Fig. 80.]

If the accident of low water occurs at a time where it is important to

continue operations with the least possible delay, a pine plug may be

driven in the opening left by the melting of the fusible metal. In any

event it is but a short job to renew the fusible cap, it being only

necessary to unscrew the nut and insert a new cap, the rest of the

device remaining intact.

The plug should be renewed occasionally and the surface exposed inside

the boiler be kept free from scale and deposit. It is to be understood

that the fusible portion extends entirely through the shell of the

boiler and when melted out makes a vent for the water or steam.

All marine boilers in service in the United States are required to have

fusible plugs, one-half inch in diameter, made of pure tin, and nearly

all first-class boiler makers put them in each boiler they build.

Maxims and Instructions for the Boiler Room Useful to Engineers, Firemen & Mechanics; Relating to Steam Generators, Pumps, Appliances, Steam Heating, Practical Plumbing, etc. · 第 165 / 328 题