SPECIFICATION FOR 125 HORSE POWER BOILER.

_For one Horizontal Tubular Boiler_ 72 _inches diameter_ 18

_feet long for_…………………_of_………

Type.

The boiler to be of the Horizontal Tubular type with all castings and

mountings complete.

Dimensions.

Boiler 72 inches diameter and 18 feet long. Each boiler to contain 90

best lap welded tubes 3-1/2 inches diameter by 18 feet long, set in

vertical and horizontal rows with a space between them vertically and

horizontally of no less than one inch and one-quarter (1-1/4) except

central vertical space, which is to be three inches (3). No tube to

be nearer than two and one-half inches (2-1/2) to shell or boiler.

Holes through heads to be neatly chamfered off. All tubes to be set

by Dudgeon Expander and slightly flared at front end, turned over and

beaded down at back end.

Quality and Thickness of Steel Plates.

Shell plates to be 1/2-inch thick of homogeneous steel of uniform

quality having a tensile strength of not less than 65,000 lbs. Name of

maker, brand and tensile strength to be plainly stamped on each plate.

Heads to be of same quality as plates of shell in all particulars

3/4-inch thick. Bottom of shell to be of one plate, and no plate to be

less than 7 feet wide. Top of shell to be in three plates. All plates

planed before rolling, and all joints fullered not caulked.

Flanges.

All flanges to be turned in a neat manner to an internal radius of not

less than two inches (2) and to be clear of cracks, checks or flaws.

Riveting.

Boilers to be riveted with 3/4-inch rivet throughout. All girth seams

to be double riveted. All horizontal seams to be double riveted. Rivet

holes to be punched or drilled so as to come fair in construction. No

drift pins to be used in construction of the boilers.

Braces.

All braces to be of the crowfoot pattern, one and one eighth (1-1/8)

inch diameter and the shortest to be no less than four feet (4) long

and of sufficient number for thorough bracing, and to bear uniform

tension.

Manholes, Hand Holes and Thimbles.

One manhole in top of each boiler with heavy cast iron frame riveted on

middle of centre plate; one manhole near the bottom of each front head;

head reinforced with a wrought iron ring two inches (2) square, riveted

to heads with flush countersunk rivets two inches (2) pitch and to

have all the necessary bolts, plates, guards and gaskets; two six-inch

thimbles riveted to top of each boiler, each to have a planed face;

one heavy 6-inch flange on bottom of each boiler, 12 inches from back

end to centre of flange. There must be two braces, one on each side of

manhole in front head; also to have three braces opposite manhole on

back head below tubes.

Lugs.

Four (4) lugs riveted on each side of boilers, of good and sufficient

size, with six one-inch rivets in each lug.

Castings.

Each boiler to have a complete set of castings consisting of ornamental

flush fronts containing tube, fire and ash-pit doors, and provide

the best stationary grate bars as may be selected by buyer, with the

necessary fixtures, all bearing bars, britching plates, dead plates,

binder bars, back cleaning out doors with frames. Anchor bolts and

buck stays. The fire door to contain adjustable air opening and to be

protected with fire shields. One heavy cast iron arch over each boiler.

Testing.

Boilers to be tested with a water pressure of 200 lbs. per square inch

and certificate of such test having been made shall be furnished with

boiler. Test of boiler to be under direction of such steam boiler

Insurance Company as may be selected by buyer.

Quality and Workmanship.

All boilers to be made in the best workmanlike manner and all material

of their respective kinds to be of the best, and in strict accordance

with specification.

Fittings and Mountings.

The boiler to be furnished with the following: One four inch heavy

mounted safety valve. One six inch flanged globe valve. Two two inch

best globe valves. Two two inch check valves. One eight inch dial

nickel plated steam gauge. One low water alarm gauge. One set of fire

irons for two boilers consisting of hoe, poker, slice bar and shovel.

Drawings.

All drawings furnished for masons in setting the boilers.

Duty of Boiler.

The boiler to develop 120 horse power and to work under a constant

pressure varying from 125 to 150 lbs. to the square inch.

All rivets are to be 2-1/2 and 1-1/2 inch pitch. The pitch line of the

rivets to be not nearer 1-1/8 inches to the edge of the sheet.

To be 8 lug plates for each boiler not less than 2 feet long, 8 inches

wide, and one inch thick.

There shall be six 1 inch anchor rods running front to rear of each

boiler, in the brick work.

These boilers and all their fronts, fittings and connections will be

subject to the inspection of…………………

Maxims and Instructions for the Boiler Room Useful to Engineers, Firemen & Mechanics; Relating to Steam Generators, Pumps, Appliances, Steam Heating, Practical Plumbing, etc. · 第 85 / 328 题