CHAPTER III

THE BORING OF THE GOTTHARD TUNNEL

The little country of Switzerland, as is well known, is a tumbled mass

of snow-clad mountain ranges. On the Italian frontier, however, this

natural barrier becomes more rugged and defiant, some of the peaks

towering 10,000 feet or higher into the clouds. For centuries this

frontier chain so successfully walled in the Helvetians that they could

not pass into Italy without making a wearisome detour. Travelling from

one country to the other before George Stephenson demonstrated the

possibilities of the steam engine running on rails, therefore, was a

journey not to be lightly undertaken, for it occupied weeks. An effort

to ease this situation was made so far back as the thirteenth century

by the blazing of a footpath over the St. Gotthard, but it was a mere

dangerous and dizzy trail. Little wonder, therefore, that it was not

favoured by other than the more adventurous.

It was not until about a century ago that the first vehicle lumbered

over this rugged hump. Then the demand for closer communication between

the two countries prompted the ambitious Helvetians to embark upon a

costly and momentous enterprise--the building of a postroad over the

mountain. They cut a roadway 18½ feet wide, with an average grade of 10

per cent. to a height of 6,936 feet up the flanks of this snow-topped

giant, with its deep rifts, rushing rivers, and faced the terrors of

the avalanche. It is a striking piece of work, for at places the road

clings, limpet-like, to perpendicular walls, describes sharp twists and

turns sudden corners. Although the people could ill afford the expense

of the undertaking, they carried it to completion, confident that

untold benefit would accrue from its provision.

They were right in their surmise. That mountain road changed completely

the direction of the stream of traffic flowing between Switzerland and

Italy. The novelty of the route, the magnificent panoramas unfolded

from every foot of its length, appealed to the tourist and traveller

and they bravely essayed the “pass.” To-day that mountain road is

trodden but seldom. It has fallen into desuetude; the railway has

killed its utility.

So soon as the iron horse invaded the little country it was sought

to carry it into Italy via the St. Gotthard; not over the mountain

crest, but through its base. Every engineer nursed the ambition to

overcome that frowning knot with the steel highway. For years brilliant

minds lived, dreamt, and died obsessed with this one great idea. Even

in 1846, when the first railway was opened from Baden to Zurich,

preparations were made to carry the line onward through the mountain

chain. To the Swiss people, boring through a mountain for nine miles or

so appeared no more difficult than burrowing through a hillock for as

many yards. It was only a question of time and expense.

An “Alpine tunnel fever” set in with terrible malignancy, and there

was fierce rivalry and jealousy created between the various railway

companies, cantons and towns as to who should have the honour of

completing this remarkable link. Fortunately the Government itself

preserved a cool head, turned a deaf ear to entreaties, refused

concessions, and discouraged any possible hope of financial aid. The

last-named factor proved the greatest stumbling-block, but there is no

doubt that if the money could have been obtained for such an enterprise

an attempt to tunnel the Alps would have been made in the ’fifties.

Though the ambition was scotched it was not killed by any means, for a

few years later the same scheme was revived and more keenly discussed

than ever. The French and Italian nations resuscitated the project

by co-operating in the effort to pierce the Col de Fréjus, popularly

known as the Mont Cenis tunnel. The first stroke of the pick-axe upon

this momentous enterprise was made in August, 1857, and the two chief

engineers, Grattoni and Sommeiller, pledged themselves to complete the

task with the assistance of the French and Italian governments. In

the face of the most terrible difficulties that could be conceived,

equipped with tools which appear puny and futile in comparison with

those used for such work to-day, they cut, blasted, and excavated

their way through 7½ miles of dense rock. Boring from either end, the

rock-hogs broke down the last wall of rock on Christmas Day, 1870, and

in September of the following year a shorter and more direct route

between the two countries was opened to traffic.

The progress of this tunnel was watched with the closest interest by

the Helvetians. This piercing of an Alpine mountain was something new

in railway engineering. The wiseacres croaked that it would never be

completed; that Nature would spring some sudden surprise upon the

engineers in the depths of the mountain which would arrest the whole

enterprise. But as the two headings slowly but surely approached one

another, and the engineers broke down their obstacles as they arose

with commendable pluck and determination, the sceptics became silenced.

[Illustration: THE GÖSCHENEN ENTRANCE TO THE ST. GOTTHARD TUNNEL

Work was commenced at this point on June 4, 1872. The huge task was

completed and the line opened for traffic on May 22, 1882.]

The pride of the Swiss was wounded. If the French and Italians could

accomplish such a herculean and apparently impossible task, why was

a similar idea beyond their powers? The “conquest of the Alps” broke

out with renewed vigour. It became more than a personal issue; it

blossomed into one of economic, political and commercial importance.

Consequently, before the Cenis Tunnel was opened for traffic, the

preliminary arrangements for burrowing through the St. Gotthard had

assumed concrete shape. But it had been a wearisome enterprise. The

promoters had to battle against intrigue and jealousies innumerable

on the part of private individuals, companies seeking for the same

concession, towns and departmental governments. But the project became

one of even more than national importance; it became an international

question. The provision of such a route would bring northern Europe

into closer touch with Italy and her ports on the Mediterranean. That

fact was realised, and when the company incorporated to carry out the

work announced that the task was far too risky for private resources,

the governments of the countries most intimately interested in the

fulfilment of the project promised tangible assistance in the form of

substantial subventions.

[Illustration: THE WONDERFUL WASSEN LOOP ON THE ST. GOTTHARD RAILWAY,

SHOWING THREE TIERS OF TRACK]

The path of the tunnel through the heart of the mountain was plotted

by Mr. M. O. Gelpke, C.E., and this in itself was a great achievement.

Fifteen stations were scattered over the mountain slopes for the

manipulation of the survey instruments, and many of these were situated

unavoidably in positions very difficult, and often impossible, of

access. Borings were made to ascertain the rock strata which would have

to be pierced by Professor Fritsch of Frankfort, and from the result of

these essential investigations it was computed that the work, including

the necessary railway line on either side of the great tunnel, could

be completed for a sum of £7,480,000, or $37,400,000. The money was

raised by guarantees of £1,800,000 ($9,000,000) from Italy, £800,000

($4,000,000) from both Germany and Switzerland, and by the issue of

shares and mortgage bonds to the extent of £2,720,000, or $13,600,000.

As a further contribution to the task, the Swiss Government undertook

to supervise actual construction.

The financial arrangements completed, the company had to search for a

man to bore the tunnel. For this purpose tenders were sought for the

whole contract. The terms of the latter were severe, as were also the

technical conditions. The tunnel was to carry a double track, to have a

height of 19.68 feet to the crown of the arch, and a maximum width of

26.24 feet, with a minimum width of 24.93 feet. The tunnel was to be

quite straight, with the exception of a slight curve at the southern

end, where, for a distance of 474 feet from the entrance, a curve of

984 feet radius was to be introduced to gain Airolo station. The rise

from the northern entrance was to be about 1 in 172 to the summit

level 3,781 feet above the sea, followed by a drop of 1 in 1000 to the

southern end. These gradients falling on either side from the centre

were necessary for drainage, and were estimated to be just sufficient

to ensure the water flowing to the portals.

Seven tenders were submitted for the enterprise, the lowest being

that of L. Favre, a well-known engineer of Geneva, who had completed

many notable railway works in Europe. He undertook to complete the

tunnel for £2,000,000 ($10,000,000) within eight years. His nearest

competitor, an Italian company, wanted twenty-five per cent. more, but

would not guarantee completion within less than nine years. Monsieur

Favre was supported by a body of influential capitalists, and the

contract was awarded to him.

Having sanctioned the project, the Government was determined that it

should be completed, and resolved that the engineer should be held to

his self-appointed time limit. The penalty it stipulated was exacting.

For every day over the ninth year Favre was to forfeit £200, or $1000,

for six months, and then double that penalty per day until completion.

A year was thus allowed over and above what he demanded to cope with

any unforeseen contingencies that might arise during the progress of

the task. Similarly, M. Favre was to receive a premium of £200, or

$1000, a day for every day he was in advance of the stipulated period.

His Italian competitor, while agreeable to the forfeit, stipulated that

it should not be enforced until after the eleventh year, which terms

the authorities refused to entertain. To ensure securing the forfeit

money should the engineer be late, Favre was compelled to deposit a sum

of £320,000 ($1,600,000) with the Government before a stone was moved.

No undertaking of such a magnitude as this tunnel, although protected

adequately by severe restrictions, ever has been carried out in the

face of so many vicissitudes; no engineer ever has been so harassed

as was M. Favre. From the moment the tender was signed and sealed

troubles commenced, some incidental to the task, others purposely

thrown in his way by jealous outside interests. In the first place,

the Government undertook, according to the terms of the contract, to

have the approaches to the tunnel completed so that he could commence

operations without delay. This was not done. Further opposition was

then encountered from another and unexpected quarter, which assumed

such proportions as to jeopardise the whole scheme. Italy, having

contributed about a sixth of the cost, and who therefore had an

important voice in the matter, demanded that half the work should be

granted to the Italian engineers who had been engaged upon the Mont

Cenis tunnel. This was a bitter question, and it took M. Favre two

weary months to adjust it.

These hindrances at last settled satisfactorily, work was commenced

on the northern side of the Alps at Göschenen on June 4, 1872, and

at Airolo, the southern portal, on July 2 of the following year. The

preliminary preparations were of a gigantic character. Though M. Favre

had sublet the constructional contract for the tunnel itself, he was

primarily responsible and nursed it as the engineer-in-chief. Huge

plants had to be installed at either end for supplying the various

demands for power for a thousand-and-one purposes. At the northern end

water turbines were laid down, driven from the river Reuss, a head

of water of 279 feet being available. At the Airolo end a similar

installation was established and operated under a water head of 541

feet from the Tremola. Subsequently, it was found that this latter

supply was inadequate. But M. Favre was a man of infinite resource.

He promptly built a viaduct 12,000 feet in length, tapping the Tessin

River, and thus overcame the water power difficulty. Small towns sprang

up at either end around the respective portals to house the machinery,

the workmen, and innumerable other details.

As tunnel-boring operations upon such a scale as this were in their

infancy, this engineer-in-chief perforcedly had to break a great deal

of new ground; to carry out considerable pioneer work. Hitherto, the

usual tools at the service of the excavators were the pick-axe,

shovel, chisel, and sledge-hammer; but such implements as these in a

work of this magnitude were akin to forging a mighty crank shaft with a

blacksmith’s hammer. New forces had to be created. The Mont Cenis had

demonstrated this fact, and in the course of its realisation a new tool

appeared. This was the mechanical percussion rock drill, operated by

compressed air at a pressure of 112 pounds and upwards per square inch.

To furnish the requisite energy to the tools elaborate air-compressing

plants had to be laid down. These were designed by Professor Colladon,

and they were capable of compressing 1,596 cubic yards of air to a

pressure of eight atmospheres every minute, the power being stored in

huge cylindrical reservoirs, not unlike mammoth steam boilers, from

which the conduits extending to the working faces on either side were

charged.

The scene in the tunnel was impressive in the extreme. At the working

face a little gallery was bored, about eight feet wide by the same in

height, at the roof of the tunnel. The drilling machines were mounted

on travelling carriages, with their perforating chisels jutting ugly

and business-like from the front. With the pent-up force of eight

atmospheres behind them, they rapped against the solid rock and slowly

but surely made a perforation. At frequent intervals there was a slight

stop, the chisel point was withdrawn and a jet of water, drawn from

a tender hauled up in the rear, was directed into the hole, when the

chisel instantly resumed its monotonous round. At intervals, a chisel,

with its cutting edge blunted from continual hammering at the iron-like

mass, was taken out, thrown on one side, and another inserted in its

place, to continue the attack on the rock. Progress was laboriously

slow, or comparatively rapid, according to the nature of the material

encountered. When the rock was of a granitic nature, then advance was

only at the rate of an inch or two per hour; on the other hand, when

soft, clayey material was tapped, then the chisels bored their way at

the rate of as many feet in the same time.

[Illustration: THE COMPRESSED AIR LOCOMOTIVE WHICH HAULED WORKMEN AND

ROCK BLASTED FROM THE MOUNTAIN IN THE CUTTING OF THE LOETSCHBERG TUNNEL]

[Illustration: WHAT THE WORKING FACE IN THE HEART OF THE MOUNTAIN IS

LIKE

The gang and drills cutting the path for the line through the

Loetschberg Tunnel recently completed.

BORING A GREAT ALPINE TUNNEL]

[Illustration:

_Photo by E. Goetz, Lucerne_]

THE LOFTY AMSTEG BRIDGE, 184 FEET HIGH, SPANNING THE MADERAN VALLEY ON

THE ST. GOTTHARD RAILWAY]

Three men attended to each machine, and by means of levers and

wheels the height of a drill could be adjusted to a nicety. Movement

was difficult, for the space was cramped. In the murky gloom the

outlines of the men could be faintly discerned. The fitful glimmer

of the oil-lamp which each carried--electric lighting had still to

be invented--fell upon their semi-nude bodies and swarthy faces.

The streaming perspiration mingling with the grime and dust, which

strayed over their skin in fantastic streaks, gave the men a fiendish

appearance. The temperature was that of an oven. As the men drew nearer

and nearer to the heart of old Gotthard, the heat rose until the men

laboured in an atmosphere of 90° or more. The only sounds were those

of the hammering of the drills as they bored into the rock, and the

hissing of the escaping air after it had completed its allotted task in

operating the chisels.

At long intervals there came a heavy silence. The holes had been bored

to the requisite depth. The machine was drawn far back into the boring.

Explosives were slipped into the holes and tamped home. From a safe

distance the charges were fired. A dull, smothered roar, a rending

and crumbling, and another gap was torn in the bowels of this monarch

of the Alps. The excavators hurried forward, cleared away the tumbled

debris, and brought the lumbering drill carriage up to the fresh

working surface.

Day in and day out, week after week, month by month, this round

continued. It was monotonous, and the work was hard. The stifling

atmosphere and the conditions told severely on the physique of the

workmen. Congestion of the brain, irregular action of the heart,

anæmia, or one of numerous other obscure maladies, was the reward for

their labour. Their faces assumed a deathly pallor; working in cramped

positions gave them an unsightly stoop, and deprived their legs of

movement, so they tottered rather than walked as they returned from the

scene of their toil at the end of the shift.

The pay was wretched, ranging from half-a-crown to five shillings

(from 60 to 125 cents) per day of eight hours, out of which they

had to board themselves! Needless to say, but few Englishmen or

western Europeans figured on the pay-roll, for none would accept such

starvation pay for such terrible work. The labourers were Italians for

the most part, and yet nearly one and all, by subsisting on miserable

food, consisting for the most part of a kind of meal porridge, cheap

and yet limited in quantity, saved a part of their earnings and sent

it home to their needy families in sunny Italy. The average number of

men employed was about 4000, half at either end, but at times it ran up

to as high as 7000. The mountain claimed 310 lives, killed by accident

alone, and 877 injured, before it was conquered; but, considering the

conditions, it is remarkable that the casualty roll was not heavier.

In the wake of the small heading gallery came the other gangs. These

rigged up the timber and other supports to the roof and excavated the

small opening to the full dimensions of the tunnel. Last of all came

the masons, setting the masonry lining, from 18 to 30 inches thick,

in position, for the tunnel is lined throughout. In passing through

the granite rock there was but little fear of a collapse of the roof,

but in the treacherous clay advance had to be made warily, and heavy

timbering resorted to, in order to prevent the soft soil caving in and

burying all in its sticky embrace.

The material for the headings and lining, as well as the workmen and

tools, were carried to and fro upon a small railway, the locomotives of

which were driven by compressed air--steam was impracticable, because

it would have fouled the workings; while on the short distance between

the inner end of the railway and the working face haulage was done by

horses. The privations suffered by the navvies was only equalled by

those experienced by the animals, the mortality of which ran up to as

high as twenty-five per cent. of the number employed.

Water was a constant menace, and at times retarded progress seriously.

On the south side it was particularly troublesome. Time after time

the drills or detonating charges would tap one of these subterranean

streams, and the water would pour out in a cascade. These rivulets were

of varying volume, but in one stretch, where the rock was extremely

friable, it was considered too dangerous to use the mechanical drilling

machine, so the men had to cut their way forward by hand. In so doing

they released a vast underground pocket of water, which rushed out

at the rate of over 3000 gallons per minute. At one spot it was only

by superhuman effort that headway was made, for the men were half

submerged in these torrential outbursts, escape from which was only

possible by penetrating farther into the mountain.

In 1876 another terrible calamity overtook Louis Favre. It was

discovered suddenly that the railway, far from costing the estimated

sum, would approximate over £11,500,000, or $57,500,000. Somebody had

blundered, and badly too. A deficit of over £4,000,000, or $20,000,000,

appeared certain. What was to be done? The development of such a

contingency never could have happened at a more inopportune moment.

Times were hard; money was scarce; financial crashes loomed in every

quarter of the Continent; and, to make matters worse, war was raging.

Never in the history of engineering had such an extraordinary and

unaccountable mistake been made in the estimates.

The discovery came as a thunderclap. The stock of the company ran

down like a thermometer plunged into ice. Those who had supported

the enterprise in the face of hostile criticism began to doubt the

wisdom of their optimism. A gloom settled everywhere. It appeared as

if the gigantic achievement would become numbered among the great

unpaid; would be another contribution to those unfinished enterprises

characterised as follies.

But Monsieur Favre kept going. There was the daily penalty staring

him in the face if he did not finish within time. Any prolonged delay

spelled ruin to him and to those who had financed his task. To make

matters worse, the Swiss departments who had the most to gain from the

completion of the railway steadfastly refused to extend the slightest

assistance.

Matters reached a crisis. Either the money must be found, or that

already spent must lie buried in the mountain. An International

Conference was called to consider the situation, where, as prominent

cities and railways who hoped to reap something from the completion

of the tunnel promised support, Germany, Switzerland and Italy agreed

to increase their subventions. Much of the projected work originally

contemplated was postponed indefinitely in order to reduce the first

cost.

This readjustment of the financial situation enabled work to be resumed

energetically. But Favre was harassed sorely still. Payments for work

became irregular, and every possible obstacle that could be placed

in his way was forced to the front by intriguing opponents. Efforts

were made even to create a rupture between him and the International

Society, but Favre’s unflagging perseverance and determination resisted

all such machinations, and he plodded along resolutely.

However, these worries and his feverish anxiety to succeed in his

enterprise told upon his health. He never lived to see his great

achievement completed. On July 19, 1879, while inspecting the progress

of the work at the headings, he was seized with an apoplectic fit, to

which he succumbed in a few hours. Literally in harness, this guiding

spirit and clever engineer passed beyond the veil when the tunnel, the

crowning effort of his life, was rapidly approaching completion.

His mantle fell upon his right-hand assistant, M. Hellwag, an

accomplished German engineer, and he pushed forward the scheme with

an energy characteristic of his late chief. But friction again rose.

Swiss engineers were jealous of this appointment, and at last in sheer

disgust the new engineer-in-chief threw up the work. He was hounded

from his post, despite the fact that on another section of the railway

he had overcome ingeniously the negotiation of sharp ascents within

short distances, which otherwise appeared impossible, by the invention

of a spiral tunnel, wherein the railway burrows into the mountain side,

describes therein a complete circle, and emerges again immediately

above the portal by which it entered.

On Saturday, the 27th of February, 1880, while the workmen on the

Göschenen side were tearing the vitals out of the peak, they were

surprised to find large masses of rock falling about their ears without

any effort on their part. They stopped. The situation seemed uncanny.

They listened intently, and then heard the familiar sound of a muffled

roar, indicating blasting in the heading. The workmen on the Airolo

side were upon them. Terrified lest the next concussion might bury them

beneath a mass of rock, they hurriedly retreated and waited. Presently

one espied the point of a chisel ploughing through the rock towards

him. He grasped its extremity, but as quickly dropped it, for it was

so hot that it burned his hand. Frantically these men rapped upon the

last remaining wall of rock to inform their comrades on the other side

that they were through. With lightning-like rapidity the news flashed

through the Göschenen workings that the men from the Airolo side might

be seen at any minute, and that the task of eight weary years was

consummated practically.

As quickly the news flashed from Göschenen to the Airolo portal to

cease work, since it was decided that the last blast tearing away the

final thickness of rock should be the occasion of great jubilation.

The whole country was excited. Officials hurried to the scene, and

the countryside from far and near flocked to the two mouths of the

tunnel. There was no sleep for any one in the constructional camps

that Saturday night. The men were in a perfect state of frenzy. In

the darkness the preparations for the culminating move were hurried

forward. It was arranged that as the men on the Airolo heading had

first pierced the last partition of rock, they should have the honour

of blowing the gap which would afford access from one side of the

mountain chain to the other through its base.

At seven o’clock on the Sunday morning a train started from each end

laden with invited guests to witness the final operation. Amid many

huzzas they disappeared into the dark, yawning mouths of the great

bore. When each party reached the heading the machines were already

at work. Only a foot of rock stood between those who had journeyed

up from Airolo and the others who had travelled from Göschenen. The

distinction of making the breach a thousand feet under the village of

Andermatt nestling in the sunshine on the mountain slopes, and with

the little lake of Sella 3000 feet above one’s head, was given to two

Piedmontese workmen, Neccaraviglia and Chisso, who had toiled in the

Cenis, and afterwards in the Gotthard, since its very commencement.

The last charges were rammed home, and at 11.45 on the Sunday morning

eight rumbling detonations heralded the piercing of St. Gotthard. Ere

the smoke had cleared away the men sprang forward. There was the final

breach, about three feet in diameter. Engineer Bossi sprang through the

gap, and emotionally embraced his confrere on the other side, followed

by his workmen, who shook hands with their comrades. It was a strange

scene in the depths of the Alps, and the wild vivas of those assembled,

to the memory of Louis Favre, reverberated weirdly down the shaft on

either side.

The excavations of the works to the full dimensions and the lining up

of the last section proceeded with great rapidity, and on May 22, 1882,

amid great festivity, the tunnel was declared open. It had taken ten

years to complete, but had Favre been left to his own devices, and had

he not been exposed to financial harassing and intrigue, and had not

his successor Hellwag been driven from his post, it would have been

finished in the time the engineer contemplated. At that time Favre’s

skill, pluck and unflagging devotion to his task were not appreciated,

but recognition of his genius was afterwards extended by the erection

of a monument to his memory at the Airolo entrance to the tunnel. It is

safe to assert that it was due to his enterprise and grim determination

in the face of adversity that the St. Gotthard tunnel became an

accomplished fact, and resulted in the reduction of the journey between

Northern Europe and Italy by thirty-six hours.

In addition to the tunnel, 172 miles of line had to be built to connect

the Swiss with the Italian railway systems. From the body of this

frowning clump 31,800,000 cubic feet of rock were torn by means of

2,200,000 pounds of dynamite.

The remaining sections of the railway named after the tunnel abound

in interesting features from the technical point of view, the most

notable, possibly, being the remarkable spiral tunnels to which

reference has been made, and the successful application of which in

this instance has been reproduced upon other railways where similar

conditions prevail. The best examples, possibly, are those by which

the Biaschina gorge is negotiated, since here there are two of these

tunnels side by side, the railway almost describing a figure 8 in

corkscrewing from one level to the other. Exclusive of the Gotthard,

there are no less than 76 tunnels and galleries, aggregating 29 miles,

as well as 1,384 other structures, 324 being bridges and viaducts

over 39 feet in length. In one stretch of 7 miles, in skirting the

south-eastern arm of the Lake of Lucerne, the railway passes through

9 tunnels, ranging from a mere 85-feet burrow to others 6,512 feet in

length. Among the Gotthard fastnesses the railway work becomes bolder,

the bridges are lofty, while the line zigzags in a remarkable manner.

It is a case of tunnel, cut and bridge all the way. Up to 1880, when

the railway was finished practically, constructional work provided

regular employment for 10,757 men.

So rapidly did the volume of traffic upon the railway swell, however,

that it became extremely difficult to handle it, as there was only

a single line, except in the tunnel and at one or two other points.

The provision of another track became imperative, and in 1886 it was

commenced. This was not a simple matter, as the new work had to be

carried out without interrupting traffic in any way--that is, so far

as the main through service was concerned. With the exception of the

Gotthard and four smaller tunnels, all the other structures had to be

excavated out to carry the second pair of metals, while, similarly,

all bridges had to be increased in width. In order to finish the work

as rapidly as possible, the task was divided up into a number of

small, separate contracts, each covering a few miles. Vehicles for the

conveyance of constructional material were provided and supplies were

hauled free of charge by the railway, while explosives for blasting

were sold at cost price.

The most difficult works were carried out by the company itself by

its own engineers and labour. In this comprehensive widening system

over 100,000 cubic yards of rock which had been excavated from the St.

Gotthard and dumped in the vicinity of Airolo were reclaimed, to be

used in the building of embankments, revetments and retaining walls.

The tunnel widening was carried out almost exclusively at night and on

Sundays, since the smoke from passing trains would have impeded such

work during the day. The quickest methods of widening were adopted,

and in the approach to the Bristen tunnel an excellent expression of

this is afforded. Instead of trimming back the mountain-side to provide

space for the second pair of rails, a gallery was built projecting

from the mountain and supported on heavy masonry pillars, giving the

appearance of a colonnade.

In the handling of unavoidable night trains an elaborate protection

system was adopted in connection with the tunnels, to prevent disaster

to the trains themselves or to the working gangs. No trains were

permitted to enter a tunnel until assurance had been made doubly sure

that there was no constructional train standing on the only line to

court collision, and that the workmen were safe. Each working squad

was covered amply by electric and other signalling devices. Similarly,

all metallic structures that required moving were handled on Sundays,

when traffic was at its lowest ebb, between the scheduled movements

of passing trains, so that the latter might not be delayed. It was

estimated that this work would occupy nine years, but in reality it was

accomplished in five and a half years, and the total cost of widening

the whole mileage to a double line was only £500,000, or $2,500,000.