SPECIFICATIONS FOR STREET ROADWAY PAVEMENTS
INTRODUCTORY
In addition to their value as memoranda and aids in preparing
specifications for a particular project, carefully prepared general
specifications, embodying the latest approved practice, sometimes supply
the most useful and acceptable brief treatises upon any particular
branch of engineering work. It has been partly with this thought in mind
that the following set of specifications for standard street pavements
has been prepared and is now offered to city engineers and municipal
authorities.
To widen their range and increase their usefulness, copious foot notes
have been added, referring to alternative requirements and methods of
construction, and giving some of the reasons for the preference or
adoption of the construction called for in the specifications. It is
recognized that in a good many matters of detail embraced in these
specifications there is difference of opinion among able engineers, many
of whom are at least as competent as the writer to determine what is
best. They are not offered in a dogmatic spirit, or with the hope that
all the provisions found therein will be accepted. If they shall be of
some assistance in bringing about correct standards for such
specifications, their preparation will have been justified.
Theoretically, three general classes of engineering specifications may
be noted. In the first, the aim of the engineer is to specify the end or
result that it is desired to secure, leaving the contractor free to
originate and follow the methods by which these results are to be
attained. In the second the engineer aims to secure the desired end by
specifying in detail the materials and the methods which in his opinion
will accomplish the purpose, he himself assuming responsibility for the
results. Either of these two classes of specifications is permissible,
and the engineer may choose the one which in his opinion seems best
adapted to the character of the work to be done, and the conditions
under which it must be prosecuted.
In the third class of specifications, met with more frequently than they
should be, the engineer undertakes to prescribe not only the character
of the materials to be used and the methods to be pursued, but also the
results to be attained. The position thus assumed is illogical, and
often unreasonable, and may lead to complications between the engineer
and the contractor. If a contractor be required to turn out a product
which shall conform to certain standards, he may properly be given much,
if not full latitude, as to how the stipulated results shall be secured,
and may be held fully responsible for the outcome; if on the other hand
the engineer chooses to specify with more or less minuteness the
character of the materials to be used and the methods of construction to
be followed, and enforces compliance therewith, it seems fair and just
that he should assume responsibility for the results produced, and
therefore unfair to hold the contractor to responsibility for
consequences arising from the use of materials and methods which he was
allowed no choice or latitude in selecting.
In street paving work, of well-known and standard character, the second
class of specifications seems preferable for a number of reasons, the
leading one being that the time required to develop the good or bad
quality of the work must usually extend over a considerable number of
years, and the conditions to which the pavement may be subjected in the
meantime are likely to vary so widely that it may be very difficult, if
not impossible, to prescribe a satisfactory standard of service and
endurance. Disputes are therefore liable to arise between the
municipality and the contractor as to the latter’s liability, or
conditions may make it difficult or impossible to hold the contractor to
strict account for that liability.
It is believed that in the present state of the art it is entirely
practicable to so frame specifications for the materials to be used and
the methods to be followed in the construction of standard street
pavements, and to so enforce compliance therewith, that the engineer and
the municipality may safely assume responsibility for the quality of the
work produced. While it may be true that local conditions sometimes make
it very difficult to enforce compliance with specifications, the same
conditions are likely to make it at least equally difficult to secure
effective responsibility on the part of the contractor for any
long-period guarantee of the work done by him; and the contractor who
negligently or purposely violates the specifications during construction
is not likely to be more faithful or scrupulous in living up to any
guarantees he may make with regard to the future, even where the terms
and conditions of such guarantees may be clearly defined and
indisputable. The writer has discussed the subject of time guarantees as
applied to street pavements pretty fully in his book, “Municipal Public
Works,” and the above brief statement seems all that is necessary here.
In conformity with this view of the matter, the following specifications
aim to set out as definitely and clearly as practicable the requirements
for the construction of good pavements of the several standard kinds,
and it is assumed that the engineer will be able to, and will enforce
them.
It is, however, not infrequently the case that the engineer will be
called upon to prepare specifications for new, or patented, or
proprietary pavements advocated by their promoters, the value or
usefulness of which have not been sufficiently established by
experience, and for which the data for detailed, definite specifications
are not yet available.
In such cases the wisest course to follow is to confine the precise
specifications to the general or standard parts of the work, while
stipulating only the _results to be attained_ with regard to those
features of the work that are proprietary or questionable, thus placing
upon the promoter or his contractors full responsibility for such
results as are promised or guaranteed. This applies to new or
comparatively untried materials or processes, whether patented or not.
A proposed form of general specifications to cover such cases is offered
herein.
It is usually unwise to adopt or to incorporate in the municipal
specifications those prepared or offered by the promoter or patentee,
which are often brief, incomplete, and indefinite, and are sometimes
carefully, and even cunningly, drawn to evade final responsibility.
No attempt has been made to submit specifications for proprietary or
patented pavements, or those composed wholly or in part of materials
which are patented or protected by trade-marks. The owners or
contractors engaged in constructing these pavements, often, if not
usually, claim the right to dictate the material parts of the
specifications under which such work shall be done, and the municipal
engineer who is called upon to construct such pavements, must, in each
case, determine whether the specifications offered are adequate and
satisfactory, and the extent to which he feels justified in accepting
responsibility for the results. Naturally, the contractor or promoter,
even if competent to prepare specifications, cannot be expected to bind
himself within closer limits than he thinks necessary to secure the
work. In many such cases the form of general specifications for “untried
or experimental pavements” given herein might appropriately be used.
The engineer is, in common with all men, fallible, and he can hardly
hope, in the preparation of specifications, to make them perfect; to
cover every item and particular; or to escape some ambiguities of
expression, and some degree of indefiniteness. The writer can only claim
that he has aimed, in the light of a considerable experience, to set out
as fully and definitely as practicable the requirements for the proper
construction of high-class street pavements, and has endeavored to avoid
loose or obscure terms and expressions. The ideal specification is one
that furnishes a wholly sufficient guide to the accomplishment of the
desired purpose; that provides for every possible contingency which may
arise, and is couched in language which not only means exactly what it
was intended to mean, but is incapable of any other interpretation. It
is needless to say that no example of such a perfect specification can
be instanced as a model.
It has been the aim to make these specifications fair and just to the
contractor; that is, to require of him no impracticable or indefinite
service, or the assumption by him of risks other than those fairly
involved in the business conduct of the work.
If the plans and specifications for any work which a contractor bids
upon are so full, specific, and clear, that he may know exactly what he
will be expected to do, and if they do not require him to assume unusual
chances and risks, he may intelligently name prices which he believes
will compensate him for the service. Having done so, his proposal having
been accepted, and a contract entered into accordingly, the engineer and
the municipality have a right both in law and equity to demand that he
will do exactly and fully what he has contracted to do. No excuses on
his part can be valid and none should be accepted. He may in all
fairness and justness be required to “toe the mark” strictly. To the
neglect to recognize and enforce these principles is chargeable the
greater part of the poor and unsatisfactory work so common in street
pavement work in our cities. Unexpected contingencies may, of course,
arise where some changes and concessions may be proper and just, but
these should be, and usually are, very rare. On the other hand, sweeping
general clauses in contracts and specifications intended to catch the
contractor “goin’ or comin’,” unnecessarily stringent stipulations which
were never intended to be strictly enforced, but were put into the
specifications with the idea that they would help hold the contractor up
to a high standard, and “one-sided” contracts intended to give the
municipality an unfair advantage over the contractor, are as inadvisable
in policy as they are wrong in principle. Nothing should be put in a
specification that is not clearly essential to secure the results aimed
at, and, this having been done, every requirement should be enforced.
The existence in specifications of requirements that are not intended to
be enforced, gives the contractor a pretext for neglecting others that
may be important.
In these specifications will be found a number of details that are often
not regarded as important and which, when found in paving
specifications, the contractor is frequently allowed to ignore. In the
writer’s opinion, based upon his experience in street paving, every one
of these requirements is essential to the production of high-class work,
which, it is hardly necessary to argue, is, in the end, the most
economical work from the standpoint of the municipality.
It may be argued that the adoption and enforcement of these
specifications would have the effect of raising prices. In many cases
this would doubtless prove true. Contractors are entitled to a fair and
reasonable compensation for their services. It is admitted that in some
cities the prevailing prices for some kinds of pavements are below the
actual cost of the work if it were done in a proper manner, conforming
strictly to the specifications. Illogical as it undoubtedly is, the low
price at which work is taken is sometimes considered a sufficient reason
for accepting work below standard. The consequence is that bidders not
only count upon concessions and lax enforcement of the specifications,
but bid lower and lower, expecting that further concessions will enable
them to get out with an undeserved profit. This is one of the most
serious evils in the paving business to-day, and the highest public
interests demand a thorough reform. Low first cost, desirable as it may
be, is the poorest economy if it be secured at the sacrifice of the
quality of the work. If one pavement costs twenty per cent. more than
another, but renders forty per cent. more service, it is obviously the
cheaper of the two.
Contractors are prone to contend that this or that provision in a
specification is unusual, unnecessary or unfair. In dealing with them
the engineer should bear in mind that no requirement of a specification
that is clearly and definitely stated, so that the bidder may understand
exactly what it means and what he will be expected to do, and may frame
his prices accordingly, can be unreasonable or unfair to the contractor.
Unusual or unnecessary requirements may result in unwarrantably
increasing the cost of the work, and this may raise a question between
the engineer and the municipality employing him, but it can furnish no
occasion for questions of fairness or unfairness between the contractor
and the engineer.
The relations that should exist between the contractee and the
contractor, and the attitude of the engineer toward the contractor have
been widely discussed and are quite well understood from both the
ethical and legal standpoint.
It is well to bear in mind that when a contract is duly entered into,
both the parties thereto are equal before the law. Neither can impose
upon the other terms or conditions that are not clearly included in or
to be fairly inferred from the contract itself. The assumption that
either party has superior or extra rights not expressed or to be fairly
inferred from the written agreement, or in accordance with the
established rulings of the courts, is wholly without warrant. The
smallest contractor is, in this respect, upon an equal footing with the
largest city government for which he may undertake to do contract work.
It is not infrequently the case that the city assumes a superior and
dictatorial attitude not in harmony with these principles, and it is too
common for the contractor to seek to evade or to escape from clear
contractural obligations. In neither case is the action warranted by
fairness, justice, or law.
It should be needless to say that the attitude of the engineer toward
the contractor should be one of unyielding and uncompromising
requirement that the contract and specifications shall be fully and
faithfully complied with, but at the same time one of absolute fairness
and even helpfulness to the contractor. The ideal relation, which should
be more commonly attainable than it appears to be, is that of helpful
cooperation to bring about the results the contract and specifications
were intended to secure.
In line with the principles here outlined some observations upon the
preparation of contracts and specifications are appropriate.
It is the general practice to include in and make a part of “The
Contract” (herein for convenience called The General Contract) all the
various documents that are supposed to relate directly to the
transaction as a whole. The separate parts of such a general contract
may vary in number or character, but the principal ones are the
following:
1. The advertisement for proposals.
2. Instructions to bidders.
3. The proposal submitted.
4. The contract proper.
5. The specifications.
Each of these should be drawn to cover fully and clearly its appropriate
purpose or function but _nothing more_. It is not unusual to find, even
in the instructions to bidders, stipulations that properly belong in the
contract or specifications, and it is quite common to find in the
contract proper a lot of matter that properly belongs in the
specifications only. In such cases there is liable to be more or less
confusion as to the actual meaning or requirements of the general
contract as a whole, which may lead to serious misunderstandings and
complications between the parties thereto. The several documents
composing the general contract are likely to be prepared by different
persons, looking at the transaction from different points of view, and
often not wholly familiar with the scope, intent and language of the
other documents. There is therefore a possibility, at least, of
indefinite, if not of conflicting expressions which are open to
different interpretations, particularly in the light of special or
unexpected conditions that may arise during the progress of the work or
the settlement therefor. It would tend to eliminate or avoid the
possibility of such complications if each of the several documents
confined itself strictly to its appropriate function in the general
contract.
Advertisements for proposals may be divided into two general classes.
The one is brief in form and substance, simply stating that proposals
for a certain named work will be received at a stated place and time,
and referring those interested to documents on file at a stated place
for all further information. This is the general form adopted by the
United States War Department for the many projects carried out by
contract under its direction. A sample advertisement taken from a
current technical journal is as follows;
TREASURY DEPARTMENT, OFFICE OF the Supervising Architect, Washington,
D. C., October 10, 1912. Sealed Proposals will be received at this
office until 3 o’clock p. m. on the 1st day of November, 1912, and
then opened, for an electric passenger elevator in the United States
post office, Bellingham, Wash., in accordance with the drawing and
specification, copies of which may be had at this office at the
discretion of the Supervising Architect. OSCAR WENDEROTH, Supervising
Architect.
The other general class of advertisement, very commonly used by
municipal corporations, is much longer and more elaborate, giving a
condensed statement of the character of the work to be done, the
conditions under which proposals are invited and will be received, and a
schedule of the quantities of work involved, together with other
particulars. A typical example of such an advertisement, taken from the
same periodical, is here given:
PUMPING MACHINERY—ROSELAND PUMPING STATION
DEPARTMENT OF PUBLIC WORKS
CHICAGO, ILL., October 2, 1912.
Sealed proposals will be received by the City of Chicago until 11 A.
M. Wednesday, October 30, 1912, at Room 406, City Hall, for furnishing
and erecting at Roseland Pumping Station one vertical triple expansion
crank and fly wheel pumping engine of a capacity of twenty-five
million (25,000,000) gallons per day against a normal head of one
hundred and forty feet (140′). This proposal also includes the
dismantling of a similar engine now at Lake View Pumping Station,
transporting and erecting it at Roseland Pumping Station, together
with the furnishing and erection of certain auxiliaries and
appurtenances, according to plans and specifications on file in the
office of the Department of Public Works of said city, Room 406, City
Hall.
Proposals must be made out upon blanks furnished at said office, and
be addressed to said Department, indorsed “Proposals for Pumping
Machinery, Roseland Pumping Station,” and be accompanied with Five
Thousand ($5,000) Dollars in money or a certified check for the same
amount on some responsible bank located and doing business in the City
of Chicago and made payable to the order of the Commissioner of Public
Works.
The Commissioner of Public Works reserves the right to reject any or
all bids. A deposit of One Hundred Dollars ($100) will be required to
insure safe return of the plans.
No proposal will be considered unless the party offering it shall
furnish evidence satisfactory to the Commissioner of Public Works of
his ability, and that he has the necessary facilities together with
sufficient pecuniary resources to fulfill the conditions of the
Contract and Specifications, provided such Contract should be awarded
to him.
Companies or firms bidding will give the individual names as well as
the name of the firm with their address.
L. E. McGANN,
_Commissioner of Public Works_.
Such advertisements as this may be required by statutes or ordinances,
and in that case are, of course, proper and necessary. Even where not so
required they may be considered advantageous, because they give
prospective bidders more complete information as to the character and
magnitude of the work, and may enable them to decide at once whether
they care to pursue the matter further. But on the whole, the shorter
form of advertisement, if permissible, seems preferable, because it
refers the enquirer directly to the original and official sources of
information, the forms to be used, the contract, specifications and
estimated quantities of work, exactly as they will and must be presented
to all bidders, and as they will appear in the subsequent stages of the
transaction, and leaves, therefore, no room for possible confusion of
statements between the advertisement and the other documents.
Furthermore, the cost of the shorter form of advertisement is much less,
and this is often a matter of some importance.
Instructions to bidders should be confined strictly to such information
and directions as the bidder may need to properly and intelligently make
up and submit his proposal in accordance with the requirements relating
thereto. This should include primarily, a reference to the contract and
specifications for all general and detailed information about the work
to be done, but should carefully avoid any statements or language that
might be construed to add to, take from, limit or modify the contract or
specifications. Perhaps the briefest and best statement of what this
document should or should not contain is that it should be so framed
that, except as a matter of record, its office and usefulness should
absolutely end with the award and signing of the contract.
No one who is not a lawyer can presume to say just what the contract
proper should contain or cover, particularly as this may vary with the
requirements of statutes and ordinances in force in a given city. It
would seem logical and proper, however, to separate the special
functions of contracts and specifications in such a way that each should
cover a distinct field of its own, and be free from encroachment upon
the proper domain of the other. With such a conception of the proper
domain of each, one might safely say that the contract should undertake
to set out only the legal and contractural relations of the parties
thereto, and should refer to the plans and specifications for all
detailed instructions as to the actual performance of the work and the
results to be secured.
In the preparation of specifications for any public work the main points
to be kept in mind are fulness, definiteness, and exact expression.
While brevity and conciseness are desirable qualities in any document,
they should not be secured at the expense of completeness and precision
of statement. Even the frequent repetition of words, phrases and
sentences throughout a document, where it is necessary to avoid the
possibility of misunderstanding or ambiguity, should be resorted to
freely. Exact description and definition are more important than
literary style, though they may often be successfully combined. Of
course, it is not possible or necessary to go into minute detail with
regard to every part of the work. Certain things may be safely assumed
to be required by established practice or trade usage. If, for instance,
it is specified that certain lumber shall be “dressed” this word has a
well-understood meaning in the trade and it is unnecessary to stipulate
how the dressing shall be done or its character or quality, though it
may be necessary to say whether it is to be dressed on one or more
sides.
The proper preparation of specifications for any work involves a clear,
distinct and complete conception, determination and design of what is to
be done; of the conditions that are likely to be met with in carrying it
out; and of alternate plans that these conditions may necessitate. This
may not always be possible, for the engineer is not omniscient. But
careful study and maturity of design will enable him to avoid the great
majority of such indefinite expressions as “or in such other manner as
the engineer may direct,” “in accordance with the instructions of the
engineer,” etc. A great many of the items to which such expressions are
intended to and do apply in practice, could be definitely settled before
the specifications are prepared and thus all uncertainty on the part of
both engineer and contractor be avoided. To illustrate: specifications
for block pavement commonly stipulate that the blocks shall be set in
rows running at right angles to the axis of the street, except at street
intersections, where the engineer may direct them to be laid at a
different angle. There is usually no good reason why the engineer should
not determine beforehand at which, if any, street intersections the
general rule should be changed and so state in the specifications. These
may be and usually are unimportant matters which may not much affect one
way or the other the cost to the contractor. But they often prove
otherwise, and the contractor is entitled to know when he submits his
proposal just what he will be required to do. Of course it may develop
during the progress of the work that changes from the original plan will
become necessary, but these should be provided for in some such definite
and previously stipulated manner as outlined in Sect. 3 of the following
specifications.
The practice of inserting, either in the specifications or the contract,
a clause making the engineer judge and arbiter in any differences that
may arise between the city and the contractor, and providing that his
decision in all such cases shall be final, is as unwise as it is often
illegal. Such clauses are based on the assumption that the engineer is a
competent as well as a disinterested party in the transaction, an
assumption that is usually wholly wrong, though to their honor it may be
said that the confidence thus reposed in engineers is seldom abused. But
the fact is that the engineer is never actually a disinterested party.
He is employed and paid by the city to look after its interests, and is
under no obligations to the contractor other than those named in the
contract and specifications and his sense of justice, propriety and
professional honor. He would be recreant to his duty if in all nicely
balanced matters of doubt he did not espouse the side of his employer.
Moreover, his personal interests are often involved. Having prepared the
plans, specifications and estimates for the work, he is naturally and
properly anxious that it shall be successful and that the cost shall not
exceed that estimated. Under all these conditions it is hardly possible
for any human being to be a wholly disinterested and unprejudiced judge.
No broad-minded and conscientious engineer desires to be placed in such
a difficult position, and it is as unfair as it is unwise and improper
to require him to assume it.
There are, however, a number of matters of fact in reference to which it
is proper and necessary to make the judgment and decision of the
engineer controlling and final, unless it may be shown that his decision
is clearly erroneous or affected by improper motives, or by fraud. Some
one must necessarily be made the immediate and final judge as to whether
the quality of materials and workmanship is in accordance with the
requirements of the plans and specifications, and as to the quantity of
work actually performed, and these duties and responsibilities are very
properly placed upon the engineer.
It not infrequently occurs that specifications are not drawn as clearly
as they should be in the matters of methods of measuring the work and of
applying contract unit prices, and indefiniteness and carelessness in
this regard are often a source of misunderstanding and dispute between
the engineer and the contractor. It is a good practice, followed by many
able engineers, after specifying how a certain part of the work shall be
done, to state how it shall be measured and paid for at the contract
unit prices.
In many respects it is desirable that all the work to be done under
contract should be quite fully itemized, and a unit price named for each
kind of work. It is the custom in many cities to name only certain
leading items of the work to be done under a paving contract, as for the
pavement complete, furnishing and setting new curbing, redressing and
resetting old curbing, and possibly a few other leading items, and to
require that all necessary incidental work shall be done by the
contractor without cost to the city; or, in other words, he must take
this possible extra work into consideration in naming his unit prices
for the leading items of the work. As the quantity of this incidental
work is often not stated, and the contractor has no means of
ascertaining it, he must guess, as intelligently as he may be able, how
much he should add to his unit prices to cover its cost. If he is a
prudent contractor he will be sure to add enough to prevent any possible
loss on this account. In most cases the quantities of this incidental
work can be determined and scheduled by the engineer with the more
important items, and the contractor may be required to name unit prices
for it. True, there are likely to develop during the progress of the
work some items that could not be foreseen or that were overlooked. In
some cities such contingencies are provided for by a clause in the
contract or specifications scheduling, by name, all the incidental minor
items of work that experience has shown are likely to be met with in
street paving contracts, and naming fair unit prices which the
contractor will be paid for each, should it occur. The contractor may
then feel assured that however much the quantity of such incidental work
may vary, he will receive compensation proportionate thereto, and he may
name his prices for the main items with more confidence. Under such
conditions it is reasonable to expect closer figures than he would be
willing to name if an unknown quantity of incidental work for which no
separate pay is provided had to be taken into consideration.
Sub-division of unit prices is also desirable in order that the engineer
may be able to analyze and record the elements that make up the
aggregate cost of the work. Thus, in the case of the construction of a
new sheet asphalt pavement it is common to ask for a single price for
the pavement complete, including a five year guarantee. Now the work
will consist of several distinct operations or kinds of work for each of
which a separate price might be named:
1. The grading of the street and preparation of the sub-grade. The
quantity of this work will vary on different streets and is best
reckoned by the cubic yard of material excavated.
2. A price, either per cubic yard or per square yard for the concrete
foundation.
3. A price per square yard for the asphalt pavement proper. This might,
if desired, be sub-divided into separate prices for the base-course and
the surface-course.
4. A price per square yard for guaranteeing the pavement for five years.
Such sub-division would, it is true, increase the work of final
computation but if of no other value, the detailed costs would be a
great aid to the engineer in estimating the reasonable cost of future
work where the relative quantity of these detailed parts varied.
SPECIFICATIONS
For Grading and Paving, or Repaving
with.. ........ ........ .............. .... Pavement
on a... ......... .......... ...... Foundation, the Roadway
of..... ........ ........... ............ . ............
Street, from...... .......... ............. .............
to. ....... ....... ........... ............ ........
together with work incidental thereto.
GENERAL DESCRIPTION OF WORK
The work embraced in and to be done under this contract consists of
grading the entire street from curb to curb between the limits named,
including the removal or readjustment of the pavement now on the
roadway, setting and resetting curbing, laying or relaying sidewalks
where required, furnishing all new material and performing all the labor
required for paving the roadway, together with all incidental work
necessary to complete the whole in a proper manner, in accordance with
the contract, the plans on file in the office of the City Engineer,
these Specifications and the instructions of the City Engineer, herein
referred to as the Engineer, or his authorized agents.
REFERENCES
The numbered divisions of these specifications are herein designated as
“sections,” each being referred to by the number standing at its
beginning. Where reference is herein made to any such section number it
shall be considered equivalent to a quotation of that section.
The plans and drawings relating to this work, on file in the office of
the City Engineer are designated as ...
=1. Authority.=—Wherever, in these specifications, the words, the City,
are used, they shall be understood to refer to the duly constituted
municipal government of the city of ... or its authorized agents, acting
within the authority specifically conferred upon them by the said
municipal government.[1]
Wherever, in these specifications, the words, the Engineer, shall be
used, they shall be understood to refer to the City Engineer of said
city, or his deputies or assistants, acting within the authority
conferred upon them by the City Engineer.
But no agent of the city shall have power to revoke, alter, enlarge or
relax the stipulations or requirements of these specifications, except
in so far as such authority may be specifically conferred in or by the
specifications themselves, without the formal authorization so to do,
conferred by the contract of which these specifications are a part, or
by ordinance, resolution or other usual official action of the city.[2]
=2. Interpretation.=—In case of any actual or alleged disagreement or
discrepancy between the contract, these specifications, and the plans
for the work on file in the office of the Engineer, the language and
provisions of the contract shall take precedence and prevail; and the
Engineer shall determine in each case whether the specifications or the
plans shall be followed.
=3.= The Engineer shall have the right to make such changes in the plans
and specifications of the work as he may deem necessary or desirable or
to provide for unexpected conditions or contingencies that may develop
at any time after the signing of the contract, or during the progress,
or before the final acceptance of the work; provided that all such
changes do not involve an aggregate increase or decrease in the cost of
the work, as shown by his estimates, of more than ten (10) per cent. The
contractor shall accept such changes when made, as a part of the
original contract and specifications, subject to all the provisions and
conditions thereof. But before any such changes shall become valid and
before the contractor shall begin the particular work involved in such
changes, the increased or decreased cost of the work by reason of such
changes, above or below what it would have been under the original plans
and specifications, shall be agreed upon in writing between the engineer
and the contractor. And when the whole work, including such changes,
shall have been completed and accepted by the engineer, the sum or sums
so agreed upon shall be added to or deducted from the sum that would
have been due the contractor if no such changes had been made.
=4. Quality of Material and Work.=—The judgment and decision of the
Engineer as to whether the materials supplied and the work done under
this contract comply with the requirements of these specifications,
shall be conclusive and final. No material shall be used in the work
until it has been examined and approved by the Engineer, or his
authorized agents. All rejected material must be promptly removed from
the work and replaced with that which is acceptable to the Engineer, and
all improper or defective work must be corrected, and, if necessary,
removed and reconstructed so as to comply with these specifications and
the instructions of the Engineer.
In all matters of detail not specifically covered by the specifications
the work shall be well and skillfully done in accordance with the best
trade or art customs and standards for work of like character and
purpose.
=5. Inspection.=—The Engineer may provide for the inspection, by
assistants and inspectors under his direction, of all materials used and
all work done under this contract. Such inspection may extend to all or
any part of the work, and to the preparation or manufacture of materials
to be used, whether within the limits of the work on the street, or at
any other place. The Engineer and his inspectors shall have free access
to all parts of the work, including mines, quarries, manufactories, or
other places where any part of the materials to be used is procured,
manufactured or prepared. The Contractor shall furnish the Engineer all
information relating to the work and the material therefor which the
Engineer may deem necessary or pertinent, and with such samples of
materials as may be required. The Contractor shall, at his expense,
supply inspectors with such labor and assistance as may be necessary in
the handling of materials for proper inspection. Inspectors shall have
authority to reject defective material and to suspend any work that is
being improperly done, subject to the final decision of the Engineer.
Inspectors shall have no authority to permit deviations from, or to
relax any of the provisions of these specifications without the written
permission or instruction of the Engineer; nor to delay the Contractor
by failure to inspect materials and work with reasonable promptness.
The payment of any compensation, whatever may be its character or form,
or the giving of any gratuity, or the granting of any valuable favor, by
the Contractor to any inspector, directly or indirectly, is strictly
prohibited, and any such act on the part of the Contractor will
constitute a violation of these specifications.[3]
=6. Injuries to Persons and Property.=—The Contractor shall be held
alone responsible for all injuries to persons, and for all damages to
the property of the city or others, caused by or resulting from the
negligence of himself, his employees or agents, during the progress of,
or connected with the prosecution of the work, whether within the limits
of the work, or elsewhere. He must restore all injured property,
including sidewalks, curbing, sodding, pipes, conduits, sewers and other
public or private property to a condition as good as it was when he
entered upon the work.
=7. Sanitary Conveniences; Nuisances.=—The Contractor shall provide all
necessary privy accommodations for the use of his employees on the
street, and shall maintain the same in a clean and sanitary condition.
He shall not create nor permit any nuisance to the public or to
residents in the vicinity of the work.
=8. Public Convenience.=—No material, or other obstruction shall be
placed within five feet of fire hydrants, which must be at all times
readily accessible to the Fire Department.
During the progress of the work the convenience of the public and of the
residents along the street must be provided for as far as practicable.
Convenient access to driveways, houses and buildings along the street
must be maintained wherever possible. Temporary approaches to and
crossings of intersecting streets and sidewalks must be provided and
kept in good condition, wherever practicable.
=9. Barriers, Lights, Watchmen.=—The Contractor shall provide and
maintain such fences, barriers, “street closed” signs, red lights, and
watchmen as may be necessary to prevent avoidable accidents to residents
and to the public.
=10. Disorderly Employees.=—Disorderly, intemperate, or incompetent
persons must not be employed, retained, or allowed upon the work.
Foremen or workmen who neglect or refuse to comply with the instructions
of the Engineer, shall, at his request, be promptly discharged, and
shall not thereafter be re-employed without his consent.
=11. Order and Progress of Doing Work.=—The work under this contract
shall be prosecuted at as many different points, at such times, and in
such sections along the line of the work, and with such forces as the
Engineer may from time to time deem necessary, and direct, to secure its
completion within the contract time. Not more than one thousand (1,000)
linear feet of the street shall be torn up, obstructed or closed to
travel at any one time without the written permission of the Engineer.
Completed portions of the pavement shall be opened to travel as directed
by the Engineer, but such opening shall not be construed as an
acceptance by the City of the work done. Where thus opened to public
travel by the direction of the Engineer, the Contractor will not be held
responsible for injuries to the work caused by such travel or public
use, pending the final completion and acceptance of the whole work.
=12. Grade and Contour of Pavement.=—Roadway pavements shall be laid to
such grades, crown and contour of surface as the plans may show or the
Engineer may direct, and the surface of the completed pavement shall
conform accurately to such grades, crown and contour. The designed
surface of the completed pavement shall be considered as the datum or
plane of reference in fixing the location or level of the sub-grade, of
the pavement foundation, and of structures connected therewith. It will
be hereafter referred to in these specifications as “The pavement
datum.”
=13. City Monuments or Stakes.=—The Contractor must carefully protect
from disturbance or injury all city monuments, stakes and benchmarks,
and shall not excavate nearer than five feet to any of them without the
permission of the Engineer; or until they have been removed, witnessed,
or otherwise disposed of by the Engineer.
=14. Old Material.=—All material or structures removed from the street
and not required for the new construction, but which the city may desire
to reserve, shall be delivered and neatly piled up in a corporation yard
or elsewhere, by the Contractor, as the Engineer may direct. Such
reserved material shall be considered in the custody of the Contractor
until delivered at the place designated, and he will be held responsible
for its care and protection, and must make good any losses occasioned by
damage, theft, or misappropriation while it is on the street or en route
to the place of storage. If the Contractor shall be required to haul
such reserved material more than one-half mile, he shall be paid a
reasonable price, to be agreed upon in advance, for the haul exceeding
that distance.
Material taken from the work which is to be used in the new construction
shall be compactly piled where it will least obstruct the sidewalks or
adjoining sections of the street, and properly protected by the
Contractor until it is required for use.
All old material removed from the work, including the material excavated
in preparing the sub-grade, not reserved by the City nor to be used
again in the work, shall belong to the Contractor and must be removed by
him from the street as promptly as possible. It must not be placed on
the sidewalks or adjacent streets, nor on any other street or property
belonging to the City, nor on the property of private owners, without
the written consent of the Engineer, or the owner of the property.
=15. Storage of New Material.=—The material for construction when
brought upon the street shall be neatly piled so as to cause as little
obstruction to travel as possible, and so that it may be conveniently
inspected.
=16. Rebuilding and Adjusting Street Structures.=—Catch basins, manhole,
sewer and water frames and covers, sewer inlets, water pipes and other
conduits, belonging to the City and within the limits of the work,
shall, if necessary, be reset to the new lines and grades of the street
and for this purpose good brick masonry of the original thickness, laid
in Portland cement mortar shall be used. Great care must be taken to set
all such structures as project through the pavement exactly to the grade
and contour of the new street surface, and any defects in the conformity
of such structures to the pavement datum, discovered at the time, or
during the progress of the work, or during the guaranty period,
stipulated in Sec. 25 shall be promptly remedied by the Contractor.
=17. Clean Sidewalks.=—During the progress of the work, the sidewalks
and portions of the street adjoining the work, or in its vicinity, must
not be obstructed or littered more than may be absolutely necessary, and
the adjacent sidewalks must be kept clean.
=18. Connection With Existing Pavements or Streets.=—Wherever a new
pavement joins or abuts against an existing pavement of a different
kind, or an unpaved street, either at the end of the new pavement or at
cross or intersecting streets, a line of stone headers shall be provided
and set. The stone shall be of sound, hard limestone, sandstone, granite
or bluestone, free from injurious imperfections. The separate stones
shall be not less than three (3) feet long, at least eighteen (18)
inches deep, not less than four and one-half (4½) inches wide at the
top, nor less than three (3) inches wide at the bottom. The top shall be
of uniform width for each line of headers, and shall be dressed square
and even. The ends shall be dressed to secure a joint not wider than
one-half (½) inch for a depth of six inches from the top, and the sides
dressed so as to secure good contact and close jointing with the
pavement. The stones shall be set accurately with their tops at the
pavement datum, on a bed of concrete nine (9) inches wide and six (6)
inches deep, and after being set the trench shall be filled and rammed
full of gravel or crushed stone.
All existing pavements adjoining or abutting against the new pavement,
with their crosswalks, curbs, and gutters, shall be adjusted, or taken
up and relaid, to conform to and connect with the pavement datum, to
such an extent as the Engineer may direct.
Where the new and adjoining pavement are of the same kind, and headers
are not used, the new and the old pavement must be properly joined and
connected, as the Engineer may direct.
Stone headers will be paid for by the linear foot at the contract price
for that item, and the other work embraced in this section will be paid
for at the contract prices for the several items, where such contract
prices are provided; otherwise the work shall be considered as
incidental work and shall be done at the expense of the Contractor.
=19. Curbing to be Completed in Advance.=—The setting of all new curbing
and guttering and the redressing, resetting or readjustment of all old
curbing must be completed at least 100 feet in advance of the
construction of the street foundation.
=20. Final Cleaning Up.=—Immediately after the completion of the work or
any consecutive portion of it, the Contractor shall remove from it all
unused material, refuse and dirt placed by him on, or in the vicinity of
the work, or resulting from its prosecution, and restore the street to a
condition as clean as before the work was begun; and the new pavement
shall be properly cleaned.
=21. Measurements and Computations.=—Unless otherwise distinctly
provided in the contract and specifications, measurements, computations
and payments will be based upon the actual quantities of completed work,
customary or conventional methods of measurement and computation to the
contrary notwithstanding.
The area of street pavement shall be reckoned in square yards of
completed pavement surface, deducting manholes, inlets and other
openings in the surface of the pavement having an area of over three (3)
square feet. Unless separately paid for under the contract, stone
headers and crosswalks will be measured as a part of the pavement
surface.
=22.= The price for the pavement per square yard shall, unless otherwise
stated herein, include the preparation of the sub-foundation, the
construction of the foundation, the cushion course, and the pavement
complete, including all the materials and labor required therefor.
=23. Incidental Work at Contractor’s Expense.=—All the work to be done
by the Contractor for which specific unit prices are not named in the
contract, specified and enumerated in Sections 4, 5, 6, 7, 8, 9, 12, 13,
14, 15, 16, 17, 18, 19, and 20, as well as any minor details of work not
specifically mentioned in the specifications, but obviously necessary
for the proper completion of the work, shall be considered as
incidental, and as being a part of and included with the work for which
prices are named in the contract. The Contractor will not be entitled to
any extra or additional compensation therefor.
=24. Extra Work.=—The City may require the Contractor to furnish such
additional materials and to do such additional work, not provided for in
the contract and these specifications, but which may be found necessary
or pertinent to the proper prosecution and completion of the work
embraced in the contract, at prices to be agreed upon in writing, in
advance. But no work other than that included in the contract and these
specifications and which is covered by and to be paid for at the prices
named in the contract, shall be done by the Contractor except upon a
written order from the Engineer, which order shall describe the work to
be done and name the compensation agreed upon therefor. In the absence
of such written order from the Engineer the Contractor will not be
entitled to payment for any such additional or extra work.
In the same manner the city may omit or dispense with items or parts of
the work, by previous agreement with the contractor, and a like written
order by the engineer. But such additions, omissions or alterations
shall not together increase or decrease the aggregate cost of the whole
work more than fifteen per cent. (15%). Any changes in the plans,
specifications, character of material used or method of doing the work
that may increase or decrease the aggregate cost of the work more than
fifteen per cent. (15%) may be authorized and validated only by a
formal, supplemental contract, regularly executed by all the parties to
the original contract.[4]
=25. Guaranty.=[5]—The Contractor shall guarantee that all the materials
used and all the work done under this contract shall fully comply with
the requirements of these specifications, the plans herein before
referred to and the instructions of the Engineer. Any defects in the
completed work, or any part of it, or any failure of the work to fully
perform or endure the service for which it was intended, which, in the
opinion of the Engineer, are attributable to the use of materials,
skill, or workmanship not in compliance with the said specifications,
plans and instructions, within a period of ... years after the date of
the certificate of completion and acceptance, shall be regarded as prima
facie and conclusive evidence that the Contractor has failed to comply
with the said specifications, plans and instructions. And the Contractor
shall, at his own expense, at such time and in such manner as the
Engineer may direct, repair or take up and reconstruct any such
defective work, in full compliance with the original specifications,
plans and instructions. And as surety for the performance of this
guaranty the Contractor’s bond, required by the contract, shall remain
in full force until the expiration of the period of ... years above
stipulated in this section.
PREPARING THE SUB-GRADE
=26. Grading.=—The whole area to be occupied by the pavement and its
foundation shall be excavated or filled up to a sub-grade at such an
elevation that after being compacted by the roller, the surface will
be ... inches below the pavement datum, and truly parallel thereto. In
excavating, the earth must not be disturbed below the sub-grade. Plowing
will not be permitted where the depth of earth to be removed is less
than five (5) inches, and in no case must the plow be allowed to
penetrate to within less than one inch of the sub-grade. Places that are
found to be loose, or soft, or composed of unsuitable material, below
sub-grade, must be dug out and refilled with sand, or other material as
good as the average of that found on the street.
Where the natural surface of the ground shall be below the sub-grade, or
shall become so by the removal of old pavement or other structures, it
must be filled to the sub-grade in layers not exceeding five inches in
depth, and each layer shall be thoroughly rolled or rammed before the
next layer is placed upon it, and when the filling is completed the
filled area must be properly trimmed and compacted by rolling or ramming
to the true sub-grade, as in excavation. The material excavated from the
street may be used for such filling, provided it be of suitable quality.
Where it cannot be thus procured from the street it must be obtained by
the Contractor elsewhere, in which case the actual quantity so obtained,
measured after it is compacted in the street, will be paid for at the
contract price for “earth filling.” The price bid for “earth excavation”
will be paid for all material excavated above the sub-grade, measured in
place on the street, which price includes the cost of disposing of the
excavated material, whether as waste or filling, and of trimming and
rolling or ramming the sub-grade, and of making it ready for the
pavement foundation.
After the excavation is completed and the surface neatly trimmed, the
whole area shall be well compacted by rolling with a roller weighing not
less than five tons. Areas inaccessible to the roller shall be rammed
until they are as well compacted as the rolled surface. When the rolling
is completed the surface must be nowhere more than three-fourths inch
below, nor more than three-eighths inch above the true sub-grade. If,
after the rolling is completed and before the pavement foundation is
laid, the surface shall become disturbed in any way, it must be replaced
and properly compacted.
Where the soil composing the sub-foundation is found to be wet or
“springy,” a system of soft tile drains, discharging into the street
drainage system, shall be constructed by the Contractor, as directed by
the Engineer. The tile shall be laid in trenches about one foot wide and
from one to two feet deep. After the tile is in place the trenches shall
be filled with crushed stone or gravel, well compacted by tamping. The
tile will be paid for per linear foot at the contract price for the
same, which price shall include the cost of excavating and refilling the
trenches with crushed stone.
PAVEMENT FOUNDATION
=27.= Pavement foundation shall consist of hydraulic concrete, or of old
pavement stone relaid, or of broken stone or gravel, as may be herein
specified, constructed upon the sub-grade.[6]
HYDRAULIC CONCRETE FOUNDATION
=28. Concrete.=—Concrete shall be composed of Portland cement, sand,
broken stone and water.
=29. Portland Cement.=[7]—Portland cement shall be defined as the
pulverized product resulting from the calcination to incipient fusion of
an intimate mixture of properly proportioned argillaceous and calcareous
materials, and to which no addition greater than three per cent. has
been made subsequent to calcination.
=Specific Gravity.=—The specific gravity of the dry cement at a
temperature of two hundred and twelve (212) degrees F. shall not be less
than 3.10.
=Fineness.=—It shall be pulverized to such fineness that not more than
eight (8) per cent. shall fail to pass a number one hundred (100) sieve
and not more than twenty-five (25) per cent. shall fail to pass a number
two hundred (200) sieve.
=Time of Setting.=—At the temperature of sixty (60) degrees F. mortar
made of neat cement shall not begin to set in less than thirty (30)
minutes, nor set hard in less than one hour, but must set hard within
ten (10) hours.
=Strength.=—When thoroughly mixed dry with clean, sharp, moderately
coarse sand, in the ratio by weight of one part cement to three parts of
sand, and then made into stiff mortar, briquets made from this mortar
and exposed for one day to moist air and immersed in water for the
balance of the periods named below, shall develop a tensile strength per
square inch not less than the following:
In seven days 175 pounds.
In twenty-eight days 250 pounds.
=Constancy of Volume.=—When subjected to standard tests for constancy of
volume, the cement shall show no tendency to swell or crack.
=Composition.=—The cement shall not contain more than one and
three-fourths (1.75) per cent. of anhydrous sulphuric acid, nor more
than four (4) per cent. of magnesia.
=Tests.=—Cement tests shall be conducted in accordance with the methods
recommended by the “Committee on Uniform Tests of Cement” of the
American Society of Civil Engineers.
=Conditions.=—All cement shall be supplied in original packages with the
brand of the manufacturer marked on each package. It shall be protected
during transportation from rain and moisture. It shall be delivered upon
the work at least ten (10) days (exclusive of Sundays and holidays)
before it is to be used, in order to allow of proper inspection, and the
contractor shall furnish all necessary facilities for such inspection.
Brands of cement without established good reputation, or not heretofore
used in the City of ... may be rejected; or they will be accepted only
after they satisfactorily pass the 28–day test. Rejected cement must be
at once removed from the street.
=30. Sand.=—Sand for concrete shall be composed of grains not softer
than hard limestone. It shall be moderately coarse and preferably made
up of grains of varying size producing a mass with low percentage of
voids. It shall not contain, in all, more than seven (7) per cent. by
volume of clay, loam, mica scales, silt, or other objectionable
inorganic matter, nor more than one (1) per cent. of organic matter.
=31. Broken Stone.=—Broken stone for concrete shall be of hard and sound
limestone or other stone equally hard and durable, broken to a roughly
cubical form. It shall be screened through efficient revolving screens,
and only such fragments as have passed through circular screen openings
two and one-half (2½) inches in diameter, shall be used. If the crushed
dust and fine fragments be not screened out, the stone must be so
handled that the fine material will be evenly distributed through the
mass when it reaches the concrete platform or mixer.[8]
=32. Water.=—Water used for concrete shall be fresh, and reasonably
clean.
=33. Care and Handling of Concrete Material.=—Cement must not be allowed
to become wet or damp. It shall be stored until used, whether in
storehouses or on the street, so that no part of the packages shall be
nearer than four (4) inches to the ground or pavement, and shall be
effectually covered so that rain cannot reach it. Sand and stone, if
stored on the street, shall be on lumber floors.[9] The stone shall be
thoroughly wetted a sufficient time before being placed in the concrete
to allow any surplus water to drain away, but shall remain moist where
it reaches the concrete platform or mixer.
=34. Ratio of Concrete Materials.=—Concrete will be composed of one part
Portland cement, ... parts of sand and ... parts of broken stone, and
the proper quantity of water, all measured by volume.[10] The unit of
measurement shall be the barrel of cement which shall be considered as
containing four (4) cubic feet. The materials shall each be measured in
such manner and with such accuracy that the quantities used will not
vary more than seven (7) per cent. from the quantities required in the
ratio named above for each batch of concrete.
=35. Mixing Concrete.=—If mixed by hand, concrete shall be mixed on
platforms of iron or wood of sufficient size to admit of proper
manipulation of the concrete. The sand shall be first spread evenly over
the platform and the cement evenly distributed over the sand. These two
materials shall then be mixed dry until a uniform and homogeneous
mixture is secured. Sufficient water shall then be added and the mixing
resumed and continued until a mortar of uniform consistency and texture
is produced and distributed in an even layer over the platform. The
stone shall then be distributed over the mortar and mixed therewith
until the mortar is evenly distributed through the mass and every
fragment of stone is well coated with mortar, sufficient additional
water being added as the mixing progresses to produce a rather wet, but
not sloppy, concrete.[11] Machine mixing of concrete will be preferred,
provided the machine used secures equal accuracy in the ratios of
materials and equally as good mixing as prescribed above for
hand-mixing. Machine-mixed concrete must be delivered from the machine
upon a wood or metal platform, or directly into barrows.
=36. Placing the Concrete.=—Concrete shall be placed on the sub-grade in
such a manner as to prevent as far as possible the separation of the
mortar from the stone. It shall be evenly distributed in a single
horizontal layer of such depth that, after ramming, it will be not less
than ... inches thick. Immediately after being so placed it shall be
well rammed until a compact mass is produced with its upper surface
parallel to and ... inches below the pavement datum. Depressions that
may appear during the ramming may be filled with concrete of the same
composition as used for the foundation, except that smaller-sized stone
shall be used; mortar alone must not be used for this purpose, nor shall
the upper surface of the concrete be plastered with mortar. The surface
of the concrete shall not be broomed or troweled.[12]
=37. Setting of Concrete.=—After the concrete is completed it shall
remain undisturbed until it be firmly set. The time allowed for setting
shall not be less than five days, and as much longer as, in the judgment
of the Engineer, may be necessary, depending upon the temperature of the
weather and the setting qualities of the cement. During this period no
hauling or traveling over the concrete must be permitted unless its
surface be first protected by a covering of plank. The Contractor shall,
if necessary, keep the concrete moist by wetting it, with hose, or
otherwise, until twenty-four (24) hours before it is to be covered with
the pavement surface.
=38. Measurement of Concrete.=—Concrete will be measured and computed in
cubic yards as found completed on the street, the thickness being taken
as ... inches. The contract price for concrete foundation covers the
cost of providing all the materials required, making, placing and
ramming the concrete, and keeping it moist for the necessary period.
FOUNDATION OF OLD PAVING STONE
=39.= Foundations made of old stone paving blocks shall be constructed
as follows:
Upon the sub-grade prepared as specified in Section 26, shall be spread
a layer of good sand to an even depth of one and one-half (1½) inches.
The paving blocks, whether taken up from the street to be paved, or
brought from other streets or storage yards, shall be cleaned of all
adhering earth, dirt and street refuse. The blocks shall then be set on
the bed of sand, on edge, perpendicular to the grade, with their long
dimension at right angles to the line of the street, in courses composed
of stones of the same width, extending entirely across and at right
angles to the axis of the street. Stones in adjoining courses shall
break joint at least two inches. Joints between courses or stones, or
along the curbstones, shall not exceed one inch in width. The stone
shall be fitted closely around manholes or other structures in the
street. The stones shall be so set in the bed of sand that after being
rammed as hereafter specified, their tops shall be at the proper grade.
After being thus set in place the stone shall be rammed with paving
rammers having wooden faces and weighing not less than thirty (30)
pounds, so as to force each stone to a good bearing in the sand below,
and to bring its top to a uniform grade, parallel to and ... inches
below the pavement datum. No stone shall project more than one-fourth
(¼) inch above the proper grade, and stones whose tops, after ramming,
are more than one-half (½) inch below such grade, shall be raised,
additional sand placed under them, and reset and re-rammed to the proper
grade and bearing. After the ramming shall have been completed, the
joints between the stones shall be filled with mortar. The mortar shall
be composed of Portland cement and sand, complying with the
specifications for these materials in Sections 29 and 30. One part of
cement and three parts of sand, by volume, shall be thoroughly mixed
dry, and then made into mortar with sufficient quantity of water to
produce a mortar of such consistency that it will just flow freely into
the joints between the stones. All the joints between the stones must be
completely filled with this mortar before it has begun to set. The
mortar filling shall be brought even with, but not above, the tops of
the stones. After the filling is thus completed, the foundation must
stand undisturbed until the mortar shall have set firmly, in no case
less than five days. The mortar must be kept moist during the period
allowed for setting.[13]
Old stone foundation will be measured in square yards, in place after
completion. The contract price includes the cost of handling and
cleaning the stone, supplying and placing the bed of sand, setting and
ramming the stone, supplying the materials for, making and placing the
mortar in the joints and watering the street while the mortar is
setting. Where stone is procured from other streets, or from storage
yards, the Contractor will be required to load, haul and unload them,
and will be allowed for this service a price of ... cents per cubic yard
for loading and unloading, plus ... cents per cubic yard for each
one-half mile, or fraction thereof, over which they are hauled by the
nearest practicable route, the measurement to be made after the stone is
set in the street, without deduction for joints.
=40. Broken Stone Foundation.=—The sub-grade for broken stone foundation
shall be prepared as specified in Section 26, except that the rolling
may be omitted at the option of the Contractor. The broken or crushed
stone shall be of hard, durable stone. The foundation shall have an
aggregate thickness of ... inches and shall be constructed in two
courses, as follows:
The broken stone used in the first course shall be of such size that it
will all pass through a screen having openings three (3) inches in
diameter, and will all be retained on a screen having openings one (1)
inch in diameter. This stone shall be evenly spread over the sub-grade
to such a thickness that after being thoroughly consolidated by rolling,
its upper surface shall be three-fourths inch below, and parallel to the
surface of the foundation when completed. It shall then be rolled with a
road-roller weighing not less than ten (10) tons until the stone is
thoroughly compacted.
The second course, composed of screenings, all of which shall have
passed through a screen with openings one inch in diameter, shall then
be spread over the first course and well raked into the voids of the
first course. It shall then be thoroughly wetted, and shall be rolled
with the ten-ton roller until the fine stone is driven into the
interstices of the first course and the whole thoroughly consolidated,
the wetting being repeated while the rolling continues. Additional
screenings shall be added and rolled in where necessary to bring the
surface to the proper elevation. When completed, the top surface of the
foundation shall be ... inches below, and parallel to the pavement
datum. No part of the upper surface of the completed foundation shall
project more than one-fourth (¼) inch above, nor shall it be more than
one-half (½) inch below the grade and contour above specified.
Gravel of a quality satisfactory to the Engineer may with his written
consent be substituted for broken stone. If of assorted sizes, such as
will compress into a mass having not more than thirty (30) per cent. of
voids, the foundation may be constructed in a single layer, graded,
watered and rolled, as prescribed above for broken stone.[14]
=41. Measurement.=—Broken stone and gravel foundation will be measured
and computed by the cubic yard in the street as completed, without any
allowance for consolidation by the roller or for settlement into the
sub-grade, the thickness being taken as ... inches. The contract price
for it shall cover the cost of supplying the material, placing it on the
street, and grading, watering and rolling it.
SHEET ASPHALT PAVEMENT
_Note._—A number of distinct varieties of asphalt are now used for
asphalt pavements, either alone or mixed. These different varieties
differ from each other quite widely in their physical and chemical
properties. Thus, in the form called “refined asphalt” some of their
properties are shown by the following table, the data for which is taken
from the second edition of Richardson’s “The Modern Asphalt Pavement.”
COMPARATIVE PROPERTIES OF DIFFERENT REFINED ASPHALTS
───────────────────────────────────────────────────────────────────────
Trinidad, Bermudez, Maracaibo, Calif. Gilsonite,
average average average of “D” average of
of two six grade, two
samples samples average samples
of two
samples
───────────────────────────────────────────────────────────────────────
Softens, degrees F. 180 165 225 132 280
Flows, degrees F. 190 175 236 151 300
Penetration at 78° F. 7 24 21 48 0
Loss, heated to 325° 1.1 3.7 3.2 1.7 1.6
for 7 hours, %.
Loss, heated to 400° 4.0 8.8 5.5 7.1 2.6
for 7 hours, %.
Bitumen soluble in 56.5 95.5 93.9 99.3 99.4
CS_{2}.
Inorganic, other than 36.5 2.2 2.9 0.3 0.5
bitumen.
Bitumen soluble in 35.6 65.6 51.1 69.6 47.2
naphtha.
Bitumen sol. in 98.7 99.0 93.2 95.7 99.8
carbon
tetra-chloride.
Fixed carbon. 10.8 13.7 17.2 17.6 13.2
───────────────────────────────────────────────────────────────────────
The practice has been heretofore, and is at the present time, to attempt
to make specifications for asphalt pavements broad enough to include all
the various varieties of asphalts, under general requirements which
shall admit these, and any new varieties that may appear on the market
suitable for the purpose, the object being to permit a wide range of
competition. This makes it exceedingly difficult if not impossible to
frame specifications that shall be sufficiently explicit and at the same
time sufficiently broad to admit these several differing materials. This
practice has been adhered to in these specifications, though in this
respect they are far from satisfactory to the author. So long as it
continues to be the policy of cities to admit these various varieties of
bitumen under the same general requirements for crude and refined
material, such objectionable specifications cannot be avoided. Even with
the great latitude now provided they exclude some materials with which
good pavements have been made.
Two remedies for this unsatisfactory condition seem practicable.
1. A city might purchase a sufficient supply of refined asphalt for its
use after asking for proposals under suitable specifications with
alternative requirements for the different varieties on the market, and
after bids are received and the samples accompanying them have been
properly examined in the laboratory, award contracts for a supply of one
or more kinds, as might seem best for the interests of the city. Stocks
of these would be delivered, tested and stored accordingly, in good time
for the season’s work. Specifications for construction with special
reference to the kind of asphalt it is proposed to use could then be
prepared, the contractors to be supplied with asphalt at the city
storage yard at a stipulated price per ton. This plan would possess a
number of advantages. A similar plan is quite commonly in use with
reference to hydraulic cement.
2. Specifications might be framed with special reference to the
properties and qualities to be possessed by the _asphaltic cement_,
permitting a liberal range as to the crude and refined bitumens to be
used in manufacturing this cement. This would be considered, at the
present time, a radical departure from well established custom, but the
author sees no reason why it should not be satisfactorily employed.
A sheet asphalt pavement is composed of two essential elements; a
mineral aggregate made up of sand of assorted sizes and mineral “dust”
and a bituminous cement. When properly compounded, manipulated and
compressed these elements make up a bituminous concrete suitable for use
as a wearing surface for streets and roads.
The character of the sand is important and we have now sufficient
knowledge from experience to specify a sand that will give,
approximately, the best results.
The bituminous cement is, however, the element of most importance, and
upon its suitability for the purpose depends very largely the utility
and durability of the pavements made with it.
It is important that this asphaltic cement shall possess certain
properties and qualities, most of which we are now able to define
satisfactorily, but others require further practical and experimental
study, and some tests not now in use would doubtless be desirable.
It is not a matter of importance what particular crude or refined
materials enter into the composition of this cement if the resulting
product is satisfactory in use. The prime requisite is a paving cement
that shall possess in a high degree the chemical and physical qualities
required for making an asphalt pavement of the best quality. If we can
devise standards and tests that will enable us to secure such a cement
we need not be concerned about its antecedents.
It would be well worth while for paving engineers and those who have
laboratory facilities to give attention to this matter. If it shall be
found practicable to define satisfactorily the qualities the cement
should possess without reference to the materials from which it is
compounded, a great advance will have been made, and our asphalt paving
specifications could not only be greatly simplified, but much greater
precision and definiteness secured.
While great advances have been made in the art of building sheet asphalt
pavements and in the framing of specifications for its construction, too
many of the specifications still in use are antiquated, indefinite and
unsatisfactory. Some of these contain requirements that, if literally
enforced, would prevent the attainment of the best results. They are
largely survivals of the time when little was known either practically
or technically of the science and art of constructing the pavements,
outside of the promoters and contractors in the business, who
consequently dictated, in a large measure, the specifications used. City
engineers were compelled to rely largely on the presumption that the
guarantee clauses of the contracts would insure good results, and
allowed the contractor wide latitude in the conduct of the work.
While there is undoubtedly much yet to learn, even by the experts, in
the matter of the materials to be used, a quite satisfactory working
basis has been arrived at, particularly as to the practical side of the
work, and a large mass of data accumulated by study and experience is
available to the municipal engineer, and the services of independent
experts is readily obtainable. There is no longer any good reason,
therefore, why the character of the materials to be used, the methods
followed, and the quality of the work secured should not be quite
definitely and fully specified in the same manner and to the same extent
as in the case of other kinds of pavement and with equally satisfactory
results.
SPECIFICATIONS
=42. General.=—Asphalt pavement surface shall be laid upon a foundation
of hydraulic cement concrete, or of stone blocks relaid, over a
sub-grade, to be constructed in accordance with Articles 26, 28, 29, 30,
31, 32, 33, 34, 35, 36 and 37.
Asphalt pavement surface shall be constructed in two courses, called the
base-course and the surface-course. The base-course may be from one (1)
inch to one and one-half (1½) inches thick, and the surface-course may
be from one (1) inch to two (2) inches thick, as shall be hereafter
specified.
=43. Crude Asphalt.=—The cementing element in asphalt pavements shall be
prepared from crude native, solid asphalts or from the proper
distillation of crude asphaltic oils.
Crude asphalts as obtained from the mines or natural deposits shall be
properly refined to drive off water and to separate foreign substances,
by melting at a temperature not exceeding four hundred and fifty degrees
F. (450° F.). Crude asphalts of the quality commonly called “glance
pitch” or “iron pitch” which do not distinctly soften at a temperature
of two hundred degrees F. (200° F.), and detached or deteriorated
material from deposits otherwise acceptable will be rejected.
=44. Refined Asphalt.=—Refined asphalt produced from native crude
asphalt shall be free from water and shall not contain an injurious
quantity of light oils or foreign matter. It shall not contain more than
four per cent. (4%) of organic matter nor more than thirty-six per cent.
(36%) of inorganic matter other than bitumen, and not more than eighteen
per cent. (18%) of fixed carbon, and not less than fifty-five per cent.
(55%) of bitumen soluble in cold carbon di-sulphide. Of the bitumen
soluble in carbon di-sulphide not less than sixty-three per cent. (63%)
shall be soluble in Pennsylvania petroleum naphtha of specific gravity
eighty-eight (88) degrees Baume at a temperature of sixty-five degrees
Fahrenheit (65° F.) and not less than ninety-eight per cent. (98%) shall
be soluble in chemically pure carbon tetra-chloride. When exposed for
seven hours to a temperature of three hundred and twenty-five degrees F.
(325° F.) in a shallow dish the bottom of which is covered with bitumen
to a depth of three-fourths (¾) inch, the refined asphalt shall not lose
more than five per cent. (5%) by evaporation.
Asphalts that are injuriously affected, in the pavement, by water (to be
determined by the test immediately hereinafter described), shall not be
used except under the conditions specified in Section 45. Cylinders made
from the surface mixture it is proposed to use, one (1) inch in diameter
and two (2) inches long, compressed to a density of two and one-tenth
(2.1), when immersed forty-five (45) days in ten (10) times their volume
of rain-water, shall retain a sound surface, unchanged and uncorroded by
the action of the water.
Refined asphalts resulting from the distillation of crude asphaltic oils
will not be accepted unless the distillation shall have been effected by
the use of suitable apparatus, at a temperature not exceeding seven
hundred (700) degrees F. The bitumen must not be over-distilled and “cut
back” by adding oil. The product, to be acceptable, shall possess the
following qualities: It shall melt and flow at a temperature not below
one hundred and forty (140) degrees F., but below a temperature of one
hundred and eighty (180) degrees F., and when tested in the standard New
York State closed oil-testing apparatus shall not flash at a temperature
below four hundred and fifty (450) degrees F. When exposed in a shallow
dish, the bottom of which is covered to a depth of three-fourths (¾)
inch with the bitumen, to a temperature of four hundred (400) degrees
F., for seven (7) hours, it shall not lose by evaporation more than
seven (7) per cent. by weight. Not less than ninety-eight (98) per cent.
shall be soluble in cold carbon di-sulphide, and not less than
sixty-five (65) per cent., nor more than seventy-five (75) per cent. of
the bitumen shall be soluble in cold Pennsylvania naphtha of gravity
eighty-eight (88) degrees Baume. Not less than ninety-nine (99) per
cent. of the bitumen shall be soluble in carbon tetra-chloride, and it
shall not contain more than sixteen (16) per cent. of fixed carbon.[15]
Bitumens resulting from destructive distillation or from artificial
oxidation, and bituminous compounds prepared from oil or oil residuums
heated with sulphur or other substances, or coal or gas tars, will not
be accepted, nor shall they be mixed with the asphalt used.[16]
=45.= Asphalts that are injuriously affected by water, and those whose
practical value for making pavements has not been established, in the
judgment of the City, by sufficient experience, will not be accepted
except under such special bond and guaranty provisions as the City may
prescribe.[17]
=46.= Full information as to the source and character of the crude
asphalt and the method of refining it shall be furnished to the Engineer
and verified by such evidence as he may require.
=47. Softening or Tempering Agent.=—For softening and tempering refined
asphalt, petroleum residuum oil or liquid asphalt shall be used. It
shall be free from water, coke, and other impurities. Its specific
gravity shall not be below 0.92, nor above 1.04. Its flash test
(determined in the standard New York State closed oil-testing apparatus)
shall not be under three hundred and fifty (350) degrees F., and when
exposed for seven (7) hours to a temperature of three hundred and
twenty-five (325) degrees F., in a shallow open dish, the bottom of
which is covered by the oil to a depth of three-fourths (¾) inch, it
shall not lose more than five (5) per cent. by evaporation. It shall not
contain more than ten (10) per cent. of paraffine scale.
=48. Sand.=—A superior quality of sand will be required and this must be
secured, if necessary, by the admixture of two or more sands. The sand
shall be silicious and so free from organic matter, mica, soft grains,
and other impurities, that these shall not aggregate more than two (2)
per cent. of the mass. The grains shall, preferably, be moderately
“sharp” or angular, and must be of assorted sizes so that the voids in
the compacted mass of dry sand shall not exceed thirty three (33) per
cent. A typical sand, to be approximated as closely as practicable, will
give the following sieve tests, the sieves being used in the order
named:
3 per cent. of the whole will pass No. 200 sieve.
15 per cent. of the whole will pass No. 100 sieve.
18 per cent. of the whole will pass No. 80 sieve.
30 per cent. of the whole will pass No. 50 sieve.
24 per cent. of the whole will pass No. 30 sieve.
10 per cent. of the whole will pass No. 10 sieve.
and none will fail to pass the No. 10 sieve.[18]
=49. Pulverized Stone.=—This may consist of limestone or other sound
stone or sand, pulverized to such fineness that the whole will pass the
No. 50 sieve, not more than ten (10) per cent. will be retained on the
No. 100 sieve, and at least seventy (70) per cent. of it will pass the
No. 200 sieve. Portland cement may be partly substituted for pulverized
stone, where the Engineer shall so direct.[19] Portland cement thus used
will be paid for at the price bid per barrel for the same, in addition
to the price paid per square yard for the pavement surface. The
pulverized material must be thoroughly dry when used.
=50. Asphaltic Paving Cement.=—Asphalt Paving Cement shall be prepared
from the refined asphalt described in Sect. 44 and the tempering agent
described in Sect. 47. The refined asphalt, together with the asphalt in
the tempering agent, shall constitute not less than sixty per cent.
(60%) of the asphaltic cement.
The refined asphalt and the tempering agent shall be mixed and melted
together at a temperature not below two hundred and seventy-five degrees
F. (275° F.), and not above three hundred and twenty-five degrees
Fahrenheit (325° F.), and thoroughly incorporated by agitation until a
homogeneous cement is produced. The agitation shall be continued until
the cement is used.