[Illustration]
When the forms have been removed from the walls and roof the floor can
be laid. Excavate the ground to a depth of 4 inches below the finished
floor level. Mix and lay the concrete as described on page 31.
The concrete milk vat should be built at the same time and as a part of
the floor. See description on page 82.