CHAPTER XII.

CARR ROCK BEACON.

1810-1821.

The Carr Rock is a tide-covered reef extending about 1¾ mile from the

shore of Fifeness, and forming a _turning point_ in the navigation

of the northern-bound shipping of the Firth of Forth, and on Mr.

Stevenson’s recommendation the Commissioners of Northern Lighthouses

resolved to erect a beacon of masonry to mark the danger.

It may seem to be unnecessary, after describing the Bell Rock

Lighthouse, to notice so apparently small a work as this; but in such

matters it is unsafe to generalise; each case must be considered on its

own merits, and great difficulties were encountered in accomplishing

the work. The formation of the Carr Rock rendered it impracticable to

secure a base for a building of greater diameter than eighteen feet,

and as part of that base had to be founded under the level of the

lowest tides by cofferdams which were removed and taken ashore after

each tide’s work, even the Engineer of the Bell Rock Lighthouse found

all his resources taxed to a considerable extent, and he was in the end

foiled in carrying out his design for the building. But irrespectively

of these physical difficulties, the Carr Rock is a work of great

interest to the lighthouse engineer, inasmuch as Mr. Stevenson at that

early date conceived the idea of calling to his aid the power given

by the rise of tide on the building to move a train of clock work to

sound a warning bell; and again, when the destruction of the upper

portion of his beacon by the sea obliged him to relinquish this plan,

unwilling to be beaten, he suggested that the same tidal action might

be made to sound a whistle; and failing that, he proposed to exhibit a

phosphorescent light from the top of the building. All of these ideas

suggested by Mr. Stevenson’s inventive mind have been from time to time

revived by modern inventors.

The original design of the Carr Rock Beacon was made in 1810, and

the work was commenced in 1813. After portions of the masonry had

repeatedly been carried away by the sea, the original design for

surmounting the building by a bell to be rung by the rise and fall

of the tide was abandoned, and the beacon was completed in 1821, by

raising an iron structure, as shown in Plate X. Fig. X-2, on the

foundation that had escaped the fury of the sea, and that structure is

still in perfect preservation. So great, indeed, was the difficulty

that Mr. Stevenson, in 1818, contemplated using blocks of cast iron

instead of stone to insure greater specific gravity--a proposal which

is believed to have been then made for the first time.

The following is Mr. Stevenson’s own description of this interesting

work:--

“The form and construction of the Carr Rock Beacon, as originally

designed and ultimately executed, will be better understood by

referring to Plate X. The motion originally intended to be given to

the bell-apparatus, or tide machine, Fig. X-1, was to be effected by

admitting the sea through a small aperture of three inches in diameter,

perforated in the solid masonry, communicating with a cylindrical

chamber in the centre of the building, measuring two feet in diameter,

in which a float or metallic air tank was to rise and fall with the

tide. During the period of flood tide, the air vessel, in its elevation

by the pressure of the water, was to give motion to machinery for

tolling the bell and winding up a weight, which last, in its descent,

during ebb tide, was to continue the motion of the machine, until the

flood tide again returned to perform the joint operation of tolling the

bell and raising the weight. A working model of a machine upon this

principle having been constructed, it was kept in motion for a period

equal to several months; this was effected by water run through a

succession of tanks raised by a pump from the lower one to the higher,

thus producing the effect of flood and ebb tides. The time during which

this apparatus was in action having been ascertained by an index, a

constant attendance upon the machine during this protracted experiment

became unnecessary.

[Illustration:

_PLATE X._

CARR ROCK BEACON AS DESIGNED IN THE YEAR 1810

CARR ROCK BEACON AS EXECUTED IN THE YEAR 1821]

“The upper termination of the beacon, in its present form, as shown in

Fig. X-2, does not admit of the application of the tide machine with

the bell apparatus. Experiments as applicable to this have, however,

been tried with a wind instrument, to be sounded by the pressure of the

sea water, but it has not succeeded to the extent that seems necessary

for a purpose of this kind. We have, indeed, thought that the

application of pressure as a power, communicated by the waters of the

ocean, in mechanical operations, might be carried to almost any extent

by simply providing a chamber or dock large enough for the reception of

a float or vessel, of dimensions equivalent to the force required. This

description of machinery is more particularly applicable in situations

where the tides have a great rise, as in the Solway Firth, Bristol

Channel, and other parts of the British seas; and at St. Malo on the

coast of France.

“A beacon of any form, unprovided with a light, must always be

considered an imperfect landmark, and therefore various modes have

been contemplated for more completely pointing out the position of

the Carr Rock. It has been proposed that phosphoric lights should be

exhibited from the top of the building. This object, however, would

be more certainly accomplished by the erection of leading lights upon

the island of May and mainland of Fife. But these, with other plans,

which have been under the writer’s consideration, would necessarily

be attended with a great additional expense, which, in the present

instance, it is not thought advisable to incur.”