C. The Completed Test.

The completed test is required as applied to the smallest gas-forming

portion of each sample in all cases other than those noted as

exceptions under the “presumptive” and the “partially confirmed”

tests.

The completed test is required in _all_ cases where the result of the

confirmed test has been doubtful.

Standard methods for the examination of water and sewage · 第 219 / 249 题