CHAPTER II

THE ROMANCE OF CONSTRUCTION

Though the task of deciding the path for the railway teems with

excitement, adventure and privation, the battle with Nature commences

in grim earnest when the constructional engineer arrives on the scene.

On paper it seems a simple task to follow the location as indicated by

an unbroken row of wooden stakes, but to carry the surveyors’ work to

completion, and to comply with requirements as to grades and curves,

often proves a heart-rending undertaking. No matter how formidable any

obstruction may appear, it is the work of the builder to beat it down;

to overcome it by some means or other with the minimum of expense. He

must be baulked by nothing.

Such a task demands a man of illimitable resource and infinite

ingenuity, conversant with every phase of civil engineering. At the

same time he must possess the happy faculty of being able to organise

great armies of men of all nationalities, and in such a manner that he

can get the utmost out of them. This is a searching difficulty. The

camp of to-day upon a large railway undertaking is a heterogeneous mass

of humanity; the confusion of tongues at the Tower of Babel could not

have been more embarrassing. I have lived among the camps of Canada

and the United States, and among a hundred men it has been no uncommon

circumstance to find representatives of a dozen different tongues.

The control of such men is rendered all the more complex for the

reason that in the majority of cases they have little or no knowledge

of any language but their own. It is not until they have been in one

another’s company for several weeks that inter-conversation becomes

possible. In addition to this drawback there are always the peculiar

troubles incidental to racial and religious prejudices confronting the

commander-in-chief, and at times he is hard pressed to preserve order

and authority.

This trouble is not experienced to any great degree in connection with

railway building operations in Great Britain, but abroad the initial

difficulties of this character are exasperating to a superlative

degree, more especially where reliance has to be made upon native

labour. The workmen have to be educated into the use of labour- and

time-saving implements. This is no easy matter. The native entertains

strong opinions concerning his own ability, and the conversion from the

primitive to the up-to-date scientific has to be effected gradually and

unconsciously, a task which demands considerable tact and patience. A

great amount of time must be expended necessarily in the early days to

drill such raw material, but perseverance and an equable temper are the

only virtues. In Mexico the railway pioneers found it almost hopeless

to impress upon the pæons, as the navvies are called, that to carry

ballast in a basket slung upon the back was not to be compared in speed

and efficiency with conveyance by small trucks pushed along a tramroad.

It was only by carrying out the work themselves in this more modern

manner that the engineers could teach them the superior advantage of

this method, with its sparing of effort and fatigue. In fact, the only

way one can convert the raw native to ideas entirely foreign to his own

custom is to show him how he can save himself trouble. Then he will

adopt the idea with alacrity.

Now and again, however, the white man, despite his ingenuity in the

devising of time-and labour-saving appliances, has to bow to the

inevitable. For instance, in India the Hindoos toil at such a low daily

wage that in many phases of work the wonders of mechanical invention

cannot compare with their crude efforts in cheapness. It comes as a

heavy blow to the engineer’s pride to realise that he must abandon his

elaborate plant and that the native holds the balance between failure

and success.

Again, in the South Americas the _laissez-faire_ attitude of the

inhabitants galls him to the quick. In the southern part of the New

World the policy is “Never do to-day what can be done to-morrow,”

and the native acts up to the very letter of the aphorism. Religious

festivals, each of which is regarded as a holiday, occur with the most

tantalizing frequency. It is no uncommon circumstance for two or three

such orgies--they scarcely can be described as anything else--to occur

in a week, and the labourer is a commendable zealot in the observance

of the religious feasts. The engineer may fret and fume at the delay,

but unless he is in a position to recruit outside labour he must

tolerate the frequent interruptions in the work with the best grace

he can muster. In the mountainous regions of South America the native

knows only too well that he holds an unassailable advantage, for he

is accustomed to the rarefied atmosphere encountered in the extreme

altitudes, whereas it plays sad havoc with the strongest constitutions

of Europeans.

Strange to say, one of the most conscientious workmen in railway

building, as in other fields of industrial endeavour, is the Chinaman.

From a cursory point of view this appears inexplicable, but it must

be borne in mind that a Celestial’s word is his bond. Johnny will

haggle and argue for hours over a bargain, but when he finally accepts

the terms he will fulfil the contract to the letter, even should he

ascertain before he has completed the task that it involves him in a

personal loss. I have seen these men pick up their tools as the clock

struck the hour for commencing the daily task, plod along quietly and

continually until the hour of cessation, and give an indisputably good

return for their daily wage. Can the same be said of the workmen of

any other nationality? I am afraid not. In fact, the steadiness of

the Chinaman has become so famous and has proved so reliable that it

is safe to say that many of the biggest railways of the day never

would have been completed but for his aid. It enabled the first

trans-continental line to be carried across the United States to link

New York with San Francisco; through Oriental labour the Canadian

Pacific was consummated, and many another great undertaking of a like

nature could tell a similar story.

The same spirit prevails when the scene of activity is removed to China

itself. The Celestial may entertain quaint ideas concerning the iron

road and its scope of utility. He may slave hard to-day laying the

track, merely to pull it up again on the morrow on the plea that it is

disturbing the spirits of his ancestors. But nevertheless he completes

his part of the bargain in the first instance. Strikes are unknown and

disputes never arise unless the employer declines to stand by his side

of the contract. China is permeated through and through with secret

societies or Guilds--Trade Unions, if you like--to one or other of

which every Celestial belongs. The white engineer when he first arrives

in the country finds it very difficult to make headway, but in reality

he is on probation in the eyes of the Orientals. They are watching

closely his methods, fathoming his code of honour, his capacity for

handling men--in fact, are investigating him just as closely as if he

were under a microscope. Once he has established his reputation and

has inspired confidence, he need entertain no further apprehensions

concerning trouble.

Yet the Celestials have their own peculiar and effective way of

settling disputes among themselves. The engineer in need of a few

thousand men negotiates for brawn and muscle through a middle-man

or labour contractor. The engineer concludes his bargain with this

worthy, and the latter makes his own terms with the men. He recruits

the navvies at a certain wage, which he takes care to leave him a

wide margin of profit. Occasionally he will be too grasping and will

resort to sweating tactics. When the labourers find this out trouble

looms ahead. The men report the matter to their Guilds, who take the

avaricious middle-man in hand and make him disgorge some of his

ill-gotten gains. If he refuses, well, one day the contractor is

missing, and never is seen again by the engineer. No questions are

asked and no explanations for his disappearance are offered. He has

settled his account with the Guilds to his own personal disadvantage.

The engineer, however, knows nothing about the dissatisfaction until he

observes the absence of the contractor, for the work meantime continues

its daily round undisturbed.

Although labour is a vital consideration, it is but one cog in the

complex machine by means of which the iron road is driven forward

through a new country. Without tools the efforts of the navvy would

count for naught, and as time has rolled by inventive effort and

engineering skill have contrived more and more wonderful devices to

enable the epoch-making work to be fulfilled in the shortest space of

time. There is the steam shovel, which will remove two and a half cubic

yards of miscellaneous rubble with every swing of its ponderous arm;

the grader, whereby the soil is ploughed up and displaced by an endless

chain of buckets into capacious wagons for removal; the drag shovel,

a huge scoop attached to the end of a chain which is pulled along the

ground from a stationary point by steam power, becoming charged with

material in its progress, and thus fashioning the cutting; the monitor,

whereby tons of gravel are washed down the mountain-side under the

disintegrating force of a powerful jet of water similar to a fireman’s

hose; and a host of other wonderful implements, all devised for the

express purpose of expediting the work in hand. Gunpowder and dynamite

are invaluable handmaids, and to-day are used with an astonishing

prodigality. Indeed, when the advance is through rock their services

are indispensable. Crags, cliffs and even whole hills are blown away

bodily by their agency, and the cost often runs into thousands of

pounds, miniature volcanoes being produced by the upheavals.

[Illustration: A RAILWAY CONSTRUCTION CAMP AMONG THE MOUNTAINS]

[Illustration: BUILDING A HIGH BANK ON THE DELAWARE, LACKAWANNA AND

WESTERN RAILWAY, U.S.A., BY MODERN METHODS

An overhead cableway was stretched across the depression, from which a

swinging line was suspended, and on which the trucks were backed to be

emptied.]

Those who have travelled over many remarkable railway systems in

various parts of the world where striking evidences of the

engineer’s skill are apparent upon a liberal scale, have pointed to

the absence of any such evidences of activity in these islands--“The

Home of the Railway.” But this to a certain degree is inevitable. The

engineer was not faced with such physical conditions when he essayed

to gridiron this country as confronted him in the Americas or Asia.

There are no towering ranges of eternally snow-wreathed mountains to

overcome, no wildly boiling wide rivers to span, no yawning canyons to

thread or stretches of sterile desert to traverse. Yet when Stephenson

and his contemporaries sought to achieve the railway conquest of Great

Britain they encountered many obstacles which to them, with their

crude appliances, were every whit as stupendous as those which rear up

before the engineer to-day, although he is equipped with an extensive

assortment of heavy artillery to assist him in his contest against the

forces of Nature. Moreover, some of the expedients which Stephenson

evolved to overcome a difficult situation are practised to-day merely

because the intervening eighty years have not provided any better

solution of a problem of a similar character.

[Illustration: THE HUGE STEAM SHOVEL WHICH TAKES SOME 3 TONS OF SPOIL

WITH EVERY BITE]

[Illustration: THE DRAG-LINE SHOVEL WHICH SCOOPS UP THE EARTH IN THE

CUTTING AS IT IS PULLED ALONG

THE RAILWAY BUILDERS’ HEAVY ARTILLERY]

Every one has read how Stephenson was for a time nonplussed by the

treacherous bog Chat Moss, across which now speed the expresses of the

London & North-Western railway. It is the largest stretch of swamp in

the country, and many wiseacres prophesied that there Stephenson would

meet his Waterloo when he essayed to carry the Manchester & Liverpool

railway over its unstable surface. Yet Stephenson plodded along

unconcerned and achieved success in a novel manner. He laid branches

of trees and hedge cuttings upon the surface of the bog, and upon the

softest patches pressed hurdles intertwined with heather into service.

Upon this network he laid a layer of rock and gravel, which caused the

foundation to sink somewhat into the morass. This formed the permanent

way, and its peculiar character provoked more than one scornful

criticism. But its stability confounded the critics.

To-day in foreign countries where huge stretches of swamp bar the

progress of the iron road the self-same principle is adopted, and it

is known as “corduroying” or “cross-waying.” In the northern States,

Canada and Siberia--the latter country and Canada especially--the

“muskeg,” or “tundra,” as this treacherous land is called, often

stretches for miles. One can sound it sedulously to a great depth, and

then will fail to touch the bottom. The soddened decayed vegetable

matter merely fills a large depression which cannot be drained.

The builders waste no time attempting to build up a solid earthen

embankment resting on the submerged solid floor of the bog. They

fashion a huge mattress of trees. Large trunks are laid horizontally

and longitudinally to the track. Upon these are laid transversely two

or three layers of shorter logs, the whole being secured together

firmly. A topmost layer of branches forming a kind of thatching

completes the structure.

At times these mattresses assume respectable proportions. I have stood

beside some almost as thick as a man is tall, and they constituted

quite formidable pieces of work. When the corduroy is completed a

layer of rock is applied, and upon this is dumped the gravel and other

material forming the embankment. Under the weight thus superimposed the

mattress sinks deeply into the morass and rests firmly. The earthen

ridge is continued to the requisite height; the whole of the embankment

for the track rests upon the fabrication of tree-trunks. Yet the whole

is just as solid as if resting upon granite. One might remark that it

appears an indifferent foundation upon which to pile up a mass of earth

weighing several hundred tons, and that in a short time the wood, under

decomposition and collapse, would precipitate a subsidence. But as a

matter of fact, the corduroy grows stronger with every passing day.

The wood immersed in the viscous liquid and preserved from all contact

with the atmosphere becomes waterlogged, until at last it assumes the

character of bog-oak and is practically indestructible.

Stephenson was called upon to cope with another critical situation

upon the same railway. The great tunnel at Kilsby was in course of

construction, but work had not proceeded very far when the contractors

struck a large pocket of water and quicksand. They combated this

adversary for several months, and then, unable to make any appreciable

headway, threw up the contract. Efforts were made to induce other

firms to accept the task, but in vain. At last Stephenson was called

upon to rescue the undertaking from failure. The outlook was far from

promising, for the shaft was being sunk through material which the

engineer always regards askance--a shale--while the fault in which

reposed a large volume of water and sand was of large proportions.

Stephenson concluded that the best way to cope with the problem was to

pump out the water first, and accordingly he rigged up an elaborate

plant capable of handling 1,800 gallons per minute, and this was kept

going day and night. Even then, however, it was only by superhuman

effort that the water was kept down. One day after Stephenson had been

on the scene about six months, the water got the upper hand and flooded

the tunnel to such a depth that the men and materials had to be floated

in on rafts.

This undertaking, however, served to demonstrate to those anxious to

participate in railway-building speculations how estimated expenses

for definite work might be sent astray seriously, and how formidable

and ubiquitous was the unexpected factor in such work. The original

contractor offered to complete the burrow, 7,169 feet in length, under

the Kilsby Ridge for some £90,000. By the time the last brick of the

lining had been laid and the tunnel was ready for use over £300,000 had

been expended.

The attempt to pierce this tunnel at that time, however, was a far more

difficult enterprise than it would be to-day. The engineers had not the

powerful marvellous appliances such as serve the contractor’s purposes

now. Electric energy was unknown, the hydraulic shield for driving

tunnels had yet to be invented, the steam shovel had not been thought

of--in short, the contractor was handicapped on every side by the crude

character of his tools. Some of these appliances which the modern

railway-builder uses are little short of wonderful, both in time- and

labour-saving qualities, and the majority have been born of necessity.

For instance, in the early railway days on the American continent

too much time would have been occupied in building lofty earthen

embankments among the mountains. Accordingly the rifts and gullies were

spanned by timber trestles. But the woodwork was perishable, and there

was always the risk of fire demolishing the structure and precipitating

disaster to a passing train. The obvious remedy was to replace the wood

by metal, but the expense was a deterrent factor.

One day a workman on one of the mountain sections suggested that the

woodwork should be left intact, but buried beneath a mass of earth.

The suggestion was received with ridicule because, as the divisional

engineer pointed out, several thousand men and several hundred trucks

and dozens of locomotives would be required to handle the material,

while the time the task would occupy was incalculable. The workman

listened to the criticisms, and then interposed with the quiet comment

that he did not suggest using any trains and trucks, and that a few

dozen men would be ample to complete the work. The divisional engineer

was somewhat astonished, and at first thought the man had taken leave

of his senses. Then the workman revealed his intentions. He would

not resort to steam shovels or any other device of that character.

He had observed minutely and tested the power of a jet of water, and

consequently had conceived an idea to wash down masses of gravel by

means of very powerful jets of water. There was no need even to rig

up a steam engine and pump to supply the requisite force to the water

flying from the nozzle. High up on the mountain-side was a creek. A dam

could be thrown across this torrent at little cost, and the pent-up

water could be led down to the working site below through piping, and

the pressure thus secured by gravitation would be more than ample for

the purpose. The gravel as washed out of the hillside would be directed

into wooden conduits and led to points around the trestles, where it

would be discharged to build up the embankment.

It was a simple means of overcoming a perplexing difficulty. The

divisional engineer was so impressed with its feasibility that he

secured the requisite permission for the workman to put his suggestion

into practical form. The creek was dammed by throwing trees from

bank to bank, and from the little pond thus formed the water was led

several hundred feet down the mountain-side through pipes to the large

nozzles. A small network of timber conduits were fashioned to convey

the displaced gravel to the feet of the timber trestle.

In a short time work was commenced, and as the jets of water struck

against the solid face of the mountain, the soft earth and gravel were

washed out at tremendous speed. Heavy streams of mud poured down the

conduits. The hill disappeared like magic under the scouring action of

the harnessed water, to reappear in a symmetrically-shaped ridge around

the woodwork, which grew rapidly in height until the level of the

railway was gained. The embankment thus formed was found to be as solid

and stable as if built by dumping, and the whole task was accomplished

in a few weeks. While the work was in progress the chief engineer

and his lieutenant visited the spot and watched the building of the

embankment by hydraulic sluicing with intense interest. Its complete

success in this initial experiment secured its adoption, and in a short

space of time, where the conditions permitted, all the trestles among

the mountains were buried beneath a ridge of earth built up by a jet of

water.

While I was being shown some of the most impressive pieces of railway

engineering among the Cascades, my cicerone, an English engineer and

railway-builder, after describing the features whereby the Great

Northern railway is taken down to the coast, remarked, “I wonder what

Brunel would have done among these mountains? I guess he would have

revelled in the difficulties they offered.”

There is no doubt that the great engineer would have found the ascent

of the steep slopes and the crossing of the great gulches an extensive

field for the exercise of his genius. His work among the vales of

Cornwall and along the rugged seashore of Wicklow, Ireland, indicate

this fact only too plainly. In these two districts are to be found the

nearest approaches to spectacular work that these islands can afford.

True there are no wonderful loops and great terraces winding up and

down mountain-sides, but there is the daring and lofty spanning of

yawning valleys, and the driving of a narrow pathway along steep rocky

slopes.

For something like half a century Brunel’s spidery timber viaducts of

Cornwall constituted one of the sights of that county. The location,

with its grades and curves, as carried through Cornwall, has been

assailed by many critics, but it must be remembered that when Brunel

penetrated the English Riviera, railway operation was very different

from what it is to-day. Engines and train loads were light, while

money was by no means plentiful. The engineer was compelled to

achieve his object at the most moderate cost, but the very fact that

he was hampered in this connection served to influence him in the

accomplishment of monumental work. His timber viaducts were remarkable

for the novel character of their design and their extent. In the course

of sixty miles he had to span no less than thirty-four valleys in this

manner, the aggregate length of the wooden structures being about four

miles. The engineer adopted timber as a constructional material because

it was cheaper than iron, and American oak was used extensively. Some

were of great height, the St. Pinnock viaduct, for instance, carrying

the train 153 feet above the bottom of the valley, while others

attained great lengths, the Landore viaduct measuring 1,760 feet from

end to end.

These evidences of Brunel’s work, however, are disappearing under the

exigencies of to-day. Timber is being replaced by steel and granite to

meet the increased weights and speeds of trains. The location through

the county also is undergoing revision, the sharp curves introduced by

Brunel being eased or eliminated, while the grades are being flattened.

Consequently in a few years the name of Brunel in Cornwall will be

naught but a memory. Fortunately other evidences of his handiwork

abound on this system notably in the Saltash, Chepstow and Maidenhead

bridges, as well as the Box and Foxwood tunnels.

In Ireland, however, a far more daring expression of his skill is

offered. This is the stretch of line along the seashore between Bray

and Wicklow, which now forms part of the Dublin & South-Eastern

railway. This was the first stretch of iron road to be opened in the

Emerald Isle, the original one and three-quarter miles being operated

in the first instance by the system of atmospheric propulsion, whereby

the train was hauled along the metals by suction.

When it was decided to connect Wicklow with Bray, the trying character

of the country lying between the two points, and especially of Bray

Head, demanded a masterhand to effect the location and to carry the

building operations through to success. It was a matter of sixteen

miles, but they proved perhaps the most trying sixteen miles of railway

construction ever attempted in this country. It was stated that Bray

Head would defy conquest, for it was approachable only through very

rocky country, and it is quite possible that the gloomy outlook

was responsible for tempting Brunel to achieve something bold and

striking. There was no need to have carried the line in this direction,

a fact which is realised to-day, for by making a detour inland an

easier location could have been found, and the present generation

would not have been called upon to pour out heavy sums of money to

keep their line intact. Brunel’s vanity has cost the railway company

several thousands of pounds since the line was opened. It is only by

superhuman effort that the railway is not devoured by the sea, over

£40,000, or $200,000, having been expended in defence works over this

sixteen miles of line during a period of ten years alone.

Apart from this unsatisfactory feature the line is a constant source

of anxiety. A little to the south of Bray is Bramstone tunnel and a

wild ravine. This gulch attracted the engineer. Instead of avoiding

it, he bridged it with a wooden viaduct 300 feet long by 75 feet high.

Before it was quite completed it was destroyed in a single night, the

demolished timbers being carried out to sea. A few years later, while

a train was crossing, the engine left the metals and precipitated a

sensational accident. Investigation revealed the fact that it was due

to the action of the waves, which, battering against the piers of the

viaduct, had so vibrated the structure as to throw the rails out of

gauge.

Thereupon it was decided to abandon the viaduct and drive the line

directly through the rocky promontory. The traveller still can see

traces of the original route in the decaying approaches to the gap

formerly conquered by a timber trestle.

[Illustration:

_Brack, photo_]

THE PECOS VIADUCT ON THE “SUNSET” RAILWAY, THE HIGHEST STRUCTURE IN THE

UNITED STATES, THE TRACK BEING 321 FEET ABOVE THE WATER BELOW]

Still it was a grim fight with Nature for every foot of the way. A

mere ledge suffices to carry the track, and this gallery is often at a

level of seventy feet above the sea beneath. Here and there the line

is enclosed by a roof recalling the snow-sheds of the Selkirks or

Cascades, to protect the rails from stones bouncing down the cliffs.

Curiously enough, the method in which Brunei drove his line along this

forbidding wild shore recalls the staggering feats accomplished in the

American mountains, and indeed a journey over this railway will provide

a thrill in miniature such as results from a toil through the mountain

backbone of the New World. The dislodgment of massive boulders and

landslides are so frequent that flagmen have to be retained to keep a

vigilant eye on the track and to warn passing trains. At places long

walls have been erected high on the hillside to arrest the descent of

the movements of loose rock on the one hand, while on the other the

cliff face has been cut into terraces to break the force of the waves,

and together with retaining walls and groynes, seek to counteract the

insidious erosion of the sea.

[Illustration: THE TRACK LAYER, WHEREBY THE METALS ARE LAID AT A SPEED

OF 3 OR 4 MILES A DAY, CROSSING A HEAVY TIMBER TRESTLE]

When Bray Head has been passed the physical character of the country

changes with startling suddenness from jagged rock to clay. Here the

engineer was brought to fierce grips with his adversary. The clay is

honeycombed on all sides with springs, and there is a constant war

between the engineer and Nature for supremacy. Building the line was

exacting indeed, but the puzzles which had to be unravelled then are

equalled by those attending the preservation of the road. The battle

was waged relentlessly for some years, but the sea won; the engineers

were compelled to re-lay their track some distance inland.

The shareholders in the railway are paying dearly for Brunel’s colossal

error. Indeed, it is a poor return for an outlay of over £400,000, or

$2,000,000, which were sunk in this sixteen miles of line. It may be

wonderful engineering, but it is not business. The railway company are

anxious to abandon this location and to rebuild the line along the

route it should have followed in the first instance. At the present

such a result is not financially possible, but its realisation is

merely a question of time.

One inspiriting phase of the railway-builder’s work is the race

against time, and in the fulfilment of such a task many an astonishing

performance has been achieved. When one of the great American railways

was pushing its way to the Pacific coast, it required a tunnel to be

driven for two miles through the Cascades. It was a daring piece of

work, and the railway company, after considering the scheme, decided

that it could be accomplished cheaper and more quickly under contract

than by direct labour. Upon the advice of their surveyors they set the

time for its completion at twenty-eight months. Considering the remote

situation of the work the feat was considered absolutely impracticable,

and no recognised contractor could be prevailed upon to incur the risk.

The company, however, was convinced that some daring spirit existed who

could, and would, fulfil their requirements, so they advertised for

tenders. When these were perused it was found that one man was willing

to meet the time-limit and at a price far below competitors. His bid

was accepted. That man was Bennett, and he lost no time in setting his

carefully-laid plans in motion.

He was over three thousand miles from the country in which the tunnel

was to be driven, yet before the ink on the contract was dry he had

wired to his assistant on the Pacific coast to hurry forward all

requisite appliances, while he himself purchased an elaborate plant of

the most modern type to be shipped to the railway point nearest the

site. From this station he had to transport every ounce of material for

a distance of eighty-two miles through the roughest and most broken

mountainous country it is possible to conceive.

There was no road, so he had to blaze one through the deadfall and

littered rock, fording creeks and streams and toiling through viscous

mud. The wagons sank above the axles, and had to be hauled through the

muskeg by block and tackle. In this way, by sheer physical effort,

he gained the mountain which was to be pierced. It took him a solid

six months to get his forces and artillery to the spot, leaving him

scarcely twenty-two months in which to hew the passage through the

solid rock.

So pressing was time that he never permitted an hour’s cessation day or

night. An agent on the coast recruited men by the score and dispatched

them up country in large corps. As they arrived they were divided into

six-hour shifts on either side of the mountain, and in this way toil

was continued unbrokenly throughout the whole twenty-four hours. When

he had settled down to work in grim earnest wages were absorbing money

at the rate of nearly £2,000, or $10,000, per week.

Preliminary to embarking upon the contract he had prepared careful

calculations showing him how much rock it was requisite to remove every

day to effect completion in time, and he made up his mind to hold to

this table by hook or by crook. A tunnel face is not a spot where much

leeway can be made up, for only a certain number of men can be crowded

upon its limited area. But he met this disadvantage by spurring the

drillers to superhuman effort by the offer of an attractive bonus. In

this way he was able to maintain the advance he had calculated per

day until the heart of the mountain was gained, when owing to the

extreme hardness of the rock the men could not help falling behind the

scheduled progress. Now and again, however, when they encountered a

softer stretch of material they were able to make up lost time.

The months sped by; the contracted time for completion loomed nearer

and nearer. Determined not to be beaten, Bennett urged his drillers

harder and harder, offering fancy wages for additional effort. The

strain wore him almost to a skeleton; he scarcely slept, so haunted was

he by the determination to fulfil his side of the bargain. Checking and

rechecking of the finished work convinced him that the opposing parties

could not be far apart in the heart of the Cascades.

One morning the men on one side paused momentarily in their drilling.

They could hear the faint muffled chink, chink of drills. It was the

party advancing from the west. With a loud cheer, answered by a ghostly

sepulchral hurrah, both parties bent to their tasks with redoubled

energy. Before long a gaping hole was revealed in the heading. The two

forces had met--the tunnel was pierced. Without hesitation they set

to widening the breach out to its appointed dimensions, and at last,

with a sigh of relief, threw down their tools. The tunnel was finished

practically, and there were seven days or so to spare.

In another instance a railway company required a bridge to be opened

within a certain period. Its accomplishment on time meant the accretion

of a large sum of money to the treasury, and accordingly a bounty of

some £5,000, or $25,000, was offered to the firm building the bridge.

The latter in turn offered a portion to the men responsible for the

actual work. Under the incentive of this offer the riveters and

erectors strove might and main. The odds were against them hopelessly,

but general co-operation enabled the work to go forward with great

speed. By maintaining this high pressure the huge fabric assumed its

definite shape in quick time, and the last rivet was driven home with a

resounding cheer a few minutes before the expiration of the stipulated

time.

Yet railway construction has its farcical side, especially in America.

Conflicting interests often clash, and then lively times ensue. In

Canada it has been no unusual sight to see an existing railway rush a

large gang of workmen to a point threatened with invasion by a rival.

Their presence ostensibly is to improve the line in possession, but in

reality the men are drafted there to thwart the competitive enterprise.

This is the “fighting gang,” and it is rightly named, because the

opposing forces often meet and a free fight results.

When these tactics are waged by opposing railway magnates the

struggle is often bitter and long drawn out. It was so when J. J.

Hill and Harriman came to close grips in Oregon. The former great

railway-builder decided to carry a line down to the coast along

the bank of the Columbia River. Harriman construed this act as an

invasion of his preserves, and spared no effort to defeat the “Grand

Old Railway-Builder of the West,” as J. J. Hill is called popularly.

Directly Hill’s proposals became known, Harriman, to secure his legal

status, revived a defunct project known as the “Wallula Pacific

railway,” which had been incorporated so many years before, and yet had

accomplished so little, as to be forgotten. Hill was coming down the

north bank of the Columbia, and suddenly Harriman discovered that his

moribund project was to follow the same course. The result was that

two rival constructional forces appeared on the scene, one bent on

building a line, and the other determined to prevent its realisation.

A hail of rock rained from one camp to the other, and the grade was

demolished as rapidly as fashioned. One day the Hill navvies were in

possession, the next, through being outnumbered, they were driven out

and the Harriman army held the position, only to evacuate it when

the former reappeared with reinforcements. No blood was spilt, but

it came perilously near it when a navvy on one side threw a piece of

rock harder against an opposing workman than the latter appreciated.

Injuries were numerous, and one day the aspect became so threatening

that a pitched battle appeared certain. At times, however, the battle

became Gilbertian. The rivals merely played catchball with pieces of

rock, tossing the missiles at one another with considerable banter and

amid a rain of jokes.

For eighteen months this state of affairs prevailed, and then the

courts deciding against Harriman, he was forced to retire from the

scene. Directly he did so, his gangs of navvies walked over to the

opposite camp, because from their point of view Hill’s money was just

as good as that of Harriman. It was immaterial to them for which side

they worked, so long as they were paid for it. The result was that the

two gangs which had been engaged in more or less deadly strife, now

worked harmoniously side by side to carry the Hill line into Portland.

Such tactics as these, however, come somewhat as an interlude to the

grim tussle with Nature which is the railway-builder’s invariable lot.

The Railway Conquest of the World · 第 2 / 26 章