DEMOLITION OF ROCKS UNDER WATER WITHOUT EXPLOSIVES-LOBNITZ SYSTEM.[1]

[Footnote 1: Read before the Engineer's Club, Philadelphia. Translated

from _Nouvelles Anodes de la Construction,_ March, 1890.]

By EDWIN S. CRAWLEY.

The methods of demolishing rocks by the use of explosives are always

attended by a certain amount of danger, while at the same time there

is always more or less uncertainty in regard to the final result of

the operation. Especially is this the case when the work must be

carried on without interrupting navigation and in the vicinity of

constructions that may receive injury from the explosions.

Such were the conditions imposed in enlarging the Suez Canal in

certain parts where the ordinary dredges could not be used.

Mr. Henry Lobnitz, engineer at Renfrew, has contrived a new method of

procedure, designed for the purpose of enlarging and deepening the

canal in those parts between the Bitter Lakes and Suez, where it runs

over a rocky bed. It was necessary to execute the work without

interrupting or obstructing traffic on the canal.

The principle of the system consists in producing a shattering of the

rock by the action of a heavy mass let fall from a convenient height,

and acting like a projectile of artillery upon the wall of a fortress.

From experiments made in the quarry of Craigmiller, near Edinburgh,

with a weight of two tons shod with a steel point, it was found that

with a fall of about 5.5 meters (18.04 ft.) there was broken up on an

average more than 0.113 cubic meter (0.148 cubic yard) of hard rock

per blow. The first blow, delivered 90 centimeters (2 ft. 11½ in.)

from the wall face, produced an almost imperceptible rent, a second or

a third blow applied at the same place extended this opening often to

a length of 1.50 meters (4 ft. 11 in.) and to a depth of from 90 to

120 centimeters (2 ft. 11 in. to 3 ft. 11 in.) The next blow opened

the fissure and detached the block of rock.

The application of the same system under water upon an unknown surface

would obviously modify the conditions of the experiment. Nevertheless,

the results obtained with the "Derocheuse," the first dredging machine

constructed upon this principle, have realized the hopes of the

inventor.

This dredging machine was launched on the Clyde and reached Port Said

in twenty days. It measures 55 meters (180 ft. 5 in.) in length, 12.20

meters (40 ft. 1 in.) in breadth, and 3.65 meters (12 ft.) in depth.

Its mean draught of water is 2.75 meters (9 ft. 2½ in.) It is divided

into eighteen watertight compartments. Five steel-pointed battering

rams, each of four tons weight, are arranged in line upon each side of

the chain of buckets of the dredging machine. See Figs. 1 and 2. The

battering rams, suspended by chains, are raised by hydraulic power to

a height varying from 1.50 to 6 meters (4 ft. 11 in. to 19 ft. 8 in.),

and are then let fall upon the rock. The mechanism of the battering

rams is carried by a metallic cage which can be moved forward or

backward by the aid of steam as the needs of the work require. A

series of five battering rams gives from 200 to 300 blows per hour.

[Illustration: FIG. 1.--LONGITUDINAL SECTION.]

[Illustration: FIG. 2.--PLAN]

A dredging machine combined with the apparatus just described, raises

the fragments of rock as they are detached from the bottom. A guide

wheel is provided, which supports the chain carrying the buckets, and

thus diminishes the stress upon the axles and bearings. With this

guide wheel or auxiliary drum there is no difficulty in dredging to a

depth of 12 meters (39 ft. 4 in.), while without this accessory it is

difficult to attain a depth of 9 meters (29 ft. 6 in.)

A compound engine, with four cylinders of 200 indicated horse power,

drives, by means of friction gear, the chain, which carries the

buckets. If the buckets happen to strike against the rock, the

friction gear yields until the excess of resistance has disappeared.

Fig. 3 indicates the manner in which the dredge is operated during the

work. It turns alternately about two spuds which are thrust

successively into the bottom and about which the dredge describes a

series of arcs in a zigzag fashion. These spuds are worked by

hydraulic power.

A three ton hand crane is placed upon the bridge for use in making

repairs to the chain which carries the buckets. A six ton steam crane

is placed upon the top of the cage which supports the hydraulic

apparatus for raising the battering rams, thus permitting them to be

easily lifted and replaced.

The dredging machine is also furnished with two screws driven by an

engine of 300 indicated horse power, as well as with two independent

boilers. Two independent series of pumps, with separate connections,

feed the hydraulic lifting apparatus, thus permitting repairs to be

made when necessary, without interrupting the work. A special machine

with three cylinders drives the pumps of the condenser. An accumulator

regulates the hydraulic pressure and serves to raise or lower the

spuds.

At the end of the Suez Canal next to the Red Sea, the bottom consists

of various conglomerates containing gypsum, sandstone and sometimes

shells. It was upon a bed of this nature that the machine was first

put to work. The mean depth of water, originally 8.25 meters (26 ft. 3

in.), was for a long time sufficient for the traffic of the canal; but

as the variations in level of the Red Sea are from 1.8 to 3 meters (5

ft. 11 in. to 9 ft. 10 in.), the depth at the moment of low water is

scarcely adequate for the constantly increasing draught of water of

the steamers. Attempts were made to attack the rocky surface of the

bottom with powerful dredges, but this method was expensive because it

necessitated constant repairs to the dredges.

[Illustration: FIG. 3.--DREDGE MOVEMENT.]

These last, although of good construction, seldom raised more than 153

cubic meters (200 cubic yards) in from eight to fifteen days. Their

daily advance was often only from sixty to ninety centimeters (about 2

to 3 ft.), while with the "Derocheuse" it was possible to advance ten

times as rapidly in dredging to the same depth. The bottom upon which

the machine commenced its work was clean and of a true rocky nature.

It was soon perceived that this conglomerate, rich in gypsum,

possessed too great elasticity for the pointed battering rams to have

their proper effect upon it. Each blow made a hole of from fifteen to

sixty centimeters (6 in. to 2. ft.) in depth. A second blow, given

even very near to the first, formed a similar hole, leaving the bed of

the rock to all appearances intact between the two holes. This result,

due entirely to the special nature of the rock, led to the fear that

the action of the battering rams would be without effect. After some

experimentation it was found that the best results were obtained by

arranging the battering rams very near to the chain of buckets and by

working the dredge and battering rams simultaneously. The advance at

each oscillation was about 90 centimeters (about 3 ft.)

The results obtained were as follows: At first the quantity extracted

varied much from day to day; but at the end of some weeks, on account

of the greater experience of the crew, more regularity was obtained.

The nature of the conglomerate was essentially variable, sometimes

hard and tenacious, like malleable iron, then suddenly changing into

friable masses surrounded by portions more elastic and richer in

gypsum.

During the last five weeks at Port Tewfik, the expense, including the

repairs, was 8,850 francs ($1,770.00) for 1,600 cubic meters (2,093

cubic yards) extracted. This would make the cost 5.52 francs per cubic

meter, or $0.84 per cubic yard, not including the insurance, the

interest and the depreciation of the plant.

After some improvements in details, suggested by practice, the machine

was put in operation at Chalouf upon a hard rock, from 1.50 to 3

meters (4 ft. 11 in. to 9 ft. 10 in.) thick. The battering rams were

given a fall of 1.80 meters (5 ft. 11 in.). To break the rock into

fragments small enough not to be rejected by the buckets of the

dredge, the operations of dredging and of disintegration were carried

on separately, permitting the battering rams to work at a greater

distance from the wall face. The time consumed in thus pulverizing the

rock by repeated blows was naturally found to be increased. It was

found more convenient to use only a single row of battering rams. The

production was from about seven to eleven cubic meters (9.2 to 14.4

cubic yards) per hour. Toward the close of September, after it had

been demonstrated that the "Derocheuse" was capable of accomplishing

with celerity and economy the result for which it was designed, it was

purchased by the Suez Canal Company.

During the month of September, an experiment, the details of which

were carefully noted, extending over a period of sixteen days, gave

the following results:

Crew (33 men), 140 hours. 2,012.50 francs $402.50

Coal, @ 87.50 francs ($7.50) per ton 787.50 francs 157.50

Oil and supplies 220.00 francs 44.00

Fresh water, 16 days 210.00 francs 42.00

Sundries 42.50 francs 8.50

---------------- ---------

Total expense for removing 764

cubic meters (999.2 cubic yards), 3,272.50 francs $654.50

Average, 4.28 francs per cubic meter ($0.65 per cubic yard).

This result cannot be taken as a universal basis, because after a

year's use there are numerous repairs to make to the plant, which

would increase the average net cost. This, besides, does not include

the cost of removal of the dredged material, nor the depreciation, the

interest and the insurance.

It should be added on the other hand, however, that the warm season

was far from being favorable to the energy and perseverance necessary

to carry on successfully experiments of this kind. The temperature,

even at midnight, was often 38° C. (100.4° F.). Still further, the work

was constantly interrupted by the passage of ships through the canal.

On an average not more than forty minutes' work to the hour was

obtained. Notwithstanding this, there were extracted at Chalouf, on an

average, 38.225 cubic meters (50 cubic yards) per day without

interrupting navigation. At Port Tewfik, where there was much less

inconvenience from the passage of ships, the work was carried on from

eight to eleven hours per day and the quantity extracted in this time

was generally more than 76 cubic meters (99.4 cubic yards).

In most cases the system could be simplified. The engine which works

the dredge could, when not thus employed, be used to drive the pumps.

The propelling engine could also be used for the same purpose.

The results obtained at Suez indicate the appreciable advantages

arising from the application of this system to the works of ports,

rivers and canals, and ever, to the work of cutting in the

construction of roads and railroads.

* * * * *

Scientific American Supplement No. 822, October 3, 1891 · 第 7 / 59 题