GENERAL CONSTRUCTION.

A horizontal cross-section of the apparatus is shown in fig. 7, and a

vertical cross-section facing the front is given in fig. 8. Other

details of structural steel are seen in fig. 9.

In constructing the new chambers, the earlier wood construction, with

its tendency to warp and its general non-rigidity, was avoided by the

use of structural steel, and hence in this calorimeter no use whatever

is made of wood other than the wood of the chair.

To avoid temperature fluctuations due to possible local stratification

of the air in the laboratory, the calorimeter is constructed so as to be

practically suspended in the air, there being a large air-space of some

76 centimeters between the lowest point of the calorimeter and the

floor, and the top of the calorimeter is some 212 centimeters below the

ceiling of the room. Four upright structural-steel channels (4-inch)

were bolted through the floor, so as to secure great rigidity, and were

tied together at the top with structural steel. As a solid base for the

calorimeter chamber two 3-inch channels were placed parallel to each

other 70 centimeters from the floor, joined to these uprights. Upon

these two 3-inch channels the calorimeter proper was constructed. The

steel used for the most part in the skeleton of the apparatus is

standard 2-1/2-inch channel. This steel frame and its support are shown

in fig. 10, before any of the copper lining was put into position. The

main 4-inch channels upon which the calorimeter is supported, the

tie-rods and turn-buckles anchoring the framework to the ceiling, the

I-beam construction at the top upon which is subsequently installed the

large balance for weighing the man, the series of small channels set on

edge upon which the asbestos floor is laid, and the upright row of

channel ribs are all clearly shown.

[Illustration: FIG. 10

Photograph of framework of chair calorimeter. In the photograph are

shown four upright channels and the channels at the top for supporting

the calorimeter. The smaller upright 2-1/2 inch channels and angles are

shown inside of this frame. In the lower part of the figure is seen the

asbestos board for the bottom of the calorimeter and underneath this a

sheet of zinc.]

[Illustration: FIG. 11

Photograph of portion of framework and copper shell. The finished copper

shell is seen in position with some of the thermal junction thimbles

soldered into it. A portion of the food aperture and the four brass

ferrules for conducting the water pipes and air pipes are shown. A

section of the zinc outside is shown in the lower part of the figure.]

A photograph taken subsequently, showing the inner copper lining in

position, is given in fig. 11.

The floor of the chamber is supported by 7 pieces of 2-1/2-inch channel

(N, N, N, fig. 8), laid on top and bolted to the two 3-inch channels (M,

fig. 8). On top of these is placed a sheet of so-called asbestos lumber

(J', fig. 8) 9.5 millimeters thick, cut to fit exactly the bottom of the

chamber. Upright 2-1/2-inch channels (H, fig. 8) are bolted to the two

outside channels on the bottom and to the ends of three of the long

channels between in such a manner as to form the skeleton of the walls.

The upper ends of these channels are fastened together by pieces of

piping (P, P, P, fig. 8) with lock-nuts on either side, thus holding the

whole framework in position.

The I-beams and channels used to tie the four upright channels at the

top form a substantial platform upon which is mounted a large balance

(fig. 9). This platform is anchored to the ceiling at four points by tie

rods and turn-buckles, shown in fig. 4. The whole apparatus, therefore,

is extremely rigid and the balance swings freely.

The top of the chamber is somewhat restricted near the edges (fig. 8)

and two lengths of 2-1/2-inch channel support the sides of the opening

through which the subject enters at the top (fig. 7).

Both the front and back lower channels upon which the bottom rests are

extended so as to provide for supports for the outer walls of asbestos

wood, which serve to insulate the calorimeter. Between the channels

beneath the calorimeter floor and the 3-inch channels is placed a sheet

of zinc which forms the outer bottom metallic wall of the chamber.

In order to prevent conduction of heat through the structural steel all

contact between the inner copper wall and the steel is avoided by having

strips of asbestos lumber placed between the steel and copper. These are

shown as J in fig. 8 and fig. 12. A sheet of asbestos lumber beneath the

copper bottom likewise serves this purpose and also serves to give a

solid foundation for the floor. The supporting channels are placed near

enough together to reinforce fully the sheet of asbestos lumber and

enable it to support solidly the weight of the man. The extra strain on

the floor due to tilting back a chair and thus throwing all the weight

on two points was taken into consideration in planning the asbestos and

the reinforcement by the steel channels. The whole forms a very

satisfactory flooring.

_Wall construction and insulation._--The inner wall of the chamber

consists of copper, preferably tinned on both sides, thus aiding in

soldering, and the tinned inner surface makes the chamber somewhat

lighter. Extra large sheets are obtained from the mill, thus reducing to

a minimum the number of seams for soldering, and seams are made tight

only with difficulty. The copper is of standard gage, the so-called

14-ounce copper, weighing 1.1 pounds per square foot or 5.5 kilograms

per square meter. It has a thickness of 0.5 millimeter. The whole

interior of the skeleton frame of the structural steel is lined with

these sheets; fig. 11 shows the copper shell in position.

For the outer metallic wall, zinc, as the less expensive metal, is used.

One sheet of this material perforated with holes for the attachment of

bolts and other appliances is shown in position on the outside of the

wall in fig. 11. The sheet zinc of the floor is obviously put in

position before the channels upon which it rests are laid. The zinc is

obtained in standard size, and is the so-called 9-ounce zinc, or 0.7

pound to the square foot, or 3.5 kilograms to the square meter. The

sheet has a thickness of 0.5 millimeter.

[Illustration: FIG. 12.--Cross-section in detail of walls of

calorimeter, showing zinc and copper walls and asbestos outside (A);

hair-felt lining (B); cross-section of channel iron (H); brass washer

soldered to copper (K); asbestos insulation between channel iron and

copper (J); bolt holding the whole together (I); heating wire (W) and

insulator holding it (F) shown in air-space between zinc and hair-felt;

section of one of the cooling pipes (C) and its brass support (G);

threaded rod (E) fastened into H at one end and passing through asbestos

wall with a nut on the outside; and iron pipe (D) used as spacer between

asbestos and zinc.]

In the cross-section, fig. 7, A represents the copper wall and B the

zinc wall. Surrounding this zinc wall and providing air insulation is a

series of panels constructed of asbestos lumber, very fire-resisting,

rigid, and light. The asbestos lumber used for these outer panels is 6.4

millimeters (0.25 inch) thick. To further aid in heat insulation we have

glued to the inner face of the different panels a patented material

composed of two layers of sheathing-paper inclosing a half-inch of

hair-felt. This material is commonly used in the construction of

refrigerators. This is shown as E in fig. 7, while the outer asbestos

panels are shown as F.

A detail of the construction of the walls, showing in addition the

heating and cooling devices, is given in fig. 12, in which the copper is

shown held firmly to the upright channel H by means of the bolt I,

screwing into a brass or copper disk K soldered to the copper wall. The

bolt I serves the purpose of holding the copper to the upright channel

and likewise by means of a washer under the head of the screw holds the

zinc to the channel. In order to hold the asbestos-lumber panel A with

the hair-felt lining B a threaded rod E is screwed into a tapped hole in

the outer part of the upright channel H. A small piece of brass or iron

tubing, cut to the proper length, is slipped over this rod and the

asbestos lumber held in position by a hexagonal nut with washer on the

threaded rod E. In this manner great rigidity of construction is

secured, and we have two air-spaces corresponding to the dead air-spaces

indicated in fig. 7, the first between the copper and zinc and the

second between the zinc and hair-felt.

Respiration Calorimeters for Studying the Respiratory Exchange and Energy Transformations of Man · 第 44 / 120 题