CHAPTER VII

THE WONDERS OF THE TYROL

Probably there is no country in Europe wherein are compressed so many

and such varied marvels of engineering executed in connection with the

building of the iron road as in Austria. As is well known, the country

is a sea of towering rugged mountains, with steep slopes, knotted by

crags and scarred by deep gullies, intersected by broad sylvan valleys.

Such topographical conditions impose a severe tax upon the skill

and resources of the engineer. Consequently this territory has been

the scene of many grim grapples with Nature--some in which the odds

have been overwhelmingly against the engineers, and in which success

has been achieved only by dogged perseverance. Conspicuous in this

direction are the wonderful tunnels.

It was the successful piercing of the Mont Cenis and St. Gotthard

tunnels that first spurred the Austrian engineers to work of this

character. Their first attempt, the boring of the Arlberg, was such

a conspicuous success that they did not hesitate afterwards to have

recourse to such methods when all other means appeared impracticable.

To-day the country can point to four huge Alpine tunnels which stand

among the foremost achievements of their class in the world. Such ways

and means for forcing the iron road from one point to another are

highly expensive, but in each instance the ends have justified the

means. By their provision, points only a few miles apart as the crow

flies, and which with surface railways could have been connected only

by wearying, devious routes, have been brought into close communication.

When the Arlberg chain was taken in hand, the preliminary surveys

showed that it would approximate seven miles in length, and that about

the centre of the tunnel a solid mass of rock, 1,600 feet in thickness,

would extend from the roof and track to the storm-swept mountain pass

overhead.

At this time the two previous projects of this character had proved so

costly, had occupied such a long time, and had entailed the grappling

with technical difficulties such as never had been encountered

before, that the idea of tunnelling the Arlberg was entertained with

mixed feelings. But Julius Lott, the engineer-in-chief, was not to

be dissuaded from his enterprise. He maintained that it could be

accomplished far more quickly and cheaply than had been the Cenis

or Gotthard works. True, it was not to be quite so long as either

of the latter undertakings, but similar difficulties, if not others

more perplexing, might lurk buried there in the heart of the crest.

The engineer was urged in his decision by the perfection of a new

boring implement which had been evolved during the final stages of

the Gotthard tunnel. Although the circumstances there did not enable

the new invention to demonstrate its possibilities to the full, yet

what had been done sufficed to show that the new tool was destined to

revolutionise the methods adopted in such huge boring operations.

This was the Brandt rock-drill, a wonderful appliance which in one

stroke displaced incalculable manual labour. The tool is operated by

water pressure, and the drill ploughs its way into the rock under a

rotary movement in much the same manner as an auger forces its way

through a piece of wood. The water pressure brought to bear upon the

drill is tremendous, ranging from 1,400 to 1,680 pounds per square

inch, and even the hardest rock scarcely can resist its attack.

But, as may be supposed, at times the hard texture of the rock played

sad havoc with the cutting edge of the drill. Occasionally three or

four drills were put out of service with every yard of advance, and

even then progress was painfully slow. When, however, soft rock was

encountered the tool cleaved its way through very rapidly, the cutter

biting half-an-inch or more into the material with every revolution.

Then it was found possible to speed up the rotations to as many as

seven or eight per minute, with proportionate increase of life for the

cutting edge.

Precisely what this Brandt drill signified to the engineers in

connection with this tunnel may be gathered from the fact that from

the time drilling commenced, in 1880, only four years elapsed before

communication was established between Bluden on the one and Innsbruck

on the other side of the range. In this short period a passage 26 feet

high by 23 feet wide was cut through solid rock for a distance of 6⅜

miles at a total cost of £1,500,000, or $7,500,000. In comparison

with the two previous enterprises of the same character this was a

magnificent achievement. The Cenis tunnel, 7½ miles in length, occupied

some 13 years to complete, while some 8 years were required to drive

9¼ miles through the St. Gotthard. This was an achievement of which

those engaged in the task were justly proud. Indeed, the Austrians

hold a unique position in the rapidity with which they can drive these

gigantic undertakings through the most formidable mountain chains.

The section of railway upon which this tunnel is situated sorely

tried the ingenuity of the engineers up to the Paznaun valley. The

line clings to the mountain-side, which is broken up by precipitous

crags, and these either had to be pierced or blasted right away to

provide a path for the railway. Gushing torrents pour madly down these

slopes, and had to be spanned by noble and lofty viaducts or bridges.

At some places the boiling waters are deflected from their bed into

an artificial channel built of concrete; at others there are massive

retaining walls to prevent the waterways from breaking bounds and

sweeping the embankment away. One wide gorge is bridged by a single

iron span 393 feet 8 inches in length. This is the Trisanna viaduct,

below which the glacial brook tumbles over the boulders at a depth of

some 262 feet. Elaborate precautions also had to be adopted to protect

the line from the ravages of avalanches and landslides.

Years before the Arlberg line was contemplated, however, some

distinctly noteworthy achievements in engineering had been placed on

record by the establishment of railway communication between Vienna

and Trieste on the Adriatic Sea. Certainly the line did not follow

the shortest route between these two points, but it must be borne in

mind that it was undertaken in the early ’forties, when Great Britain,

“the home of the railway,” only possessed some 840 miles of line, and

railway engineering was quite in its infancy. It is little wonder,

therefore, that the engineers of the project in this wild corner of

Europe followed a circuitous path, to avoid fearsome obstacles as far

as practicable. They resorted to sharp curves and heavy banks, and the

line doubled and redoubled in the most amazing manner. Bridges and

tunnels were introduced very freely, some of the viaducts spanning deep

clefts on the mountain flanks being very lofty.

By the most direct route of this system the journey from the Austrian

capital to Trieste occupies nine hours. In that journey, comparatively

no longer than that entailed in speeding over the greater distance

separating London from Edinburgh, one passes through four distinct

expanses of scenery. Vienna nestles in a broad valley flanked on all

sides by the towering snow-topped Alps. The line, upon leaving the

capital, first traverses the undulating foot-hills, then wends its way

through the mountains to gain the richly wooded, verdant and beautiful

country of Styria, and finally passes over a vast stretch of wilderness

to descend abruptly to the coast.

In forging this link in the railway chain the engineers had to overcome

the Semmering range, which is amongst the most tumbled in the whole

of the Austrian Alps. How did they do it? By following the natural

facilities open to them: a ledge here, a gallery there; passing from

this slope to that by a viaduct or bridge; zigzagging up the mountain

slopes; tunnelling through rocky eminences; following winding paths

for miles merely to gain points only a mile or two apart in a straight

line. No doubt if that line were built to-day it would have its length

cut in half, for railway engineering has advanced by leaps and bounds

since 1848, when this pioneer project was taken in hand.

In carrying their scheme to fulfilment these early engineers

unconsciously achieved one notable distinction: they built the first

mountain railway. What matter if banks did assume a rise of 132 feet or

so per mile, and the line did wander in apparent aimlessness among the

peaks? Speed then was not the vital consideration it is to-day, while

traffic was comparatively light, so that the haulage facilities were

not taxed severely.

This mountain climb on the main line occurs between Gloggnitz and

Murzzuschlag, the famous winter sporting centre in the Tyrol. The

mountain crest is 4,577 feet above the sea-level, but the railway does

not rise to that height; its summit is at 2,940 feet in the middle of a

tunnel three-quarters of a mile in length beneath the Semmering Pass.

But to gain that altitude from either side of the mountain entailed

prodigious work. Pick, shovel, and gunpowder made heavy cuttings

through projecting spurs, raised lofty embankments, filled gaping

fissures, and cleaved galleries out of the solid rock. The two points

on either side of the mountain are only fourteen miles apart in a

straight line; by the railway it is more than twice the distance, the

outstanding features which were necessary to render the undertaking

_un fait accompli_ being fifteen tunnels, and a score of viaducts and

bridges. To construct the thirty miles over the Semmering cost a round

£2,000,000, or $10,000,000, in money, and occupied between three and

four years to complete.

[Illustration: THE WORKMEN CUTTING AND BLASTING A NARROW PATH ON THE

STEEP MOUNTAIN SLOPES FOR THE KARAWANKEN RAILWAY]

With the march of time, however, the traffic over this railway

increased, hand in hand with the expansion of Trieste, to such an

extent that it proved inadequate. A more direct route between the

capital and the port, as well as accelerated communication with the

great centres of Europe, was demanded by the commercial community. This

agitation became so insistent that at last the government was compelled

to move, and the engineer of the Imperial Railways was commissioned

to survey the country for the purpose of devising some scheme which

would satisfy the public outcry.

[Illustration: THE MASSIVE STEEL BRIDGE WHICH CARRIES THE RAILWAY

ACROSS THE DRAVE RIVER TO APPROACH THE TUNNEL THROUGH THE KARAWANKEN

RANGE IN THE BACKGROUND.]

[Illustration: THE NORTHERN ENTRANCE TO THE KARAWANKEN TUNNEL.

Five miles in length, through the Karawanken mountain chain.]

This was no easy task. Innumerable knots of mountains break up the

country between Vienna and the Adriatic, and they are compressed so

tightly together that the narrow valleys between offered but slight

assistance towards the solution of the problem. Then, again, those

three well-known mountain ranges, the Tauern, Karawanken, and Julian

Alps, stood right in the way, disputing any possibly shorter route than

that already in existence.

The prospect before the surveyors was not very promising. However, they

braved the elements among the inhospitable peaks, suffered extreme

privations and fatigue as they toiled up and down the rugged, wild

mountain slopes with their instruments, for month after month. At

last they succeeded in formulating a project which was submitted to

Parliament. In this it was proposed to make avail of any favourable

stretches of existing railways which intersected the valleys in

all directions, and to connect them together, so that in the end a

tolerably direct route might be obtained. At any rate this proposal

would reduce the journey between the Adriatic and Munich by at least

eleven hours. The scheme was divided into four broad sections. It was

discussed thoroughly in Parliament, but in the end it was decided

to carry out in the first instance the most essential parts of the

project, because embarkation upon the undertakings as set forth by the

engineers would have entailed the expenditure of a gigantic sum of

money. Even that which was sanctioned represented a total financial

commitment of about £30,000,000, or $150,000,000, for 211¼ miles of

line.

The accepted enterprise was memorable because it entailed the piercing

of three mountain ranges by tunnels 5¼, 5, and 4 miles in length

respectively. Of the total mileage only 41¼ miles were to be level! The

remaining 170 miles represented banks, with grades running as high as

132 feet to the mile.

The project as sanctioned was divided into three sections for

constructional purposes. The first section is that known as the Pyrhn

railway, which connects the main line between Vienna and Switzerland

via the Arlberg tunnel at Linz. From this point a short branch line

ran directly southwards through the Krems valley to Klaus, having been

built for tourist purposes. It was decided to overhaul this spur to

bring it into conformity with the conditions of a main line, and to

build the new line onwards from Klaus.

From Auspoint, which is at an altitude of 1,563 feet, the line makes

one continual climb, climb, to the Selzthal terminus, nearly 40

miles distant. The average rise ranges from 70 to 132 feet per mile

to overcome the Pyrhn Pass, beneath which a tunnel nearly 3 miles

in length was bored. This tunnel, however, is only one of many, for

there are numerous short burrows through shoulders and crags. Nor are

the bridges a whit less majestic. The Steyr River is crossed by a

lofty single masonry arch, and again lower down by an iron suspension

structure, while the Teichl is spanned by a single-span lattice

steel bridge. The loftiness of these structures is an outstanding

characteristic. The rivers at the points in question have cut their

beds at a great depth below the banks which constitute the railway

level. Swerving bends are also conspicuous, for the railway continually

swings from one side of the valley to the other.

The construction of the Pyrhn railway, however, was simple in

comparison with the other links of this chain of communication. At

Klagenfurt, south-east of Vienna, commences the Karawanken railway, so

named because it pierces the difficult mountain range of that name. The

stretch is only 19 miles in length, but the country proved to be so

broken that only 4 miles of level track could be introduced, and those

in the vicinity of the stations! Throughout the remaining 15 miles the

railway is really a gigantic switchback.

The line hugs the hill-sides, and has to make the rough descent of the

broken Hollenburger in order to gain the level of the Drave River, to

pass between the Stattnitz on the northern and the Karawanken chains

on the southern side of the depression. The mountain-side is steep and

broken in the extreme. In all directions gullies extended, where the

soft earth had been washed away by the violence of the snow freshets.

These had to be filled in with solid, heavy embankments, the debris for

which was torn from deep cuttings through projecting humps of rock.

Some of the gaps were too wide and deep to be overcome in this summary

manner, and had to be bridged. The Hollenburger viaduct stands out

prominently among works of this kind. From end to end it measures 262½

feet in length, and in the centre the rift is 92 feet below the level

of the rails. The mountains sheer up precipitously on the one, and the

beautiful valley of the Rosenbach falls away on the other, side of the

track.

Gaining the river-bank, the line sweeps across the waterway by a

majestic lofty iron bridge 656 feet in length. Gaining the opposite

bank, it plunges among the well-wooded slopes of the Karawanken belt

of mountains, effecting a good climb up and down towards the Rosenbach

valley, which is crossed by means of a long viaduct, consisting of four

arched masonry spans each 24 feet and three steel spans of 177 feet

apiece, at a height of 170 feet.

The ascent is heavy, as the objective is the northern entrance to the

Karawanken tunnel, which burrows through the range for a distance

of five miles. The piercing of this subterranean passage excited

considerable attention. The Austrian engineers who had achieved such a

triumph in the rapid boring of the Arlberg upheld their reputation as

accomplished masters in this phase of railway-building, notwithstanding

the fact that the rocky mass was found to be of such unstable character

that the tunnel had to be lined from end to end.

The task was taken in hand shortly after the Austrian Government

sanctioned these railways in 1901. Boring was carried out

simultaneously from each end. The ground around each portal was quickly

cleared, and when the work was in full swing 6000 men found employment.

The first step was to secure power to furnish the energy to operate

the variety of mechanical appliances that were necessary to dislodge

and transport the rock, as well as to dispel the Cimmerian gloom in

the heart of the mountain. There was a small waterfall six miles from

the proposed southern mouth of the tunnel, with a drop of 35 feet, and

capable of furnishing some 900 horse-power. This picturesque Alpine

cascade was harnessed and compelled to drive turbines and dynamos to

generate electricity, which was transmitted by overhead wires for six

miles to the boring works at the tunnel entrance. Here the current was

pressed into a multitude of services, not the least important of which

was the driving of the huge fans, whereby a great volume of clean,

pure, cool air was swept in a steady stream through the shaft to strike

against the wall of rock upon which the drillers were concentrating

their energies, displacing the atmosphere contaminated by the fumes of

the dynamite blasting, grime and dust. Moreover, the temperature, which

rapidly rose as the heart of the mountain was penetrated, was tempered

pleasantly by the incoming currents, so that the fatigue of toiling in

the blackness and confined space was reduced.

[Illustration: THE TAUERN RAILWAY, SHOWING WINDING CHARACTER OF THE

LINE]

[Illustration: THE ENTRANCE TO THE TAUERN TUNNEL,

Five and a quarter miles in length, which occupied five years to bore

through the range

RAILWAY BUILDING IN THE TYROL]

On the northern side of the tunnel similar arrangements were laid down.

In this instance, however, the electricity, obtained by harnessing

two small waterfalls, had to operate wonderful electric drills which

were used at this end for boring into the rock--on the southern side

hydraulic and pneumatic drills were employed. The working face in the

tunnel was illuminated brilliantly by electric light, so that the

drillers laboured under conditions vastly dissimilar to those which

prevailed when the first Alpine tunnel was driven. As the top of the

tunnel was cut out the roof was shored up with heavy timbering, and

hard on the tracks of the excavators came the stonemasons, cutting,

trimming, and setting the masonry lining into position. The work was

so planned that the actual progress per day should be thirteen lineal

feet, and although at times the calculations were somewhat upset by

something unforeseen being encountered, yet, taken on the whole, the

average was well maintained. Commenced in June 1902, the mountain chain

was pierced and ready for the double line of rails by November 1905, so

that the work had been carried out very smartly indeed.

[Illustration: ONE OF THE HUGE LOOPS ON THE TAUERN RAILWAY

Showing heavy character of earth cutting and masonry work.]

Emerging from the tunnel, the line once more becomes a single track,

and issues into the Wurzner Save valley, the descent continuing until

Assling, the terminus of the Karawanken railway, is reached, this

point being 151 feet below the southern mouth of the tunnel. Here

a connection is formed with the next link in the chain, this being

the “Wochenier” section, which runs to the shores of the Adriatic at

Trieste.

But before the latter terminal is gained another mountain mass has

to be penetrated--the Julian Alps. It is a meandering line in very

truth, for the configuration of the country prevented more than short

pieces of straight track being sandwiched here and there between

sweeping curves, elaborate winds, stiff ascents and descents--in

fact, the longest piece of straight line is only of 6,600 feet in the

first 55 miles. In running from Assling to the seaboard 28 tunnels

are threaded, exclusive of the Wochenier, which is 4 miles long, 15

bridges and 30 viaducts are crossed, while the cuttings and embankments

are innumerable. The railway traverses some of the most romantic and

wildest scenery in the whole Alpine chain, especially as it approaches

the southernmost clump of these mountains.

On this section the engineers accomplished an unparalleled engineering

feat. The narrow Isonzo gorge had to be crossed, and it was effected

by throwing a single span from one bank to the other, a matter of 733

feet. This is the longest single-arch masonry bridge in the world, and

the rail-level is 120 feet above the level of the water. As the coast

is approached the windings of the line become more tortuous, while

the bridging, owing to the numerous rivers, is terrific. When at last

Opcina tunnel is penetrated, the Adriatic is seen spread out in a vast

panorama 1000 feet below.

To descend the mountain slopes with an easy grade for a distance of ten

miles was a stiff problem. In order to do so the engineers had to carry

the track in the form of elaborate saw-like loops. Heavy gradients

could not be avoided, and this part of the line is one of the steepest

and most trying to the locomotives.

Though these sections of the railway had proved difficult to carry out,

it was the Tauern link in the chain that tried the energy and ingenuity

of the engineers to the supreme degree, for on this stretch of railway

the mighty Tauern group of mountains had to be negotiated. Surveys

showed that to pierce this clump involved the boring of a tunnel for

a distance of five miles at least. They proved the hardest five miles

in the whole undertaking; the piercing of the Karawanken and Wochenier

tunnels sank into insignificance by comparison, for this knot of the

Alps was found to be formed of much sterner rock. Granite gneiss,

one of the hardest substances against which it is possible to bring

the edge of a drill, made progress provokingly slow. At times, when

the hand drills had to be used, an advance of two feet in the course

of twenty-four hours was considered excellent. The Brandt hydraulic

drills, however, with the enormous energy behind them, made the task

somewhat lighter, for they moved through the hardest rock at a rate of

about seventeen feet every day, with occasional spurts of a foot per

hour.

In this undertaking, however, many misfortunes served to delay

progress. The task had barely commenced, when a flood destroyed part of

the works at the northern end. The river whose water had been harnessed

had been deviated from its accustomed path, because it flowed over

the roof of the tunnel. As the engineers had no desire to invite an

inundation by tapping the bed of the river waterway, they had provided

it with a new channel. Heavy snows and rains, however, so swelled the

volume of the diverted river that it broke through its artificial bonds

to resume its original course. The result was that, owing to the crust

of earth between the old bed and the roof of the tunnel being so thin,

the water crashed through, and poured into the tunnel in an immense

cascade.

The men abandoned everything hurriedly, and rushed madly for their

lives from the incoming avalanche of water. For days the tunnel was

absolutely inaccessible. Not content with flooding the workings, the

impetuous torrent completed its devastation by sweeping away many of

the supports to the line conveying the water to the drills under a

pressure of 1,500 pounds per square inch, leaving the slender conduit

of this great force hanging in graceful festoons in mid-air. Some

of these gaps were as much as 260 feet in width, and had a break in

the pipe occurred widespread damage would have been caused. But the

engineers set to work, and reconstructed the temporary dam that had

thus been torn roughly away and rebuilt the river’s new channel. At

the same time they adopted such precautions as would preclude the

possibility of the waterway again inundating the tunnel in times of the

most severe floods.

Such incidents, however, are inherent to works of this character. The

inundation was but one means adopted by Nature to thwart the advance of

the iron road. Work had scarcely been resumed, when another disaster

occurred. The drills were whirring merrily against the rock face in

the tunnel, and the drillers were light-heartedly conversing with one

another as they fed the boring giant in its rock-penetrating task.

Suddenly there was a cry of alarm. Water was trickling rapidly from

a bore-hole; it rapidly increased in volume. The drillers hurriedly

withdrew their tools and backed down the cavern. There was a roar,

and a limpid stream burst from the rock face. The drillers stampeded;

they had tapped a subterranean spring, and it was now rushing forth

with fiendish violence. The engineers hastened to the front. Such a

contingency had been expected, for such incidents are inseparable from

tunnelling tasks of this magnitude. The rushing stream was turned

into one of the conduits at the side to carry it to the tunnel mouth,

where it expended its energy harmlessly by tumbling wildly among the

rocks. When pockets of water and springs are tapped in this manner, the

question is to control the water so encountered in such a manner that

it does not interfere with the drilling work or flood the workings.

As a matter of fact, when the Simplon tunnel was in progress these

underground springs were harnessed and compelled to perform useful

work; they were thrown against the rock face to keep down the internal

temperature.

Work continued incessantly day and night; but it was hard and

exhausting the farther the men advanced. The drills scarcely could bite

into the rock, as it was so tough. At one time the question became

so acute that the engineers brought up the electric drills used in

the Karawanken undertaking in order to see if matters could not be

expedited, but they failed to make as much headway as the hydraulic

tools. Another handicapping factor was the heat, which rose very

rapidly, and although it did not attain that degree experienced in the

boring of the Simplon, yet it caused considerable fatigue among the

workmen engaged in such a confined space. The elaborate ventilating

system sufficed to keep the air as sweet and cool as possible, but it

did not solve the problem completely. The workmen, cramped as they were

in the confined space--the area available for manipulating the tools

only measured a few feet in each direction--often betrayed painful

signs of physical distress.

But at last there was a wild cheer, which echoed and re-echoed through

the caverns to the tunnel’s mouths. Those outside realised that

something untoward had occurred, and in a few seconds the news came

through the gloomy depths that the drills had pierced the last 72

inches of rock separating the two headings, and that the Tauern was

conquered. That was on July 21, 1907, some five years after the first

boulder was torn from the mountain-side. Once this last barrier was

broken down the finishing touches were soon applied, and the double

track laid from end to end.

Though the Tauern tunnel constitutes the outstanding features on

the section stretching from Schwarzach St. Veit to Villach, there

are innumerable other subsidiary works which in themselves are of

importance. One of more than passing interest is a clever piece of

construction in order to overcome a difference of 2,975 feet in level

between the Tauern tunnel and Ober Villach by means of a huge “S” loop

four and a half miles in length.

The fulfilment of this undertaking constitutes one of the most

remarkable railway engineering feats in Europe. Certainly it ranks

among the most expensive enterprises that ever have been attempted west

of the Urals. To the travelling and commercial community its value

is incalculable, for Munich, which was formerly a tedious journey of

twenty-three hours from Trieste, is now within twelve hours’ run, while

the other great centres of Europe have been brought proportionately

nearer the Adriatic by this new and more direct route.