CHAPTER VI

THE LONGEST “TOY” RAILWAY

The Principality is a land of many surprises to the visitor, for it

possesses innumerable attractions. Yet it is doubtful whether any

feature arouses more interest in North Wales than the strange little

railway which runs from Portmadoc for a distance of 13¼ miles among

the mountains. Certain it is that no tourist would think of omitting a

journey over what is known colloquially as the Festiniog “Toy” Railway,

for it is one of the great sights of North Wales.

For several years it held a unique position among the great systems of

the world as the narrowest gauge line in operation. The metals are laid

only 23¼ inches apart--less than half the distance between the rails

forming the roads of the greater proportion of steel highways bounding

the globe--and yet it has a traffic which many a more important railway

would have just cause to envy. Visitors disembarking from the London &

North-Western express at Portmadoc, and seeing the diminutive engine

and trucks drawn up alongside on their own road and completely dwarfed

by the towering rolling-stock of the standard-gauge line, cannot

repress a smile, for the engines, cars, trucks and wagons are no larger

than are used upon the larger-sized model railways devised to-day for

the amusement and education of the young.

Yet it is a complete pocket edition of the familiar railway, and its

capacity is amazing. The engine provokes interest, for it is no taller

than an average-sized person. Its coupled wheels are only 28 inches in

diameter, while the cylinders measure but 8¼ inches in diameter and

have a stroke of only 13 inches. The cars and wagons are on the same

scale, and the first impression of the diminutive iron horse awakens

doubts as to whether it is safe to trust oneself to its care. But see

that self-same engine busy at work hauling a train of 7 passenger

coaches, a guard’s van, 10 goods wagons and 100 or more empty slate

trucks, stretching out for a length of 1,200 feet and representing a

total load of 110 tons, out of Portmadoc, bound for the quarries, and

disdain gives way to complete admiration.

The locomotive “Little Wonder,” despite its age, for it dates back from

1869, completely justifies its appellation, for it handles the above

load on the steepest grades with ease, and attains a speed of 30 miles

an hour where the physical conditions are suited to fast travelling.

The work it has to fulfil is not to be despised by any means, for the

country through which the line extends is amongst the most rugged in

the country. In the course of the thirteen and a quarter miles it

has to overcome a difference of 700 feet in altitude, which means a

pull against the collar for the whole way from Portmadoc, though the

gradients are of varying severity. Yet even the easiest climb is 1 in

186, while the steepest rise is 1 in 68.6; with a bank of no less than

1 in 36 on one of the spur lines. The curves likewise are startling in

their sharpness and frequency, and at times when the engine is loaded

to its utmost capacity the train may be seen writhing like a gigantic

black snake along three curves at the same time.

The permanent way was originally laid in 1839, the enterprise having

been carried out for the conveyance of slate from the quarries

to Portmadoc. On the downward journey the laden trucks travelled

by gravity, the empties being hauled back by horses. In the late

’fifties, however, the chief engineer, Mr. C. E. Spooner, realising

the far-reaching advantages arising from the use of power, suggested

that the tramway should be converted into a railway, and in 1863 his

suggestion was adopted. In the early days travelling was exciting, for

the bridges and tunnels were so low that the engine-driver, stoker and

other officials on the line had to duck their heads when they reached

these obstacles, since to stand upright in one of the vehicles was

certain to court a violent end by collision with these structures.

These, however, have been altered so that one need entertain no more

apprehension concerning safety on this line than when travelling

upon a standard-gauge road. Visitors, realising the fact that by its

means they could be conveyed comfortably to some of the wildest and

most beautiful corners of the Principality, sought its transportation

assistance, and in 1864 passengers were first carried as an experiment,

but free of charge. The Board of Trade did not decline to sanction its

operation in the interests of the public, but possibly somewhat dubious

of the wisdom of their action, hedged in the privilege with certain

restrictions, the most important of which was limitation of speed.

When, however, it was proved that there was no danger in travelling

over this two-foot line at 30 miles an hour this latter ban was removed.

The line possesses several features of technical interest, and being

a single track, is operated upon the staff system, with every device

to secure absolute safety in operation in the form of signalling

and telegraphing facilities. Moreover, travelling is comfortable,

for although the gauge is less than two feet, the cars, designed

by the engineer, are built on the bogie principle and have seating

accommodation for fifty passengers. A trip over the line certainly

constitutes an experience.

The complete success which attended the conversion of this railway from

equine- to steam-power in 1864 stimulated the wider adoption of the

narrow-gauge system, though as a rule this term is somewhat elastic,

inasmuch as it signifies that such a railway has a gauge less than the

standard width of 4 feet 8½ inches, and is particularly associated with

the 39 inch or 42 inch gauge. Still several “two-foot” lines were laid

down, especially in France and India, so that the Festiniog experiment

has proved a very profitable “toy” to more countries than one. In

fact, not far distant from the pioneer toy railway is another--the

North Wales Narrow Gauge railway--which connects Dinas, near Carnarvon,

with Snowdon Station.

These railway systems, however, are of short length, and when one

remembers the broken character of the country which they serve, their

_raison d’être_ is obvious. But the application of the idea to a

trunk line 360 miles in length appears quite impracticable. Yet it

has been accomplished, and its realisation has opened up a corner of

Africa which formerly was almost impassable, and which, but for its

fulfilment, would have left the country traversed in the hands of

hostile natives.

This “toy” railway upon a large scale is the Otavi Line, which connects

Tsumeb, buried 368 miles in the heart of the wilderness of German

South-West Africa, with the coast at Swapkomund. To-day it ranks as

the longest narrowest gauge line in the world, the metals, as in the

case of the Festiniog railway, being laid only 600 millimetres, or

approximately two feet apart.

In the late ’eighties prospecting parties who had heard of the mineral

wealth lying dormant in this inhospitable and inaccessible country,

set out to ascertain whether rumour could be verified to a sufficient

extent to ensure the riches of the rocks being exploited commercially.

They suffered great privations and hardships in their toil across the

waterless veldt, but when they gained the Otavi country they found that

their journey was more than repaid by enormous discoveries of copper.

They collected detailed information concerning the extent of these

deposits, and when they returned to Europe it was decided to develop

the new “Copperado” without further delay.

However, there was one critical point. How could the mineral, after

being mined, be transported to the coast for shipment. The intervening

country was among the most sterile to be found in the continent south

of the Sahara. The mining companies concerned at once suggested a

railway as the only solution of the problem. But they realised very

readily, from the reports of their emissaries who had ventured

to Otavi, that such an undertaking was beset with difficulties

innumerable, while the construction of a line upon the standard gauge

would prove ruinously expensive. In order to secure extrication from

their plight the companies approached the firm of Arthur Koppel of

Berlin. The latter company dispatched a corps of its own surveyors to

the country to spy out the desert between the coast and the mines,

in order to find the best location and to report generally upon the

engineering features of the scheme.

When the surveyors returned to civilisation they unhesitatingly

recommended a light narrow-gauge railway, such as they had built

in several parts of the world where similar conditions prevailed.

They advocated the 600 millimetre or two-foot gauge because it not

only would meet all traffic requirements for many years to come, but

its initial cost would be so much cheaper, and it could be built so

much more quickly than a wider or standard gauge. The recommendation

was debated at great length, and after discussing the relative

estimated capital and operating costs of lines of different gauges,

the overwhelming advantages presented by the “toy-line” gauge were

found to outweigh any arguments that could be raised against it.

The mining companies merely demanded the line as a link between the

copper country and the coast for their own purposes. The country

lying between the coast and the mines held out no attractions for any

economic development, so that all the requisitions likely to be made

by the mining companies could be met adequately by such a railway.

Consequently the recommendation of the engineers was accepted, and they

were entrusted with the completion of the undertaking.

[Illustration: BUILDING THE OTAVI LINE THROUGH THE GERMAN SOUTH-WEST

AFRICAN BUSH

Hereros, Ovambos and Italians working side by side.]

When the mining companies expressed their decision they did not

anticipate the extraordinary traffic which the railway would be called

upon to fulfil a little later. These were duties which not only taxed

the capacity of the diminutive railway to a supreme degree, but were

of a character which justified the confidence of the engineers and

practically saved the colony to the German Empire.

[Illustration: THE PASSAGE OF THE FIRST TRAIN, GAILY DECORATED FOR THE

OCCASION, OVER THE “TOY-LIKE” OTAVI RAILWAY]

This reproduction of the Festiniog toy railway was commenced without

loss of time. In 1903 constructional engineers with a boat-load of

constructional material were dispatched to South Africa, and the grade

was commenced from Swakopmund, at a point 40 feet above the sea-level,

the location extending in a north-easterly direction to Otavi, 300

miles distant in the interior.

The first sod was turned in October, and the constructional engineers

bent to their task with great zest. But scarcely had they got into

their stride when the Hereros rebellion broke out. This was an

unexpected development, and as the natives had been recruited in large

numbers to build the permanent way, the engineers were faced with a

grave situation. At the first signs of the insurrection the greater

majority of the natives threw down their tools and stampeded from the

line to their towns and villages to take up arms. The Governor of the

colony strove to arrest this wholesale desertion by recourse to drastic

measures--he seized as many men working on the grade as he could and

placed them safely under lock and key. The result was that the little

band of white engineers was left with scarcely a navvy to assist them.

However, they struggled on as best they could, but progress was

painfully slow. At first the insurrection was belittled--regarded as a

flash in the pan--and the engineers anticipated confidently the early

return of their workmen. But these illusions were dispelled rudely when

it became realised at last that the country was up in arms from end to

end. There was only one way out of the desperate situation, and that

was to import labour from Europe. Such a step upset the preliminary

estimates for the undertaking to a pronounced degree, for the native

labour had been taken into the calculation when framing the cost of the

work. To bring white labour from Europe increased the capital outlay

very appreciably. However, there was no alternative, and accordingly

an Italian contractor arrived on the scene with a small army of 300

Italians, and work resumed its former busy aspect.

However, peace did not reign for long. The Italian workmen saw

that they held the advantage over the engineers, that there was no

competitive labour, and accordingly they struck for higher pay. The

engineers, caught on the horns of a dilemma, had to surrender, and the

Italians picked up their tools. Then another cause of dissatisfaction

manifested itself. The workmen concluded that they were being driven

too hard, so they declined to perform a full day’s labour. They

held the whip-hand and emphasised its potency so frequently, and

the friction between employers and employed became so keen, that it

appeared more than once as if the contract would have to be suspended

until the rebellion was quelled.

While these disputes and continual bickerings were at their height

further complication was provoked. The German military authorities,

finding the subjugation of the Hereros a far heavier task than they

had anticipated, wished to penetrate into the heart of the country

so as to strike a supreme blow upon the enemy’s stronghold. They had

their own line extending from Swakopmund to Windhuk, but owing to its

heavy grades and light construction it had broken down completely

under the strain of the heavy military traffic. The authorities strove

to alleviate this situation by utilising bullock-carts to transport

troops and commissariat up-country, but this alternative failed

lamentably. This service was so slow, and the absence of water by the

wayside was felt to a serious degree. In their extremity the German

Government appealed to the engineers of the Otavi line. They besought

them to spare no effort to drive the railway forward speedily, first

to Ouguati, 109¾ miles from the coast, and then to Omaruru, 145 miles

beyond the former point. As an inducement the builders were offered a

heavy premium.

The engineers agreed to meet official demands, and to expedite the

constructional work a further army of 750 Italians and 500 Ovambo

coolies was sent to reinforce the forces on the grade. To tempt the

Italian workmen to strive their utmost they offered a fixed minimum

wage as an incentive. However, it was not long before trouble arose

once more. The new arrivals fraternised with their compatriots already

on the scene, and learned how the engineers had been forced to pay

higher and higher wages by recourse to strikes. The Italians came

to the conclusion that concerted action would be highly successful

because several weeks would elapse before their places could be taken

by other imported labour, while they regarded the Ovambo coolies, who

proved industrious workmen, with supreme contempt. Every conceivable

obstacle was thrown in the way of the engineers. Work was stopped upon

the slightest provocation, and apparent grievances were aired with

monotonous frequency.

When at last they were placated and the workmen did settle down to

their tasks they proceeded in a lackadaisical manner, and the day’s

work was only a quarter of what might have been accomplished. Under

ordinary circumstances each Italian could have coped with 10 cubic

yards of earthwork per day, but they handled only about 2¾ cubic yards!

This rendered them distinctly inferior to the Ovambos, who, though not

comparable with the Europeans from the physical point of view, plodded

along steadily, and handled on the average from 3½ to 4 cubic yards per

day. The Italians had no complaint concerning their scale of payment,

for they received from 5_s._ to 10_s._--$1.25 to $2.00--per day, while

the coolies, who did twice the work, received but 2_s._ 6_d._ or 60

cents a day, together with food and housing accommodation.

One day matters reached a climax. The white workmen struck in a body,

and declined to move a hand unless they received another increase in

wages. The engineers, who had been groaning under the extortionate

demands of the blackmailing Italians for several weeks past, now took

a firm stand. They declined point-blank to entertain the proposal.

Moreover, they commenced to take the law into their own hands and

to adopt stern measures. Several of the leading recalcitrants were

straightway dismissed for breach of contract. This situation lasted for

eight weeks, and at times the outlook became extremely threatening,

for the Italians chafed under the unexpected opposition they had

encountered. Suddenly the dispute collapsed and the Italians sullenly

returned to their work.

Coupled with this distressing condition of affairs at the railhead,

the engineers experienced grave difficulties at Swakopmund. They could

not get the constructional and other material unloaded from their

ships. This harbour is notoriously a bad one, and being congested with

military traffic, method and order had given way to complete chaos.

Weeks elapsed before an incoming ship could discharge its cargo for

the railway, and then the engineers only secured their requirements by

building a special mole because the anchorage was silting up with sand.

In the spring of 1905 matters took a more hopeful turn. The sullen

Italians were spurred on by the granting of premiums, and under this

inducement more rapid progress was effected. The white workmen were

forced to their tasks by the appearance of severe competition. Many of

the Hereros grew tired of fighting and surrendered to the authorities.

When asked if they would be content to work upon the railway they

accepted the offer with alacrity, and the Italians saw that they were

in serious danger of being displaced entirely. The fair treatment that

was meted out to the natives who had surrendered became noised far

and wide through the country, with the result that large numbers of

Hereros, who had grasped the hopelessness of their opposition, made

their way to the railhead and threw down their arms and offered to take

up the pick and shovel. It was a curious sight, for here were large

numbers of the natives, against whom war was being waged, voluntarily

assisting in the advance of the very force that was being driven

forward to bring about the complete subjugation of their race. Curious

to relate, moreover, the engineers found that their former implacable

foes, when properly treated, developed into splendid conscientious

workmen, and far easier to control than the much-vaunted white labour.

After leaving the coast the railway makes practically a continuous and

steady climb to a maximum height of some 5,218 feet in the course of

its 360 miles. Notwithstanding this extreme difference in altitude, it

was found possible to keep the banks easy, the sharpest gradient being

1 in 50. The country traversed is most inhospitable, the first 145

miles being through a wild desert, and wide stretches of scrub-covered

country broken with kopjes. Extensive bridging was found necessary

to carry the track across gullies and rivulets, there being in all

110 of these structures. They are built throughout of steel, the

deckplate girder type being the most generally favoured, and the most

important work of this class has a length of 333 feet, built up in five

spans. The curves were kept as easy as possible, the standard radius

being about 500 feet. Here and there, however, owing to the cramped

conditions of the route open to the track, it was found requisite

to reduce the radius to some 270 feet in order to avoid heavy and

expensive cutting through rocks and hills.

Some idea of the extent to which the engineers were delayed by their

repeated differences with the Italian workmen may be gathered from

the fact that although 23 months were occupied in carrying the rails

from Swakopmund to Omaruru, a matter of 145 miles, the second section,

from the latter point to Tsumeb, the present terminus, a matter of

215 miles, required but another year. When the railway was rushed

onwards from Omaruru, although the country to be crossed was somewhat

easier from the physical point of view, and lent itself to more rapid

construction, acceleration was attributable in the main to the ample

supply of labour available and absence of trouble with the workmen

engaged.

Another grave difficulty against which the builders had to struggle

was water. In fact, it might be said that the scarcity of this

commodity was more perplexing than those governing the labour, strikes

notwithstanding. It was not merely securing sufficient supplies for

the workmen’s needs, but also for constructional purposes, such as for

the locomotive boilers, mixing of concrete for masonry, and so forth.

On the first section every pint of drinking water had to be brought

up from the base on the coast to the railhead, and as this advanced

the difficulties concerned with its transportation increased. In some

instances bullock-carts were the only vehicles that could be pressed

into service for its conveyance over 30 or 40 miles. Throughout the

first 85 miles from Swakopmund to Usakos not a drop could be drawn

from the earth. Innumerable borings in search of the liquid were made

alongside the line as it progressed, but they were rewarded with no

material success. Occasionally small quantities were found, but it was

too brackish and quite unfit for drinking purposes. When Usakos was

gained the situation was eased somewhat by a local discovery, but the

water had to be softened before it could be used by the engines, and

accordingly a plant for treating the water in this manner had to be

brought up country and erected. This, however, was useless for domestic

purposes, and when the line was pushed on from Omaruru, special water

trains had to be run for the convenience of the workmen. Huge tanks

were laden on the cars and were carried from the coast to the railhead,

the journey occupying several hours. The trouble and expense involved

in connection with this vital requisite influenced the cost and time

occupied in building the line very unfavourably, so much so indeed,

that the preliminary estimates of the cost were exceeded very markedly.

This question has not been solved satisfactorily yet, and it

will remain to puzzle the administration of the line until some

conveniently-situated subterranean water supply is tapped on the

barren veldt. The load of every train has to be increased by a special

tank-tender coupled behind the engine containing 2,200 gallons of

water, which represents so much unremunerative load.

The rolling-stock is quite in keeping with this diminutive railway.

The tiny engines have driving-wheels 24 inches in diameter, while the

cylinders have a diameter of 12 inches and a stroke of 17¾ inches. Yet

they can haul a load of 100 tons at a speed of 25 miles an hour on the

level and at 9½ miles an hour on the steepest banks of 1 in 50.

This appears to be a mere crawl in comparison with the speeds with

which we are familiar on the standard railways. But when one recalls

the manner in which this little “toy” line has changed conditions of

travel in a lonely corner of the African continent, and the former

rate of progress possible by bullock-cart, even 9½ miles an hour

appears to be an amazing speed. Before the iron horse appeared in

German South-West Africa, to travel from Swakopmund to Omaruru, a mere

145 miles, was a heroic achievement, entailing a laborious slow tramp

through lonely sterile wastes of boulders and scrub. A pace of 7 or 10

miles a day was considered fast travelling, and one who covered the

journey in a fortnight was considered to have driven hard. To-day the

same distance can be reeled off in about 12 hours.

The Railway Conquest of the World · 第 6 / 26 章