CHAPTER XI

CECIL RHODES’ DREAM--FROM THE CAPE TO CAIRO

I.--_Northwards from Cape Town_

Few phrases have become so familiar to the ear as from the “Cape to

Cairo.” It is a phrase that has made history, though perhaps not so

rapidly as its creator anticipated. When Cecil Rhodes first cast

his eyes from north to south, and conceived the idea of binding the

two extreme points of the African continent together, there is no

indication that he experienced great difficulty in finding a title for

his undertaking. There was Cairo in the north, and Cape Town in the

south. He aspired to join the two by rail. Consequently, from the “Cape

to Cairo” was obvious. Probably the alliteration caught his fancy, and

conveyed his complete thought so forcibly in three words, and in a

manner that could not fail to impress the public, that it inadvertently

flew through his mind.

When the materialisation of this vision commenced, the general

knowledge of the interior of the continent had not been widened very

appreciably since the travels of Livingstone and Stanley. It was “Dark”

in the truest sense of the word, and conquest either by the mysteries

of peace or the arts of war was necessary before the steel rail could

be driven either northward or southward. However, it was determined

to carry the idea to fulfilment--the question of the penetration of

the hostile country could be taken in hand when the railway was within

measurable distance of its borders so far as Rhodes was concerned,

while in the north the English Government had decided to settle terms

with the Mahdi.

There was one benefit accruing from the empire-builder’s dream--he gave

the engineers of South Africa elbow-room in which to display their

ability within certain limits. It might be said that he inaugurated a

new railway-construction policy so far as South Africa was concerned.

The railway-builders had an extensive territory to cover, and they

appeared to cherish the belief that the best means by which this

conquest could be achieved was upon the most expensive lines possible.

Thus, for instance, the railway network in Natal, the Transvaal and

Orange Free State cost about £15,000, or $75,000, per mile, and those

of Cape Colony about £10,000, or $50,000, per mile--sums out of all

proportion to the railway needs of the time, and which served to commit

the countries to a heavy capital outlay and interest charges. When

Cecil Rhodes outlined his project he set himself to a limit of about

£5,000, or $25,000, per mile.

Such a line was a pioneer road in the fullest sense of the word, but

it would suffice to meet the demands of the country for many years

to come, and could be improved as circumstances demanded. The time

will come, doubtless, when a standard-gauge road from the waters of

the Mediterranean to the southern end of the continent will become

imperative, but a few decades will have to pass before the line of 3

feet 6 inches gauge becomes inadequate.

The Cape to Cairo is remarkable in many respects: in fact, it might be

described as a string of record-breaking feats in railway engineering.

In the first place it was the first trans-continental road ever to be

driven longitudinally through a continent--the coast to coast lines in

other parts of the world cut across the continent from east to west.

When completed it will be the longest continuous trunk iron road ever

built. In its length are comprised both the highest and longest bridges

in Africa, in its realisation the highest speed in track-laying has

been recorded, and it has been driven steadily forward under conditions

such as never have attended the realisation of any comparative

project--war, plague and famine.

When the scheme was commenced the railways of the southern colony

had penetrated 647 miles up-country from Cape Town to the diamond

mines at Kimberley. Consequently, Diamondopolis was selected as the

starting-point for the northward advance, through the hinterland now

known as Rhodesia. The first rail out of Kimberley was laid in 1889,

and by October, 1894, it had gained Mafeking, 223 miles beyond.

While this part of the work was under way the colonisation of

Mashonaland had proceeded, and had progressed so favourably that

the railway’s advance became an urgent necessity, especially as the

Matabele under Lobengula were giving signs of trouble, and it was

essential that the latter should be subdued. So in 1896 the dull, grey

snake resumed its tortuous crawl to the north. Further trouble was

experienced at this juncture, and retarded operations to a material

degree. The deadly rinderpest broke out, and swept off the settlers’

cattle like flies. Transport was paralysed, and the engineers were

called upon to perform a superhuman task to pour supplies and material

forward. As animals were unavailable, traction engines had to be

brought up-country to ply between the point where the locomotive

stopped and the construction camps strung out ahead.

However, Rhodes decided that the rails must reach Buluwayo before

the end of 1897. Seeing that 492 miles divided the railhead from the

latter point, this was no mean order; but Messrs. Pauling & Co., the

contractors, promised that his wishes should be fulfilled. Large forces

of natives were whipped up, and by superhuman effort the apparently

impossible was achieved, the 492 miles of metals being laid in 500

working days.

As might be supposed from the low cost of the line (£4,500 or $22,500,

per mile), the engineering work was not of an elaborate character.

Rapidity of construction, combined with low cost, were the two

governing considerations that had to be borne in mind, for the sooner

railway transportation was provided, the earlier settlement would take

place. The terms governing construction demanded that the line should

be of such a character as “would be capable of effectually conveying

traffic at a speed of twelve miles an hour on completion, and that

grades and curves were not to be sharper and heavier than generally

prevailed upon a line of this gauge.” Ballasting was only to be used on

such portions of the line as was necessary to ensure the safe running

of the trains during the rainy season.

In laying the road very little regard was paid to formation, and

wherever the surface of the ground was even it was followed, the steel

sleepers being packed with the minimum of ballast to give a moderately

smooth running top. The shallower streams and rivers were not bridged,

but the railway was carried across over a ford. If the water rose above

the track a few inches, a thrilling spectacle was offered when a train

crossed. It would creep carefully down the bank and crash full tilt

into the water, sending up a column of spray which entirely obliterated

the front of the engine from view. Later, the line was overhauled and

brought into conformity with modern requirements, bridges of steel

being introduced to span all obstructions of this character. Timber was

impossible, owing to the ravages of white ants, though creosoted wood

was found to offer a substitute for the metal for a short period, and

was adopted sparingly.

Buluwayo lies at an altitude of 4,400 feet, and from this point the

line falls steadily until it gains the Gwaai River, 1,200 feet lower.

Crossing this waterway, the line makes a straight cut across the flat,

sandy and wooded country for 71 miles as the crow flies, to enter the

Wankie coalfield.

In this district the surface run could not be continued, and

consequently heavy cuttings and embankments had to be carried out over

a distance of 59 miles.

Beyond the Wankie coal territory, and 282 miles north of Buluwayo, the

line ran up against the first serious physical difficulty, but one

of such proportions as to make amends on the part of Nature for the

easiness of the grading hitherto. This was the Victoria Falls on the

Zambesi River, and the location of the line compelled a crossing of

this magnificent waterway just below the cataract, where the water,

after tumbling over the ledge, is forced through a deep, narrow gorge

400 feet in depth.

The situation demanded the consummation of some monumental piece of

work. The Niagara gorge had been bridged, but the task of spanning that

chasm was mere child’s play in comparison with that confronting the

engineers below the Victoria Falls. The cliffs are sheer practically,

for the canyon through which the water rushes for some 20 miles is but

a fissure in the earth’s crust.

The surveys, which were carried out with great difficulty, showed that

the break would have to be bridged in a single span about 500 feet in

length from brink to brink, with the rails over 420 feet above low

water. For purposes of comparison, it may be mentioned that, although

the structure of the same type thrown across the Niagara gorge to carry

the Grand Trunk railway from Canadian to American soil has a main

span 50 feet wider, while the bridge itself is almost twice as long,

the rails are laid only a little more than half the height above the

water--226, as compared with 420 feet.

One early difficulty was the establishment of communication with the

opposite bank, to avoid a long detour of about ten miles in order to

cross the river. First, in order to bring the camps perched on each

cliff closer together, a telephone wire was thrown across the ravine.

This frail connection was completed in an ingenious manner. A thin

string was tied to the stick of a rocket which was fired across the

gorge. The opposite party secured the stick and end of the stout twine,

and by its means hauled across a thicker length of string, which in

turn was followed by one still stouter, with which the telephone wire

was hauled across. In this way the opposite camps were brought as

closely into touch with one another as if they were side by side on the

same bank. Previously, attempts had been made to fly a string across by

means of a kite, but the upward rush of eddying air from the vortex of

the water caused the kite to become the sport of the wind and to play

sorry pranks, without gaining the opposite bank. The complete success

of the rocket caused a similar cycle of operations to be repeated, only

in this case, instead of hauling a telephone wire across the gorge, a

marked wire was handled, the idea being to measure accurately the width

of the gap, a spring balance being introduced at one end to compute the

extent of the “sag” of the wire for the purposes of calculations.

The result of these investigations served to countercheck the surveys,

which were found to be strikingly correct, and the design of the bridge

was taken in hand immediately by Mr. G. A. Hobson.

Actual construction was commenced without delay, the task being

undertaken by the Cleveland Engineering & Bridge Building Company

of Darlington, who, by the successful completion of this task, once

more emphasised the predominance of the British bridge-building

engineer. The main span is a graceful curve of steel springing from the

cliff-face on either side, the latter being excavated for the purpose

of securing the foundations. As construction was possible only on the

cantilever principle from either side, facilities had to be provided

for the transportation of material as it was brought up by the railway,

from the south to the opposite cliff, and for this purpose an overhead

cableway was slung across the gorge. This vehicle of transport was

employed not only for the building of the bridge, but also for the

conveyance of other necessities for the railway, as the latter was

pushed ahead from the north bank while the bridge was being erected.

Workmen were also slung across the gorge by this means in a little

cage, and occasionally visitors who were anxious to experience a new

sensation made the trip at a cost of 10_s._, or $2.50 per head.

[Illustration:

_Photo by courtesy of Cleveland Engineering & Bridge-Building

Co., Darlington_]

THE GREATEST BRIDGE IN THE WORLD

The steel link springing in a single span of 500 feet from one cliff

to the other over the Zambesi River just below the Victoria Falls. The

trains pass across the gorge 420 feet above low water. Observe the net

which was suspended below to catch falling tools and workmen.]

One feature of the undertaking was the extreme care taken to protect

the workmen from certain death in the river below if they slipped from

their precarious perches in mid-air. A heavy, strong net was slung

across the chasm beneath the actual working point to catch “boys and

tools should they inadvertently drop.” The two ribs of steel were

pushed outwards from either bank, and finally met in the centre, where

the final bolts, securing first the two sections of the bottom members

together, were slipped in without any untoward incident. At the point

where the maze of steel springs from the cliff-face the bridge measures

105 feet from the bottom to the top member, while at the crown of the

arch the depth is 15 feet. The width at the rail-level is 30 feet,

while the bottom curved steel ribs, at the point where they are secured

to the rock, are about 54 feet apart.

[Illustration: SETTING UP THE WORLD’S RAILWAY BUILDING RECORD IN AFRICA

Natives laying 5¾ miles of track in 10 hours, on the Cape to Cairo

Railway.]

Notwithstanding the difficulties, attending the erection of such a

massive bridge upon such a site, construction was carried out so

rapidly that the first train was enabled to cross the structure within

about eighteen months of work being commenced. The celerity with which

this task was completed was striking, bearing in mind that native

labour was employed for the most part, under the supervision of English

foremen and engineers.

At the time it was built it ranked as the loftiest bridge in the

world, but it has been deposed since from that premier position by the

wonderful Fades viaduct which spans the Sioule River in the French

province of Puy de Dôme, where the train crosses the water at a height

of 434½ feet.

By the time the Victoria bridge was able to permit trains to pass from

bank to bank, the end of steel had been hurried towards Kalomo, the

capital of North-Western Rhodesia, 1,733 miles from Cape Town. On this

section another remarkable record was established. The engineer, Sir

Charles Metcalfe, Bart., was in the field on one of his periodical

visits, and was accompanied by an interested French engineer, who had

built railways in French West Africa. The latter was greatly interested

in the progress of the Cape to Cairo line, but observing the methods of

the native workmen, ventured to ask how many miles of track could be

laid per day.

“Well, what do you think we can lay?” asked Sir Charles Metcalfe.

“Oh, I don’t think you can lay more than half-a-mile. That seems to me

a fair estimate,” remarked the French railway-builder.

The English engineer had a brief conversation with his lieutenant in

charge of the rail-laying operations, and the latter in a few brief

words galvanised the whole of the crew into electric movement. In

twenty minutes the track had advanced a quarter of a mile before the

astonished French engineer’s eyes. He scarcely could credit what he had

seen, and left the spot with a high regard for the English engineer’s

organisation and methods of handling the natives to be able to wrest

such a spurt at a moment’s notice.

This incident impressed Sir Charles Metcalfe, and, after a chat with

the English overseers, foremen and engineers surveying the placing of

the 33-feet lengths of steel upon the ground, it was decided to make an

experiment just to see what could be accomplished under an emergency

with native labour. The black men were marshalled up for a full day’s

work, and were urged to let themselves go, the desire of establishing a

record being communicated to the more enterprising spirits. The natives

love a contest, and they girdled into the work with astonishing zest.

They did not seem to tire, and they spurned the heat. The result was

that when the ten hours’ labour was completed for the day the steel had

crept forward no less that 5¾ miles--a world’s record. Yet everything

proceeded so smoothly that it appeared, from the stranger’s point of

view, as if work were being carried out at the normal rate of a mile a

day.

This result, with native labour, was remarkable. The engineers in

charge of the wonderful track-layer used in America point to the speed

with which the metals can be laid with its aid. Yet it comes somewhat

as a shock to their pride to learn that their best performances of 3 to

4½ miles a day can be exceeded by unskilled black men, with no tools

whatever.

From Kalomo the engineers pushed north-eastwards to Broken Hill,

280 miles beyond. In this stretch, however, another obstacle had to

be overcome. This was the Kafue River, which is the most important

tributary to the Zambesi River, and indeed forms one leg of this great

waterway. The great width of the Kafue River, 1,300 feet, called for a

lengthy bridge. Although the waters are shallow during the dry season,

the average depth being 9 feet, in the wet season, however, the river

rises to 17 feet or so. It is a comparatively sluggish waterway, the

speed of the current being about 3 miles an hour.

Mr. G. A. Hobson was responsible for the design of this bridge also,

and he decided that a light structure, divided into 13 spans each of

100 feet, would meet the case. The actual construction was carried

out by Mr. A. L. Lawley as supervising engineer on behalf of the

railway-builders. The bridge is of the lattice girder type, the trains

running through the bridge. The whole of the steel-work was prepared

in England, shipped to Cape Town, and then transported 2000 miles up

country by railway to a yard improvised on the river bank, where the

ribs of steel were assembled to form the spans. In addition, a pontoon,

likewise of steel, was sent up in pieces in a similar manner, assembled

on the bank and launched. This pontoon was utilised to float the spans

into position, and also to convey material across the river to enable

the grade to be pushed ahead while the waterway was being spanned. The

pontoon was pulled from bank to bank by means of an endless wire cable,

driven by a steam engine.

The spans are supported on masonry piers, each 18 feet wide by 8

feet thick. Mr. Lawley found the river-bed to be composed of rock

and gravel, which gave a first-class foundation, and favoured the

expeditious erection of the piers. Consequently he concluded, if the

piers were pushed forward at low water, that it would be possible to

set the steel-work directly the river once more gained flood-level,

and arrangements to this end were carried out. Timber coffer-dams were

built around the sites for the piers, and by the aid of pumps the

interior was kept clear of water to permit the workmen to achieve

their stone-setting task within under the most favourable conditions.

While the piers were progressing other gangs of natives were hard at

work in the improvised shipyard riveting the steel-work together. Each

span measured 100 feet long, 14 feet in width, 20 feet in height, and

weighed 56 tons. The pontoon itself measured 95 feet long by 45 feet

wide.

Work continued so favourably that by the time the masonry work on the

piers was completed the spans had been assembled, and all was ready

for transhipping them from the yard to their respective positions on

the piers. Novel means for transporting the weighty and bulky masses

of steel were adopted. The pontoon was brought endwise against the

river bank and made fast. A length of railway track was laid from end

to end along the deck of the pontoon, and was brought against the ends

of another short track running down the river bank, thereby making a

continuous length of railway line. As the completed spans were ranged

side by side in the yard at right angles to the river, they had to be

hauled sideways for some distance. Rails were laid under each end of

the spans at right angles to the railway and were well greased so as

to become a kind of “ways” such as are used to launch a vessel. Gangs

of natives tugged at the span to haul it broadside until it rested on

the railway line, which also was lubricated. Then two locomotives were

brought up to the rear end of the span, and by sheer steam force pushed

it down the bank railway on to the pontoon, where it rested fairly and

squarely, and overhanging equally each end of the pontoon, which was

five feet shorter than the span.

The pontoon was then released from its moorings and was hauled out

into the stream by means of the endless cable, until it came centrally

between the two piers on which the span was to be placed. From each

pier a hawser was passed to stanchions on either end of the pontoon.

The endless cable was slackened, and the pontoon, with its novel cargo,

was permitted to drift slowly down-stream towards the space between

the two piers, being guided in its course by manipulation of one or

the other of the two hawsers. In this manner the craft was steered

delicately into position and was made fast. The actual transference

of the span from the pontoon to the masonry bed was carried out by

hydraulic jacks, which lifted the whole mass of steel. When the jacks

were released, the ends of the span rested firmly on the two piers. By

hauling on to the endless cable the pontoon now was drawn clear of the

bridge to return for another load.

This novel method proved so completely successful that the 13 spans

were transferred from the bank and set in position within the short

space of 8 days!--half the time the engineer had computed as being

requisite for the operation. The whole undertaking was accomplished in

record time, bearing in mind the peculiar conditions prevailing in the

heart of Africa, and the use of native labour; for, from the time the

first move towards the erection of the piers was made, to the setting

of the last span, only five months elapsed. The total cost of this mass

of steel, weighing 728 tons and stretching in an unbroken line for

1,300 feet across the river, was £50,000, or $250,000.

When Broken Hill was gained, 2,013 miles from Cape Town, construction

was brought to a stop. The mastermind had passed away some time before,

and the colleague who had assisted Rhodes when other financial magnates

turned a deaf ear to the project, had also joined the great majority.

By the time Broken Hill was gained, £8,000,000 (or $40,000,000) had

been sunk in the enterprise. For months the stack of 2000 tons of

steel for the resumption northwards remained untouched, through lack

of funds, though Mr. Alfred Beit had left £1,500,000 (or $7,500,000)

towards the continuation of the work. Then the mineral wealth around

Katanga in the Congo Free State, which was under exploitation, demanded

transportation to the coast. Accordingly, the line was pushed on to the

border of the adjacent country. Rhodes’ objective was Kituta, at the

southern end of Lake Tanganyika, 450 miles north of Broken Hill, which

point marks the limit of British sway in South Africa, a distance of

about 2,700 miles by rail from Cape Town.

When Rhodes’ vision presented the railway stretching in an unbroken

thread from north to south, the knowledge of the country lying between

the Zambesi and the Nile was somewhat scanty. As the scheme progressed

it became known that Lake Tanganyika was hemmed in by precipitous

mountains, where railway-building would soar to an enormous figure

per mile. On the other hand, the lake is a splendid sheet of water,

offering excellent navigation throughout its length of 400 miles.

Therefore, there should be no reason why the example of the Russian

Government, in regard to the use of ferry steamers on Lake Baikal,

should not be emulated to transport trains intact from Kituta at the

southern, to Usamburu at the northern, end of Lake Tanganyika.

Ninety miles north of Usamburu is Lake Kivu, and the dividing neck of

land offers no great difficulties to construction beyond a gradual

rise of 2000 feet. Reaching Lake Kivu, which is also surrounded by

lofty ridges, the railway would once more take to the water for

some 60 miles. Continuing northwards, there is another stretch of

rising country to be crossed, where the track would be lifted to its

greatest height, or summit level, between Cape Town and Cairo, to

gain the head of Lake Edward, which is 75 miles in length. Owing to

the flat character of the country around this sheet of water lending

itself to cheap railway construction, probably it would be found

preferable to keep to the land, especially as the country is healthy,

thickly populated, and offers great promise of becoming wealthy under

commercial development.

But the line, after leaving Lake Kivu, has to pass through Belgian

territory, and as this location is inevitable unless it were decided

to swing somewhat to the east to pass through German East Africa, an

easier route has been offered through the Congo. The railway has been

taken from Broken Hill to Elizabethville. The Belgian authorities

are anxious that it should be extended from that point to Bukana on

the Congo River. Boats could be used between this point and Congolo,

where communication by rail would extend to Kindu, to be followed by

another stretch of river as far as Ponthierville. The existing railway

to Stanleyville would then be pressed into service, and from the

last-named point the line would debouch to the north-east to gain the

Albert Nyanza, and there link up with the railway that has been driven

southwards from Cairo.

The Railway Conquest of the World · 第 11 / 26 章