came round him and kissed him. “But you will succeed all
the same, won’t you, father?” they kept on repeating; and
one of the younger children, a little girl about seven,
coming up to me, said, “Did the Right vote against papa,
Monsieur?” I replied, “I do not think so, Mademoiselle.”
She said, “Ah!” and, delighted at having had her say, she
rushed into her mother’s arms, who, still thinking of
the vote, repeated, “It is infamous, and will drive six
hundred thousand subscribers to revolt. It will be the
ruin of all these poor folk.”
The experience of the Panama Canal Company, has only been a repetition,
on a large scale, of that of the Panama Railway projectors. That line
was commenced in 1850 and completed in 1855. The distance which it
traverses, between Aspinwall and Panama, is 47½ miles, and the cost of
construction was 48,600_l._ per mile, as compared with an average cost
of under 12,000_l._ per mile for the railways of the United States as
a whole. The great summit-level was attained at a height of 264 feet
above the mean tide of the Atlantic, and the ascent required gradients
of 1 in 18. The greatest source of the heavy expense of the Panama
Railroad was the labour difficulty, resulting from the influences of
the climate. Of this Dr. Otis[187] says:—
“The working force was increased as rapidly as possible,
drawing labourers from almost every quarter of the
globe. Irishmen were imported from Ireland, coolies
from Hindostan, Chinamen from China, English, French,
Germans, and Austrians, amounting in all to more than
7,000 men, were thus gathered in, appropriately, as it
were, to construct this highway for all nations. It was
now anticipated that, with the enormous forces employed,
the time required for the completion of the entire work
would be in a ratio proportionate to the numerical increase
of labourers, all of whom were supposed to be hardy,
able-bodied men. But it was soon found that many of these
people, from their previous habits and modes of life,
were little adapted to the work for which they had been
engaged. The Chinamen, 1000 in number, had been brought to
the isthmus by the company, and every possible care taken
which could conduce to their health and comfort. Their
hill-rice, their tea, and opium in sufficient quantities
to last several months, had been imported with them; they
were carefully housed and attended to; and it was expected
that they would prove efficient and valuable men. But they
had been engaged upon the work scarcely a fortnight before
almost the entire body became affected with a melancholic
suicidal tendency, and scores of them ended their unhappy
existence by their own hands. Disease broke out among them,
and raged so fiercely that in a few weeks scarcely 200
remained. The freshly-imported Irishmen and Frenchmen also
suffered severely, and there was found no other resource
but to re-ship them as soon as possible, and replenish from
the neighbouring provinces and Jamaica, the natives of
which, with the exception of the northmen of America, were
found best able to resist the influences of the climate.”
_The proposed Panama Canal locks._—The original plans of the Panama
Canal provided for a waterway that should be 28 feet below the mean
ocean level throughout its entire length. It has since been found that
this design would involve an enormous expenditure and a serious delay,
and hence the decision in 1888 to provide a series of four locks on the
Pacific, and four locks on the Atlantic side. On the Atlantic side,
two of the locks were to have a fall of 8 metres (26 feet 5 inches),
and two others a fall of 11 metres each (36 feet 3 inches), while on
the Pacific side, three locks were to have a fall of 11 metres each
(36 feet 3 inches), and one a fall of 8 metres (26 feet 5 inches). The
height of the water level on the Pacific side would, therefore, be 41
metres (135·6 feet), and on the Atlantic side it would be 38 metres
(125·7 feet). The width of the lock gates was to be 18 metres (59·5
feet), and the length was 180 metres (595·5 feet). The locks and their
gates were to be constructed in iron, and it was estimated that 20,000
tons of cast, and 15,000 tons of wrought, iron would be employed in
their construction. The effect of this modification of the original
plans would, of course, be to reduce the amount of excavation necessary
in the Culebra cut by at least one-third, but it would also obviously
alter the entire character of the canal as first projected.
The opinion of some engineers appears to be that the frequent opening
and shutting of the sluice-gates, with such a considerable pressure of
water, would not be without a certain amount of danger. The pressure
would be increased little by little until it had been raised to a
breadth of 10 metres, and even as much as 15·40 metres. It is not
unusual to find a pressure of this extent at dock gates, but in the
largest canals hitherto constructed with locks, the pressure has seldom
exceeded three to four metres. In order to meet similar cases, it has
been proposed, where there was a constant use of a canal at all hours
of the day and night, to employ a very large number of small sluices
adapted to the slopes of the canal. This expedient has been put in
practice in the case of the eight successive sluices known as Neptune’s
Staircase, on the Caledonian Canal, and, on the Canal du Midi in
France, in the case of the seven sluices of the staircase of Béziers.
It is, however, held by _Le Génie Civil_ that such small sluices,
although more easy to open and offering perhaps greater resistance,
are, nevertheless, not well adapted to the necessarily rapid and
constant working of a canal like that of Panama. This expedient having,
therefore, been abandoned, there remained that of movable caissons
suspended by the upper part, which is known as the Eiffel system. This
system, with its movable gate shut, and the recess into which it fits
when open on the right, is illustrated in one of the drawings attached
to this chapter, while another drawing shows the lock gate open.
[Illustration: TRACING AND PROFILE OF THE PANAMA CANAL.]
[Illustration: M. EIFFEL’S PROPOSED SLUICES FOR THE PANAMA CANAL.]
The proposed modification of the original plans has been so designed
as to enable the works of the tide-level canal to be continued without
interruption. The lock canal was to be at sea-level from Colon to the
fourteenth mile, where the first lock with a lift of 26¼ feet would
be placed. The second lock with the same lift was to be placed 23-1/9
miles from Colon, and the third and fourth locks, with lifts of 36-1/11
feet each, at 27¼ and 28¾ miles respectively, making the summit-level
124⅔ feet above the Atlantic. The canal was to descend to the Pacific
by three locks of 36-1/11 feet drop, situated at 35½, 35-9/10, and 38-2/5
miles respectively from Colon, and one lock of 26¼ feet drop at 36¾
miles, thus making up the difference in level of 134½ feet between
the summit-level and low-water of spring tides at Panama. It has been
suggested that in the event of difficulties occurring in the excavation
of the Culebra cutting, the summit-level might be raised to 160¾ feet,
by inserting a lock with a lift of 36-1/11 feet on each slope of the
Cordilleras, whereby time might be gained by a further reduction in the
amount of excavation. The section adopted for the level canal was to
be maintained in each reach. The width of the locks was to be 59 feet,
and their available length 590 feet. At the Colon entrance, the canal
was to have a bottom width of 590 feet for 1·86 mile, and at the Panama
end, 164 feet for 3¼ miles; whilst the channel in the Pacific, from the
shore at Boca to Naos, was to be 164 feet wide. Allowing a speed of 6¼
miles per hour in the long reaches, and 2¼ miles in the short reaches,
and one hour for passing through a lock, a single ship would traverse
the canal in seventeen hours twenty-eight minutes, and in a convoy in
twenty-eight hours twenty-five minutes. Accordingly, ten vessels, or
25,000 tons, could pass through the canal in twenty-four hours, so
that, if necessary, 9,125,000 tons of traffic could be accommodated
annually. The water supply required for this traffic was estimated
at 1,050,000 cubic yards per day, which could be obtained from the
Chagres, the Obispo, and the Rio Grande. With the summit-level at 124⅔
feet above the sea, it could be supplied from the reservoir created by
the large dam at Gamboa; but if the summit-level was raised to 160¾
feet above the sea, pumps not exceeding 3600 H.P. would be
needed for lifting the supply the additional height. The gates for
the locks were designed to be hollow-iron counterbalanced caissons,
suspended from a frame with rollers, running on a roadway supported by
a swing-bridge across the lock, and continued above the recess at the
side, into which the caisson was to retreat for opening the lock.
The watertight compartments at the lower part of the caisson, as well
as the bottom portion, arranged to serve as a working-chamber, were
to communicate with the outer air by shafts, provided with air-locks,
so that water or compressed air could be introduced at pleasure. This
arrangement would enable the counterpoise of the caisson to be readily
adjusted, the different chambers to be easily reached for repairs,
and the working-chamber at the base to be used for cleaning the sill
from silt or _débris_. The caisson gates, in a lock of 36-1/11 feet
lift, would be 69 feet high, 71 feet long, 13⅛ feet broad at the tail,
and 32¾ feet high, 71 feet long, and 9⅚ feet broad at the head of the
lock. The locks, being situated in rock, would have the sides of their
chambers formed of the natural rock, with a slight facing of masonry
where necessary; but the side walls below the gates were to be iron
caissons, 18 feet broad, filled with concrete. The swing-bridges, of
iron or steel, were to be 18 feet wide, and 112 feet long, the swing
portion being 78 feet; and the recesses for the caissons were to be
98½ feet long; and 23 feet wide at the top. The filling and emptying
of the locks were to be effected by two cast-iron pipes, each 9⅙
feet diameter, and it was calculated that the required volume of
52,300 cubic yards of water could be admitted or shut out in fifteen
minutes.[188]
_Special Features of the Enterprise._—Probably no great engineering
or constructive work of either ancient or modern times has been of
such a gigantic and difficult character as that of the canalisation
of the Isthmus of Panama. It is not that the length of the canal is
exceptional; it is, on the contrary, shorter than that of many existing
canals, some of which are of very small account indeed—being less
than one-half the Suez Canal, less than one-third that of the canal
of Languedoc, and less than one-fourteenth that of the Grand Canal of
China. It is probable, also, that the building of the Great Wall of
China, the Pyramids of Egypt, and several other works of antiquity
that might be named, extended over a much longer period, and involved
the employment of a greater number of men. The _Royal_ or _Grand Canal_
of China, which was completed in the year 980, is said to have occupied
the labour of thirty thousand men for forty-three years.[189] But none
of the great works of previous epochs have been environed with so
many difficulties as the Panama Canal. The scheme, on the face of it,
does not look so formidable. It is only when we come to look into its
details, and compare them with those of other similar undertakings,
that we realise its magnitude. And it is only when we, in like manner,
compare its engineering features with those of the other great
engineering works of the world that we can appreciate the vast energy,
enterprise, and resource that has ventured to essay so colossal a task.
The first and the most serious difficulty to be encountered was that
of controlling the waters of a torrential stream, almost equal to
that of some of the chief rivers of Italy, through which the canal
was to run. This stream, which crosses and recrosses the line of the
canal twenty-seven times, as shown in the drawing attached hereto, has
several different levels, and would, if left to itself, be certain to
destroy the canal in a very short time. It had therefore to be dealt
with by constructing an enormous embankment raised 45 feet above the
waters of the Chagres, so as to allow of their gradual escape. In this
dam there are 26 millions of cubic yards of cutting; in the Culebra
Col, a channel cut right through a mountain more than 300 feet above
sea level, there were estimated to be 37 millions more; and in the
entire line of the canal there were calculated to be about 75 to 100
millions of cubic yards of excavation, to accomplish which a serious
writer in the _Edinburgh Review_ maintained that it would require the
labour of 20,000 men for forty-two years.
Worse than all, however, was the dreadful and deadly climate. Five
months of the year are continually wet. There are few fine days in the
other seven months. The annual rainfall is twelve to fifteen times
that of Europe. The mortality is excessive. The cost of labour is
consequently high,[190] but pay what they may, the company could not
command the amount of labour it was anxious to employ. For the most
part the labour has had to be imported from Europe and the West Indies.
The men were brought to Panama at the expense of the Company, but a
very large proportion of them left again immediately, for various
reasons, so that the company has not been able to keep up the proper
quotas of men with which they undertook to provide their contractors,
who were left at liberty to throw up their contracts when they ceased
to be remunerative. The cost of the undertaking was thus enormously
increased beyond the original estimates. The difficulty of procuring
ways and means, and the high prices that had to be paid for borrowed
money, have also seriously added to the expenditure. Another serious
element of cost has been the outlay incurred in providing hospital and
other facilities, and the maintenance of the usually very considerable
numbers who were stricken with illness, induced by their unhealthy
surroundings. These and other difficulties have so seriously weighed
upon the undertaking that its accomplishment has been pronounced
impossible, and M. de Lesseps and his colleagues have been denounced
for following a “will-o’-the-wisp.” They have, however, persevered
with their task for about eight years, and have made heroic, and
almost superhuman efforts to keep the enterprise on its legs. In this
effort they have had to depend absolutely upon their own countrymen,
although they have much less maritime interest in the matter than the
people of England and the United States of North America. In the latter
countries the canal has all along been regarded with disfavour, not to
say declared hostility. In the United States especially, M. de Lesseps
has been told again and again that he was “beating the wind,” and that
nothing but failure could come of his project. For the time being it
looks as if his candid friends were right, and M. de Lesseps was wrong.
As might be expected, there have been very conflicting calculations
made as to the amount of traffic which an interoceanic canal on the
American isthmus would be likely to carry. The Geographical Congress,
held at Antwerp in 1871, did not venture to go beyond 4,000,000 tons
per annum. When the Canal Company was started, the expected tonnage
was raised to about 6,000,000 tons annually. In 1887 M. de Lesseps, in
his letter to the French Premier, put the quantity at 7,500,000 tons.
A writer in the _Revue-Gazette Maritime et Commerciale_ (Paris) has
estimated that if the Panama Canal had been opened in 1884, there would
have passed through it the following tonnage:—
──────────┬──────────┬───────────
│ Ships. │ Tonnage.
├──────────┼───────────
Europe │ 4,226 │ 4,650,390
Asia │ 2,255 │ 1,212,178
America │ 2,987 │ 3,441,598
├──────────┼───────────
Totals │ 9,468 │ 9,304,166
──────────┴──────────┴───────────
This latter estimate appears to be greatly exaggerated. It is
apparently founded on the assumption that the greater part of the
Australasian trade would pass that way. But the fact is that the
geographical distance to Sydney does not differ by quite 500 knots
between any of the four routes that are, or would be, available—that
is, the Cape of Good Hope, the Suez Canal, Cape Horn, and Panama, the
distances increasing in the order stated. Nautical distance, moreover,
as has been properly remarked, “is only one element in determining
choice of route; prevailing winds and currents, avoidance of stormy
seas or of rock-bound coasts, have all to be studied by the mariner;
and the comparatively trifling difference in the length of the course
from the Thames to Sydney by four such different routes is enough to
show how important it is to have this question of routes illustrated by
the experience of the skilled navigator. This consideration is enhanced
by the remark that the dues for the passage of the canal would amount
to as much as the cost of more than 800 knots of additional voyage.”[191]
A much more reasonable and modest estimate than that of either of the
foregoing, is that made in a recent report on the proposed Nicaraguan
Canal. This estimate, based ostensibly on the United States Treasury
Reports, puts the total tonnage that would have made use of the canal
in 1885 at 4,252,000 tons, which is stated to be an increase of 53
per cent. in six years. At the same rate of increase, the tonnage
available in 1892, when the canal was expected to be completed, would
be 6,506,000 tons.[192]
The diagrams attached hereto show the enormous difficulties that
have just been referred to in a much more graphic way than any mere
description could do. It will be observed from the illustration (p.
298) that the Rio Chagres crosses the course of the canal no fewer than
five times in little more than five kilometres, and that the Rio Obispo
also steps in to add to the complications of the situation. On the San
Pablo section again, within a distance of three kilometres, the river
crosses the line of canal three times.
The Chagres river, which is so great an obstacle in the project of the
Panama Canal, rises on the western slopes of the Cordilleras, and runs
through a broken and irregular country, to the north of the auriferous
granite hills which branch off to Cruces and Gorgona. This river and
its affluents is said to drain an area of about 1550 square miles.[193]
From Matachin, where the Panama canal parts company with the valley
of the Chagres, to the sea, there is a total distance of twenty-eight
miles, in the course of which the river falls about 35 feet.[194] The
rain of a single day is said to raise the waters of the Chagres from 35
to 40 feet, and below Matachin there is a cataract of 50 to 60 feet.
It was part of the project to abandon at this point the valley of the
Chagres, and to cut through the Cordilleras. The level of the bottom
of the canal is here 100 feet below that of the bed of the Chagres, or
140 feet below the mean level of the nearest indicated points on the
section of the plans above and below the intersection. In a length of
nine miles, at the foot of the ascent of the Cordillera at Matachin,
the lowest point is 166 feet, and the highest 333 feet above the bed of
the canal. A tunnel of 7720 metres in length was at one time proposed
to be cut through this section, but M. de Lesseps stood out for a
cutting _á ciel ouvert_, and it has been remarked that according to the
plans there has been an assumption that the sides of this vast cutting
will stand so nearly perpendicular as to slope only one foot horizontal
in every ten feet vertical. In a dry climate, with good firm clay or
rock, this might not involve difficulty or danger, but the climate of
Panama is exposed to a tropical rainfall. A rainfall of six or seven
inches in a few hours is not uncommon.
The flood volume of the river Chagres has been estimated at 1600 metric
tons of water per second, which is four times the volume of the highest
flood ever measured on the Thames, and the rainfall, as a whole, has
been known to exceed 120 inches in a single year. Besides all this, it
was reported by M. de Lesseps himself,[195] that the borings on the
Culebra range, had reached the depth of 100 feet without having met
with rock. Some engineers have therefore condemned this part of the
plans as faulty, arguing that such a cutting could not be expected to
stand at a slope of one to one, even in a much drier climate—which
means that the cutting through the Culebra would require to assume
greatly larger dimensions, if it were to be of any value.
One of the most serious undertakings connected with the Panama canal
was the proposal to retain the flood waters of the Chagres, by means
of the enormous embankment already referred to, between the Cerro
Gamboa on the south, and the Cerro Barneo on the north, thus raising
the level of the waters from 40 to 45 feet above the river, in order
to allow of their escape. Other two projects were submitted to meet
this difficulty—the first, that of constructing a canal for the
flood waters of the Chagres alongside of the navigable canal; and the
second, that of tapping the Chagres at Matachin, and diverting its
waters to the Pacific. As regards the first of these two alternatives,
it was objected that, as large affluents flow into the river below
Matachin, three parallel canals of large size would require to be
constructed, in order to make the alternative of any real value; the
second alternative, it was held, would afford no relief to the floods
of the Trinidad, the Gatun, and the smaller affluents of the Chagres
below Matachin, while it would be likely to increase the difficulties
of construction at the one end as much as it reduced them at the other.
Nor is it admitted by some authorities that the Gamboa dam would be
likely to answer its purpose. It is contended that many embankments
would be required, instead of only one, and that the construction of
such an embankment from such a cutting could hardly by any possible
effort be completed in twenty-six years, so that it would not be until
after that time had elapsed that the canal could be commenced between
Chagres and Matachin, with its bed 30 feet under sea level.
The low-water flood of the Chagres river, just below the site of the
proposed Gamboa Dam, is 209 feet wide by 7 feet 6 inches deep, the bed
being triangular in cross section. In November 1885, a flood occurred
here, under the influence of which the river was swollen to a width of
1560 feet, with a maximum depth of 28 feet, so that it was twelve times
as wide as the canal and almost as deep at its deepest point. It is
stated that the last four feet of the rise took place in four hours,
and in thirty-six hours the water had risen about 20 feet. The general
consensus of opinion among engineers appears to be that this immense
flood has to be provided for in some way. M. de Lesseps originally
proposed to meet the difficulty by constructing a dam, or embankment,
two-thirds of a mile long, 1300 feet wide at the base, and 164 feet in
height. This dam was to be designed so as to retain the floods which
descend the Chagres river, storing the water and allowing it to escape
gradually. The only alternative was to provide the flood waters with
such a rapid means of escape to the ocean that they could not flood the
canal.
From considerations of economy, it was recently determined to abandon
the lock gates at the port of Panama. It was intended in the original
scheme to provide these gates in order to control the rise and fall of
the tide at this end of the canal. This movement of the tide varies
from 20 to 27 feet, being at least twelve times as much as at the other
end of the canal. Obviously, therefore, the canal would be seriously
affected by a tidal movement of so considerable a character, and
leading engineers have not hesitated to say that without the lock gates
at Panama the canal is an impossibility.
AMERICAN VIEWS OF THE ENTERPRISE.
“American engineers,” we are told, “have never had but one opinion of
the canal. As a general thing they have never believed that it could be
built on the lines, within the time, nor for the money specified by M.
de Lesseps.” The same writer adds that “M. de Lesseps, having won fame
by scooping out some sand hills and connecting some lakes and streams
at Suez, thought it was a simple matter to make a canal anywhere.
He has persistently refused to see any difficulties, or to squarely
look the undertaking in the face, and to estimate the chances for and
against its completion, and the collapse of all this will simply be a
question of time.”[196]
Another American writer adopts much the same view, in even more
emphatic language, when he says[197] that, “of the final cost of M. de
Lesseps’s sea-level canal at Panama, if there could be anything about it
save utter failure, nothing can be known, except that it will be a
fabulous amount.... The great difficulties and expense of excavation
are still before them, and the knotty, perhaps impossible, problem of
the Chagres river is still unsolved.”
Further light on the difficulties in the way of the enterprise was
thrown upon it in a report made by Lieut. Kemball, in 1887, to the
United States Government. He found on the Pacific slope, a short
distance west of the summit, that the route of the canal was here
crossed and recrossed by the Rio Grande, which had been trained in a
straight line down the north side of the valley, at a considerable
height above the level of the canal.[198] It was found, however, when the
rainy season had set in, that in different places the hillside began
to slide into the cutting made for the deflection of the river, and
that one bank moved almost intact across the cut, with the top surface
unbroken, and without any disturbance of the vegetation. The existence
of a substratum of a greasy clay bank was the cause of this trouble.
Such a foundation is, of course, not to be relied on. It is ready, as
has been pointed out, to “swell upwards, or glide sideways, on the
slightest provocation, and it may easily develop into a difficulty of
the most formidable character, requiring the river to be carried round
the back of the hills away from the canal.”[199]
In the summer of 1887, Lieut. Rogers, of the United States Navy,
visited the canal works, and made a report on them. He declared that
in 1886, 11,727,000 cubic metres of excavation had been done, bringing
the total quantity completed up to that date at 30 millions of cubic
metres. This had, however, been done in the face of tremendous odds.
An American dredger of greater power was steadily engaged on the same
spot for weeks, the pressure of the material laid on the bank forcing
up the soft spongy bed of the cut so rapidly that the machine could do
little more than merely hold its own. The canal bed had here and there
been destroyed by floods. Lines and trucks had been buried under two
metres of silt. In the Culebra cut, the mountain to the left hand of
the cut was found to be moving towards the canal, at the rate of 11 to
12 inches per annum. Seeing that this was the case when not one-third
of the excavation had been completed, the query is naturally suggested,
What will be the rate of movement when the bed of the canal is 250 feet
or more under the level of the surrounding country?
[Illustration: AMERICAN DREDGER ON THE PANAMA CANAL.]
Nor have English writers been slow to condemn the project both from
its economic and from its engineering points of view. The following
quotation is given as typical of much that has been written elsewhere:—
“We cannot avoid the remark that if the Inter-oceanic
Canal be regarded, not as a Bourse speculation, but as
an excavation which it is proposed to make by human
agency, the question of its actual feasibility has not
yet been really entered upon. An excavation which, if the
last accounts of the borings be correct, would contain
at least twenty times the bulk of the great pyramid; an
embankment holding more than a third of the contents of
that excavation, and requiring twenty-six years for its
execution at the wholly unprecedented rate (from one end)
of a million cubic yards in a year; a canal displacing for
its execution a torrential river of four times the volume
of the Thames in its heaviest flood, and with its bed at a
depth of thirty feet below sea level—all this to be done
while as yet the preliminary observations of rainfall,
river discharge, and cross section of country have to be
made—the proposal of such an enterprise seems rather
worthy to adorn the name of Alexandre Dumas, or of the
author of the tales of the Arabian Nights, than that of any
person familiar with the practical execution of engineering
work.”[200]
With reference to the actual state of affairs at the Panama Canal in
1887, Mr. Froude has written in the following unmeasured terms[201]:—
“If half the reports which reached me are correct,
in all the world there is not perhaps now concentrated
in any single spot so much swindling and villainy, so
much foul disease, such a hideous dungheap of moral and
physical abomination, as in the scene of this far-famed
undertaking of nineteenth century engineering. By the
scheme, as it was first propounded, £26,000,000 of English
money were to unite the Atlantic and Pacific oceans, to
form a highway for the commerce of the globe, and enrich
with untold wealth the happy owners of original shares.
The thrifty French peasantry were tempted by the golden
bait, and poured their savings into M. de Lesseps’ lottery
box. Almost all that money, I was told, has been already
spent, and only a fifth of the work is done. Meanwhile, the
human vultures have gathered to the spoil. Speculators,
adventurers, card sharpers, hell keepers, and doubtful
ladies have carried their charms to this delightful
market. The scene of operations is a damp tropical
jungle, intensely hot, swarming with mosquitoes, snakes,
alligators, scorpions, and centipedes; the home, even as
nature made it, of yellow fever, typhus, and dysentery,
and now made immeasurably more deadly by the multitudes
of people who crowd thither. Half buried in mud lie about
the wrecks of costly machinery, consuming by rust, sent
out under lavish orders, and found unfit for the work for
which they were intended. Unburied altogether lie skeletons
of the human machines which have broken down there, picked
clean by the vultures. Everything which imagination can
conceive that is ghastly and loathsome seems to be gathered
into that locality just now. I was pressed to go on and
look at the moral surroundings of ‘the greatest undertaking
of our age,’ but my curiosity was less strong than my
disgust.”
[Illustration: PROPOSED SLUICE OF 11 METRES ON THE PANAMA CANAL,
SHOWING THE ROLLING GATE OPEN.]
[Illustration: DINGLE’S DREDGER AT WORK AT GATUN, ON THE EXCAVATION
OF THE PANAMA CANAL.]
The time has not yet come when the true history of the Panama Canal
Scheme can be written. It may have been an ill-judged project, or
it may not. It has, however, had enormous difficulties to contend
with. Those difficulties began with the climate, continued with the
administration and finances, and concluded with the open hostility
of very many individuals and interests that were never very friendly
to its success. The enterprise was essentially French, alike in its
conception, initiation, engineering, and finances. The phenomenal
success that attended the Suez Canal probably led the majority of the
unfortunate people who put money into the Panama Canal to suppose that
it was to be another Egyptian Canal “writ large;” but there has also
been a strong feeling of _esprit de corps_, which we cannot fail to
admire, however disastrously it may have turned out for themselves,
which the French have put into this matter. The truth is that the
French people have come to regard themselves as a royal race in canal
construction. The Languedoc Canal, which they constructed in the
reign of Louis XIV. cost 14,000,000 livres, and marked a new epoch in
the history of canal construction.[202] Of the Suez Canal, the leading
features of which are so well known, it is unnecessary to say more than
that its success has not only been phenomenal, but has been achieved
in the face of the most discouraging attitude on the part of the
engineers of other countries, including England. At the time that the
Panama Canal was being promoted, M. de Lesseps was able to point his
countrymen to the fact that the shares in the Suez Canal, which had
been issued at 500 francs, had risen to a value of 2200 francs, while
the debentures issued at 300 francs were worth 565. The impressionable
French people did not stay to recollect that the two enterprises
were totally different in character, in cost, in accessibility, in
practicability, and in prospects. And it is only fair to recollect
that the original estimate of the cost of the canal has been largely
exceeded by circumstances that were hardly capable of being foreseen.
The repeated attacks made by inimical interests, led to the company
having to borrow on higher terms, as well as to the suspension of work
on the isthmus for nearly a year. A much larger amount and higher rate
of interest has had to be paid to share and debenture holders than was
ever expected. The Company have also had to contend with a want of
navvies, and with labour disturbance, that told unfavourably on their
interests.
The Report of the Special Commission appointed in 1889 to inquire
into the affairs of the Panama Canal was published in May, 1890, and
describes in detail the position of the undertaking. It is estimated
that some 30 millions will be required to complete it, so that its
ultimate construction does not appear at present very probable.
FOOTNOTES:
[165] In 1588 P. Acosta, an old Spanish historian, wrote, with
reference to the proposal to construct a canal between the two
oceans, that “it would be just to fear the vengeance of Heaven for
attempting such a work.”
[166] William Paterson, the originator of the Darien Expedition, was
also the founder of the Bank of England.
[167] Dampier was born in Somersetshire in 1652. In 1673 he served in
the Dutch war under Sir Edward Sprague. He was afterwards for some
years overseer of a plantation in Jamaica. Several vicissitudes of
fortune followed, and it is stated that for a time he was one of a
band of pirates who roved about the Peruvian coasts. He made several
voyages to the northern coast of Mexico, to the East Indies, and
to the islands in the Pacific. His ‘Voyages’ have been many times
reprinted.
[168] Lionel Wafer was bred a surgeon in London, and in 1677 embarked
as such on board a ship bound for Bantam. He afterwards engaged with
Linch and Cook, two celebrated buccaneers, which brought him into the
company of Dampier. The two did not, however, agree, and Wafer was
left on shore on the Isthmus of Darien, where he spent some years
among the Indians. He returned to England in 1690, and published an
account of his adventures.
[169] De Ulloas was born at Seville in 1716. He distinguished himself
as an engineer and man of science. In 1730 he was sent to Peru to
measure a degree of meridian, and remained nearly ten years in South
America. Afterwards visiting England, he contributed several papers
to the Royal Society, and was appointed by Ferdinand III. to collect
information as to the condition of the arts and sciences in Europe.
[170] Letter to Mr. F. Kelly, in ‘Proceedings’ of the Royal
Geographical Society for 1856.
[171] Vide ‘Philosophical Trans.,’ 1830, p. 62 _et seq._
[172] The details of the survey are in the library of the Royal
Society, to which the author communicated a paper on the subject.
Captain Lloyd also gave an account of the country and its productions
to the Royal Geographical Society.
[173] ‘Edinburgh Review,’ April 1882.
[174] ‘Minutes of Proceedings of the Institution of Civil Engineers,’
vol. xv., p. 378.
[175] ‘Bulletin du Canal Interocéanique,’ An. 1, No. 2, p. 10.
[176] ‘Edinburgh Review,’ April 1882.
[177] At this congress Admiral Ammen represented the United States;
General Sir John Stokes, England; Vice-Admiral Likhatchof, Russia;
Commander Christoforo, Italy; and Colonel Coêlle, Spain.
[178] The items adopted by the Commission as the probable cost of the
undertaking were as follows:—
Millions of francs. 1. Excavation 570 2. Barrage 100 3. Rigoles de
déviation 75 4. Portes de marée 12 5. Jetées 10 6. Imprevus, 10 per
cent. 76 ─── 843 ═══
[179] ‘Minutes of Proceedings of the Institution of Civil Engineers,’
vol. lxxiii., p. 421.
[180] It may be interesting to state how this sum had been expended.
The items are as follows:—
Francs.
The purchase of the concession 10,000,000
Caution money to the Colombian Government 750,000
Expenses incurred before the company was founded 23,393,605
Repayment of advances to founders 2,000,000
Cost of administration at Panama 26,415,927
Expenses of the company 26,036,551
Interest on money advanced and shares 55,700,148
Construction, purchase of land, &c. 25,289,743
Purchase of materials and equipment 83,537,568
Installations, &c. 115,137,354
───────────
368,260,896
═══════════
[181] This was a journal, published at Paris, which, at an early
stage of the enterprise, was issued periodically as the official
organ of the Canal Company.
[182] This sum was raised by the issue of 409,667 4 per cent. bonds,
sold at 333 francs on 500.
[183] 458,000 shares out of 500,000 offered, were taken at 450 on
1000 francs.
[184] The manual work is and has all along been performed mainly by
West Indians and natives, the number of Europeans employed being
relatively very small.
[185] The Consultative Committee of 1879 based their Report on an
anticipated annual traffic of over 4 millions of tons.
[186] The _Times_ of the 17th December declared, in a leading
article, that “it would be surprising if the collapse of the Panama
scheme had not a momentous effect upon French politics. The small
investors who have lost their money would not be human if they
omitted to turn and rend the Parliament which, after affording
legislative facilities to M. de Lesseps, now refuses to lift a hand
to save the colossal scheme from ruin. Some of the French journals
are already beginning to say that Saturday was the beginning of the
end for the Republic. It is possible to commend the action of the
Chamber, and at the same time to feel that ‘Parliamentarism’ hardly
realised the magnitude of the forces which he challenged with such
a light heart. All the vague discontent which has been accumulating
against Parliamentary government will now naturally be brought to a
head. The Panama collapse will furnish a specific grievance which
will appeal with irresistible force to the unfortunate subscribers,
and send them crowding into the ranks of the enemies of the Republic.”
[187] ‘Isthmus of Panama,’ p. 35.
[188] ‘Proceedings of the Institution of Civil Engineers,’ vol. xcii.
p. 447.
[189] Prestley’s ‘Historical Account of Canals,’ preface.
[190] In 1880, when the canal had been commenced, unskilled labour
was paid 3_s._ 8_d._ per day. The supply at that rate was, however,
insufficient, and the rate of wages was increased from time to time,
until in 1877 they had reached a minimum of 7_s._ per day.
[191] ‘Edinburgh Review.’
[192] Paper read in 1887 before the American Association for the
Advancement of Science.
[193] According to M. Reclus, 4010 square kilometres (‘Comptes
Rendus,’ p. 265).
[194] This has been established by the levels of Col. Lloyd.
[195] ‘Comptes Rendus de l’Académie des Sciences,’ vol. xciii. 1887.
[196] _Engineering_, August 26, 1887.
[197] Commander Taylor’s paper on “The General Question of Isthmian
Transit,” read before the American Association for the Advancement of
Science, August 1887.
[198] The bottom of the canal is here 164 feet below the river,
which, again, is 80 feet below the Panama Railway. The three courses
run parallel at this point.
[199] _Engineering_, Aug. 5, 1887.
[200] ‘Edinburgh Review,’ August 1882.
[201] ‘The English in the West Indies.’
[202] The history of this canal, which crosses the isthmus that
connects Spain with France, is told elsewhere in this volume.
CHAPTER XXII.
THE NICARAGUAN CANAL.
One of the most important and costly of isthmian canal projects
that now looms on the horizon is that which is designed to afford a
communication between the Atlantic and the Pacific Oceans _viâ_ the
Lake of Nicaragua. This is a purely American project. It is put forward
by American citizens, it has been drawn up by American engineers,
and it is in favour with the American people. After the Nicaraguan
Canal project had been before the world in one shape or another for
many years, and after many different routes had been proposed and
considered, the plans for a canal have now been definitively adopted,
and the work of construction has, it is stated, actually begun. It
has not yet been announced whether the capital required has been
subscribed, but the United States, which approves the scheme, and has
raised from first to last some 9000 millions of dollars for railway
enterprise, is perhaps hardly likely to allow the canal to drop for
want of the 20 millions sterling required to complete it.
None of the many schemes for a canal across the American isthmus has
obtained more extensive support, both in America and in Europe, than
that _viâ_ the Lake of Nicaragua. It had the very earnest support of
the Emperor Napoleon between 1845 and 1848. In 1846, the Emperor,
then Prince Louis Napoleon, wrote a pamphlet on the subject,[203] in
the course of which he pronounced against the Panama route, and he
once declared, as regards the rival Nicaraguan scheme that, “from the
embouchure of the river San Juan to the Pacific Ocean the canal would
run in a straight line about 278 miles, enhancing the prosperity on
either bank of more than a thousand miles of territory. The effect that
would be produced by the annual passage through this fine country of
two or three thousand ships, exchanging foreign produce with that of
Central America, and spreading everywhere activity and wealth, would be
almost miraculous.”[204]
[Illustration: SECTION AND PLAN OF THE PROPOSED NICARAGUA CANAL.]
The expense of the Nicaraguan Canal was estimated by Napoleon at
only four millions sterling; but it is obvious, from the Prince’s
own statements, that such a passage as he contemplated would only
have afforded draught of water for vessels of 300 tons. Napoleon’s
object was, however, quite as much to promote emigration, trade, and
civilisation in the State of Nicaragua, as to open a communication
between the two oceans.[205]
The river San Juan de Nicaragua directly connects the Atlantic with
the south end of the lake of the above name, from the northern end of
which but a few miles intervene to the Pacific. Various surveys have
been made of the river, with a view to the construction of a canal.
In 1837-8 Lieutenant Baily[206] was employed by the Central American
Government to explore the route. He found that the surface of the lake
of Nicaragua is 121 feet 9 inches above low water in the Atlantic.
The river San Juan, in its course of 79 miles from the lake, varies
in depth from 9 feet to 20 feet, and its course is broken by various
rapids, some of which are of considerable length. The summit-level
of the mountain chain which divides the valley of the lake from the
Pacific is 487 feet above the lake, and a tunnel of nearly 16 miles
long would have to be pierced through this wall in order to reach
the port of San Juan del Sur on the Pacific. The total length of
navigation, through river, lake, and canal, according to Mr. Baily’s
plans, would be 190 miles.
The port of San Juan del Sur is narrow at the entrance, but widens
within the harbour. It is surrounded by high land, except from W.S.W.
to W. by S. The depth of water at the entrance is 3 fathoms, and the
width 1100 yards. Ships could thence go up for a mile and a half, but
the amount of excavation required for a canal 30 feet deep and 50 feet
wide was estimated at not less than 162 million cubic yards, which has
been stated to be more than that required for the construction of 2000
miles of English railway—a figure quite conclusive against this scheme.
In 1852 the route was surveyed by Colonel Childs,[207] who proposed to
descend from the lake by fourteen locks to Brito, on the Pacific,
where, however, there was no harbour. The length of this route was
given as 194 miles.
To avoid the difficulty of cutting through the ridge, it has been
proposed to continue the navigation from the extreme north of the
Lake of Nicaragua, by the Estero de Panaloya and the river Tipitapa
to the Lake Leon, or Managua, and thence to the port of Realejo, on
the Pacific, or, yet more to the north, to the Estero Real, an arm
of the Gulf of Fonseca. But it has been pointed out that the length
of the navigation would thus be increased by a hundred miles, and it
is doubtful whether Lake Leon could furnish the water necessary for
lockage, in both directions, which it would have to supply.
The Nicaragua route, therefore, whatever may be its advantages, if
any, over that of Panama, is liable to the objections of great length,
large works, numerous locks, and the no less formidable danger, to use
the words of Humboldt, that “there is no part of the globe so full of
volcanoes as this part of America, from the 11th to the 13th degrees of
latitude.”[208]
The distance from ocean to ocean by the route that has recently
received the approval of the United States Government, and is now in
course of apparent realisation, is 169·8 miles. Of actual canal there
will be 40·3 miles, the remaining 129·5 miles being free navigation
through Lake Nicaragua, the Rio San Juan, and the valley of the Rio San
Francisco.
Beginning on the Pacific side, the canal starts from the port of Brito,
situated about 12 miles north-west of San Juan del Sur, the Pacific
terminus of the famous gold-fever transit route, where there is a broad
channel, 342 feet wide at high water, reaching inland about 1½ miles to
the tidal lock. This lock lifts the canal 24·2 feet above high tide of
the Pacific.
From this lock, which is really the beginning of the canal—the portion
between the lock and Brito being in reality an extension of the
harbour—the canal ascends the broad gently-sloping lower valley of the
Rio Grande, which is to be diverted into the lake by an artificial
channel, rising by means of three or more locks of from 26 feet to 29
feet lift, till, at a point 8¾ miles from Brito, it reaches the western
end of the summit level, 110 feet above mean tide; thence it proceeds
through the upper valley of the Rio Grande and across a moderately
rolling country to the summit or “divide,” between the Pacific and the
lake, 41·4 feet above the level of the water in the canal; then through
the valley of the Guscoyol, a tributary of the Lajas, and along the bed
of the diverted Lajas to the lake, a total distance of 8½ miles from
the last lock and 17·27 miles from Brito.
Between the lake and Brito one small stream is taken into the canal by
a receiving weir. The river Tola and several small streams coming from
the north are to be passed under the canal, and along its lower portion
there will be ditches to intercept the surface drainage, which is
inconsiderable, and convey it to the sea.
The material to be excavated in this division is sand, gravel,
clay, and in the “divide” cut rock, which will be utilised in the
construction of the breakwater at Brito, in pitching the canal slopes,
and in concrete for the locks, culverts, weirs, and the dam across the
Rio Grande. The location of the canal in this division is the same as
that proposed by the engineer Menocal on his return from Nicaragua
in 1880. The prism, however, has been increased, the number of locks
reduced, and their location changed. The enlargement of the terminal
section is also a new feature.
The canal enters Lake Nicaragua, an inland sea, 40 miles wide, and over
90 miles long, which forms its summit level, and with the Chontales
Mountains on the left, the route is continued to Fort San Carlos at
the outlet of the lake into the Rio San Juan. Throughout this distance
of 56½ miles, 28 feet of water can be carried to within 2400 feet
of the mouth of the Lajas on the west shore of the lake, and within
eight miles of Fort San Carlos on the south-eastern shore. In the
former distance some dredging and rock excavation under water will be
necessary, and in the latter, dredging in soft mud to an average depth
of 3½ feet. From Fort San Carlos the route proceeds 64 miles down the
San Juan river, which, with the exception of the 28 miles from the lake
to Toro Rapids, has a depth varying from 28 feet to 130 feet, to the
dam thrown across the river at Ochoa just below the mouth of the Rio
San Carlos. Throughout this stretch of river, the only work to be done
is dredging in mud and gravel, and some rock excavation under water
to an average depth of four feet along a distance of 24 miles, below
Fort San Carlos, and light excavation above water on some points in the
lower river in order to flatten the bends.
The dam just mentioned is located between two steep, rocky hills, at
a point where the river is 1133 feet wide between the banks, with an
average depth of 6·6 feet. Its length on the crest will be 1255 feet,
its height 52 feet, the depth of foundations 20 feet below present
water level, and it is to be constructed entirely of concrete, with
timber-lined crest, front, and apron, and rip-rap protected back,
forming a monolith wedged between rock abutments. This dam will back
the water of the river the entire distance to Fort Carlos and into the
lake, maintaining the water of the latter at the proposed level of 110
feet, and will convert the upper San Juan into an extension of the
lake, with a fall of ¾ inch per mile.
The valley referred to, flooded by the back water from the dam,
affords an excellent basin at the entrance of the canal, free from
the influence of the river current, and the latter forms a natural,
ready-made canal, 3300´ long, needing only slight excavation on the
points of two or three spurs for rectifying the channel. From the
head of this valley, a canal 1·82 miles long extends across a broken
country of moderate elevation, intersecting one deep narrow ravine,
debouching towards the San Juan, across which a short embankment will
be necessary, and enters the valley of the river San Francisco. This
river San Francisco flows east, north-east, and east, approximately
parallel to the San Juan, and separated from it by a range of hills
to a point about nine miles (in straight line) from the dam, then,
receiving a considerable tributary (the Cano de los Chanchos) from the
north-east, turns abruptly to the south-east and south, and enters the
San Juan. Its valley thus forms an irregular flattened Y, with its foot
or stem resting on the San Juan, one arm extending westerly to within a
short distance of the dam, and the other easterly in the direction of
Greytown.
Across the stem of this Y, just below the junction of the two arms,
will be built an embankment 6500 feet long on the crest, and having a
maximum height of 51 feet. This embankment will retain the water of the
San Francisco and its tributaries, flooding the whole upper valley (the
arms of the Y) to a depth of from 30 to 50 feet, and forming a large
lake at the same level as the river above the dam—in other words, a
continuation of the summit level.
Proceeding from the end of the short canal already described,
the main canal passes down the westerly arm of this broad, deep,
crescent-shaped basin, past the embankment, then up the easterly arm
to the western foot of the divide between the San Francisco and the San
Juanillo, 12·55 miles from the dam, and within 19·48 miles of Greytown.
Here the eastern division of the canal is entered, beginning at the
Saltos de Elvira, whence it proceeds nearly due east, through the
broad, flat upper valley of the Arroyo de las Cascadas, cutting a spur
here and there to the “divide,” less than one mile from the Saltos,
and 280 feet above the sea. Then curving gradually to the south-east,
across the little plain at the summit, it cuts a steep, narrow spur,
enters the valley of the Deseado, a stream flowing into the San
Juanillo, follows its bed a short distance, then crosses to the left
bank, and reaches the site of the upper lock of the eastern flight,
14,200 feet from the Saltos. The average cut for this distance is 149
feet.
At this lock, excavated in the rock foundations of a spur of the
northern hills, the summit level, reaching back through the San
Francisco basin, up the San Juan, and across the lake to the first
lock on the west side, a distance of 144·8 miles, ends, and the canal,
lowered 53 feet by the lock, passes by easy curves down the widening
valley of the Deseado to the next lock, less than a mile beyond. Here
another drop of 27 feet occurs, and then the canal follows the still
widening and gradually descending valley in a north-easterly direction
for less than three miles to the third and last lock at the mouth of
the valley. This lock lowers the canal to the sea level, and from here
it takes a direct course across the flat low basin of the San Juanillo
and the Lagoon region, to the harbour of San Juan del Norte, or
Greytown, about 11½ miles distant.
The surface drainage to be provided for in this division is not
extensive, and it is especially small on the western slope of the
“divide,” where three short artificial channels will divert it all
into the San Francisco Lake at some distance from the canal. Across
the “divide,” and as far as the first intersection of the canal and
the Deseado, the natural drainage is away from the canal. From this
point to the San Juanillo the canal will be protected on both sides by
drains formed partly by the present bed of the Deseado, and partly by
artificial channels. The remainder of the canal, through the lowland
from the San Juanillo to Greytown, will be protected by embankments
formed by the material deposited by the dredgers, an artificial channel
being cut on the south to divert the San Juanillo, and another on the
north to give Laguna Bernard and its tributaries an independent outlet
to the sea. From the last lock to Greytown the canal is enlarged, as at
Brito, on the west side, forming an extension of the harbour 11½ miles
inland. The material to be excavated in this division is sand, gravel,
and alluvial soil (all dredgable material) for a distance of 12 to 15
miles from Greytown, then clay, gravel, and rock in the deeper cuts,
and finally, in the “divide,” cut rock, which will be utilised as on
the west side, in the construction of the embankment, in the breakwater
at Greytown, in pitching the canal slopes, and in concrete for the dam
and locks.
About 27 miles of the actual canal will be ordinary excavation,
and it is proposed that the remaining 13 miles will be largely, if
not entirely, excavated by dredgers. In the western division, the
excavation of the portion of the canal between the last lock and the
Pacific by dredgers will solve the problem of the drainage of the
work for that division, as on the remaining excavation, being above
sea-level, the question of drainage will be perfectly simple.
In the eastern division, as in the western, the portion of the canal
between Greytown harbour and the first lock, a distance of 11½ miles,
will be dredged.
The “divide” cut from the basin of the San Francisco to the upper
lock, 14,200 feet in length, and with an average depth of 149 feet,
is admitted to be a serious work; but with the neighbouring streams
offering water at a high head for removing the surface earth by
hydraulic mining, with a large plant of power drills worked by
compressed air from the same source, and the use of modern explosives
to loosen the rock, with a large proportion of the excavated rock to
be used in the construction of the locks and the dam, and in pitching
the slopes of the canal, a still larger quantity utilised in the
construction of the harbour at Greytown, and convenient dumping-grounds
for the remainder, the engineers claim that the work can be
accomplished.
The following description of the proposed locks is taken from the
report of Mr. Menocal, one of the engineers:—
“The locks proposed have a uniform length of 650 feet
between the gates, and at least a width of 65 feet between
the gate abutments. Locks Nos. 1, 2, 4, 5, and 6 have lifts
of 26, 27, 26·4, 29·7, and 29·7 feet respectively. No. 3
has a lift of 53 feet, and No. 7, being a combination tide
and lift lock, its lift will vary between 24·2 and 33·18
feet, depending on the state of the tide. It is believed
that Nos. 1 and 7 will rest on firm, heavy soil, but
timber and concrete foundations have been provided for in
the estimates. Nos. 2 and 4 are estimated to rest on solid
rock, and as for Nos. 5 and 6, the borings taken in 1873
show that stiff clay, compact sand and gravel will be met
with. No. 3 is proposed to be cut out of the solid rock in
the eastern slope of the ‘divide,’ by which the maximum
strength will be secured with the least expense, concrete
will be used only to the extent required to fill cavities,
to give the proper dimensions to the various parts, and
to give a surface to the blasted rock. The other locks it
is proposed to build of concrete, and all of them, No. 3
included, will have a heavy timber lining in the chambers
and bays, extending from the top of the walls to 15 feet
below the low-water level.
“Cribs on firm bottom, or fender piles, when piles can
be driven, have been provided at the approaches to the
locks for the protection and better guidance of ships into
the locks. Provision has also been made for making ships
fast to the lock walls, so that the lines will, by means
of floats, rise or fall with the ship, thus preserving the
same tension on the lines while the vessel is kept in the
axis of the lock. Each lock will be filled or emptied by
conduits extending from the upper to the lower reach of the
canal, and branch culverts connecting the main conduit with
the lock chamber. The only operation required for either
filling or emptying the lock will be, irrespective of the
movements of the lock gate, the opening and closing of the
upper and lower main culvert-gates. The time required to
fill or empty lock No. 3, of 53 feet lift, will be fifteen
minutes, and for the other locks an average of eleven
minutes. The question of the best style of gates for these
locks has been a subject of much consideration. It is
desirable to combine strength, economy in construction,
rapid and simple movements, facilities for repairs or
for renewing the gates, and the least danger of accident
by vessels entering or leaving the locks. The necessary
machinery for moving the locks and culvert-gates, for
hauling ships in and out of the locks, for electric lights,
and other purposes, will be worked by hydraulic power
furnished by the locks themselves.”
The chamber width of the locks will be 80 feet, so that these
structures will contain almost any merchant vessel afloat.
In the plans proposed for the canal, not only have enlarged prisms been
provided for, but large basins are proposed at the extremities of the
locks. These basins, the enlargement of the canal at each end, with the
lake, the river and the San Francisco basin, will permit vessels to
pass each other without delay at almost every point on the route. Mr.
Menocal states that—
In 22·37 miles, or 57 per cent. of the canal in
excavation, the prism is large enough for vessels in
transit to pass each other, and of a sectional area in
excess of the maximum area in the Suez Canal; the remaining
distance in which large vessels cannot conveniently pass
each other is so divided that the longest is only 3·67
miles in length; with two exceptions, those short reaches
of narrow canal are situated between the locks, and can be
traversed by any vessel in less time than is estimated for
the passage of a lock; consequently, unless a double system
of locks be constructed, nothing will be gained by an
enlargement of the prisms. The exceptions referred to are
the rock-cuts through the eastern and western ‘divides,’
2·58 and 3·67 miles, respectively, in length. The possible
detention in the transit, due to those narrow cuts, which
should not in any case exceed 45 minutes, would not
justify the necessary increase of expense involved in an
enlargement of the cross-section proposed. Both the bottom
width and the depth of the proposed canal are larger than
those of the Suez Canal.
In the lake and in the largest portion of the San Juan
River vessels can travel almost as fast as at sea. In some
sections of the river, and possibly in the basin of the San
Francisco, although the channel is at all points deep and
of considerable width, the speed may be somewhat checked by
reason of the curves.
Estimated time of through-transit by steamer.
Hrs. Mins.
38·98 miles of canal, at 5 miles an hour 7 48
8·51 miles in the San Francisco basin, at 7 miles an hour 1 14
64·54 miles in the San Juan River, at 8 miles an hour 8 4
56·50 miles in the lake, at 10 miles an hour 5 39
Time allowed for passing 7 locks, at 45 minutes each 5 15
Allow for detention in narrow cuts, &c. 2 0
───────
Total time 30 0
The experience of the Suez Canal shows that the actual
time of transit is more likely to fall under than to exceed
the above estimate.[209]
The traffic of the canal is limited by the time required
to pass a lock, and on the basis of 45 minutes (above
estimated), and allowing but one vessel to each lockage,
the number of vessels that can pass the canal in one day
will be 32, or in one year 11,680,[210] which, at the average
net tonnage of vessels passing the Suez Canal, will give
an annual traffic of 20,440,000 tons. This is on the basis
that the navigation will not be stopped during the night.
With abundant water power at the several locks and the
dam, there is no reason why the whole canal should not
be sufficiently illuminated by electric lights; and with
beacons and range lights in the river and lake, vessels can
travel at all times with perfect safety. The estimated cost
of the canal is 64 millions of dollars, or 13,000,000_l._
including electric lighting, &c., and it is calculated that
the work can be completed in six years.
ESTIMATES OF COST MADE IN 1888.
Per cubic yard.
TABLE OF PRICES. dols.
Excavation in earth 0·40
Excavation in rock 1·50
Excavation in rock (submarine) 5·00
Dredging 0·20 and 0·40
Concrete 6·00 and 9·00
Stone pitching 2·00
Stone in breakwaters 1·50
Puddle 0·75
Timber 0·50
_Western Division:—_ dols.
Excavation and embankment 8,496,292
Diversion of Rio Grande and Rio Lajas 1,870,447
Other auxiliary work, including R. R. 753,329
Locks (four) 4,762,480
Harbour of Brito 1,611,500
───────────
Total $17,484,048
_Middle Division:—_ dols.
Lake Nicaragua 379,520
River San Juan 3,074,791
Valley of R. San Francisco 1,112,413
Dam across R. San Juan 1,858,975
Embankment across R. San Francisco 1,331,262
Embankment near Ochoa 45,578
Railroad 240,000
──────────
Total $8,042,539
_Eastern Division:—_ dols.
The “Divide” 11,982,938
From the “Divide” to Greytown 8,077,294
Locks (three) 3,561,515
Railroad 320,000
Harbour of Greytown 1,766,625
───────────
Total $25,708,372
RECAPITULATION.
dols.
Western Division 17,484,048
Middle Division 8,042,539
Eastern Division 25,708,372
───────────
Total $51,234,239
Surveys, hospitals, shops, &c.; management and
contingencies, 25 per cent. 12,808,740
───────────
Grand total $64,043,699
═══════════
The Canal Company has received from the Nicaraguan Government a
concession which allows a period of 2½ years from 1887, within which to
begin operations, a grant of 1,000,000 acres of land, and immunity from
taxation and import duties for 99 years. The Canal Company estimate
that by 1894, shipping to the amount of 8,000,000 to 9,000,000 of tons
would avail itself of this route. The leading commercial bodies of New
York, New Orleans, St. Louis, Cincinnati, Chicago, Indianapolis, and
San Francisco, have expressed themselves favourable to the project,
which has also been supported by the Legislatures of California and
Oregon.
The great majority of the people of the United States are only
interested in the construction of a canal across the American isthmus,
in so far as it will tend to make them independent of the Pacific
railway companies, which have of late years shown a disposition to
work together and pool their traffic at the expense of the traders.
There is, perhaps, very little to complain of in this respect, so far
as the average range of American railway rates is concerned. But the
Americans are ’cute enough to know that if they could play off the
steamship against the railway, the ultimate result, though it might
be disastrous to both transportation agencies, would be favourable to
the trader so long as the competition lasted. The actual present sea
distance from New York to San Francisco, with an isthmian canal opened,
would be shortened by 8000 miles. The distance, therefore, would not
be materially greater by canal than by railway. The ship, however,
all other things being equal, will always carry more cheaply than the
locomotive.[211] Whether the difference would be very material when the
canal company’s tolls have been paid remains to be seen.
It is probable, that with the opening of the canal, a great stimulus
would be given to the coasting trade of the United States, and
especially between the two ports of New York and San Francisco, to
the probable detriment, at least for a time, of the trans-continental
railways. The very large trade that is now being cultivated between
the United States and Central America, the republics of Peru, Chili,
and Ecuador, and something like one-half of Mexico, would be equally
benefited by the new means of communication. With all this to depend
upon, the promoters of the canal are probably not over-sanguine in
expecting that its financial results would be fairly satisfactory. The
experience of the Suez Canal at least encourages that hope, although it
is to be remarked that the cost of the Nicaraguan canal, will probably,
when completed, have been more than that of the Suez waterway.
The local advantages of the Nicaragua route for a ship canal are
generally recognised in the United States. A recent writer[212] on the
subject states that—
“The range of what in other parts of Northern and Central
America are mountains, and at Panama has proved one of
the obstacles that have wrecked the French Company, on
the Nicaragua line, dwindles to its lowest elevation, as
if inviting a junction between the Atlantic and Pacific
Oceans. The western shore of Lake Nicaragua is but fifteen
miles from the Pacific, and the ‘divide,’ which north
and south at this point assumes mountainous proportions,
is less than 50 feet above the level of the lake, and
about 150 feet above the mean level of the Pacific Ocean.
Although so close to the Pacific slope, and with so
slight a barrier holding back its waters, the great lake
of Nicaragua drains through the river San Juan to the
East into the Caribbean Sea. The lake itself is deep and
unobstructed, and that portion of the river San Juan needed
for navigation purposes requires but little work to adapt
it for the heaviest draught vessels. The Lake of Nicaragua
is undoubtedly the key to the situation, forming the summit
level, and supplying the immense amount of water required
to operate a lock canal on the large scale projected.”
The route from Greytown, on the Atlantic, to Brito, on the Pacific, a
distance of 170·099 miles, has been divided thus:—
Free Canal in
navigation. excavation.
East side .. 16·048
West side .. 11·160
Six locks .. 0·759
Deseado basin 4·220 ..
San Francisco and Machado basins 11·368 ..
Tola basin 5·504 ..
River San Juan 64·540 ..
Lake Nicaragua 56·500 ..
─────── ──────
Total miles 142·132 27·907
The minimum radius of curvature is 2500, and the principal dimensions
of the canal in excavation are as follows: rock, width, bottom, 80
feet; top, 80 feet; depth, 30 feet; earth—width, bottom, 120 feet,
top, 180 feet; depth, 46 feet; sand and loose material—width, bottom,
120 feet; top, 360 feet; depth, 30 feet.
The most important parts of the work are the construction of the
harbours—Greytown on the Caribbean Sea, and Brito on the Pacific;
the damming of the San Juan river, for the purpose of raising and
maintaining the level of Lake Nicaragua and the river at about 110 feet
above mean tide level; the formation of artificial basins at different
levels by means of dams, and the use of locks to pass from one level to
another.
The harbour of Greytown is now closed by a sand bar, and nothing of
greater draught than six feet can enter, but it is said that in three
months or less from the commencement of the work vessels drawing 15
feet of water will be able to land materials. It is proposed to make
this opening through the sand bar by means of a temporary jetty of
brush and pile, to furnish protection to a dredger cutting through
the bar. This jetty will also give the necessary protection for the
maintenance of the passage by diverting the shore current which has
deposited the sand.
The branch mouth of the river San Juan, which at present empties into
the harbour, and is constantly, with every heavy rain, adding to the
accumulation of silt in it, will be cut off, and, by a short canal,
diverted so as to empty by the principal mouth of the San Juan some
miles to the south.
The heaviest piece of work on the canal is a rock cut through the
“divide” on the eastern portion of the summit level, commencing about
four miles to the west of lock No. 3. This cut is about 2·9 miles long
and the average depth is about 150 feet, involving a removal of about
2,150,000 cubic yards of earth, and 7,500,000 cubic yards of rock.
Lake Nicaragua has a watershed of 8000 miles. The only outlet of the
lake is the San Juan river, which discharges, at its lowest stage, near
the close of the dry season, 11,390 cubic feet of water per second. For
thirty-two double lockages, it is estimated that 129½ million cubic
feet of water will be required, being little more than one-eighth of
the total supply of the lake alone. It is claimed that as this supply
is from the summit, a dry summit level is almost impossible, while
importance is attached to the fact that the canal will be a fresh-water
one.
The principal distances to be saved by the Nicaraguan Canal, as
compared with the only existing alternative route by Cape Horn, are
said by the Company to be:—
────────────────────┬───────────┬────────────┬─────────
│ │ By │
│ By │ Nicaraguan │ Distance
│ Cape Horn.│ Canal. │ Saved.
├───────────┼────────────┼─────────
│ miles. │ miles. │ miles.
_New York to_— │ │ │
San Francisco │ 14,840 │ 4,760 │ 10,080
Hong Kong │ 18,180 │ 11,038 │ 4,163
Yokohama │ 17,679 │ 9,363 │ 6,827
Melbourne │ 13,502 │ 10,000 │ 3,290
Sandwich Islands │ 14,230 │ 6,388 │ 7,842
│ │ │
_Liverpool to_— │ │ │
San Francisco │ 14,690 │ 7,508 │ 7,182
Guayaquil │ 11,321 │ 5,890 │ 5,431
Callao │ 10,539 │ 6,461 │ 4,078
Valparaiso │ 9,600 │ 7,448 │ 2,152
────────────────────┴───────────┴────────────┴─────────
The promoters of the Nicaraguan Canal appear to have got fairly to
work. A considerable quantity of machinery, as well as a number
of surveyors and engineers, have been forwarded to the scene of
operations, and the latest reports are favourable to the prospect of
the enterprise being carried out. It will necessarily, however, involve
several years of close work before it is available, even under the most
favourable circumstances, for the commerce of the world.
FOOTNOTES:
[203] In 1842 several influential persons in Central America wrote
to the Prince, then a prisoner in the fortress of Ham, suggesting
that he should endeavour to obtain his liberation from the French
Government, under an engagement to proceed forthwith to Central
America. In 1845 this overture was more formally repeated in a
despatch from M. Castellon, then Minister of the Central American
States in Paris; and a few months later, Señor del Montenegro
announced to the Prince that the Government of Nicaragua had
conferred on his highness full powers to conduct and execute the
undertaking. The refusal of the French Government to liberate the
Prince put an end to the scheme at that time; but after his escape
and arrival in London he was not indisposed to renew the negotiation,
and he then wrote the pamphlet referred to.
[204] Min. Proc. Inst. C. E., vol. vi. p. 428.
[205] ‘Edinburgh Review,’ April, 1882.
[206] Vide ‘Central America,’ by John Baily, R.M., London, 1850.
[207] Min. Proc. Inst. C. E., vol. xv. p. 379.
[208] ‘Edinburgh Review,’ April, 1882.
[209] The time of passage through the Suez Canal is now about 16
hours.
[210] In July, 1886, 1296 vessels passed through the St. Mary’s Canal
lock.
[211] The cost of transport of a ton of traffic by an Atlantic
freight steamer has been reduced to one penny for some forty miles.
[212] ‘Engineering and Mining Journal’ (New York), Map 4, 1889.
CHAPTER XXIII.
THE MANCHESTER SHIP CANAL.
“Rivers diverted from their native course,
And bound with chains of artificial force,
From large cascades in pleasing tumult rolled,
Or rose through figured stone or breathing gold.”
—_Prior._
Whether we regard the magnitude of the enterprise, the importance of
the district it is intended to serve, the difficulties and opposition
that have had to be surmounted, or the many and varied influences that
it is likely to exercise upon the future of transport in the United
Kingdom, the Manchester Ship Canal is undoubtedly one of the most
remarkable undertakings of modern times.
It is not that the canal is unique in point of the expenditure
involved, or in so far as the engineering problems to be dealt with
are concerned. The Suez Canal is at once a much more costly and a much
more extensive work, its actual cost having been about 20,000,000_l._
sterling, as against less than half that sum for the Manchester
enterprise; and its length having been about 100 miles, as against
35. The Panama Canal, again, although approximately about the same
length as the ship canal between Manchester and the sea, has cost,
up to the present time, about 60,000,000_l._ sterling, including the
expenditure on financing. The Nicaraguan Canal, again, which is now
about to be undertaken in real earnest, is estimated to cost from
13,000,000_l._ to 20,000,000_l._, and will involve the cutting of some
28 miles of canal, in addition to the almost equally serious work of
canalising the St. Juan River. But these are all works of a different
character, and having a different object in view. The Suez, Panama,
Nicaraguan, and Corinth Canals are isthmian waterways, intended, or
constructed with the view of connecting together seas or oceans that
Nature had divorced, and thereby carried out with the primary, if not
with the sole, object of abridging distance. The Welland and the St.
Mary’s Falls Canals, in Canada and the United States, are of much the
same character, their object being that of uniting waters that were
originally kept apart by natural barriers. But the Manchester Ship
Canal has but few antetypes. The canals already in existence that most
nearly correspond to it in character are the Erie Canal, which connects
Buffalo with New York, and thereby secures an unbroken line of water
communication between Chicago and New York, a distance of over 1000
miles; and the Poutiloff Canal, 38 miles in length, which connects
Cronstadt with St. Petersburg, and has converted the latter city into a
seaport. The design of the Manchester Ship Canal is to transform that
large centre of population and industry from a landlocked city into a
seaport, and to confer the same facilities on a number of other towns
in the neighbourhood.
There is no district and probably no community that appears to offer
better facilities for making the experiment of providing a great inland
waterway of this description. Manchester and Liverpool, with their
immediate suburbs contain at least a million and a half of souls. But
the trade and industry of the two towns are even more important than
their population, relatively to other districts. The cotton trade of
the world is carried on in this part of Lancashire. Manchester and
Liverpool together have obtained and maintained a great repute as the
centre of large industrial operations of almost every kind: engineering
works, shipbuilding works, alkali works, tobacco factories, chemical
and copper works, and many others. Liverpool has to-day a larger export
shipping trade than any other port in the world, and is only eclipsed
by the Thames in the matter of imports. But this great business of
imports and exports is not originated in Liverpool herself. She is only
the distributing centre for a very large and a very populous district,
and a centre moreover that did not appear to offer to that district the
economical facilities and advantages to which it was entitled. The port
and harbour dues at Liverpool were heavy and onerous, and the rates
charged by the railway companies for the transportation of traffic
between the Mersey and the interior of the country were deemed to be
much higher than they should have been, having regard to the importance
of the traffic.
The proposal to construct a canal is by no means a new one. Manchester,
as every one knows, has for more than a century and a quarter been
the foremost in all plans and operations designed to secure economy
and facility of transport. Many years ago it was proposed to convert
the Irwell into a navigable river, and this, of course, would have
connected Manchester with the Mersey and so with the sea. But the
Irwell—a tortuous, narrow, and in many respects unsatisfactory
stream—did not readily lend itself to a grand proposal of this kind,
and the little that was done to make it a maritime highway was never
attended with any real advantage to trade and commerce. The Bridgwater
Canal was a larger and more ambitious venture. It also connected
Manchester with the sea by the Mersey, as well as with many inland
towns by auxiliary canals—Bolton, by the Manchester, Bolton, and Bury
Canal; Rochdale, by the Rochdale Canal; Blackburn and Accrington,
by the Leeds and Liverpool Canal; Ashton and Huddersfield, by the
Manchester and Huddersfield Canal; and so with some other large towns.
The truth is that Manchester is, and has been for more than a century,
the centre of a vast network of canals, whereby water communication was
made possible with nearly every other important town and district
in the country. But this possibility was one that could only be
taken advantage of to a very limited extent. The canals surrounding
Manchester have been of small size and depth, admitting of the passage
of small boats and barges only, so that they could not be utilised
for sea-going craft. For most practical purposes, such waterways
were therefore of little use. What was felt to be necessary was a
canal sufficiently broad and deep to admit of the passage of large
ocean-going steamers right up to the warehouses and mills of Manchester
and the neighbouring towns. This necessity was all the more keenly
felt, and all the more readily acted upon, that the railway rates
between Manchester and Liverpool were generally onerous and oppressive.
[Illustration: TRACING OF THE MANCHESTER SHIP CANAL.]
It was under the circumstances just stated that a meeting was held at
the house of Mr. Daniel Adamson, in June 1882, to discuss the question
of constructing a canal from Manchester to the sea.
The outcome of this meeting was the appointment of Mr. Hamilton
Fulton and Mr. E. Leader Williams as engineers, with instructions
to investigate the subject, and to submit separate schemes to a
provisional committee showing the best means of carrying out such
a work. Mr. Fulton’s scheme was to improve the existing navigation
through the estuary of the Mersey by dredging and retaining walls, and
to excavate, straighten, and improve the Mersey and Irwell Navigation
to Manchester, leaving, when completed, a tidal canal to Manchester,
with a depth of 22 feet at low water spring tides. Passing places were
to be left every 3 or 4 miles, and the traffic was to be worked as on
the Suez Canal. Docks were to be constructed, and all necessary works.
The gross estimate, including water and land, was 5,072,291_l._
Mr. Williams’s proposal was to construct a canal 22 feet deep and 100
feet wide, with three locks. The channel through the estuary was to be
confined between training walls from Garston to Runcorn, and from there
the channel was to be improved and straightened to Latchford (first
lock), and be practically a tideway. Between Latchford and Manchester
it was to be a canal with locks, the existing navigation to be improved
and utilised where practicable, otherwise to be filled up; while docks
were to be made at Latchford, Irlam, and Barton. The water-level in the
docks at Manchester were to be 8 feet below the level of the quays.
The estimate of cost, including works, water, and land, was about
5,160,000_l._
[Illustration: MANCHESTER SHIP CANAL MANCHESTER AND SALFORD DOCKS.]
Mr. Williams argued that were the tide to be brought to Manchester, the
bottom of the dock would be 92 feet below the surface of the ground,
and therefore most inconvenient for working. The docks and canal ending
abruptly, would, moreover, form a depositing place for silt brought up
by the tide, and the tide flowing up or down would materially affect
the passage of vessels proceeding the reverse way.
Mr. Abernethy, who had, in the meantime, been appointed consulting
engineer, considered both of these proposals, and reported favourably
on Mr. Williams’s scheme, practically endorsing his views, but
suggesting an additional dock at Warrington, and some deeper dredging,
and estimating the cost of the work at 5,400,000_l._, or 240,000_l._
more than Mr. Williams had provided for. Mr. Abernethy also expressed
the opinion that if the work was carried out with energy, it could be
completed within four years from the commencement. Upon the basis of
the report of Mr. Williams, endorsed by Mr. Abernethy, the committee
decided in the end to proceed with the scheme.
The promoters had to secure the power to acquire “all the easements,
rights, powers, authorities, and privileges of the company of the
proprietors of the Mersey and Irwell Navigation,” as the ship canal,
if constructed, would clash with and extinguish these. The Bridgwater
Navigation Company were possessed of the foregoing rights, and were a
wealthy corporation, owning a going and paying concern, with a capital
of over 1,300,000_l._ Notice had to be served that power would be
sought to absorb this company also. Then, again, the powers sought by
the ship canal were certain to clash materially with the dock and other
interests in Liverpool, as well as with the several lines of railway
at present dominating the carrying trade of Manchester. The property
owners along the route, and many other interests, joined together to
oppose the new enterprise.
After the most arduous and prolonged struggle in the annals of private
bill legislation, the Manchester Ship Canal Bill became law, and
received the Royal Assent as an Act of Parliament on the 6th August,
1885.
The inquiries of the six Parliamentary Select Committees appointed to
investigate into the merits of the project extended over a period of
175 days. The total number of individual witnesses (including both
promoters and opponents) was 285, and the number of repeated witnesses
(including those on both sides) was 543. As illustrating the exhaustive
character of these inquiries, it may be mentioned that no less than
87,936 questions were put and answered.
The Right Honourable W. E. Forster, Chairman of the Commons Select
Committee, which was the last to deal with the Bill, in announcing that
their decision was favourable, said, “The conclusion we have come to is
unanimous,” the Committee considering the preamble proved, subject to
certain obligations being imposed upon the promoters, but none of an
onerous character.
The House of Commons Select Committee, before which the first
inquiry was made, acting entirely upon its own initiative, inserted
the following clause in the Bill, a proceeding said to be without
precedent:—“And whereas it appeared from the evidence adduced that if
the scheme could be carried out with due regard to existing interests,
the Manchester Ship Canal would afford valuable facilities, and ought
to be sanctioned.”
It is worthy of remark that though two Select Committees declined to
take the responsibility of passing the Bill absolutely in the form in
which it was presented to them, all the six Committees were satisfied
as regards the necessity of the undertaking.
The Manchester Ship Canal Company is incorporated by 48 and 49 Vict.
cap. 118, for the following amongst other purposes:—
To construct a ship canal from the river Mersey at Eastham, near
Liverpool, past Ellesmere Port, Weston Point, and Runcorn, to
Warrington, Salford, and Manchester, available for the largest class of
ocean steamers, with docks at Manchester, Salford, and Warrington, and
other incidental works.
To purchase the entire undertakings of the then existing Bridgwater
Navigation Company (Limited), including not only the Bridgwater canals
and the Runcorn and Weston canal, but the Mersey and Irwell Navigation,
the Runcorn docks, the Duke’s dock in Liverpool, and all that company’s
warehouses, wharves, buildings, lands, rents, rights, and privileges,
as a going concern.
A further Bill, authorising the payment by the Manchester Ship
Canal Company of interest at the rate of 4 per cent. per annum to
shareholders during the construction of the works, became law and
received the Royal Assent as an Act of Parliament on 26th June, 1886.
During the progress of this Bill, on a division in the House of Commons
on a motion by a Liverpool member for reference to Committee and
_locus_ for opponents, the motion was negatived by 375 votes as against
61 votes.
The authorised share capital of the Manchester Ship Canal Company is
8,000,000_l._, with borrowing powers to the extent of 1,812,000_l._,
making the total authorised capital 9,812,000_l._, a sum sufficient to
enable the company to complete the construction of the works, to pay
interest during their construction, and to carry into effect all the
objects of the Act and leave an ample surplus.
The Act provides that the Bridgwater Navigation Company shall sell the
whole of the Bridgwater undertakings for the sum of 1,710,000_l._
These undertakings earn a net revenue of nearly 60,000_l._ per annum.
Under the auspices of the Manchester Ship Canal Company, a considerable
development of the traffic on the Bridgwater canal system is expected
to result from the abolition of the bar tolls, which obstruct traffic,
and from throwing open the canal to general carriers.
DESCRIPTION OF THE CANAL WORKS.
A brief description of the canal works may here be introduced. The
engineering journals, from which we have mainly borrowed our facts,
have dealt with them so fully as to render a detailed statement quite
unnecessary.
The Manchester Ship Canal begins at Eastham, on the south bank of the
Estuary of the Mersey, and about midway between its mouth and head near
Runcorn. The canal follows this bank for 13½ miles, the greater portion
being in entirely solid ground, but, sometimes going below high-water
mark, it is confined by embankments and retaining walls until reaching
Runcorn, where it leaves the waters of the Mersey, and takes an
independent and almost direct course to its terminus in the docks at
Salford and Manchester.
The total length of the canal is slightly over 35½ miles. This is
practically one continuous cutting, but it has been subdivided into
thirty lengths or sections, each with a local name and number; these
vary in cubical contents from 223,000 cubic yards in the smallest, to
3,345,000 cubic yards in the largest. The total quantity of earthwork
to be moved is 44,428,535 cubic yards, composed of 6,970,815 cubic
yards of rock, and 37,457,720 cubic yards of soft materials. Of the
rock, 1,591,570 cubic yards will be utilised for lock and river wall
work, abutments of railway bridges, facing slopes of the canal in soft
ground, and other operations, the remainder going to spoil. Of the soft
excavations 3,603,690 cubic yards are to be used in forming the
embankments of the canal, 5,176,278 cubic yards for forming embankments
on railway diversions, 1,555,000 cubic yards in filling up what will be
the disused bed of the Irwell and other water-courses; 552,000 cubic
yards in raising quays and making roads; 800,000 cubic yards are to be
stacked along the canal banks for future use in maintenance; and the
remainder, amounting to 31,149,997 cubic yards, will go to spoil.
The carrying of the Bridgwater Navigation across the Manchester Canal
at the distance of 32 miles, will be one of the most interesting works
in the contract, because an entirely new departure will be undertaken
in the aqueduct. It was on this navigation that Brindley made his
famous viaduct, the precursor of the more splendid structures of Rennie
and Telford.
As the level of the Bridgwater Navigation has to be maintained, and as
the saving of water is a consideration, Mr. Williams proposes to make
the aqueduct in the form of a swing bridge, which may be opened, swung,
and closed again without losing any water either from the swinging
portion or from the canal. Here also, parallel to the aqueduct, will be
constructed a hydraulic lift, to lower barges and boats from the waters
of the navigation, to the canal, where they will cross on its level to
a similar lift, there to be raised to their former waters and level. A
similar lift has been at work for some years with satisfactory results
at Anderton on the Weaver Navigation, of which Mr. Leader Williams was
formerly the engineer.
Throughout the entire length of the canal, hard red sandstone forms the
bedrock, and the formation, of course, varies according to the nature
of the stratification. For instance, at 1½ miles distance, where the
canal works are inside high-water mark, all layers of deposit have been
washed away, and only from 2 feet to 4 feet of black sludge overlies
the rock. Occasionally the rock dips and leaves the bottom of the
canal in the softer deposits, in some places beds of what has been
termed black river sludges, but which are, in all probability, peaty
deposits, are sandwiched in, and underlie deposits of from 15 feet to
16 feet of clean river sand. At 5½ miles between Stanlow Point and Ince
Lighthouse, large beds of blue loam are met with, varying in depth to
25 feet; and at 6 miles black sludge comes in again, about 20 feet in
thickness. At 6½ miles there is a peculiar erosion of the underlying
sandstone, apparently from some creek having cut across the line of
canal. At 8 miles the section overlies a bed of gravel, and at 9 miles
the bottom of the canal runs into a large deposit of sand. From about
10 to 10½ miles the strata becomes very soft, being sludge, sand, and
gravel mixed. At 11 miles 45 chains the bottom of the canal is again
very soft ground, the sandstone suddenly dipping and not appearing
again until about 12 miles.
At 13 miles 70 chains the first of the deep cuttings begin, the bottom
of the canal being 67 feet below the surface of the ground, and the
strata is much less complex than along the estuary. It is near to this
place that the canal leaves the waters of the Mersey, and takes an
independent and almost direct course to its terminus.
From 15 miles, 50 chains to 16 miles there is again a very considerable
alteration in the strata, the rock dipping sharply, and softer deposits
coming in. At 15 miles 68 chains, where a bore was put down, no rock
was encountered to a depth of 88 feet. Following along from 16 miles,
where the bedrock rises, a fairly even contour of its surface is
maintained, together with overlying strata of soil, sand, and gravel,
to near 18 miles 20 chains, where the London and North-Western main
line, and the Birkenhead, Lancashire, and Cheshire Junction railways
are crossed.
From this point the surface rises gradually to 19 miles, opposite the
Warrington Dock entrance, where the cutting is 50 feet deep. Near
Warrington the existing river bed will be shortened by a cut-off and
diverted from the course of the canal. At 21 miles 20 chains Latchford
Lock is reached; the section through it is very similar to that in the
preceding 5 miles. At 21 miles 70 chains the bedrock again disappears,
giving place to a deep bed of quicksand and marl. The Mersey is twice
crossed between 22 miles 10 chains and 22 miles 35 chains. There is
another cut-off and diversion of the river near 22 miles 50 chains,
where the bottom becomes soft brown sandy clay, and sludge, being in
a bed 24 feet thick, which reaches 18 inches or 20 inches below the
bottom of the canal; this runs into gravel and clay at 23 miles 10
chains, which again dies into a large bed of quicksand from about 23
miles 25 chains to 75 chains. At 24 miles 2 chains the rock is again
struck by a bore at a depth of 12 feet below the bottom of the canal.
The Mersey is again twice crossed at 23 miles 40 chains, and 70 chains,
and the river is to be diverted through the existing channel, called
the “Butchersfield Cut.” At 24 miles 20 chains the Mersey joins with
the Bollin; from there the canal will become practically the river to
Manchester, and the old river bed will be filled up. A sand and gravel
formation continues to about 25 miles, where a bed of marl is reached,
overlaid by hard and soft shale, but from the point where this runs
out, about 25 miles 40 chains to Manchester, the canal follows more or
less the bed of the river, wherein a much more complicated strata is
met with than along the line of route which is away from the influence
of the river, at between 14 and 25½ miles. Loam and streaks of sand,
overlying hard red sand are met with from 25 miles 60 chains, to 26
miles 20 chains, where gravel and red rock come in, to 25 miles 15
chains, between which points the bottom of the canal by a strange
coincidence follows almost parallel with the upper surface of the
bedrock. At 27 miles 15 chains the rock dips and is not met with again
for nearly half a mile. The Irlam locks are at 28 miles 50 chains;
just at the entrance, rock again crops up and forms the bottom of the
canal. At 29 miles a wedge-shaped layer of brown clay comes in which
runs about half a mile, reaching a depth of 20 feet at the Manchester
end; this suddenly ends in a deep bed of loam which it partially
overlies—evidently it is a deposit from the river which flows
above—then loam, sand, and gravel make the strata to about 29½ miles,
when rock again appears, and runs almost to the surface at 29 miles 68
chains. At 30 miles 30 chains the rock runs out again from the bottom,
and a heavy bed of loam, 36 feet deep, covers it, the cutting at this
point being entirely in loam. A little further on, the rock bottom
again rises, and from there sand and rock are chiefly met with to 31
miles 10 chains, where the rock dies out again, and blue loam comes in,
forming a deep bed overlying sand, sludge, gravel and marl; near the
Barton Locks this runs into heavy beds of loam near 33½ miles. At 34
miles soil, clay, and rock are the formations met with, each in nearly
equal beds of 10 feet deep, until about 34 miles 50 chains, when much
sand shows; at 34 miles 55 chains the bedrock dips, and sand over clay
and loam form the strata to the terminal dock entrances at Throstle
Nest. This completes the course of the canal proper.
The canal is to be constructed with a minimum width of 120 feet on the
bottom. From Barton to the terminus, a distance of 3½ miles, the width
on the bottom is to be increased to 170 feet; on the Salford side of
this increased width of waterway, one mile of wharfage is to be built,
giving a total length of 4½ miles of quay or wharfage frontage at the
Manchester end, and leaving 2½ miles of frontage available for mooring
lighters or vessels along this portion of the canal.
[Illustration: SECTIONS OF SHIP CANALS.
PANAMA CANAL
SUEZ CANAL
MANCHESTER SHIP CANAL
ORDINARY SECTION
SECTION THRU ROCK]
[Illustration: SECTIONS OF SHIP CANALS.
BRUSSELS CANAL
NORTH HOLLAND CANAL
WELLAND CANAL
AMSTERDAM SHIP CANAL]
The sections of the canal are compared with those of other large ship
canals in the diagrams at pp. 340-41.
The total rise from the level of the mean tide at Eastham to the Docks
at Manchester is nearly 60 feet. This is overcome by the average rise
of 15 feet at each of the locks. The water level in the Manchester
Docks is to be the same as the present river level at this point.
The depth of the canal throughout is to be 26 feet, but the sills of
the docks are to be put in at a depth of 28 feet, so as to allow for a
deepening throughout should the traffic demand it.
As compared with existing large canals, the Manchester Ship Canal will
be capable of carrying much the greatest traffic. The widths on the
bottom, and the depths are: Ghent Canal 55 feet 6 inches, depth 21 feet
2 inches; Suez Canal, 72 feet, depth 26 feet; and Amsterdam Canal, 88
feet 7 inches, depth 23 feet. On the Suez Canal it has been necessary
to provide passing places, otherwise the traffic could only be worked
in one direction at a time, but on the Manchester Canal there will be
ample room for two large size vessels to pass at any point
The estimates for the canal works include large docks in Manchester,
Salford, and Warrington, as sanctioned by the Company’s Act, with a
water area of 114½ acres, containing more than five miles of quays, the
area of quay space being 152 acres. There will also be a mile of quay
space near Manchester on the Ship Canal, in addition to wharves at many
places alongside its course. The docks will be of the most approved
construction, and special provision will be made to secure the rapid
loading and discharging of vessels. Extensive shed accommodation will
be provided at the docks, and the cost of some fifty hydraulic cranes
is included in the estimates.
The level of the docks at Manchester, which is 60 feet 6 inches above
the ordinary level of the tidal portion of the canal, will be reached
by four sets of locks. The locks will be of a size sufficient to admit
the largest merchant steamers afloat. Each set comprises (_a_) a large
lock, 550 feet by 60 feet; (_b_) a smaller lock 300 feet by 40 feet for
ordinary vessels; and (_c_) one lock 100 feet by 20 feet, for small
coasters and barges. All will be capable of being worked together.
Each set of locks will be worked by hydraulic power, enabling vessels
to be passed in 15 minutes. It has been ascertained by careful gaugings
that the rivers Irwell and Mersey (which will be diverted into the
upper reaches of the canal) will supply more than sufficient water for
the locks, even in the driest season.
There will be tidal gates at the entrance to the canal, which will be
worked as locks at low water, so that large vessels can enter and leave
at almost any state of the tide, instead of only during a period of 40
minutes of each tide as at Liverpool. Small vessels will be able to
enter and leave at any time.
It is claimed that vessels will be able to navigate the canal with
safety at a speed of five miles an hour, and it is estimated that the
journey from the entrance at Eastham to Manchester will be accomplished
in eight hours, which is less time than is now taken to cart goods
from ship to rail in Liverpool, and to carry them thence by rail to
Manchester.
One of the most interesting operations to be carried out in connection
with the canal works, will be the removal and rebuilding of the
aqueduct which Brindley constructed for the Bridgwater Navigation in
1765. The aqueduct and the neighbouring viaduct (shown in the old
print at p. 344) pass over the Mersey and Irwell Navigation at such a
height as to allow the passage through the archways of small vessels.
To accommodate the larger vessels that will pass up the Ship Canal, the
archways of the aqueduct and viaduct would have to be more than double
the height. This was the engineering difficulty which the Ship Canal
promoters had first of all to encounter and by many it was regarded as
insuperable. The suggestion was made that the Ship Canal should end at
a point below the aqueduct. Mr. E. Leader Williams, the engineer of
the company has, however, proposed to construct a short diversion of
the Bridgwater Canal immediately over the line at which it would cross
the Ship Canal. The length of the Bridgwater over the Ship Canal will
then be formed in the manner of a long movable iron caisson or trough,
somewhat deeper in the centre than at the two ends, supported by and
turning (when required) upon a circle of live rollers. This caisson is
to be filled with water to a depth equal to that of the canal itself,
and is to be fitted at either end with watertight gates, which are also
to be fixed at either end of the approaches from the canal.
[Illustration: THE BRIDGWATER CANAL.—(_a_) Across the Irwell
(_b_) Barton Bridge.]
Upon the completion of this work, the central portion of Brindley’s
aqueduct will be removed, the ends being allowed to remain. The manner
of working the new aqueduct will be as follows:—The operator in charge
of the machinery will, on descrying an approaching steamship, cause the
four watertight gates at the ends of the caisson and of the approaches
to be closed, and will then, by means of hydraulic machinery, cause
the caisson to revolve for a quarter of a circle upon the live roller
which will support it, thus leaving a perfectly clear passage for the
vessel. Through this passage, up- or down-going vessels will be able
readily to steam, and when clear of the aqueduct the process will be
reversed—that is to say, the attendant will cause the caisson to turn
back into its original position, and will have his watertight gates
opened once more, when the line of the Bridgwater traffic will be clear
again, after a very brief interval, and without any loss of the water
in the canal.
At the ends of the existing line of the canal (after the removal of
Brindley’s old aqueduct) it is proposed to construct hydraulic lifts as
already stated, by means of which it will be competent to lower barges
with full cargoes (the barges remaining afloat throughout the whole
operation) from the Bridgwater to the Ship Canal, or, _vice versâ_, to
raise them from the Ship Canal to the Bridgwater, thus making Barton
a point of interchange of traffic between the high and the low level
navigation.
The works on the Manchester Ship Canal were commenced in 1886, and
are to be completed, under contract, in 1892. The estimate of the
promoters is that the canal will have a traffic of 3,000,000 tons per
annum, from which a net annual income of 709,000_l._ may be expected.
This estimate, however, did not include any coastwise traffic, nor
such goods as coal, salt, and iron, and took no account of the future
expansion of trade. Another estimate, submitted to Parliament, which
included these items, calculated on a revenue of over 9½ millions of
tons, and a net revenue of over a million and a half sterling.
Whatever the financial results of this great undertaking may be, its
future can hardly fail to be well assured, and Lancashire has reason
to be satisfied with the energy, capacity, and public spirit that have
placed such a valuable means of communication at the disposal of its
principal industrial centres.
CHAPTER XXIV.
THE ISTHMUS OF CORINTH CANAL.
One of the many schemes that have been put forward from time to time,
with a view to affording a more direct communication between the Ægean
and the Black Sea, appears likely to become an accomplished fact by the
cutting of the Isthmus of Corinth, which at the point where the ship
canal has been undertaken, is about 3¾ miles in breadth. The scheme now
being carried out, is understood to have originated with General Tarr,
who obtained a concession from the Greek Government for the purpose.
The required capital was estimated at some 30,000,000 francs, and
this sum was readily subscribed. The undertaking does not present any
very considerable engineering difficulties, although it has involved
a considerable amount of excavation, the earthwork requiring to be
removed being estimated at 10,000,000 cubic metres.
The Isthmus of Corinth obliges vessels passing from the Mediterranean
and Adriatic Seas to the Archipelago and the Black Sea to make a
considerable bend to the south. The idea of piercing the isthmus
originated several centuries before the Christian era, and the works
were actually commenced before the reign of Nero. The route across the
isthmus will shorten the distance between the Piræus and Marseilles 11
per cent.; Genoa, 12·2 per cent.; Venice and Trieste, 18·4 per cent.;
and Brindisi, 32·4 per cent. The probable traffic through the canal
has been estimated at over 4,500,000 tons. The works were commenced in
1882, following the straight course indicated by the traces of Nero’s
canal. The canal will have a depth of 26¼ feet, and a bottom width
of 72 feet, like the original section of the Suez Canal; but, as the
Corinth Canal has a total length of only about four miles, the transit
of vessels through it will be effected without the aid of passing
places. The principal mass of the excavation is concentrated within
the central 2½ miles, and the greatest depth of cutting is 285 feet.
Alluvial soil is mostly found for about two-thirds of a mile from each
end; but the central portion consists of close chalk underlying hard
calcareous conglomerate and compact sand, necessitating blasting and
the use of the pick. Depths of 33 feet are reached within 550 yards
of the coast, both in the Bay of Corinth and the Gulf of Egina, and
the dredging required at the entrances of the canal is not large. The
west entrance, at Poseidonia, is protected by two converging jetties,
forming a roadstead; and the east entrance, at Isthunia, is sheltered
by a single curved jetty on the northern side. These three jetties,
formed with natural blocks, are nearly completed. The canal will be
open throughout, as the variations in the level of the sea are very
slight; and the only large work of construction is the metal bridge of
262 feet span, which crosses the canal at a height of 170 feet above
the water level, and will carry the Piræus and Peloponesus Railway and
the road to Corinth over the canal.
It is not a little remarkable that both the Greeks and the Romans
proposed to make a canal across the Isthmus of Corinth, in order to
obtain a navigable passage by the Ionian Sea into the Archipelago.
Demetrius Poliorcetes, Julius Cæsar, Nero, and Caligula renewed the
attempt, but without success.[213] Before their time, the Cnidians had
made the same endeavour, which called forth the famous reply of the
Pythia—a reply that may be translated thus—
“Delve not, nor towers upon the Isthmian pile:
Had Jove so wished, himself had made an isle.”
The Isthmus of Corinth Canal has been cut through the tongue of land
which is situated between the gulfs of Athens and Lepantus and unites
the classic mainland with the shores of the Morea. By its geographical
position, this isthmus, as we have seen, bars the union between the
Adriatic and the Archipelago, and obliges all vessels passing from the
one sea to the other to round Cape Matapan. Its existence materially
lengthens the voyages of all ships bound from the western parts of
Europe to the Levant, Syria, Asia Minor, and Smyrna. The last-mentioned
port is the emporium to which the numerous caravans from the interior
of Asia, from Persia, and the Caucasian regions have long transported
the rich products of oriental countries still more distant. In a
similar manner it lengthens the route from Europe to the Black Sea,
which is a matter of serious importance, as from the ports on the
latter are shipped the enormous quantities of wheat and other cereals
which supply a considerable portion of Western Europe. The junction of
the waters of the Adriatic with those of the Archipelago is expected
to effect a saving in time of two days in the voyage from the harbours
of Brindisi, Ancona, and Trieste, to the Levant. It will also greatly
facilitate the establishment of local traffic, and probably lead to the
adoption of a regular system of steam communication, of which Greece is
much in want. At present, the coast is not particularly well furnished
with harbours, but those that do exist are said to be easily capable of
extension, and there is some inducement to construct new ones, as the
adjoining bays are deep, and afford a secure anchorage for vessels of
heavy tonnage.
The extreme points of the Isthmus of Corinth are Heapolis and
Kalamakis, and supposing them, like Suez and Port Said, to represent
the respective mouths of the canal, its length would not exceed three
miles at most—an insignificant cutting, so far as the actual lineal
dimensions are concerned. It was anticipated, and experience has now
demonstrated, that the nature of the material through which the Suez
Canal is excavated will constitute the principal and possibly the sole
difficulty to be contended with in future. As it is, the reduction of
the present batter of the side slopes is imperative. If not performed
by excavation, the operation will proceed spontaneously by the gradual
sliding of the sand into the water, whence it will be removed by the
dredgers, which, under any circumstances, will have a busy time of it
for some years to come. Fortunately this difficulty does not exist in
the canal in the Morea. The earth is of a tenacious character, which
will offer a better resistance to the disintegrating action of the
water agitated by the passage of ships, and the motion of screws and
paddles, and thus reduce the cost of maintenance and repair. It was
estimated that this important work could be carried out at the moderate
cost of half a million sterling. Without taking into account the number
of contingent steam and sailing ships which would avail themselves of
the passage _viâ_ the Corinth Canal, a regular traffic of the boats of
the Messageries Impériales, of the Company of Marseilles, of those of
the Austrian Lloyd’s, and of those belonging to the Italian service
was looked for. With the canal completed, Kalamakis, which at present
is but a village, was expected to speedily become a maritime town of
importance, and numerous cities, long since abandoned, and, as it were,
buried, were to be disinterred, restored to life, and ultimately to
become commercial centres, from which the mineral wealth with which the
country abounds may be exported.
On the 19th February, 1870, the concession for the construction of
the Isthmus of Corinth Canal was given to M. Maxime Chollet, on the
understanding that the works should be commenced within eighteen
months, and completed within six years. The Hellenic Government granted
to the concessionnaires all the land required for the canal, and 12,350
acres on each side, as well as the privilege of working the mines,
quarries, and forests of the State, within a distance of 19 miles of
the canal.[214] It was not, however, until 12 years afterwards that the
work was actually proceeded with, so that the terms of the original
concession were not carried out.
The canal was not formally commenced until the 23rd of April, 1882, the
first mine being fired by Her Majesty Queen Olga, in the presence of
His Majesty King George, the Diplomatic Corps, and the principal Greek
Government officials.
According to the plans ultimately adopted, the entrances to the channel
will be 100 metres in breadth, diminishing to 22 metres, and the depth
will be 8 metres.
The nature of the ground through which this channel has to be cut is
composed, according to the report of the engineers of the company, of
three distinct kinds:—
Firstly.—From the Gulf of Corinth, through a plain, consisting of sand
and alluvial soil, for the distance of 1¼ kiloms.
Secondly.—Through a mountain range, varying in height from 40 to 80
metres, of the length of 4½ kiloms.
Thirdly.—Beyond the mountain range to the sea, in the Bay of Kalamaki,
the canal will traverse a little plain of the length of 600 metres,
composed of alluvial soil and rocks.
The excavation of those parts of the canal situated in the plains
presented no difficulties, but this was not the case as regards the
mountainous part, where a mass of 8,000,000 metres of solid rock has
had to be excavated and transported to a distance, which labour,
according to the contract, had to be done within the comparatively
short period of three years.
The following plan of executing the works was decided on by the
engineers of the company, M. Gerster and M. Kauser:—[215]
1. That part of the canal situated in the plains to be
excavated by ordinary means, namely, hand labour, dredging
machines, and sand pumps. This portion of the work was to
be finished at the end of 1883.
2. At the same time as the above-mentioned work was
in progress, the upper portion of the rocky crest to be
blasted, and the refuse carried away by railway.
3. Towards the end of the year 1883 several large
dredging machines, constructed on the most approved
principles, were delivered to the company. These machines
were capable of removing 5500 cubic metres of soil in
ten hours. They were each of 300 horse-power, and were
constructed by the firm of Messrs. Sâtre and Demange, of
Lyons. They cost 550,000 fr. each.
As regards the system of excavating the rock, M. Gerster’s plan was to
sink vertical shafts to the level of the canal, by means of machines
constructed for the purpose, for which cartridges of dynamite were to
be employed at distances of 2 to 3 metres from each other, which were
to be exploded simultaneously.
The execution of this enterprise was confided to the Société des Ponts
et Travaux en Fer (ancienne maison Joret et Cie), in conjunction
with L’Association des Constructeurs. These two companies engaged to
undertake the cutting of the canal for the sum of 24,600,000 fr., under
forfeit if it is not completed within the prescribed time.
The annexed general and sectional diagrams (p. 351) explain the method
by which it was proposed to carry out the execution of the enterprise.
The Isthmus of Corinth Canal Company was compelled, in consequence of
unforeseen delays in their works, to obtain in 1887 an extension of
three years for their completion. The canal was to have been opened in
1888. The geological strata to be passed through in excavation does
not appear to have been accurately ascertained, and as a consequence
of having to work to some extent upon rock, instead of in sand or
gravel, the progress made was less than had been anticipated. For this
reason also it has been found necessary to raise additional capital
to the amount of double the original capital; that is to say, by an
issue of 60,000 additional shares of 500 francs each, bearing 6 per
cent. interest. In order that the canal may become a remunerative
undertaking, it is calculated that 3½ million francs of net revenue
must be realised annually. Whether the canal will ever realise this
financial result is doubtful, but, if it is ever completed, it will be
of undoubted advantage to commerce in saving 100 to 250 miles in the
passage from the Ægean to the Black Sea, and in avoiding the dangers of
the coast of Southern Greece.
[Illustration: THE ISTHMUS OF CORINTH CANAL.]
Meanwhile, the canal works, for which the capital was chiefly found
in France, have been abandoned, pending the acquisition of additional
funds. There are those who hold that it is little likely that the canal
will ever be consummated, and the unfortunate issue of the works on
the Panama Canal appears to justify the view that the French nation,
who are almost alone concerned, will hesitate before they put their
hands very deeply into their pockets in order to carry to completion an
undertaking which is by no means certain to be a financial success.
FOOTNOTES:
[213] Plin., t. iv. c. 4.
[214] ‘Moniteur de la Banque et de la Bourse.’
[215] These particulars are taken from a report made to the Foreign
Office by Her Majesty’s Secretary of Legation at Athens.
CHAPTER XXV.
THE RIVER THAMES.
“My eye, descending from the hill, surveys
Where Thames along the wanton valley strays.”
—_Denham._
The river Thames is in many respects one of the most remarkable in the
world. No other river has so large a commerce, no other river can boast
such a display of shipping, no other river is the highway for such a
large population, no other river has such a romantic and interesting
history. The Thames is, however, eclipsed by many other waterways as
regards natural advantages for maritime commerce. It has an extremely
tortuous, irregular, and dangerous channel; it is subject to great
fluctuations of tides; it is liable to be silted up with the deposits
of sand and sewage from its lower reaches; and it is inadequately
provided with artificial light to enable the mariner to find his way up
the stream after nightfall. These disadvantages have again and again
been the subject of serious accidents to life and limb, heavy losses to
shipping and marine insurance companies, complaints and proposals on
the part of the shipping interest, and representations to the Trinity
House, the Board of Trade, and other constituted authorities. Only
quite recently, the Chamber of Shipping sent a deputation to the Board
of Trade, in order to urge that the Duke of Edinburgh channel should be
better lighted, and it was then stated that the shifty and temporary
character of the channel made the lighting of the Thames difficult at
this point. For this reason, and owing to the influence of the tides,
steamers have generally to cast anchor off Gravesend, if they reach the
Thames after darkness has set in. This is so unpleasant an alternative
for passenger steamers that they frequently brave the dangers of the
river—much more serious, as a rule, than the dangers of the ocean—and
run the risk of grounding or collision, in order that they may reach
their destined berth or dock. Those who have had the misfortune to be
on board a vessel under such circumstances must have felt devoutly
thankful that they ever reached their destination without accident, and
must have registered a vow that they would never repeat the experiment.
Within the last few years, search lights have been shown from some
of the docks, which, although intended to assist the navigator to
his intended haven, have been found to produce the opposite effect,
inasmuch that they cast into deeper shadow a great part of the
intermediate channel. These dangers and difficulties are increasing,
as it is natural they should do, when no adequate provision is made to
overcome them.
The importance of this matter can only be fairly appreciated by giving
an idea of the magnitude of the trade that is now carried on between
the Thames and other ports. The largest amount of tonnage that entered
and cleared from the Thames in any recent year was as under:—
───────────┬────────────┬───────────┬───────────
│ Entered. │ Cleared. │ Total.
├────────────┼───────────┼───────────
Foreign │ 6,591,225 │ 4,127,045 │ 10,718,270
Coastwise │ 5,025,724 │ 1,756,565 │ 6,782,189
├────────────┼───────────┼───────────
Totals │ 11,616,949 │ 5,883,610 │ 17,500,559
───────────┴────────────┴───────────┴───────────
This represents nearly one-fifth of the total shipping trade of England
in the same year, and an average of about 48,000 tons of shipping per
day. The total value of our imports from, and exports to, foreign
countries and British possessions has in some recent years amounted,
for the port of London alone, to upwards of 200 millions sterling. The
value of our coastwise trade is not recorded, but it will probably be
sixty or seventy millions more, which would bring up the total annual
value of the shipping trade of the Thames to close on 300 millions. The
extent to which this trade has increased within the last twenty-five
years has been quite phenomenal. In 1860 the total entrances and
clearances of the port of London amounted to only 9,506,000 tons,
so that the trade has nearly doubled within twenty-seven years.
The tonnage entered and cleared over the last few years represents
an average of over four tons per head of the population of the
metropolis—taking the latter at, say, 4 millions over the four years
ending 1887.