, Superintendent of the Bureau of

City Property, and Mr. Lee C. Beatty, First Assistant City Solicitor.

Throughout the investigation and the preparation of this report I have

had the benefit of illuminating and stimulating conferences with Mayor

Magee.

The actual gathering of necessary information from the above and other

sources, the field studies and the preparation of nearly all of the

drawings accompanying the report, were carried on under the direction

of my personal assistant, Mr. Edward C. Whiting, with the active help

of Mr. Allen T. Burns and Mr. Sherrard Ewing, General Secretary and

Assistant Secretary of the Commission, to all of whom my hearty thanks

are due.

My friend and colleague in the study of several city problems

elsewhere, Mr. Arnold W. Brunner, of New York, has given me valued

counsel in regard to the possible architectural treatment of the

proposed Civic Center, and has been good enough to contribute to the

report the interesting sketches on pages 13 and 14 for a possible

municipal building framing the east side of the proposed square.

As explained at length in the body of the report, the work has been

greatly handicapped and limited in its scope and effectiveness by the

entire lack of accurate detailed maps of the city and surrounding

country. This lack would have rendered the report almost wholly

impossible had it not been for the very useful topographical map

of this part of Pennsylvania prepared and published by the United

States Geological Survey. Not only have my studies of the outlying

thoroughfares been based almost wholly upon this map, but the Survey

has courteously permitted the use of transfer sheets from their

original plates for the thoroughfare map published in this report.

Respectfully submitted,

(Signed) FREDERICK LAW OLMSTED.

_City Planning and the Cost of Living in Pittsburgh_

PURPOSE AND PREPARATION OF THE REPORT

A factor in the cost of living in Pittsburgh is stated graphically in

the frontispiece of this report. These drawings also suggest, from

Pittsburgh's own provision for some of her needs, a method to decrease

this cost. All delays and congestion of traffic, such as illustrated on

Fifth Avenue and East Ohio Street in the frontispiece and as shown by

illustrations in this preface and the introduction, add to the expenses

of manufacturers, the costs borne by wholesale merchants, and the

prices charged consumers by retail dealers; in short inadequate traffic

facilities in Pittsburgh, as in other cities, add to the cost of doing

business and of living.

The map at the end of this preface portrays a second factor influencing

the cost of living. This map shows how much land Pittsburgh has, both

used and still unused, for business, manufacturing and residence

districts and for means of communication, i. e., streets between these

districts. A glance also indicates the almost unparalleled problems

of this city because of the large amount of territory 25 per cent or

over in grade. For land of this grade is not only unused for buildings

and streets, but also often erects barriers to the natural growth and

spread of business, manufacturing and residence sections. Consequently,

Pittsburgh must exercise greater ingenuity and foresight than other

cities to prevent such congestion of all these activities as would

increase rents of all kinds abnormally. This would mean again an added

burden to the ultimate consumer for all life's necessities.

In addition, tax rates are chronically assailed as a charge on the cost

of living. But taxes are spent largely for improvements to furnish

adequate streets, to provide for the city's spread and growth and to

carry out other improvements which alone can make life livable and

desirable in a modern city. In fact, "taxes may actually diminish

the cost of living, if the city's money is spent economically in the

performance of necessary co-operative service." But taxes are often

wasted because the improvements are made piecemeal, by patchwork, with

no reference to future needs. Taxes for such improvements should be

made only as a part of a far-sighted and comprehensive plan. Then,

without waste, work done at the present will fit into the work to be

done in the future.

[Illustration: DIAGRAM SHOWING MOVEMENT OF TRAFFIC AT IMPORTANT STREET

INTERSECTIONS IN PITTSBURGH--WIDTH OF BAND REPRESENTS NUMBER OF CARS

AND VEHICLES PER RUSH HOUR.

Note: Vehicle traffic on Market Street, between Fifth and Liberty

Avenues, now discontinued]

By offering solutions for the above and many other similar problems

this report demonstrates that practical city planning--or better,

replanning--is part of the world-wide conservation movement. City

planning is municipal conservation. Pittsburgh, like other cities and

to a greater extent than most of them, faces the problem of using her

financial and territorial resources to the utmost. The "utmost" means

making these resources go the furthest in securing ample streets for

transportation and traffic, and easy communication between all parts

of the city; in providing for the cheap distribution of food, fuel

and clothing; in making all residence districts as nearly as possible

equally healthful, un-congested, and provided with trees and yards; in

establishing for all residents public accommodations for recreation

and leisure; and in maintaining and developing adequate districts for

retail and wholesale trade, manufacture and commerce.

The Pittsburgh Civic Commission has conducted its city planning with

the above ends in view, and purposes by this report to contribute

to the economy, convenience, practicability and attractiveness of

Pittsburgh's development and growth. The Commission began this work by

retaining Bion J. Arnold, John R. Freeman and Frederick Law Olmsted

to make a report on the outline and procedure of city planning for

Pittsburgh. This report stated the scope and methods for investigations

on the following subjects:

Steam Railroads

Water Transportation

Electric Railroads

Street Systems

Public Lands and Buildings

Water System

Sewerage System

Control over Developments on Private Property

Smoke Abatement

Building Code

Provision has been made by which several sections of this program

are already under way. The city administration has been foremost in

appreciating the necessity for just such investigations as the report

recommended. Expert advice at this period in our civic advance is

imperative if this city is to take its proper rank among American

cities. Upon completion of the preliminary report Mayor Magee undertook

to have studies made upon the electric and steam railroads, and

requested that the Commission release to the city Mr. Bion J. Arnold

for this purpose. This the Commission gladly did, and since then Mr.

Arnold has conducted these investigations for the city along the lines

laid down in this preliminary report. The preparation of a building

code as suggested in this report was authorized by the city councils

at the request of the Mayor, and the latter appointed a competent

building code commission, and an appropriation has been made for the

carrying out of this part of the City Plan. Mayor Magee also secured

the retention of Mr. Allen Hazen of New York, who is making such a

comprehensive study of an adequate sewerage system as was suggested in

this report. Likewise, the Mayor has planned to carry out the studies

for the water system.

The Commission itself continued the retention of Mr. Frederick Law

Olmsted to make a study of a comprehensive main thoroughfare system for

the center of the city and to the principal residence and manufacturing

districts and the surrounding boroughs. Mr. Olmsted was also asked to

report upon the locations of the main public buildings and grounds

of the down town district. This report was to cover both immediately

necessary improvements and a comprehensive improvement program for

the next twenty-five years. Thus could present improvements be made

economically because planned with reference to those of the future.

The Commission presents herewith Mr. Olmsted's report on these

subjects, made under the supervision of the Committee on City Planning.

The members of this Committee have given months of time from their

private business to the consideration of every detail of this report;

and this committee, with Mr. Olmsted, has given to the report its value

as a contribution to the movement for the Greater and Better Pittsburgh.

PITTSBURGH CIVIC COMMISSION.

[Illustration: GENERAL MAP OF THE PITTSBURGH DISTRICT]

PITTSBURGH

MAIN THOROUGHFARES AND

THE DOWN TOWN DISTRICT

_Introduction_

There are two main divisions of City Planning. One looks to the

rearrangement and improvement of what has already been unwisely

done through lack of proper planning or through force of adverse

circumstances of any sort. The other looks to the wise and economical

layout of what still remains to be done, especially at the outskirts of

the city where the major part of the city's growth is bound to occur,

and where the city plan is daily taking shape out of nothing, whether

it is intelligently designed or not.

Prevention is cheaper than cure, and a moderate expenditure of effort

and money will accomplish far greater results in the long run if

applied to the wise control of the growing suburban districts, where

new streets are constantly coming into existence, than if applied to

costly remodeling of the older parts of the city; but the latter is

sometimes of the utmost importance, and is of direct interest to a

much larger number of citizens than the prosaic work of controlling

scattered suburban development. In accordance with the instructions of

the Commission this report deals primarily with certain problems of

remodeling in the down town district, and with the improvement of the

main thoroughfares between this, the heart of the city, and the more

important outlying districts.

To carry out at once all the recommendations of this report would,

even if it were possible, impose an altogether unreasonable financial

burden upon the City and the contiguous boroughs. Such procedure is

unnecessary and indeed impossible. But in many cases there is a crying

need for the improvement already, or it is of such a nature that any

delay is apt to involve a considerable increase in the cost and the

difficulty of carrying it out.

[Illustration: Suggestive treatment of street junctions in outlying

districts, Stuttgart]

The most urgent general improvement of this sort is the establishment

of new building lines on all main thoroughfares which it is proposed

to widen; this in order to anticipate, as far as possible, the

construction of new and costly buildings on the present street lines.

Of the specific recommendations made in this report it seems advisable

to give the earliest attention to the following:

=In the Down Town District= Page

The cutting of the Hump and the widening of certain streets in the

Hump District as recommended 10

The extension of Grant Boulevard to Webster Avenue 11

The acquisition of land required for the proposed Civic Center 11

The widening of Diamond Street 17

The widening of Market Street 17

The relocation of the Market 18

The new connection between Penn and Liberty Avenues at Eleventh

Street 7

The elimination of the Try Street grade crossing 10

The proposed bridge and tunnel to the South Hills 49

=Along Outlying Thoroughfares= Section

Sixteenth Street bridge 1 56

Twenty-eighth Street grade crossings 2 57

Thirty-third Street improvement 3 57

Forty-third Street bridge 6 59

[1]Haights Run bridge 9 59

Hazelwood grade crossing 18 64

[1]Baum Street improvement 20 65

Center Avenue improvement 21 65

[1]Hamilton Avenue extension and connection with Kelly Street 22 65

Larimer Avenue extension 24 66

Batavia Street 33 71

Wilkinsburg grade crossings 34 71

Wilkinsburg-Edgewood connection 35 71

Rankin improvement 38 72

Duquesne bridge 51 75

California Avenue and Brighton Road extension 52 75

Lowry's Lane 56 77

East Ohio Street paving 57 77

Sycamore Street grade crossing and Bridge Street improvement

in Etna 60 78

Allegheny River Boulevard as far as Main Street connection 61 79

Main Street grade crossing in Sharpsburg 62 79

Carson Street 64_b_ 80

Chartiers Avenue grade crossing 65 80

Crafton-Carnegie connection 69 81

Washington Avenue improvement 72_a_ 82

Thoroughfare to Beechview 73_a_ 83

Carrick connection from South Hills tunnel, probably Climax

Street route 75 84

Twenty-second Street bridge approach--South Side 80 86

In the following cases the actual improvements are not so urgent,

but the new street locations should be established before expensive

developments, which are apt to occur at any time, shall interpose

serious new difficulties in the way of the proposed improvements:

Section Page

Penn-Liberty connection at Howley Street 5 58

Fifth Avenue--Center Avenue connection at Soho 12 61

Ellsworth Avenue extension 13 62

Forbes Street extension 39 72

Etna improvement 59 78

For other specific thoroughfare improvements recommended in this

report there appear to be no very urgent demands at present. Generally

speaking they should be carried out only as some special opportunity

offers, or in anticipation of some obstructing development which cannot

now be foreseen, or as a growing traffic shall demand.

But a thing of greater consequence than any one of these specific

improvements, a thing of vital import to every taxpaying citizen of the

present and future City, is the making of comprehensive and accurate

topographical maps. It is only on the basis of such maps that all

municipal engineering, and indeed much other work, directly managed

by the City, can be planned and carried out with proper economy and

efficiency. It is only on the basis of such maps that improvements

in the city--details of city replanning--can be most economically

determined. And in the outlying districts, where the future city is

being built, such maps are absolutely essential to an intelligent

planning or control which will avoid the heavy penalties that follow

haphazard city growth, especially in such a hilly region.

[Illustration: Comparative diagram showing the volume and the estimated

gross tonnage of traffic on the thoroughfares leading into the Down

Town District]

[Illustration: GENERAL PLAN

OF THE

DOWN TOWN DISTRICT]

FOOTNOTES:

[1] Already provided for, wholly or in part, in the current bond issue.

PART I

_The Down Town District_

[Sidenote:

The Main Arteries]

The down town district is substantially that part of the city

known as the Point District. It is bounded by the two rivers and

by the steep hills to the eastward, and within this section of

the city, as elsewhere, the basic problem is that of the means of

transportation--specifically the problem of the street plan. There

is a daily circulation of inward and outward travel to be borne by a

limited number of main arteries, of which those leading to most of the

tributary districts are bridges. It is clear that the bridges can be

enlarged or increased in number at any time when the volume of travel

justifies the expense of reconstruction.

[Illustration: A one-span bridge across the Danube at Budapest]

Considering the fact that Pittsburgh is a world capital in the steel

bridge industry, that its busiest quarters are sundered by three of

the world's big rivers, and that it is traversed in every direction

by ravines which demand the construction of mighty viaducts, it is a

striking and rather shameful thing that it does not possess a single

bridge over its rivers that is notable among the bridges of the

world either for its beauty, for its perfect engineering adaptation

to its purpose, for its size, strength or amplitude. In fact the

bridges of Pittsburgh, compared with those of other great cities, are

rather unusually limited in capacity and lacking in the qualities of

impressiveness and beauty.

It is a case of the cobbler's children going barefoot: when a man

sells shoes at wholesale in every quarter of the globe, it is time for

his own family to be well shod. Pittsburgh can afford to have, and owes

it to herself to have, the very best of bridges. No time or pains or

reasonable expense should be spared in planning future bridges, whether

they be on new locations or to replace existing structures, to get

the best designs that the highest engineering skill combined with the

highest artistic ability can produce. Bridge-builders everywhere should

be enabled to think of Pittsburgh not merely as a source of cheap raw

material for bridges, but as an all-round leader in the bridge-building

art.

[Illustration: Bridge of distinctive character at Budapest]

To the eastward, where the most active growth of the city has been

taking place, the arteries consist not of bridges over open rivers,

but of streets, very limited in number by reason of the form of the

land, and so situated that the cost of securing greater capacity will

increase by leaps and bounds with the rise of land values and the

erection of new structures. The first step in planning improvements for

the heart of the city must therefore be to consider the possibilities

for improvement in the eastward arteries.

[Sidenote:

Eastward Arteries and Their Improvement]

There are only three places where such arteries could ever have been

laid out, even if the wisest foresight had been exercised in the early

planning of the city when all was free and open. These three places

are around the north edge of the hills along the Allegheny, around the

south edge of the hills along the Monongahela, and through the gap in

the hills followed by Fifth Avenue and Forbes Street.

The northerly route is followed by Penn and Liberty Avenues, by the

Pennsylvania Railroad, and by Grant Boulevard clinging to the hillside

above the railroad. The space between Penn Avenue and the river is

largely occupied by railroads and by business dependent upon the

railroads, and there seems to be no possibility of opening any new

line for relief, except in so far as a subway might reduce the number

of people inconvenienced by delays on the surface. On account of its

gradients and of the districts toward which it leads at both ends, the

usefulness of Grant Boulevard seems likely to remain confined to light

passenger traffic, chiefly automobiles. In any case all the teaming

and surface traffic of a very large region must be carried through

the throat on the lower level. It is important also to note that the

only street which passes through the down town district with more than

village dimensions--eighty-foot Liberty Avenue--leads directly to this

throat and then chokes down to a fifty-foot street.

It may safely be said that increased capacity for east and west general

traffic north of the hills can be secured only by a radical widening of

Liberty Avenue or Penn Avenue. Upon the whole the latter seems the more

advantageous route. On the score of cost there seems to be but little

choice; on the score of value in the result Penn Avenue is the better.

To have one side of such an important avenue flanked by a railroad to

the exclusion of general business frontage would make it less agreeable

as a thoroughfare and less productive as a real estate proposition. On

the other hand if Penn Avenue is widened the narrow portion of Liberty,

above Eleventh Street and next the railroad, will be important almost

solely for local purposes; warehouses or factories could be erected

extending through from the principal, or Penn Avenue, frontage to

Liberty Avenue, and could be provided with sidings from the railroad

passing over Liberty.

Further details as to this suggested widening of Penn Avenue and its

connections eastward are given, along with other highway improvements,

in Part II of this report. But considering here only its relation to

the down town district, this widening will undoubtedly throw increased

emphasis upon Penn and Liberty Avenues as traffic lines within this

district; and it is obvious that a good cross-connection should be

provided so that eastbound traffic coming from Liberty Avenue and

from Grant Street, as well as from Penn Avenue, can freely reach

the widened portion of the latter. A traffic square at the angle in

front of the Union Station, where the broad part of Liberty Avenue

ends and the narrow part begins, would furnish the desired connection.

Fortunately such a square can now be formed with the destruction of but

few buildings and those of relatively little cost.[2]

[Illustration: Second Avenue between Try Street and the Tenth Street

Bridge]

The street along the Monongahela--Second Avenue--although it might

have been made of great importance and value by proper planning at the

start, cannot at the present time be greatly widened without the most

serious difficulties. For much of its length it is pinched between

railroads and industrial plants. It does not lead eastward into any

district comparable in population or importance with those tapped by

Penn and Liberty Avenues, and its connection westward through the Point

District is narrow, difficult to widen, and relatively unimportant. For

these reasons Second Avenue, although it must be recognized as a main

thoroughfare and should be improved as much as practicable, especially

as far east as the Tenth Street bridge, is not of such first-class

importance as to demand radical enlargement in spite of all obstacles.

The only remaining natural outlet to the east is that occupied by Fifth

Avenue and Forbes Street and the block between them. Neither street is

wide enough for the traffic it will be called upon to bear, but the

widening of Fifth Avenue would be so costly as to be almost out of

the question. For many reasons, discussed in detail in Part II, the

widening of Forbes Street into an ample main thoroughfare seems to be

the best solution of the problem here presented.

The importance of this route and of its future traffic burden will be

better realized when it is understood that at Soho a direct extension

can be made, on easy gradients, from the widened Forbes Street to

Fifth Avenue, the street which can more easily be widened beyond that

point; and further, that, a little to the east, a new and greatly

needed street might branch off to the right from Forbes Street where

the latter turns inland. This new street would continue along the side

hill above the river, and would provide the only possible convenient

outlet from the down town district to all the upland regions south and

southwest of Squirrel Hill. Thus the western portion of Forbes Street,

when widened, would carry the great bulk of all future street traffic

between the down town district and the whole district from East Liberty

to the Monongahela River as well as all the country east and southeast

of that triangle.

[Sidenote:

A New Traffic Center]

The intersection of Forbes Street, widened, with Sixth Avenue,

extended, is likely to become a traffic center of the utmost

consequence to Pittsburgh. The importance of the Forbes Street route

to the eastward has been indicated above; Sixth Avenue, crossing Fifth

Avenue and Grant Street, leads toward the Union Station and toward all

the northeast part of the business district, and to the North Side

bridges; a new bridge and tunnel are quite likely to lead from this

very intersection to the South Side and the South Hills; from this

center a good connection is readily obtainable with Fourth, Third, and

Second Avenues and with the southern water front; and Diamond Street

can be widened at moderate expense so as to continue Forbes Street

right through the heart of the business district.

[Sidenote:

Sixth Avenue]

The importance of Sixth Avenue between Forbes and Grant Streets has

been pointed out. It is the natural route from the Union Station and

the adjacent freight yards and from all the Allegheny bridges to the

districts fed by Fifth Avenue, Forbes Street, the proposed South Hills

bridge, and Second Avenue. It ought to be widened to the dimensions of

a main thoroughfare, and its grade ought to be lessened. Its stream

of travel splits at Grant Street, a portion turning to the left into

the other part of Sixth Avenue, and a portion turning to the right

along Grant Street to Liberty Avenue and the freight yards. The latter

obviously is a very important line, and the off-set which makes at

Seventh Avenue is so serious that the corner ought to be cut.

[Sidenote:

Try Street Grade Crossing]

The elimination of the grade crossing of Second Avenue with the

Panhandle Road at Try Street is a pressing improvement. The avenue now

descends toward the railroad from both directions, and the best plan

appears to be to carry it over the tracks. In this way Second Avenue

would connect directly (through the west side of the Civic Center) with

Forbes Street; with Fourth, Fifth, and Sixth Avenues, and so with the

Union Station and the Allegheny Valley; with the main or upper deck of

the South Hills bridge rising across the river to the proposed tunnel;

and with the suggested lower deck of that bridge leading to the South

Side. In order to secure a good gradient, the westerly approach of

Second Avenue should start from Grant Street, rising on an incline

or viaduct through the so-called park and the street on one side of

it, in order to pass over Ross Street. In this way there would be no

interference with the teaming through Ross Street to the Baltimore and

Ohio freight yards.

[Sidenote:

Second Avenue Freight Yards]

Mention should here be made of a plan, which it is understood is

already being considered, to develop the area between Second Avenue

and the river, from Try Street to the Tenth Street bridge, for freight

purposes. Even now the connections from this region to the Tenth Street

and Smithfield Street bridges, and, via First and Second Avenues, to

the whole Point District, are good. But the street changes proposed

in connection with the traffic center at Sixth Avenue and Forbes

Street will provide greatly improved connections directly to the Point

District, the East End and the South Hills. First Avenue and Water

Street would enter the freight yard underneath the Panhandle and the

proposed Baltimore and Ohio local tracks; and if Second Avenue is

raised to go over the Panhandle tracks, as recommended above, direct

entrances can be secured to the second or third floor of a freight

house with car elevators such as those at St. Louis. On the whole this

seems like a good place for a large distributing freight station.

[Sidenote:

The "Hump Cut"]

The Sixth Avenue improvement, and others in the vicinity, are bound

up with the question of the "Hump Cut." Pushing to one side all

differences of opinion as to the _local_ effect of the proposed

cut,--its influence on land values, and the share of the cost which

ought to be borne by abutters,--the fact stands out that the City as

a whole needs the improvement in order to clear an obstruction from

some of its most important general highways. Another fact, seen clearly

from this larger point of view, is that the essential matter is to

secure a radical reduction of the maximum gradients on the three great

thoroughfare lines, Sixth Avenue, Fifth Avenue, and Diamond Street,

even though the minor streets on the margins of the Hump be skimped.

Detailed recommendations, as to gradients, etc., are discussed in Part

V and are embodied in the accompanying plans and profiles.

[Sidenote:

Grant Boulevard Extension]

[Illustration: Diagram showing the distribution of automobiles coming

in town on Grant Boulevard]

Only one other thoroughfare problem is involved with the "Hump Cut,"

that of Grant Boulevard extension. Since the grade of Webster Avenue

will be considerably lowered in connection with the "Hump Cut," and

the buildings along its lower end greatly damaged in any case, by far

the best plan for Grant Boulevard is to carry it straight through to

Webster Avenue and to widen the lower end of the latter to 60 feet, as

far as Grant Street. The widening of Oliver Avenue to 50 feet between

Grant and Smithfield Streets, and the possible widening of Strawberry

Way, would, together with existing streets, provide adequate means of

distribution for the large number of automobiles using the boulevard,

and would at the same time create a decided local improvement.

[Sidenote:

A Civic Center]

The location of a Civic Center, where the city offices can be grouped

in a convenient and dignified manner, ought to connect with the main

transportation lines. It ought, if possible, to embrace the county

buildings. It ought, if possible, to occupy land which is not of such

high cost as to preclude the setting apart of the open space which is

requisite to the highest dignity and beauty of public buildings. All

these advantages are embraced to a high degree in a locality now so

unpromising and unattractive that it is hard not to feel an unfair

prejudice against it.

[Illustration: County Buildings--the northwest side of the proposed

Civic Center]

[Illustration: Present appearance of the Civic Center site from the

rear of the County Buildings]

[Illustration: Princes Street in Edinburgh--an interesting example of a

public garden built over a railroad]

[Illustration: Suggestion for the Municipal Building in the Civic

Center]

The locality in question lies to the east and southeast of the present

county buildings. It embraces a bit of low ground occupied by the

little Panhandle station and local freight yard, surrounded, except

for the county buildings, by vacant lands and cheap buildings at

various higher levels, mounting on the east to the commanding ridge

that dominates all this part of the city. Through this locality the

Forbes and Diamond Street thoroughfare and the South Hills and Sixth

Avenue thoroughfare will pass. Fifth Avenue borders it on the north,

and Second Avenue on the south. It is flanked on the northwest by

the noble and distinguished architecture of the court house and the

jail--masterpieces of Richardson, priceless examples of the work of one

of the few great artists America has yet produced. To the west a new

county building is about to be erected. It is proposed that the central

area of low ground, occupied by the railroad, be decked over at about

the level of Fifth Avenue, and that a great public square with gardens

be laid out thereon somewhat after the manner of the celebrated public

gardens built over the railroad at Princes Street, Edinburgh, or, in

a much smaller way, at Park Avenue, New York. Below the structure

would simply be a first class station and freight sheds of permanent

construction, with skylights and ventilators, at suitable locations,

piercing a flat roof of adequate strength. The cost of construction

would be less than the cost of an equal area of land independently

acquired for an open space in connection with a Civic Center in any

other locality that could reasonably be considered.

[Illustration: Sketch of the proposed Civic Center for Pittsburgh,

looking south. The crossing of tracks in center of foreground is at the

present corner of Sixth Avenue and Forbes Street]

[Illustration: Retaining wall supporting a local park at Lyons--a

suggestion for the bluff between Second Avenue and the new City Hall.]

[Illustration: Hillside site of the proposed City Hall]

Along the east side of this square or garden, in the form of a

gradually rising terrace, would run the approach to the new South Hills

bridge ascending gently from Forbes Street; and on the east side of

this again, as though terraced on the hillside, would be the principal

municipal building culminating in a tower which would spring from the

highest level at Bluff Street, where the playground of the Holy Ghost

College could be utilized as a park. The group enclosing the square

would be completed by another building at the north with frontage on

Forbes Street, Fifth Avenue, and Sixth Avenue, and by a low building

on the south serving to screen the factories and freight yards south

of Second Avenue but leaving open the view of the opposite hills. The

plan and the sketch perspectives indicate in a general way the sort of

architectural development for which the situation appears to call. The

pronounced and unsymmetrical differences in elevation, the slanting

grade of the approach to the great South Hills bridge, the irregular

and picturesque form of the site and of the existing county buildings,

all seem to demand a certain informality and picturesqueness of design.

These peculiarities of the site ought to be welcomed because they are

eminently characteristic of the city and of the mountainous region

in which it is set. Throughout the city and its surroundings the one

preëminent quality of an agreeable sort is the bold picturesqueness

of the landscape--the deep ravines, the lofty hills, the precipitous

declivities, the plunging prospects from hilltops into the river

valleys--and a similar quality of forcefulness, activity, and bold,

irregular adaptation of means to ends, is to be felt in all the more

dominant and impressive works of man in the city--the steel works, the

bridges and viaducts, the jagged sky-line of office buildings. To build

a City Hall and Civic Center of scholastic formality, appropriate in

the placid surroundings of Paris, would be to lose a great esthetic

opportunity.

[Illustration: The Cathedral Terrace at Bern; a suggestion for

utilizing a high situation for public buildings and grounds]

[Illustration: The hillside of Ofen at Budapest, an interesting

treatment of the slope crowned by a public building]

[Sidenote:

Diamond Street Widening]

It would be difficult to overestimate the value, to the future

convenience prosperity and business efficiency of the city, of carrying

the Forbes Street improvement straight through to a junction with

Liberty Avenue on the line of Diamond Street; and it is deemed a

peculiarly fortunate thing that this is the only east and west line in

the midst of the business district where a wide street can still be put

through without destroying any considerable number of costly modern

buildings.

When Diamond Alley was widened, in part, from 20 feet to 50 feet, not

long ago, the improvement was of much importance because it added one

more street large enough for general business in a locality where there

was a great demand for business frontage, and where the original lots

were of very excessive depth. But the improvement was a distinctly

local one and contributed little or nothing to the solution of the

general traffic problem. But the peculiar relation of Diamond Street to

the general system of main traffic lines demands a much more courageous

action for the benefit of the whole city. In connection with the

widening of Forbes Street, it should be converted into a thoroughfare

at least equal in width to Liberty Avenue. A glance at the map shows

the convenient and equitable location of Diamond Street, and its

importance as a thoroughfare to supplement Liberty Avenue in handling

the traffic of the Point District.

[Sidenote:

Market Street Widening]

Coming, as it does, directly opposite the Sixth Street bridge, Market

Street ought to be a very important cross-town connection; and because

the buildings are generally small and old, and most of the lots are

so deep as not to be seriously injured by curtailment, a widening is

suggested throughout its length.

The widening of Diamond and Market Streets makes clear that the

Diamond Square Market site should not be occupied in any way that

would perpetuate the obstruction offered by the present use of the

square to through travel. The need is not for a mere mitigation or

slight improvement of the present conditions by opening little archways

through a new building on the Market site, but for a radical and

effective clearance. The space was originally set apart as an open

public square, and the complete occupation of it by revenue-producing

buildings was a diversion of the square from its original purpose--an

act in general accordance with the unfortunately short-sighted policy

which has done much to bring about the notably congested conditions

prevailing in the city today.

[Sidenote:

The Market]

[Illustration: A bridge and water front at Pittsburgh--Monongahela

River]

It may be necessary to provide elsewhere for the Market, and a site

is suggested in the block between Third and Fourth Streets on Liberty

Avenue, having the great advantage of rail connections. On account

of the character of the surrounding country, an exceptionally large

proportion of market supplies comes to Pittsburgh by rail and must

continue to do so. It is highly uneconomical, and adds needlessly and

considerably to the congestion of the streets, to unload the market

supplies from the railroad a full mile away (as is now done) and to

then haul them by team through the heart of the retail district.[3]

Within the interior of the Point District, Diamond and Market Streets

widened, supplemented by the existing Liberty Avenue, appear to be the

only thoroughfares of Metropolitan dimensions which it is reasonable to

provide for. But around the borders of the district there is much that

ought to be done.

[Sidenote:

The Water Front]

In its water front Pittsburgh has a great public asset which now lies

undeveloped both from the point of view of transportation and from that

of recreation and civic beauty.

[Illustration: Primitive commercial quay at Pittsburgh--Allegheny River]

As a transportation factor, its primary use is for the transshipment of

water-born commodities. As discussed elsewhere,[4] the actual amount

of river freight is at present relatively small; but it is potentially

important, and one of the reasons for its lack of growth is the

neglect of Pittsburgh and other river ports to provide for the quick,

convenient, and economical handling of river-born traffic at the public

wharf.

[Illustration: Berlin water front, both useful and attractive]

At river ports throughout the world, the first primitive step, beyond

the mere dumping of stuff and passengers on the natural shelving

bank or river bed of mud or gravel, is the paving of the slope, as

at Pittsburgh, still leaving the goods to be dragged up and down the

bank by main force. But among the live modern river cities of Europe,

wherever a real water competition with rail service has been desired,

even though such competition be limited in its range, the day of the

primitive or mud-bank type of shore has long gone by; and the public

wharf has been reconstructed into one of the many well-recognized types

of commercial embankment providing an up-to-date equipment for handling

freight, and decent, attractive conditions for passengers. This

development of the public wharf properties in Europe has kept pace with

the activities of the railroads, making for the steady and intelligent

improvement of terminal facilities. Indeed in many European river ports

the improvement of the water terminals has rather forced the pace for

the railroads.

[Illustration: Frankfurt's double use of its river front, for business

and for pleasure]

In contrast to this active aggressive spirit, Pittsburgh, like most

American river towns, where she has not actually turned her water

front over bodily to the railroads, has left it in a most inefficient

primitive condition.

[Illustration: Shaded promenade upon the embankment that protects Lyons

from the floods of the Rhone]

But the value of Pittsburgh's water front lies not merely in its use

as a wharf, however much improved. Another use, shown by the varied

experiences of other river cities, is that, in a commercial water

front on modern lines, there is generally opportunity for a wide

marginal thoroughfare for the relief of traffic congestion in the

adjacent streets. Sometimes such a water-front thoroughfare becomes a

busy avenue of retail trade and general travel; but more usually its

peculiar value lies in diverting some of the main streams of heavy

teaming from the older interior streets where the retail trade and

office business tend to concentrate, and where the passenger travel is

most dense. Especially with an isolated and limited business district

like that of Pittsburgh, made up almost wholly of narrow streets and

connected with the rest of the city by a series of bridges and of

bridge-like gaps in the hills which wall it in, it becomes of the

utmost importance to secure the formation of a wide circuit street

connecting these outlets together, so that not all the travel is forced

to filter slowly through the midst of the business district.

[Illustration: View of the same water front at Lyons, showing the

commercial quay]

A third undeveloped asset of the Pittsburgh water front is its value

for recreation and as an element of civic comeliness and self-respect.

One of the deplorable consequences of the short-sighted and wasteful

commercialism of the later nineteenth century lay in its disregard of

what might have been the esthetic by-products of economic improvement;

in the false impression spread abroad that economical and useful things

were normally ugly; and in the vicious idea which followed, that beauty

and the higher pleasures of civilized life were to be sought only in

things otherwise useless. Thus the pursuit of beauty was confounded

with extravagance.

Among the most significant illustrations of the fallacy of such ideas

are the comeliness and the incidental recreation value which attach to

many of the commercial water fronts of European river ports, and it is

along such lines that Pittsburgh still has opportunity for redeeming

the sordid aspect of its business center.

[Illustration: How Paris appreciates the value of its river frontage]

[Illustration: The outlook from The Point, Pittsburgh]

Wherever in the world, as an incident of the highways and wharves along

its riverbanks, a city has provided opportunity for the people to walk

and sit under pleasant conditions where they can watch the water and

the life upon it, where they can enjoy the breadth of outlook and the

sight of the open sky and the opposite bank and the reflections in the

stream, the result has added to the comeliness of the city itself, the

health and happiness of the people and their loyalty and local pride.

This has been true in the case of a bare, paved promenade, running

along like an elevated railroad over the sheds and tracks and derricks

of a busy ocean port, as at Antwerp; in the case of a tree-shaded

sidewalk along a commercial street with the river quays below it, as

at Paris and Lyons and hundreds of lesser cities; and in the case of a

broad embankment garden won from the mud-banks by dredging and filling,

as at London. Pittsburgh has an unusual opportunity to secure this

incidental value for recreation in the treatment of its river front.

Immediately across the Monongahela are the high and rugged hillsides of

Mt. Washington and Duquesne Heights, and below these are the lesser but

still striking hills along the Ohio River from the West End to McKees

Rocks. The outlook over the river with its varied activities to these

hills immediately beyond, would be notable in any part of the world.

Furthermore, the rivers and the hills are the two big fundamental

natural elements characteristic of the Pittsburgh District. Thus, any

provision close to the heart of the city, whereby the people can have

the enjoyment of these mighty landscapes, is of peculiar importance.

[Illustration: Mt. Washington hillside from the Monongahela water front]

It does not diminish the essential grandeur of the situation that

the river swarms with barges and steamers; that it is spanned by

busy bridges; that the flat lands along the rivers are crowded with

railroads, buildings and smoking factories; and that the hillsides are

crowned with houses. It is a spacious and impressive landscape in any

case. But for the people to get the good of it two things are needful.

A locally agreeable place must be provided from which the scene can

be enjoyed; and the landscape must be treated with the respect which

it deserves, by the elimination of certain features which are merely

indicative of neglect, waste, and abuse, and which have no economic

justification. Especially is it desirable that the precipitous hillside

rising to Mt. Washington, now largely an unfruitful waste, a place of

raw gulleys and slides mingled with some painful advertising signs,

should be treated with respect as a vital part of the great landscape

of the city. It should be protected from defacement and its earthy

portions should be reclothed with the beauty of foliage.

The accompanying illustrations are suggestive of the sort of thing

which might be done by Pittsburgh with its remaining public water

front, and in time, let us hope, with portions of the water front

which have passed into private hands. But the actual details of the

treatment to be adopted can be properly worked out only in connection

with the comprehensive plans for flood protection with which the Flood

Commission is now grappling.

[Illustration: Water front and hillside at Lyons]

The great majority of river cities which have undertaken modern

improvements on their water fronts have had to deal with more or less

serious flood problems, and the complex and varying conditions of each

river have had an important influence on the design of the embankment.

The technical problems involved in the control of rivers are among

the most complex and baffling with which the engineering profession

has to deal, and any attempt to forestall the investigations of the

Flood Commission, by definite plans for permanent improvements on the

water front, would be folly. Nevertheless, the experience of hundreds

of cities and the work of thousands of engineers have developed

certain types of treatment, one or more of which, with suitable local

modifications, will pretty surely appear in the final solution of the

Pittsburgh problem. Subject, therefore, to the conclusions of the Flood

Commission, a satisfactory development of the Pittsburgh wharf may be

expected to include the following features.

First, there should be an amply wide water-front street, presumably

formed by extending Water Street and Duquesne Way over the upper part

of the present sloping bank. Second, the outer sidewalk of this street

should become at most points a tree-shaded promenade, of such width and

with such equipment of benches and other features for public recreation

as the circumstances permit, so arranged that the people using it will

neither be in the way of the transportation activities nor be annoyed

or endangered by them, and so designed that the people can enjoy to the

full the natural beauty of the river valley and the always interesting

activities of which it is the stage. Third, there should be next the

water a commercial quay, substantially level, of adequate but not

unnecessary width, and accessible from the streets by inclined roads of

reasonable gradient, parallel with the river, in place of the present

excessive slopes.

In the first typical section here given is shown one such arrangement.

Here, the level of the promenade is such that its solid parapet rises

above the maximum flood level. This is of a type adopted for rivers

that are subject to occasional excessive floods, as at Pittsburgh. It

assumes the embankment to be made water-tight; the sewers and drains

to be provided with proper back-pressure gates, and the openings from

the streets, through the promenade and its parapet to the commercial

quay, to be arranged for prompt damming on the rise of the water above

the danger level. Thus would the entire business district be protected

from floods, not only on the surface but also in the basements. The

quay shown on this section is supposed to be at a level just above

ordinary navigable stages, and to be equipped with power cranes for

direct loading and unloading between steamers or barges, tied up at the

quay, and wagons upon it. Provision could also be made for a freight

track running in alongside the cranes for transfer between cars and

vessels (if thought desirable), in addition to the facilities provided

on railroad property. Alongside the quay, floating landing-stages for

packets and so forth, reached by gang-planks or bridges, would be

provided as at present, but in a more decent and commodious style.

[Illustration: Typical section for the water front. The parapet along

the promenade would be above extreme flood height; the commercial quay

would be at a lower level, flooded at very high water, but above all

ordinary river stages.]

[Illustration: Alternative section for the water front, suggesting

a floating commercial quay that would rise and fall with the river.

Large cranes could transfer freight directly from the boats to trucks

at the street level. At certain places roadways would cut through the

promenade to provide access to ramps leading down to the quays and

to provide places for freight trucks to stand while being loaded and

unloaded.]

This section is of a type tested by practical experience and is clearly

a great improvement upon the present primitive conditions. But it is

open to two objections: first, that the quay is flooded at intervals,

although so designed as to suffer no injury and to be put out of

commission only when the river is practically closed to navigation by

the height of the flood; and, second, that at low water, that is to say

"pool full," it is not at the most convenient height.

An alternative section is therefore suggested, which has less precedent

behind it, but which might prove better adapted to the Pittsburgh

conditions. In this the fixed level of the commercial quay is replaced

by a continuous landing stage formed of long floats or barges, of

permanent construction, moored against the wall and free to rise and

fall with the changing level of the river. The approaches to the

floating quay for wagons would be, as in the case of the fixed quay,

by descending inclines parallel with the river just outside the main

wall; but in this case the roadway would be formed by a line of barges

which would rest on a fixed incline during low water. The rising water

would lift the barges off the incline successively, beginning with

the lowest, so that at all stages of the water they would maintain an

uninterrupted roadway to the quay on a proper gradient. Successful

precedents for such use of permanent floating quays, and of alternately

floating and grounded driveways to the landing stage, are to be found

in Italy and in the recent harbor developments at Manaos, Brazil.

A great advantage of the floating quay is that in this type of

construction the bed of the river may be excavated to its full depth

back to the face of the flood wall itself, and that the space necessary

for the commercial quay is secured on the floating structure outside

of this line without materially reducing the prism, or section, of the

flood discharge. It would therefore be possible, with this design, to

secure more ample width for street, for promenade, and for commercial

quay, and at the same time have more space in the river for the passage

of the floods.

Whatever may prove to be the best details of the river-front treatment,

it is clear that it can and should provide an ample thoroughfare, a

clean, pleasant, tree-shaded promenade, and a convenient, up-to-date

wharf with easy access to and from the streets. There is no serious

difficulty in providing for such an improvement from the junction of

the two bridges at The Point to Ninth Street, on the Allegheny, and to

Smithfield Street, on the Monongahela.

East of Smithfield Street the passenger station of the Baltimore &

Ohio now blocks the way. But it is not unreasonable to expect that

the main Baltimore & Ohio station will, before long, be moved to some

point in Junction Hollow in order to avoid the long delay, to all

through trains, caused by the run down to Smithfield Street and back

again. The suburban business of the Baltimore & Ohio could then be

turned in, parallel with the Panhandle tracks, to a new joint suburban

station in connection with the important future center of traffic near

the junction of Forbes and Diamond Streets with Sixth Avenue and the

proposed South Hill bridge.

When the Baltimore & Ohio passenger station is removed from Smithfield

Street it would be possible to continue the new water-front street and

promenade east of Smithfield on a viaduct just outside of the present

Water Street; this viaduct would rise over the Baltimore & Ohio freight

yard and the grade entrances thereto at Grant and Ross Streets, and so

connect along the line of the Panhandle (Try Street) with the proposed

Second Avenue bridge over the railroad, and thence with Forbes Street

and Sixth Avenue.

Any better connection than now exists from Ninth Street and Duquesne

Way to Liberty Avenue would be so costly as to seem hardly worth while,

although it would be a much-desired link in the circuit thoroughfare.

It is probably impossible for Pittsburghers, who are familiar with

the present neglected aspect of the water front and are not familiar

with the finer European quays, to form any conception of how fine a

situation will be created for public or private buildings, especially

on the southern water front when thus improved. If it were not so much

to one side of the main streams of passenger travel, the river frontage

between Smithfield and Ferry Streets would offer a most admirable site

for public buildings in the down town district.

[Sidenote:

The Improvement of The Point]

At the opposite end of the business district from the proposed Civic

Center is another spot where the civic pride of Pittsburgh should lead

the City to make liberal expenditures for other than the economic ends

which justify those Street improvements which are the main burden of

this report.

[Illustration: Water front park and an interesting bridge at Bonn,

Germany]

At the end of The Point, where the two lines of water-front improvement

would join, is a considerable area of public open space. Here is the

spot where the Ohio River has its birth: here was built the fort

which broke the peace of Europe and around which turned the frontier

struggles of the war that gave America to the English speaking race.

It is here that all the most inspiring associations of the city are

chiefly concentrated. Poetically, this spot, at the meeting of the

rivers, stands for Pittsburgh.

Because the eastward drift of the business center has followed the

eastward drift of residences, and the growth of business has not

yet expanded back to fill the void; and because The Point is left

pocketed beyond the freight yards, and is visited only by the throngs

who use the old Point bridge, it seems to be rather forgotten and

disregarded by most Pittsburghers. But its historical and topographical

significance can never be altered, and it is to be hoped that the City

will rise to its opportunity and nobly form The Point into a great

monument.

The North Point bridge is about to be rebuilt; the South Point bridge

is very narrow and some day must be rebuilt in its own turn. In the

placing of these bridges, in every feature of their design and of the

design and decoration of their approaches, the monumental element ought

always to control. The plan shown herewith in outline is an attempt

to solve, in a dignified and monumental way, the obvious problems

presented by the bridges and the means of approach to them. Whether

just this plan or some better one be adopted, it is essential that

the whole Point be regarded as one single monument, that no pains be

spared in bringing the best artistic skill to bear in working out the

details of the plan, and that the general plan, when thus worked out,

shall really determine the construction of all the parts. At any time

conditions may arise, as in regard to one of the bridges, for which the

general plan does not exactly provide; but, if so, the plan should be

adapted as a _whole_ to meet the new conditions, so that work may still

proceed in accordance with a complete plan. Never can a single feature

of The Point safely be designed independent of the rest, if worthy

results are to be obtained. And what is true of this great monumental

feature is true in large measure of all public improvements in relation

to a comprehensive city plan.

FOOTNOTES:

[2] See Plan of the Down Town District.

[3] A general discussion of the Market problem is included in Part V.

[4] The City and the Allegheny River Bridges, Part V.

Pittsburgh Main Thoroughfares and the Down Town District Improvements Necessary to Meet the City's Present and Future Needs · 第 1 / 6 章