CHAPTER XIV

THE IRON HORSE IN AUSTRALASIA

I

Probably owing to its somewhat remote geographical situation in

relation to the busy centres of the northern hemisphere but a hazy

conception prevails of the great activity that has been, and still is

being, maintained in regard to railway conquests in the far southern

continent. Although large expanses of its territory still rank as

_terra incognita_, the iron horse is tearing the veil from the unknown

with amazing rapidity; it is fulfilling the dual role of exploring and

colonising force simultaneously. Several imposing feats of engineering

have been consummated in the task of wresting the interior stretches of

the country from oblivion.

As is well known, the island continent is divided into five States,

and each has worked out its own salvation by means of an independent

railway system, though the practice has been the same in each instance.

The early lines were laid through the fringe of settled territory along

the coast, and some time passed before the rails ventured inland. As

the agricultural, forest and mineralogical wealth of the country became

known, however, and attracted large flocks of settlers, the map was

rolled back by the railway in the various states. Up to the year 1870

railway expansion developed very leisurely. Then there came a sudden

awakening. Railway development went forward with a tremendous rush, and

this feverish expansion has been maintained steadily ever since.

The fact, however, that there was no general plan of campaign has in

a certain measure produced confusion. Each State had to consider its

individual purse and to calculate carefully how much it could afford

in the work of railway colonisation. The result is that there is a

sad lack of uniformity among the gauges. Indeed, Australia is worse

in this respect to-day than was the United States thirty years ago.

In the latter country three gauges struggled hard for supremacy, viz.

the narrow 3 feet 6 inches gauge, the standard gauge of 4 feet 8½

inches, and the wide gauge of 5 feet 6 inches. In Australia the gauges

vary from 2 feet 6 inches to 5 feet 3 inches. For instance, New South

Wales is threaded entirely by the standard gauge of the world--4 feet

8½ inches--for some 4000 miles. Its neighbour to the south, Victoria,

favours both the gauge of 5 feet 3 inches and that of 2 feet 6 inches;

its western neighbour, Western Australia, has the wide gauge and the

intermediate gauge of 3 feet 6 inches; Queensland adopted this gauge

also. With such a variegated system each State becomes isolated so

far as through railway communication is concerned; change of carriage

at the borders is inevitable. This disadvantage is experienced

emphatically when it comes to the transportation of merchandise.

The locomotive made its debut in Australia in 1885, in which year the

first length of railway from Sydney to Paramatta in the oldest colony

was opened. From that small beginning extension did not proceed very

rapidly, for while the population of New South Wales remained small

and scattered, the outlook from the financial point of view was not

promising. Consequently the network only extended over 473 miles 20

years later. Since 1875, however, the iron tentacles have grown with

tremendous speed, no less than 2,995 miles of track having been laid in

the course of 32 years.

In the early days, while money was scarce, the cost of construction had

to be kept down very severely. The coast of New South Wales is hemmed

in by a high mountain range, set from 20 to 70 miles back from the

water’s edge. This barrier forms the rim of a tableland some 200 miles

in width, extending from the extreme northern to the southern border

of the State, and runs roughly parallel with the shore. Consequently

it was obvious that whatever direction the railways might take to tap

inland territory, the mountains had to be crossed. The State railway

system is divided into three divisions, the main northern, southern and

western lines respectively, and the range accordingly is crossed at

three points.

The first subjugation of this rugged, frowning barrier was brought

about by the urgent necessity to connect Bathurst with the coast at

Sydney. Years before gold had been discovered on the highlands a

flourishing little community had sprung up and had founded a promising

town. But the inhabitants felt their isolation keenly, and they

petitioned the Government relentlessly for railway communication. At

that time the line had gained a point known as Penrith, about 22 miles

from Sydney, lying at the foot of the mountains, and heavy expensive

work confronted the engineers anxious to proceed farther inland.

Moreover, owing to the steepness with which the edge of the plateau rim

dropped into the valley, it was realised that the metals would have to

be lifted quickly to a great height. As the engineer was handicapped by

financial stringency he was compelled to resort to heroic measures.

He set to work and succeeded in reducing the costliness of the

earthwork by adopting grades of 1 in 33, introducing what is known as

a “zigzag.” The track, instead of climbing the bank continuously in

terraces, with curves connecting the successive tiers, makes a diagonal

cut up the cliff face to a dead-end. From this point another stretch of

line cuts similarly up the flank, to terminate in another dead-end, to

lead to another diagonal rise, and so on until the upper desired level

is gained. Meiggs introduced a similar system when he built the Oroya

railway to overcome the Andes, and in the days the “zigzag” was carried

out it was considered the only means of solving the situation with the

minimum of expense. The grades on the “zigzag” were as heavy as 1 in

30, but their introduction served to lift the track to the summit of

the tableland 3,500 feet above sea-level at a distance of 28 miles from

the capital.

Some twenty years ago this “Small Zigzag,” as it was called to

distinguish it from the similar and more imposing work of the same

class on the opposite side of the range, was cut out. A direct descent

was provided by driving a tunnel through the spur which the zigzag

followed, and the curves were eased. The re-alignment cost about

£50,000, or $250,000, but the interest on this capital expenditure is

less than the saving in the expense of working the trains over this

section.

Gaining the top of the spur, the railway continues a gentle ascent

until it notches an altitude of 3,658 feet, when the descent of the

western slope commences. The Lithgow valley is the objective, and the

precipice tumbles down suddenly for 600 feet. To carry the line down

the mountain-side appeared impossible, and when the engineer-in-chief,

the late Mr. John Whitton, surveyed the scene, to say that he was

perturbed fails to express his thoughts adequately. He could overcome

the descent fairly easily if he were permitted to carry out tunnelling

operations, whereby he would secure both easy grades and curves. But he

was overruled. Tunnelling was considered too expensive and could not be

countenanced; in fact, the whole conquest of the mountains provoked a

long-drawn-out and bitter controversy.

The general attitude towards railways, and the slight knowledge

concerning their construction and operation in those early days,

is afforded from the engineer-in-chief’s struggle with the

Governor-General for permission to follow his own inclinations, which,

as he pointed out, might entail heavy initial expenditure, but would

pay in the long run. When the scheme was unfolded and the engineer

admitted that the work, however accomplished, must prove costly, the

Governor-General pointed out that a highroad had been built over the

mountains for pedestrian and wagon traffic. Consequently he suggested

that this channel should be used, that the lines should be laid in the

middle of the road, and that the trains should be hauled by horses! The

engineer had considerable difficulty, and had to resort to prolonged

communications and lengthy explanations, to impress upon the official

mind that the locomotive was the best means of hauling trains. He

became so insistent, and persecuted his demands so relentlessly that

the Governor-General, probably sick at heart over the whole thing, gave

way at last to the engineer’s importunities, but stipulated that the

constructional cost should not exceed £20,000, or $100,000, per mile.

By imposing this financial drag the official possibly thought

that he had discomfited the engineer. But this was by no means

the case. Certainly it ruled tunnelling out of consideration as a

means of overcoming difficulty, but it only served to stimulate the

engineer-in-chief to something more startling. As he could not make his

way from the summit to the lower level by the direct route he decided

to saw his way down the precipice. The rocky wall rose up for about 470

feet so steeply as to defy a mountain goat to secure a foothold. The

surveyors had to be lowered from the top by means of ropes and chains

to carry out their tasks with the transit and level to plot the path

for the line. Here and there were wide, deep V-shaped rifts breaking

the profile of the precipice. Massive arches in masonry were thrown

across these obstructions, and a path was cut in the side of the cliff

to carry the track.

The line struck along the face for about a mile, descending steadily 1

in 42 feet. It then came to a dead-end. Another mile of track with the

same falling grade wound backward to terminate in a second dead-end,

and lower down came another mile of descent in the reverse direction

to gain the valley. It required 3 miles of line to carry the track

downwards 600 feet. When one stood at the top of the “Great Zigzag” one

saw the three tiers of track sawing the slope, to disappear finally in

the depths of the valley. The engine in the descent pulled the train

down the top side of the serrated road to the dead-end, pushed it

backwards along the second gallery to the second dead-end, and finally

hauled it to enter the depression.

The “Great Zigzag” for years stood as a striking monument to the

ingenuity responsible for the work, for it is even more daring than

Meiggs’ famous V-switches. As time passed and the railway traffic of

the State increased, the heaviness of the grades, the sharpness of the

curves and the time occupied in negotiating the zigzag, reacted more

and more adversely upon the economical operation of the line. Moreover,

it constituted a serious menace to safety, although fortunately it

never was the scene of an accident. Still, a proposal for its abolition

was advanced so far back as 1885, although it was realised that heavy

and costly reconstruction was the only alternative.

The proposed deviation was discussed more or less for several years,

but was deferred from motives of expense. But when the traffic had

gained the respectable proportions of some 2,585,000 tons in 1908, it

was recognised that the inevitable could be postponed no longer. It was

pointed out that if there were no zigzag the number of goods trains

using this part of the line could be cut down by over 30 per cent.,

since a single locomotive would be able to handle a heavier load and

longer train than was possible at that time, while so far as passenger

traffic was concerned, no less than 686 hours could be saved every

year, and operating expenses could be reduced 50 per cent, upon this

division.

[Illustration: BEFORE THE EXPLOSION

THE BLAST

THE CLIFF-FACE DISLODGED

THE CLIFF-FACE BROKEN UP

A HUGE BLAST

35,000 tons of rock were dislodged by 10,125 lb. of explosives.]

Accordingly the deviation was commenced. The surveys for the new

line had been prepared by Mr. Henry Deane, M.INST.C.E., while

engineer-in-chief for railway construction. He proposed a series

of tunnels built on a gradient of 1 in 90 running through a number

of spurs projecting from the main range, and although these were

intercepted by gulches the latter could be filled with the rock

excavated from the tunnel borings. The line in many places hugs steep

precipices where the land falls away vertically for a distance of

1000 feet or so into the Kinambla Valley.

[Illustration: THE PUTTAPA GAP BRIDGE, 200 FEET IN LENGTH]

[Illustration: THE HOOKINA CREEK BRIDGE

In the summer the watercourse is dry. Note the measures adopted to

protect the piers from the force of the flood waters.

TWO VIEWS ON THE SOUTH AUSTRALIAN GOVERNMENT RAILWAYS]

The task was commenced in July 1908 under the guidance of Mr. James

Fraser, M.INST.C.E., the engineer-in-chief for existing lines, to whom

I am indebted for this information, and in a short time 1000 men were

engaged in boring the tunnels and making the deep, heavy cuts through

the sandstone rock. All tunnels were attacked simultaneously, and

the blasting assumed heavy proportions. In one case a shaft was sunk

practically to formation-level. When completed it was charged with

about 10,000 pounds of blasting powder and 125 pounds of gelignite.

It was fired electrically, and the splitting force of the explosives

dislodged 35,000 tons of rock. In another case 1000 pounds of blasting

powder were tamped home in the face of a cliff, and 10,000 tons of rock

were shivered to be used for embanking purposes.

In order to rush the work through at tip-top speed, special

arrangements were made to facilitate the handling of the necessary

supplies and men, as well as the operation of the tools. As the new

line passed 350 feet below the old line, connection between the two at

this crossing was effected by means of a funicular railway with a grade

of 1 in 1.87. The material was brought by rail to the upper end of this

temporary line, and from a special siding was dispatched direct on to

the works. A small electric generating station was set up, and wires

for the transmission of current for power and lighting were strung

along the route from end to end to compress the air to drive the rock

drills, for the motors actuating the ventilating fans and also the

water-pumps.

The scheme as originally planned provided for the building of 6 miles

858 yards of new double track, which represented a saving of 22 yards

upon the line that was being displaced, though the curves and grades

were easier. It was estimated that the earthworks would involve the

handling of 466,000 cubic yards apart from the tunnel borings. Eleven

tunnels were planned, representing a total length of 2,991 yards,

but during the work it was decided to cut out one tunnel as the rock

was found to be shattered. Consequently it was converted into an open

cutting, the sides of which are 132 feet high. Some idea of the speed

with which the task was pushed forward may be gauged from the fact that

in 11 months 410,000 cubic yards of excavation were completed, 1¼ miles

of permanent way were laid with a single line, and 1,430 yards of the

tunnelling were completed. The total cost of the work was estimated at

£256,000, or $1,280,000. Its recent completion, although it relegates

an imposing engineering achievement to the limbo of things that were,

has resulted in the creation of another achievement equally as notable.

In building the north coast line which connects Sydney with the

Queensland border, a feat of a totally different character from the

zigzag was completed. This is the massive bridge, 3000 feet in length,

which carries the track across the Hawkesbury River, 36 miles distant

from the capital. It is divided into seven spans, each of which

measures 416 feet in length, supported on substantial masonry piers.

The erection of this structure, which still ranks as the largest work

of its type in Australia, occasioned considerable difficulty, both in

regard to the piers and the setting of the steel-work into position.

Indeed, it is doubtful as to which section of the work provoked the

greater anxiety. The difficulty with the piers was the great depth to

which the engineers had to descend to secure a foundation, because in

mid-stream the 40 feet of water flows over a bed of mud ranging up to

120 feet in thickness.

The only practicable means by which this essential subaqueous work

could be carried out was by sinking a huge steel cylinder filled

with concrete. The bottom section of this huge tub, or caisson, as

it is called, was closed, and after it was completed on shore it

was towed out to the site where the pier was to be erected and sunk

by the introduction of the concrete. The under side of the caisson

was fitted with a knife edge, by means of which it could cut its way

through the soft soil, the driving force for this purpose being the

weight of the superimposed concrete. The mud over the area representing

the superficies of the cylinder bottom was removed from the inside

to enable the mass to settle down. The steel shell was built up

continually from the water-level in rings, until a solid foundation

was gained. When this was reached and deemed satisfactory the spaces

through which the spoil from below had been withdrawn were likewise

filled with concrete, so that the contents of the cylinder really form

a huge pillar of concrete homogeneous from end to end.

The conditions prevailing also compelled each span to be completed

near the bank upon a pontoon, the steel-work being supported upon a

heavy scaffolding. The pontoon was somewhat shorter than the span of

steel which projected an equal distance over either end of the former.

When all was ready, and when the tide was approaching its highest

point, the pontoon, with its ungainly load, was towed and was warped

gently between two adjacent piers, in such a way that the ends of the

span were brought into their relative positions upon the masonry. The

pontoon was then made fast, and the actual settling of the steel-work

was left to the movement of the tide. As the river fell, carrying the

pontoon with it, the span descended until in due course the ends rested

on the masonry. The water still falling, the scaffolding presently

dropped below the steel-work, leaving the latter clear in position.

Finally, when the tide had fallen still more, the pontoon was cast off

and drawn away, leaving the two piers connected by the steel.

Such methods demand extreme care, unerring judgment, and a readiness

to meet any emergency on the part of the engineers. The American

bridge-builders who carried out this undertaking had several exciting

incidents. The most thrilling and anxious was when one of the pontoons

got out of control with its precious freight and became stranded on the

bank, where it had to remain in a dangerous listing condition until

the tide rose again, to enable it to be floated off and towed to its

destination.

In comparison with the New South Wales railways, the lines of the other

States lack outstanding features, yet their work has been attended

with peculiar difficulties. In South Australia, where settlement has

not proceeded so rapidly as in the adjacent State, the policy is to

build the lines with the minimum of cost to meet the demands for cheap

railways to connect communities scattered over a large area. That

this is a remunerative practice is borne out by results. Although

the wide gauge of 5 feet 3 inches is adopted on what may be called

the trunk lines extending from Adelaide to the eastern border, to

effect junction with the Victorian railways, thereby securing through

railway communication between Adelaide and Melbourne without change of

carriage, the greater part of the railway system is the narrow gauge of

3½ feet.

The railway thus acts as a pioneering campaigner in the fullest sense

of the word, and in this way it has been possible to push the iron road

towards the heart of the rich inland country so far as Oodnadatta.

Queensland is practising the same principle, three lines having been

forced slowly towards the eastern boundary of that State in three

roughly parallel lines from three different points on the coast--though

the latter in turn are connected. In due course the inland ends of

these lines will be joined up, and there will be a complete circle from

which spurs can be driven to meet development.

Railway construction in South Australia is noticeable because of the

cheapness with which it is carried out in the first place, with an

accompanying economy in maintenance. The whole of the work is effected

for the most part by the Government department, small contracts for

construction only being let on rare occasions. This policy, combined

with the application of every modern appliance which can establish

reason for its utilisation, has been eminently satisfactory from every

point of view.

At the present time the tendency is to anticipate the settler, and

thus, by the provision of transportation facilities, to attract

the farmer into the district. The reverse is generally the method

adopted--the farmer establishes himself on the land, and then when

there is an agitation for transport the railway is advanced. In

this State, however, the railway creates the situation, and in this

manner a large area of good agricultural land has been opened up for

cultivation. This is the policy which Mr. James J. Hill followed in

the western United States, and its soundness in the course of time is

demonstrated conclusively from the enormous traffic which flows over

his systems.

In order that this pioneering may not saddle the South Australian

Government with an unremunerative heavy debt, the line in the first

instance is of the lightest possible description. As the country

traversed develops and more traffic accrues to the road, rendering

improvement advisable, the track is overhauled and relaid with heavier

metals, the lighter rails being shipped to another point to enable the

pioneering process to be continued.

This is an elastic system eminently adapted to such a country as South

Australia, which is still in its infancy, and where the demand for

railway communication is confined almost entirely to agricultural

requirements and to the transportation of farming produce, especially

in the more remote up-country districts.

The Railway Conquest of the World · 第 14 / 26 章