DIFFERENT MODES OF RIVETING.

+---------+----------+----------+-----------+

| CHAIN | ZIG ZAG | TREBLE | UNEQUAL |

|RIVETING.| RIVETING.| RIVETING.| PITCHES. |

+---------+----------+----------+-----------+

| O O | O | O O | O O O |

| | O | O | |

| O O | O | O O | O O |

| | O | O | |

| O O | O | O O | O O O |

| | O | O | |

| O O | O | O O | O O |

| | O | O | |

| O O | O | O O | O O O |

+---------+----------+----------+-----------+

In fig. 41 may be seen an example of zig-zag riveting.

[Illustration: Fig. 41.]

CAULKING.—By this is meant the closing of the edges of the seams of

boilers or plates. In preparing the seams for caulking, the edges are

first planed true inside and outside; and after the plates have been

riveted together, the edges are caulked or closed by a blunt chisel

about 1/4-inch thick at the edge, which should be struck with a 3 or

4-lb. hammer; sometimes one man doing the work alone and sometimes one

holding the chisel and another striking.

_Fullering_ a boiler plate is done by a round-nosed tool, while

_caulking_ is executed by a sharper instrument.

The thinnest plate which should be used in a boiler is one-fourth of an

inch, on account of the almost impossibility of caulking the seams of

thinner plates.

It is a rule well known to all practical boiler makers that the thinner

the metal (compatible with due strength) the longer the life of the

boiler under its varying stresses and the better the caulking will

stand.

Maxims and Instructions for the Boiler Room Useful to Engineers, Firemen & Mechanics; Relating to Steam Generators, Pumps, Appliances, Steam Heating, Practical Plumbing, etc. · 第 91 / 328 题