CHAPTER XXXIII.

CONTRACTS.

Clauses of Public Health Act -- Public contracts different from

private ones -- Specifications necessary -- Conclusion -- A list of

useful books 381

MUNICIPAL

AND

SANITARY ENGINEERS’

HANDBOOK.

CHAPTER I.

THE TOWN SURVEYOR.

The office of town surveyor was first legalised by the Towns Improvement

Clauses Act 1847 (10 & 11 Vic. c. 34, s. 7),[1] although for some

considerable period prior to this date similar appointments had been

made in several of the more important English towns, notably in the case

of Liverpool. In the following year the legal office of surveyor was

confirmed by the Public Health Act 1848 (11 & 12 Vic. c. 63, s. 37), and

it is now law under the Public Health Act 1875 (38 & 39 Vic. c. 55):

that comprehensive statute, under which all Sanitary Acts are now

included, and which Act will be frequently alluded to in the course of

this book.

The clause which specially refers to the appointment of the surveyor is

as follows:--

“Every urban authority shall from time to time appoint fit and proper

persons to be medical officer of health, surveyor, inspector of

nuisances, clerk, and treasurer: Provided that if any such authority is

empowered by any other Act in force within their district to appoint

any such officer, this enactment shall be deemed to be satisfied by the

employment under this Act of the officer so appointed, with such

additional remuneration as they think fit, and no second appointment

shall be made under this Act. Every urban authority shall also appoint

or employ such assistants, collectors, and other officers and servants

as may be necessary and proper for the efficient execution of this Act,

and may make regulations with respect to the duties and conduct of the

officers and servants so appointed or employed . . .” (38 & 39 Vic. c.

55, s. 189), and these officers (except the medical officer of health

and the inspector of nuisances, when any portion of their salary is paid

out of moneys voted by Parliament _to the powers of the Local Government

Board_), may be removed by the urban authority at their pleasure, which

was not the case when the appointment was first made in 1847.

Here it is necessary to state that for sanitary purposes England and

Wales are divided into two divisions--viz. urban sanitary districts and

rural sanitary districts, the former of these divisions being further

subdivided into boroughs, where the urban sanitary authority is the

mayor, aldermen, and burgesses acting by the council, and districts,

which are under the authority of improvement commissioners or local

boards; the rural sanitary districts are the areas of unions not

included in urban districts, and they are under the authority of the

guardians of the union.

It is my intention to deal more particularly with the duties of a

surveyor acting under an urban authority, but the following section of

the Public Health Act 1875 relates apparently to the appointment of a

surveyor to a rural authority, although no mention is made in this or

any other clause of the Act directly of such an officer by name, except

that amongst the definitions of the Public Health Act the following

appears:--

“‘Surveyor’ includes any person appointed by a rural authority to

perform any of the duties of surveyor under this Act” (38 & 39 Vic. c.

55, s. 4).

The clause I have above referred to is as follows:--

“Every rural authority shall from time to time appoint fit and proper

persons to be medical officer or officers of health and inspector or

inspectors of nuisances; they shall also appoint such assistants and

other officers and servants as may be necessary and proper for the

efficient execution of this Act . . .” (38 & 39 Vic. c. 55, s. 190).

The following clauses apply to officers of rural as well as urban

authorities:--

“The same person may be both surveyor and inspector of nuisances . . .”

(38 & 39 Vic. c. 55, s. 192).

“Officers or servants appointed or employed under this Act by the local

authority shall not in any wise be concerned or interested in any

bargain or contract made with such authority for any of the purposes of

this Act . . .” (38 & 39 Vic. c. 55, s. 193).

“Before any officer or servant of a local authority enters on any office

or employment under this Act by reason whereof he will or may be

entrusted with the custody or control of money, the local authority by

whom he is appointed shall take from him sufficient security for the

faithful execution of such office or employment and for duly accounting

for all moneys which may be entrusted to him by reason thereof” (38 & 39

Vic. c. 55, s. 194).

In addition to these clauses there are several regulating the receipt of

money by officers, but these should not affect the town surveyor.

Although in many places he has the onerous duty of paying workmen,

certifying tradesmen’s accounts, and other financial transactions, he

ought under no circumstances to have anything to do with the receipt of

money. Unfortunately, in some of the smaller towns the surveyor is also

employed as rate collector; but as this is evidently a very improper

proceeding, I shall not further allude to it in any manner.

It will be observed that in the foregoing clauses of the Public Health

Act the word “surveyor” is always used, and thus this is the legal title

of those holding such appointments. It is obvious, however, that,

although this title may have well suited the office up to the year 1847,

when it was made the legal title, the prodigious growth of municipal

work during the last 35 years has made it necessary that some change

should be made, and the title altered to that of “engineer,” or some

other similar suitable name. At the present time several different

meanings and occupations are attached to the word “surveyor,” as the

following list will show:--“land surveyor,” “district surveyor,” “county

surveyor,” “road surveyor,” “surveyor of taxes,” “surveyor of customs,”

“quantity surveyor,” “fire insurance surveyor,” “Lloyd’s surveyor,” and

a still more curious instance where an urban authority is itself dubbed

“surveyor of highways” by the 144th section of the Public Health Act

1875; and the title of town surveyor as now applied cannot but lead to

confusion and to perfectly erroneous impressions as to his work and

duties.

Dr. Ackland, in a paper read before the Association of Municipal and

Sanitary Engineers and Surveyors, at a district meeting held at Oxford,

makes the following remarks on this point:--“In the Public Health Act

1875 (the summary of all health enactments) the name of ‘engineer’ does

not once occur in the 343 clauses. He is still the old ‘surveyor’ we all

remember, the plodding, energetic man of highways and byeways . . . but

then the surveyor of the present day may be called on to advise on

anything, from the form and cost of an earthen syphon trap to the

calculation of work to be done by engines which are to supply half a

million of persons with water; to be responsible for the construction of

sanitary mechanisms, from a housemaid’s sink to an intermittent downward

filtration farm.”

There can be but little doubt that it is absolutely necessary for the

town surveyor of the present day to be a competent civil engineer of

great knowledge and varied experience, for he may at any moment be

called upon to advise his corporation upon any of the following

subjects, or to act in any one of the following capacities, in addition

to the multifarious ordinary duties legally devolving upon him as

surveyor under the Sanitary Acts:--

(1.) As engineer for sewerage and sewage works.

(2.) As engineer for water and gas works.

(3.) As engineer for canals, docks, harbour improvements, and river

navigation, or for the protection of coasts against the encroachments of

the sea, and the prevention of floods by rivers.

(4.) As engineer for the construction and maintenance of roads and

bridges.

(5.) As engineer for the construction and maintenance of lines of

tramways.

(6.) As architect for the construction of lunatic asylums, municipal

offices, hospitals, abattoirs, mortuaries, baths and wash-houses,

cemetery chapels, stables, police stations, and other similar works.

(7.) As landscape gardener for the laying out of public recreation

grounds, parks, and cemeteries.

(8.) As quantity surveyor to make estimates of all works, and often

(very improperly) to furnish bills of quantities to intending

contractors.

(9.) As surveyor and valuer to advise his employers on the values, &c.,

of corporate or other property.

(10.) As land surveyor to make surveys of any size that may be required.

(11.) As accountant to examine and rectify the workmen’s wages sheets,

and all tradesmen’s accounts for work performed or goods supplied.

The foregoing list is no exaggeration of the onerous duties of the town

surveyor, and it seems to be a grievous mistake that this officer, whose

importance in all practical sanitary work cannot be over-stated (as

without him no useful municipal work could go on) has been left

unprotected by the Public Health Act of 1875.

In that Act both the medical officer of health and the inspector of

nuisances have received Government protection, whereas the surveyor, the

very officer of all others who necessarily is more likely to come into

collision and to be unpopular with his employers in the faithful

discharge of his duties, has been afforded no protection whatever, but

has been left to the tender mercies of an annually changing body of

municipal governors, “to be removable at their pleasure” (38 & 39 Vic.,

c. 55, s. 189).

On this highly important point I cannot do better than quote several

passages from Mr. Lewis Angell’s interesting address to the Association

of Municipal and Sanitary Engineers and Surveyors on the occasion of

their inauguration in the year 1873:[2]

“The ‘town surveyor,’ according to his opportunities, has done the

country good service, but, surrounded as we have been with obstructions

and difficulties, cramped and restricted by popular prejudices and

private interest, subject to clamour and attack, without protection and

without appeal, it is indeed surprising that we have accomplished so

much. Had such officers been from the first judiciously selected,

adequately remunerated, properly supported, and duly protected, our

influence upon sanitary progress would have been more conspicuous and

our office better appreciated.

“As engineers we do not pretend to a knowledge of medical science, but

it is equally within the knowledge of the average sanitary engineer as

of a medical officer of health that pure air, pure water, properly

constructed houses, and an unpolluted soil are the cardinal conditions

of health. These are mere sanitary axioms. The means by which such

conditions are attained are drainage, ventilation, water-supply, and

other matters entirely within the functions of the engineer. It is the

function of the sanitary engineer to prevent that which the medical

officer of health is called upon to detect. . . .

“In many cases the unprotected surveyor may be required to report to a

protected medical officer the negligence of his own employers. No local

surveyor or engineer can be expected to give cordial and active

assistance in compulsory sanitary work when he is conscious that his

action would be opposed to the views or the interests of his employers,

the public upon whom he is dependent. The existence of such a

distinction between the medical officer and surveyor under the same

board will produce a want of harmony in interest, and must lead to a

divergence of action between the two departments. . . .”

And speaking of the multifarious duties of the town surveyor, Mr. Angell

says: “Any one section of his duties would, under commercial

circumstances, command fair pay according to its importance; but where

cumulative duties are included in the same office, they demand constant

attention, special knowledge, professional experience, and

administrative ability; to which is added the anxiety which the

responsibilities of public office always involve. Such a position in a

commercial concern would receive high remuneration in proportion to the

extent of the undertaking, but unfortunately, our work does not pay a

dividend: it is all expenditure from which the town derives no return

excepting in health and comfort, matters which are neither fairly

assessed, nor duly appreciated; consequently, the municipal engineer is

paid less for his professional knowledge than the contractor’s agent

whose work he directs.”

Speaking further on the subject of Government protection, Mr. Angell

says: “Surveyors appointed under the Towns Improvement Clauses Act were

protected during the existence of the General Board of Health. Sir C.

Adderley’s Public Health and Local Government Bill of 1872 proposed

similar protection. Officers employed under the Poor Laws are fully

protected as to position, emoluments, and superannuation. The

administration of the Poor Laws and the Public Health Acts is now united

in one department under the newly established Local Government Board: it

is therefore in my opinion equally due to Local Board officers, that

they also should be recognised and protected. Without such protection,

sanitary legislation cannot, in the words of the Royal Sanitary

Commission, be ‘active and effective,’ because local officers are too

dependent on their immediate employers to be thoroughly efficient.

“In advocating protection let me not be misunderstood. I do not mean

centralisation or the removal of that proper control which every local

authority should maintain over its own officers. I would maintain intact

the great principle of local government, which has been the bulwark of

our social and political freedom. But local government may degenerate,

and in small towns deteriorate into littleness: local affairs are too

frequently avoided by those who are most fitted by intelligence and

social standing to take part therein. I would simply control in the most

constitutional manner the short-comings or excesses of local government

as is already done in various other departments. I would require that

local officers should be properly qualified and adequately remunerated;

that in the honest discharge of their duties and during good behaviour

they should be protected from the effects of ignorance, narrow

prejudices, and interested clamour, and that they should have an appeal

to a disinterested and judicial body, superior to local feeling. The

demand is reasonable--I ask no more. . . . .”

To these admirable remarks by Mr. Angell on the present position of the

town surveyor I can add but little.

I believe that the sole reason which is given why Government protection

is not granted to the surveyor is the argument used by those in

authority, that if a surveyor disagrees with the corporation he serves,

it is considered better that he should resign his appointment rather

than be protected by the Local Government Board or other central office;

but if this argument is sound, why does it not also apply in a similar

manner to the medical officer of health or the inspector of nuisances?

The real fact no doubt is, that in framing the Public Health Act of

1875, medical men were consulted and not engineers, and this is very

apparent in many of the clauses, which will be fully considered in their

proper places in this book.

The time will no doubt come when the necessity for some change in the

position of the town surveyor will be apparent, and adequate protection

will be afforded him; in the meantime let him strive, by attention to

work, and by daily advancement in scientific knowledge, and in courtesy

to those with whom he is associated, to make the position and power of

the town surveyor felt and honoured as it should be throughout the

kingdom.

[1] The section is as follows:--“The Commissioners shall appoint,

subject to the prescribed approval, or where no approval is

prescribed, subject to approval by one of Her Majesty’s principal

Secretaries of State, a person duly qualified to act as a local

surveyor of the paving, drainage, and other works authorized under the

provisions of this and the special Act . . . . . . and the

Commissioners with the like approval may remove any such surveyor.”

[2] _Vide_ ‘Minutes of Proceedings of the Association of Municipal and

Sanitary Engineers and Surveyors,’ vol. i. p. 18.

CHAPTER II.

THE APPOINTMENT OF SURVEYOR.

Whenever a vacancy occurs in the office of surveyor to a town, or upon a

sanitary authority determining to make such an appointment, the question

is usually relegated to a committee or sub-committee to report upon the

subject, to fix the amount of salary proposed to be given, and frame the

duties of the office.

The following report is one that has lately emanated from an important

English borough, and is given in full as a specimen of such reports, and

as a guide on which a report could be framed; altered, of course, to

such requirements as may be locally necessary:--

_Report of the Special Sub-Committee as to the Surveyor._

(1.) Your sub-committee report that they have, in compliance with the

resolution of the      day of     , carefully considered the steps to be

taken with reference to the vacancy caused by Mr. ------’s resignation,

and they have come to the unanimous conclusion that it is desirable that

the office of surveyor should be continued.

(2.) Your sub-committee have also considered the duties which were

assigned to the office of Mr. ------’s appointment, and they beg now to

submit them, revised in accordance with the present circumstances of the

department, and with the recommendations contained in this report.

(3.) Your sub-committee further recommend that the salary of the

surveyor be fixed at £ . . per annum, and that advertisements be issued

for candidates.

_Duties of the Surveyor._

(1.) To have charge of the repairs of all highways, and to perform all

duties devolving on the council as surveyors of highways.

(2.) To report from time to time to the committee superintending the

same, the state of the several highways and lines of tramway, and as to

the materials wanted or works necessary.

(3.) To prepare all plans, specifications, or instructions necessary in

relation thereto, and as to the materials to be used therein, and to see

that all works are completed according to contracts entered into.

(4.) To engage and dismiss under sanction of the committee all workmen

employed at daily and weekly wages.[3]

(5.) To certify all accounts for work done, materials supplied, and

wages due.

(6.) To have charge of all materials and implements.

(7.) To purchase or contract for, or hire all horses, carts, tumbrils,

stones, flags, gravel, draining pipes, and proper implements and

materials, and all other matters and things, at such prices and in such

manner as the committee shall judge reasonable and expedient, and to

sell or otherwise dispose of the same as he may be directed.

(8.) To have the entire charge and superintendence of the breaking up

and repairing of all streets, for the purpose of laying or replacing gas

and water pipes.

(9.) To inspect and report, in conjunction with the medical officer of

health, upon slaughter-houses preliminary to licences being granted, and

to make the plans and superintend the construction of any

slaughter-houses which the council may hereafter erect.

(10.) To take all levels and surveys which may be necessary for the

purpose of deciding on the best mode of draining the several districts,

or any part thereof, or for the purpose of fixing the levels and

inclinations of any streets or roads, or in anywise relating thereto.

(11.) To carry out the scheme now in course of construction for the

interception of the sewage of the borough, and any future scheme, for

its precipitation, filtration, deodorization, or any other process which

the council may adopt, either within or without the borough.

(12.) To superintend the construction and completion of all tramway

lines and sidings which may be required.

(13.) To prepare, from time to time, schemes for the drainage of the

several districts or any part thereof.

(14.) To prepare all such plans, sections, and specifications as may be

necessary for the due execution of any flagging, paving, sewering, or

other works required to be done, or for entering into any contracts in

relation thereto, and to see that all works are executed in accordance

therewith.

(15.) To measure up and duly certify the execution of all works, and

apportion the cost to the parties chargeable therewith.

(16.) To see that all house drains, which may from time to time be

carried into any public sewer, are made and connected in accordance with

the regulations.

(17.) To give to the several contractors performing any works, orders

for the same in writing only, keeping duplicates thereof, duly entered

in a book to be kept by him for that purpose.

(18.) To prepare all plans, drawings, and estimates required, and to

superintend the execution of all improvements.

(19.) To see that no encroachments be made on any highway or public

place.

(20.) To advise on, and execute, all engineering works, and prepare all

such plans, specifications, and estimates of, and take out quantities

for, such sewers, buildings, bridges, and works as may be required, and

to superintend the erection and execution thereof.

(21.) To have in his charge, and be responsible for, the proper

management of all buildings and properties belonging to the corporation,

or for the repair and maintenance of which the corporation is liable,

except otherwise directed by the council.

(22.) To examine and report upon all plans and elevations of buildings

proposed to be erected or altered upon land sold or leased by the

corporation.

(23.) To inspect and report on plans of new streets to be laid out, of

houses to be built, and of buildings to be erected or altered.

(24) To see that all streets are properly named, and that the name

plates are kept in good order.

(25.) To act as building surveyor in all matters relating to the

execution of the Sanitary and Local Acts, and to examine and certify new

houses as fit for habitation.

(26.) To examine all buildings in a condition dangerous to the public,

to report thereon, and to take such steps as may be necessary to prevent

accidents arising therefrom.

(27.) To prepare all plans and sections for deposit, pursuant to

Standing Orders, with respect to all street improvements, tramways,

gasworks, waterworks, or other works, unless otherwise ordered by the

council, and to prepare all other surveys, plans, and sections required.

(28.) To attend the meetings of the several committees when required.

(29.) To prepare all returns relating to his office that may be required

by the Government.

(30.) To attend in London or elsewhere when required, without extra

charge, excepting only his travelling and hotel expenses.

(31.) To keep accurate permanent records and plans relating to all

properties purchased, leased, or sold, or in possession.

(32.) To devote the whole of his time to the duties of his office, and

not to be engaged in any other office, business, or employment

whatever.

(33.) To report from time to time all and every matter connected with

any branch of his office which, in his opinion, may require the

attention of any committee, and take their instructions thereon.

* * * * *

Clauses 18 and 20 in the above list of duties are very comprehensive,

and as a rule a town surveyor’s duties may be summed up in a very few

words--“to do anything that he is requested.” It is, however, better

that some definite instructions should be laid down, and those which I

have given may be taken as a fair specimen of what such duties may be.

Unlike the medical officer of health, who by Act of Parliament is

required to hold a diploma of competency,[4] it is open to anyone to

apply for and obtain the appointment of a town surveyor. This is no

doubt unfortunate, as some test of merit is desirable, and of late years

the necessity of some examination as to competency has been much

discussed.

In order to meet this requirement, the Sanitary Institute of Great

Britain has instituted examinations and granted certificates of

competency for both town surveyors and inspectors of nuisances. The

following particulars of these examinations, and the reasons given for

their necessity, may be of interest, and are given in full.[5]

_Examination of Local Surveyors and Inspectors of Nuisances._

The great and increasing importance of the duties devolving upon local

surveyors and inspectors of nuisances in connection with the various

statutes relating to Public Health and the Sale of Food and Drugs Act,

has led the council of the Institute to establish voluntary examinations

for local surveyors and inspectors of nuisances, and for persons

desirous of becoming such, or of obtaining the certificate of the

Institute.

Each examination occupies a portion of two days. On the first day the

examination of surveyors is continued for four hours, viz. from 2 to 4

and 6 to 8 P.M. and consists of written papers only. Inspectors of

nuisances have two hours’ written examination on the first day, viz.

from 4 to 6 P.M. On the second day the examination for both classes

commences at 11 A.M., and is _vivâ voce_; with one or more questions to

be answered in writing if deemed necessary. A certificate of competence

signed by the examiners is granted to successful candidates.

As rural sanitary authorities are able under the Public Health Act 1875

to obtain almost all the powers of urban sanitary authorities, it is not

considered advisable to make any distinction in the examination of the

two classes of surveyors.

As one person may, under the Public Health Act 1875, be both local

surveyor and inspector of nuisances, candidates wishing to obtain the

double qualification may enter for both examinations on the same

occasion.

Candidates are required to furnish to the council of the Institute

satisfactory testimonials as to personal character, and to give two

weeks’ notice to the secretary previous to presenting themselves for

examination, stating whether they wish to be examined as surveyors or

inspectors of nuisances, or as both.

The fee for the examination must be paid to the secretary, by

post-office order or otherwise, at least six days before the the day of

examination. On receipt of the fee a ticket will be forwarded admitting

to the examination.

The fees payable for the examination are as follows:--

For Surveyors £5 5 0

For Inspectors of Nuisances 2 2 0

Unsuccessful candidates are allowed to present themselves a second time

for one fee.

_Syllabus of Subjects for Examination for Local Surveyors._

_Laws and Bye-Laws._--A thorough knowledge of the Acts affecting

sanitary authorities, so far as they relate to the duties of local

surveyors; also of the model bye-laws issued by the Local Government

Board.

_Sewerage and Drainage._--The sanitary principles which should be

observed in the preparation of schemes for, and the construction of

sewerage works; the ventilating and flushing of sewers and drains; the

internal drainage and other sanitary arrangements of houses, privies,

water-closets, dry-closets, and the removal of refuse; the sanitary

details of builders’ and plumbers’ work.

_Water Supply of Towns and Houses._--The sanitary principles which

should be observed in the preparation of schemes for, and the

construction of water-works; the various ways in which water is likely

to become polluted and the best means of ensuring its purity.

_Regulations of Cellar Dwellings and Lodging Houses._--General

principles of ventilation; the amount of air and space necessary for men

and animals; the means of supplying air, and of ensuring its purity.

_Highways and Streets._--The sanitary principles which should be

observed in the construction and cleansing of streets and roads.

EXAMINATION PAPERS, NOVEMBER 6, 1879.

_Questions for Surveyors, November 6, 1879, 2 to 4 o’clock._

1. Define street; state the law applicable to every description of

street in an urban sanitary authority district, and the rights and

obligations and duties of sanitary authorities, owners and occupiers

therein.

2. What are the relative advantages of circular and egg-shaped sewers;

in what case are they respectively preferred?

3. Give a specification of a water-tight sewer. Describe and give a

sketch of the form of man-hole which you consider best adapted for

ordinary town sewers, and state the rule which you adopt for determining

the amount of ventilation to be afforded in a main street sewer.

4. In what way does the size and shape of the sewer affect the velocity

of sewage flowing through it? If a nine-inch pipe sewer, laid at an

inclination of 1 in 200, gives a velocity of 3 feet per second, what

velocity will it give when laid at an inclination of 1 in 800, the pipe

running full in each case? Will this velocity suffice to keep it clear

from deposits? Describe the various modes which may be resorted to for

flushing sewers.

5. Give a description of the process termed intermittent downward

filtration. State what area of land you would require, with a gravelly

soil, for applying this method of purifying sewage to a town with a

population of 1000 inhabitants, and state the arrangements you would

adopt for dealing with the rain-water falling on the roofs, yards, and

streets.

_November 6, 1879, 6 to 8 o’clock._

1. In reporting upon the source of water supply for a town, what are the

points to which you would direct your attention?

2. Give a sketch of a ~D~ trap, an ~S~ trap, a ~P~ trap, and a pan water

closet (plan of a dwelling-house annexed).

3. Criticise the arrangements of this residence as to position of rooms,

walls, doors, fire places, windows, &c., from a sanitary point of view.

4. Describe the drainage arrangements shown on the plan. Say whether

they are satisfactory; if not, in what way are they faulty?

5. Sketch on the plan any other system of drains which you would think

preferable.

6. Describe in detail the arrangements necessary for the water supply

of the residence, a bath being fixed in the room over the serving room,

a W.C. on the first floor over that on the ground floor, and a

housemaid’s sink near.

* * * * *

It is, of course, open to consideration whether the Sanitary Institute

of Great Britain is the proper authority to hold these examinations or

not; but there is no doubt that some such examination is necessary, and

would be welcomed by nearly all town surveyors in order to more firmly

secure their positions; and the Sanitary Institute is entitled to every

credit for having taken the initiative step in the matter.

Under the present system of appointment to the office of town surveyor

those seeking that office must be prepared to work hard to obtain it,

and to give up some considerable time to its acquisition. Tact,

patience, and perseverance are indispensable qualities when seeking such

appointments, and the following suggestions on this matter may be of

use.

The appointment usually rests finally with the whole body of the town

council or corporation, even if a sub-committee or committee has been

appointed in the first case to make some selection of candidates. The

candidates thus selected by the committee are usually requested to

appear before the whole body of the town council, who then make the

appointment from amongst them.

The first thing a candidate should do when he hears of a vacancy

occurring in the office of a town surveyor, or sees an advertisement

requiring a surveyor’s services, is to obtain fresh testimonials from

those persons of position and influence for whom he has worked or who

know him professionally. These testimonials, with any very good old ones

(but not too many of either), should be sent by post to the town clerk

or person mentioned in the advertisement, with a formal,

carefully-worded application for the appointment.

If canvassing is not prohibited, a list of the members of the town

council, with their addresses, should then be procured, to whom printed

copies of the application and testimonials should be sent, accompanied

by an autograph letter asking that the application and testimonials

should be read.

This should be followed up (if possible, immediately), by a journey to

the town and a personal visit to each member of the council or

corporation, not necessarily for the purpose of soliciting a vote, but

with a view to making the acquaintance of the members of the corporation

and to identify the applicant with his testimonials; and in these visits

great tact and patience are necessary. It is also of importance to seek

and obtain all the outside influence that is possible, in order to bear

upon the members of the corporation, by means of letters of

introduction, and informal testimonials as to eligibility for the

appointment, and personal character and position, &c.

Canvassing on behalf of oneself is extremely unpleasant and harrassing

work; but wrong as the system may appear to be, it is not easy to see

how, in municipal government, any other method can be adopted, and the

visit of the candidate to each member gives the latter an opportunity of

asking him questions and satisfying himself as to his qualifications,

and thus he will not feel he is acting blindly when he gives his vote in

favour of that candidate whom he thinks, after a personal interview, the

most suitable for the appointment.

[3] This seems to be an undue interference with the control which a

surveyor should always have over his men.

[4] “A person shall not be appointed Medical Officer of Health under

this Act unless he is a legally qualified medical practitioner” (38 &

39 Vic. c. 55, sec. 191).

[5] _Vide_ ‘Calendar of the Sanitary Institution of Great Britain for

the year 1880.’

CHAPTER III.

THE SURVEYOR’S DUTIES.

It will be observed on reference to the list of the duties of the

surveyor, given in the preceding chapter, that the first on the list is

as follows:--

“To have charge of the repairs of all highways, and to perform all

duties devolving on the council as surveyors of highways.”

The necessity for these duties are obvious when we turn to the Public

Health Act 1875, and read the following sections:--[6]

“Every urban authority shall within their district, exclusively of any

other person, execute the office of and be surveyor of highways, and

have, exercise, and be subject to all the powers, authorities, duties,

and liabilities of surveyors of highways under the law for the time

being in force, save so far as such powers, authorities, or duties are

or may be inconsistent with the provisions of this Act; every urban

authority shall also have, exercise, and be subject to all the powers,

authorities, duties, and liabilities which by the Highway Act 1835, or

any Act amending the same, are vested in and given to the inhabitants in

vestry assembled of any parish within their district.

“All ministerial acts required by any Act of Parliament to be done by or

to the surveyor of highways may be done by or to the surveyor of the

urban authority, or by or to such other person as they may appoint” (38

& 39 Vic. c. 55, s. 144).

“All streets being or which at any time become highways repairable by

the inhabitants at large within any urban district, and the pavements,

stones, and other materials thereof, and all buildings, implements, and

other things provided for the purposes thereof, shall vest in and be

under the control of the urban authority. The urban authority shall from

time to time cause all such streets to be levelled, paved, metalled,

flagged, channelled, altered, and repaired as occasion may require; they

may from time to time cause the soil of any such street to be raised,

lowered, or altered as they may think fit, and may place and may keep in

repair fences and posts for the safety of foot-passengers. Any person

who without the consent of the urban authority wilfully displaces, or

takes up, or who injures the pavement, stones, material, fences, or

posts of, or the trees in, any such street shall be liable to a penalty

not exceeding five pounds, and to a further penalty not exceeding five

shillings for every square foot of pavement, stones, or other materials

so displaced, taken up, or injured; he shall also be liable, in the case

of any injury to trees, to pay to the local authority such amount of

compensation as the court may award” (38 & 39 Vic. c. 55, s. 149).

The duties thus devolving upon the town surveyor by reason of these

sections and the orders of the council are very considerable. The

following table gives a list of the principal subjects which will

require his attention; all of which will be considered in due course in

this book.

_List of Duties devolving upon a Town Surveyor as “Surveyor of

Highways.”_

(1.) The construction and maintenance of highways or streets,

including--

(_a._) Roads formed of broken stones or “metal,” commonly called

macadamised roadways;

(_b._) Streets paved with granite cubes or setts;

(_c._) Streets paved with wood;

(_d._) Streets paved with asphalte.

(2.) The construction and maintenance of footwalks or footpaths,

including the different materials of which these are formed.

(3.) The breaking of stone for road metal.

(4.) Steam rolling.

(5.) The necessary notices and specifications under the 150th Section of

the Public Health Act 1875, for the purpose of compelling private

streets to be properly sewered, levelled, paved, metalled, flagged,

channelled, lighted, and made good.

(6.) The lighting, cleansing, and watering of streets.

(7.) The naming and numbering of streets.

(8.) The planting of trees along the sides of footwalks.

(9.) Obstructions caused by builders’ rubbish or by hoardings and

scaffold poles; and also by dangerous or defective cellar coverings.

(10.) The damage caused to footpaths by allowing water from private

premises to flow over them, and the nuisance caused by defective

rain-water gutters or shutes.

(11.) The damage caused to roadways by the laying or removal of gas and

water mains and services, and the surveyor’s powers and duties in

connection therewith.

(12.) The importance, especially in old towns, of laying down improved

building lines of frontage in the narrower or crooked streets.

(13.) The examination of all plans of proposed new streets or buildings.

(14.) The supervision of all new streets and buildings whilst their

construction is in progress.

(15.) Dealing with all buildings in a condition dangerous to the public.

Each of the foregoing list of duties will be dealt with in separate

chapters in addition to other matters which will be treated, but before

closing this chapter a few words upon the subject of “meetings” may be

of use.

It will be observed upon reference to the list which I have given of

the duties of the surveyor, that there is one which says, “To attend all

meetings of the board, and committee meetings, except where his

attendance has been previously dispensed with; to attend upon the

chairman when so required.”

The result of this order is that a very large percentage of the

surveyor’s time has to be devoted to attendances at long meetings of the

Board or town council, and at the numerous committee and sub-committee

meetings which are appointed under it.

This work is doubled where, as in some towns, the corporation and their

committees sit in a dual capacity, viz. as the council proper, and the

council as the urban sanitary authority; this generally involves two

ordinary meetings of the whole body each month, and probably at least

six committee meetings a week, leaving the surveyor but scanty time to

look properly after his works.

With regard to these committee meetings it is necessary that each should

have some distinguishing title descriptive of the class of work over

which it has jurisdiction, and in selecting names for them the following

list may be of some service:--Finance Committee, General Purposes

Committee, Law and Parliamentary Committee, Surveyor’s Committee, Land

and Estates Committee, Rates and Taxes Committee, Streets Committee,

Lighting and Cleansing Committee, Navigation of Port Committee, Public

Grounds Committee, Sanitary Committee, Drainage and Sewerage Committee,

Markets Committee, Properties for Sale Committee, Works Committee, Water

Committee, Gas Committee, Watch Committee, Health Committee, Library

Museum and Arts Committee, Baths Committee, Parks, Gardens, and

Improvement Committee, Streets Improvement Committee, etc. etc.

The surveyor should always endeavour to be punctual in his attendance at

the council meetings and those of the committees, as to be late is

always looked upon with disfavour. His reports should as much as

possible be in writing, so that there should be no misunderstanding as

to what his advice is on any subject. To save trouble and expense it is

well that all drawings of new schemes should be first submitted to a

committee in pencil, as they are frequently much altered; this is very

vexing if they have been neatly and highly finished. It must not be

forgotten that the gentlemen who form municipal bodies give their time

gratuitously, and everything should be done to save it as much as

possible. It is an excellent plan and a great convenience, if a surveyor

will have a series of named and numbered pigeon holes in his office

corresponding to his committees, in which to place all papers, drawings,

correspondence etc., which he intends to bring up to the next meeting of

a committee; thus saving himself flurry at the last moment before the

meeting, in endeavouring to find the papers he wants. With his varied

duties, correspondence, interviews, meetings, inspections,

investigations, reports, drawings, and calculations, the motto of a

surveyor’s office should be “method.”

[6] For full particulars and explanations of the various Highway Acts

see ‘The Powers and Duties of Surveyors of Highways and of other

Authorities with regard to the Management of the Public Highways,’ by

Alex. Glen, M.A., etc.

CHAPTER IV.

TRAFFIC.

Before a surveyor can decide upon the best material with which the

streets of his town shall be paved, it will be well to consider the

question of the class of traffic they will have to bear.

It must be remembered that three distinct interests have to be

considered in dealing with this question, viz. (1.) The rate-payers,

upon whom the cost of construction and maintenance of streets falls.

(2.) The owners and employers of horses and vehicles who principally use

the streets; and (3.) The inhabitants of the adjoining premises, who

would be annoyed if the material selected were unduly noisy or dirty. In

addition to these considerations, much depends upon local circumstances;

the class of trade upon which the welfare of a town is dependent must

not be lost sight of. A pavement suitable for a busy, pushing

manufacturing city may not be suitable for a quiet agricultural or

cathedral town, or for a town which is used as a health resort. Again,

the question of the most adaptable materials must be considered, and the

climate and physical character of a town should enter largely also into

this question.

To condense the requirements of a good roadway into as small a compass

as possible, the following may be given as some of its principal

requisites:--

(1.) It must not be extravagantly costly in its first construction.

(2.) It must be durable and require the least possible amount of repairs

at the least cost.

(3.) It must be safe, firm and hard, with an even face and yet giving

sufficient foothold to horses.

(4.) It must be as noiseless as possible.

(5.) It must be so constructed as to be quickly laid down and repaired

when broken up for water, gas, drains, or other purposes.

(6.) It must be of strong foundation, so as to carry the heaviest weight

without subsidence.

(7.) It must be of such a shape as will throw off all surface water at

once.

(8.) It must be of such materials as will make a minimum of dust or mud.

(9.) It must be easily cleansed.

(10.) It must be non-absorbent of impurities or moisture of any kind.

(11.) It must give easy traction upon its surface.

(12.) It must not cause jolting to the traffic.

(13.) It must not injure horses’ legs or hoofs.

Of the above requirements No. 1 affects the ratepayers alone; Nos. 3,

11, 12, 13, affect the traffic only, except that the occupiers of shops

are indirectly affected by them; No. 4 affects both traffic and

occupiers, and No. 10 affects the occupiers principally. The remainder

of the requirements affect all three interests.

With reference to the wearing effect of traffic upon the surface of the

roadway, no standard has yet been arrived at by which this can be

determined with accuracy. In France a great number of observations and

experiments have been made from time to time by the engineers of the

Ponts et Chaussées, but their practice has been to count the number of

“collars” passing a given section of a roadway in a given time,

irrespective of the weights, speeds, or number of wheels such collars

may be drawing. Mr. Deacon, the former Borough Engineer of Liverpool,

has, however, reduced traffic to a standard of tons per yard width of

roadway per annum. This he effected by having the traffic in any street

carefully watched for a certain definite time, the number of vehicles,

their character and approximate weight being noted as well as the number

of horses by which they were drawn, and their number of wheels.

The effect of the traffic thus tabulated, arranged, and reduced to ton

yards per annum, can be ascertained upon any roadway, and Mr. Deacon has

given the results of his observations in a valuable paper on the subject

of street carriage pavements which he read before the Institution of

Civil Engineers.[7]

Sir John MacNeill has estimated that 80 per cent. of the total wear of a

road is due to traffic, the remaining 20 per cent. being due to

atmospheric causes. Of this 80 per cent. 60 per cent. he considers is

due to the action of horses’ hoofs where the traffic is fast, and 44·5

per cent. where the traffic is slow. General Morin estimates the wear of

a road due to horses’ feet to be two-thirds of all causes. There can be

no doubt that the action of horses’ feet, shod as they are with heavy

iron shoes with long toe pieces and heels, must have a destructive

effect upon the surface of a carriage-way, and this may be easily

observed when watching the ruts formed by any continuous line of traffic

in a roadway.

The following remarks from a report of the Society of Arts on this

subject may here be of interest. “It may be mentioned that as respects

the horses’ shoes, attention has long been called to its defects by Sir

Francis Head and others, but Sir Joseph Whitworth now points out the

achievement of a decided and important improvement, which will have a

large effect in road conservancy, as well as the reduction of noise. The

improvement consists in the fastening of a rim of hardened steel, of

about half-an-inch square, to the horses’ feet, and letting the frog

grow to its natural size. One effect is to reduce by five-sixths the

weight of the old shoe, or in other words to reduce by five-sixths the

weight of the iron hammers constituted by the common horses’ shoes,

pounding the road surface, and creating road dust and dirt, and

distributing it about. The saving in this respect, as well as the

reduction of noise by the reduction of the weight of rim, and also the

saving of road wear, would warrant the imposition of the stimulus of a

tax, or a toll upon heavy horses’ shoes to hasten this removal.”[8]

Up to the present date, however (1883), no general change has been

effected in the manner of shoeing horses, notwithstanding these

admirable remarks of Sir Joseph Whitworth upon the subject.

With reference to the question of traction upon roads General Morin, in

his ‘Expériences sur le Tirage des Voitures,’ states that the resistance

to the rolling of vehicles upon solid metalled roads and pavements is

proportional to the weight and inversely proportional to the diameter of

the wheels. On solid roads he states that the resistance is nearly

independent of the width of the tires when they exceed 3 or 4 inches,

but on a compressible face it decreases in proportion to the width of

the tire; the resistance further increases with the velocity on hard

roads, but does not do so when they are soft.

The following table is almost universally now adopted as showing the

traction upon level roads formed of different materials, asphalte being

taken as the standard of excellence in this respect.

Asphalted roadway 1·0

Paved roadway, dry and in good order 1·5 to 2·0

„ „ in fair order 2·0 „ 2·5

„ „ but covered with mud 2·0 „ 2·7

Macadamised roadway, dry and in good order 2·5 „ 3·0

„ „ in a wet state 3·3

„ „ in fair order 4·5

„ „ but covered with mud 5·5

„ „ with the stones loose 5·0 „ 8·2

There are four forces constantly at work tending to destroy the momentum

of vehicles passing along a roadway: they are gravity, collision,

friction, and the resistance of the air.

The first of these is lessened by easy gradients in a road, the second

can be overcome to a great extent by evenness of surface, the third by

hardness, and the fourth, as well as all the others, by giving

sufficient foothold to the animal drawing the vehicle.

Another excellent table[9] prepared from experiments made by Mr. Amos on

different descriptions of pavement in the City of London may be useful,

and is here given:--

-------------------+---------+-------+--------+--------------

| Speed | | |Tractive Force

Road Material. |in Miles |Draught|Fraction| in Decimals

|per hour.|in lbs.|of Load.| of the Load.

-------------------+---------+-------+--------+--------------

Gravelly Macadam in| 6·945 |126·6 | 1/45·3 | ·0219

a side street | 3·45 |114·322| 1/50·3 | ·0197

| | | |

| 5·15 | 70·963| 1/81·1 | ·0123

Granite pitching by| 3·196 | 41·932| 1/137·3| ·0072

side of tramway | 2·557 | 47·572| 1/121 | ·0082

| | | |

Granite Macadam | 4·239 |262·886| 1/21·9 | ·0456

“freshly laid” | 2·775 |242·726| 1/23·7 | ·0421

| | | |

| 5·025 | 91·525| 1/64·9 | ·0158

Asphalte Pavement | 3·56 | 69·753| 1/82·5 | ·0121

| 5·687 | 84·268| 1/68·3 | ·0111

| | | |

| 3·932 |118·163| 1/48·7 | ·0205

Wood Pavement | 3·278 |102·412| 1/56·2 | ·0177

| 3·827 |100·066| 1/57·5 | ·0173

| | | |

Macadam road, very | | | |

good on Victoria | 6·65 |109·06 | 1/52·7 | ·0181

Embankment | | | |

-------------------+---------+-------+--------+--------------

The following table from Law’s ‘Rudimentary Treatise on Civil

Engineering’ shows the force required to move a load of a ton weight on

different descriptions of roadway, the limiting angle of resistance, and

the greatest inclination which should be given to the road being also

stated.

--------------------------------+--------+-----------+------------

| Force | | Greatest

| in lbs.| Limiting |inclination

Description of the Road. |required| angle |which should

| to move| of | be given

| a ton. |resistance.|to the road.

--------------------------------+--------+-----------+------------

| | ° ′ |

Well laid pavement | 33 | 0 50 | 1 in 68

| | |

Broken stone surface on a bottom| 46 | 1 11 | 1 „ 49

of rough pavement or concrete | | |

| | |

Broken stone surface laid on an | 65 | 1 40 | 1 „ 34

old flint road | | |

| | |

Gravel road | 147 | 3 45 | 1 „ 15

--------------------------------+--------+-----------+------------

As a matter of fact, however, the gradient of a macadamised road should

not, if possible, exceed 1 in 20,[10] experience having shown that a

horse, unless the hill is a very long one, is able to draw his ordinary

load for a level up such an inclination, whereas, if it is steeper he is

sometimes stopped altogether, even though the carter tries the zigzag

route so as to obtain an artificial ease of gradient.

The table given in ‘Molesworth’ upon the same subject is too well known

to be repeated, and another table may be found in Sir Henry Parnell’s

work on roads, which gives a comparison between the draught necessary on

a well-paved road at 2, on a well-made, clean macadamised road at 5,

whereas on a wet and muddy gravel or flint road it rises to 32!

Mr. T. D. Hope, of Liverpool, assuming the power of traction at 100,

gives the following table:--

Weight drawn.

Level macadamised road 27 cwt.

„ granite pavement 30·5 „

„ wood „ 54·75 „

And Lieut. Crompton has given the resistance of wheels in lbs. per ton

on different surfaces as follows:--

Very good pavement 35 lbs.

Good macadam 60 „

Ordinary ditto 90 „

Newly-laid gravel 200 „

Soft grass land 300 „

Newly-laid metal 440 „

Here “newly-laid metal” comes out very badly, and points to the

necessity of rolling, of which I shall speak in a future chapter.

Whilst on the question of wheel resistance, it may be well to note that

the small front wheels of a waggon cause considerably more harm to a

macadamised road than the larger hind wheels. In the smaller diameter

any loose stone or obstruction is pushed along in front for a

considerable distance, often tearing up the surface of the road, whereas

in the other case the stone is forced into its place or crushed as under

a roller.

On the question of “safety” to traffic, Mr. Haywood, the eminent

Surveyor of the City of London, has caused several most complete

observations to be made from time to time, the results of such

observations being detailed by him in various reports. Amongst other

useful information compiled by him, he has ascertained that a horse will

travel 446 miles upon a roadway paved with blocks of wood without a

fall, 191 miles upon asphalte, and 132 miles upon granite setts. I

cannot do better than give verbatim his remarks upon this point:--

“Slight rain makes both asphalte and wood more slippery than they are at

other times. On asphalte the slipperiness begins almost immediately the

rain commences, wood requires more rain before its worst condition

ensues. The slipperiness lasts longer upon wood, on account of its

absorbent nature, than it does upon the asphalte; when dry weather comes

after the rain, when asphalte is in its most slippery state, and the

horses fall on it very suddenly, _on wood their efforts to save

themselves are more effectual_; wood also is frequently in that peculiar

condition of surface in which horses slip or glide along it without

falling. A small quantity of dirt upon asphalte makes it very slippery,

wood requires a large quantity. Slipperiness can be temporarily cured on

both pavements; on the asphalte by sprinkling it with sand, on the wood

by sprinkling it with gravel. The result in both cases is dirt. _The

sand thrown on asphalte helps to wear it out, the gravel thrown on wood

tends to preserve it._ When a horse falls on asphalte it has difficulty

in getting up; on wood it rises more readily.”[11]

In streets crowded with traffic, the constant stopping and starting,

especially on any surface that is slippery, is very trying to horses.

Attention has lately been directed to this point with a view to the

storage of some power in a vehicle, either by the compression of a

spring in stopping or by some other mechanical means, in order that in

starting the driver may at will liberate this power so as to assist the

horse in overcoming the inertia of his load. These trials, however, have

not at present met with much success.

Before closing this chapter on traffic, it will be well to point out

that nearly all vehicles travelling rapidly can pass each other safely

if allowed a clear space of eight feet; hence all roadways should, if

possible, be made of a width between the kerbs of some multiple of

eight: a convenient width for the footpaths, so far as foot-passenger

traffic is concerned, is found to be one-fifth of the entire width of

street. It is scarcely necessary to add that vehicles pass each other

on the left side, pedestrians on the right. It is not easy to assign a

cause for the former beyond custom, except that the whip is held in the

right hand, and in consequence free play is given for its use as the

driver sits on that side and can watch his wheels in passing. In France

and other countries the right side is the “rule of the road.” In the

case of pedestrians it is perhaps more convenient for many reasons to

pass on the right side, one being that the umbrella or parasol is always

carried in the right hand, which is also used to remove the hat when

bowing, and another because one’s tendency in passing any obstacle is to

give way with the left shoulder. For regulating the traffic and for the

protection of foot passengers, “sanctuaries,” as they are termed, have

often to be constructed by surveyors in broad streets or awkward centres

of traffic, and it is well to place a lamp-post on these sanctuaries, on

which may be advantageously fixed a notice, “Keep to the Left,” so as to

regulate vehicular traffic. On the lamp-posts at the edge of the

footpaths it is also sometimes customary to fix small enamelled iron

plates bearing the inscription on both sides, “Keep to the Right,” so as

to regulate the pedestrian traffic.

Of the danger to life and limb to pedestrians in London much has

frequently been said, and no wonder, when we consider the number of

persons who are daily injured and sometimes killed according to the

Registrar-General’s returns. Some years ago it was proposed to erect

light iron bridges over the most dangerous crossings approached by

winding stairs, but “time is money” in the mighty metropolis, and the

scheme was abandoned because it was felt that most persons would prefer

the risk of being run over rather than spend the time in ascending and

descending the necessary steps for this purpose.

[7] _Vide_ ‘Minutes of Proceedings of the Institution of Civil

Engineers,’ vol. lviii.

[8] _Vide_ Report of the Society of Arts on the application of Science

and Art to street paving and street cleansing of the metropolis, 1875.

[9] Ibid.

[10] Experiments made by the direction of the French Government on the

tramway between Sèvres and Versailles, showed that a horse on a level

tramway draws three-and-a-half times the weight, at the same speed and

with the same expenditure of power, that he can do on an ordinary

road. Up a gradient of 1 to 100, he is capable of drawing 2·25 times

the weight he can do up the same gradient on an ordinary road, and up

a gradient of 1 to 25 he can draw one-and-a-half times the load he can

do under similar circumstances on the ordinary road.

[11] ‘Report on accidents to Horses on Carriageway Pavements,’ by

William Haywood (1874).

CHAPTER V.

MACADAMISED ROADWAYS.

I do not propose in this work to speak of any of the engineering

operations necessary to lay out or construct long lines of connecting

roadways, as that is a duty which seldom falls to a town surveyor to

perform, and there are a great number of treatises and books upon the

subject already published. The object of this chapter will be to give

some information and hints upon the construction and maintenance of what

are known as macadamised roads, suitable for urban and suburban traffic.

There can be little doubt that roadways of this description are

expensive luxuries where the cost of their maintenance, owing to

excessive traffic or other causes, exceeds 2_s._ per square yard per

annum, but they are often necessary luxuries when the requirements of

the locality are considered, a point to which I drew attention in the

preceding chapter upon “Traffic.” For purposes of what may be styled

“pleasure traffic,” macadamised roadways are unequalled when well

constructed and maintained, but there are many objections to them which

will be considered in their place in this chapter.

The word macadamised is, as is well known, derived from one John Loudon

Macadam, who in the year 1816 first took up the question of putting

broken metal upon a road instead of the boulders previously used.[12]

His name, being rather a peculiar one, has been attached to this

description of road ever since.

As a matter of fact, the “macadamised” roadways of the present day are

constructed after a method introduced by Thomas Telford as an

improvement upon Macadam’s principles, and a perusal of the two

following specifications will, I think, show that there is not very much

difference between the method introduced by Telford and that followed at

the present time.

_Specification of a Roadway as designed by Thomas Telford more than

fifty years ago._[13]

“Upon the level bed prepared for the road materials, a bottom course or

layer of stones is to be set by hand in form of a close, firm pavement;

the stones set in the middle of the road are to be seven inches in

depth; at nine feet from the centre five inches; at twelve feet from the

centre four inches; and at fifteen feet three inches. They are to be set

on their broadest edges lengthwise across the road, and the breadth of

the upper edge is not to exceed four inches in any case. All the

irregularities of the upper part of the said pavement are to be broken

off by the hammer, and all the interstices to be filled with stone chips

firmly wedged or packed by hand with a light hammer, so that when the

whole pavement is finished there shall be a convexity of four inches in

the breadth of fifteen feet from the centre.[14]

“The middle eighteen feet of pavement is to be coated with hard stones

to the depth of six inches. Four of these six inches to be first put on

and worked in by carriages and horses; care being taken to rake in the

ruts until the surface becomes firm and consolidated, after which the

remaining two inches are to be put on.

“The whole of this stone is to be broken into pieces, as nearly cubical

as possible, so that the largest piece in its longest dimensions may

pass through a ring of two and a half inches inside diameter.

“The paved spaces on each side of the eighteen middle feet are to be

coated with broken stones or well-cleaned stony gravel up to the foot

path or other boundary of the road, so as to make the whole convexity of

the road six inches from the centre to the sides of it, and the whole of

the materials are to be covered with a binding of an inch and a half of

good gravel free from clay or earth.”

If the above specification, written more than fifty years ago, is

compared with one of the present date, it will be seen that there is a

strong resemblance between them.

_Specification of a Roadway as now executed._

The cross section of the roadway _when finished_ is to be an arc of a

circle, with a rise of 1 in 27 from kerb to the centre of the roadway

each way.[15] The roadway, when consolidated and finished, to be 12

inches in depth at the gutters and 15 inches at the centre, diminishing

gradually from this point right and left to the depth named. The gutters

to be 2 feet in width, formed of stone setts 6 inches by 6 inches, and

laid in sand, on a firmly consolidated surface of small broken stone or

gravel.

The earth road-bed on which the surface formation is to rest is to be

excavated to the required depth, and when graded and shaped to its

proper form, it is to be thoroughly and repeatedly rolled with a steam

roller, and all depressions which then appear are to be filled with the

same material as the road-bed, and rolled until the whole be uniformly

compact and firm.

On the road-bed thus formed and compacted, a bottom layer of stone of a

depth of 8 inches at the centre of the road, and gradually diminishing

to 6 inches at the kerb, is to be set by hand, to form a close, firm

pavement. The stones are to be laid, with their largest side down, in

parallel lines across the street, breaking joint as much as

practicable.[16] The width of the upper part of the stone not to be more

than 8 inches, nor less than 6 inches. The stone not to exceed 15 inches

in length. After being set closely together, the stones are to be firmly

wedged by inserting a bar in all possible places, and placing between

them stones as nearly as possible of the depth of the pavement, until

the whole is bound in position. Projections of the upper part of this

course are to be broken off, care being taken not to loosen the

pavement; and no wedging is to be done within 20 feet of the face of the

work being laid. The small interstices are to be filled in with stone

chips firmly wedged with hammers. The whole is to be thoroughly rammed

and settled to place, and all undue irregularities of surface broken

off.

On the foundation course must be laid an intermediate layer of broken

stones, varying in size from 3 inches in their greatest diameters to 1

inch in their smallest diameters. These irregular-sized stones may be

either the “tailings” of the screened stones, or may be raked from the

quarry, and placed on the roadway without being machine-broken; but they

must nevertheless be so laid as to compact solidly, and must be clean

broken stone, free from dust and dirt, and within the dimensions given

above. This intermediate course must be 4 inches in depth at the centre

of the roadway, gradually decreasing to 3 inches in depth at the

gutters; it is to be thoroughly rolled with the steam roller until it be

firm, compact, and solid. On its upper surface it must be identical in

rise and form to the cross-section of the finished pavement, as

specified above. In the laying of this course of stone a small quantity

of binding material is to be used, sufficient only to fill up the

crevices, and render this portion of the pavement solid. Preferably the

binding is to be of fine screened gravel or sand, which is to be

sufficiently watered during the process of rolling, so that the “licking

up” of the road material, and its adherence to the rolling-wheels may be

prevented.

On the intermediate course is to be laid the surface layer of broken

stone.[17] It must be 2¹⁄₂ inches in depth, and the stones must be

practically uniform in quality, and as near an approach to a cube in

form as possible. Each stone used in this layer must have passed through

a 2¹⁄₂-inch circular hole, and all stones that are wedge-shaped, and do

not approach uniformity of measurement on their sides, are to be taken

from the road with properly shaped rakes, and no stones allowed to

remain which are not sound, strong, and equable in size and quality of

material. The stones are to be raked into an even layer, and the steam

roller passed over them twice or thrice. After this a quantity of fine

screened gravel or sand is to be thrown on and sufficiently sprinkled to

moisten the mass without “licking up.” The rolling is then to be

continued (working the roller backwards and forwards, gradually from the

gutter to the crown), with an occasional light watering of the pavement,

until the cross-section be exact according to specification, the

interstices filled in, the roadway firmly compacted and solid, and all

excess of binding removed from the surface of the finished pavement.[18]

Telford’s object was the complete separation of the road metal from the

subsoil by a firm and regular foundation, and this system has ever since

held its ground. The advantages to be gained in constructing a roadway

in this manner may be summed up as follows:--

(1.) Economy of construction, as a considerable quantity of metalling is

saved; only 3 inches of properly broken stone and a little binding

material being necessary, the foundation of the roadway (which really

carries the traffic) may be made of a quality of stone unsuitable for

road metal, or even of bricks or stones from old buildings that are

being pulled down.

(2.) The prevention of the rising up or “spewing” of the clay or other

soft material on which the roadway rests.

(3.) A solid foundation is secured which will successfully resist the

weight and percussion of the traffic.

(4.) The increased facility for the drainage of the roadway water being

ruinous to it.[19]

Instead of forming a paved or “pinned” foundation for macadamised

roadways, sometimes what is called “hard core” is placed at the bottom

of the road upon the surface formation.

This “hard core” is made of very heterogenous materials, often the waste

products of the house refuse depôt, and consists of ashes, old pots and

pans, meat tins, old bottles, shells, and a variety of similar articles;

sometimes the core is made of burnt ballast, but in no case does it make

so good a foundation as stones set by hand.

Concrete has also been employed as a foundation with great success, but

it is very expensive, and is seldom used except under streets paved with

either granite, wood, or asphalte, of which I shall speak hereafter; for

if the traffic was so great as to necessitate the use of concrete for a

foundation it would surely be better to give the roadway a more durable

surface than macadam.

The following tables, showing the thickness of the foundation and

metalling of broken stone roads, is from a paper on roadways, read to

the Association of Municipal and Sanitary Engineers, by Mr. James Hall,

Borough Surveyor of Stockton, and may be of use to those who would like

to know what proportions to use.

-------------+-------------------------+---------------+------------

| Pinned Foundations. | Broken Stones.| Concrete.

+--------+---------+------+-------+-------+-----+------

|Pinning.|Covering.|Metal.| Under.| Upper.| Con-|Metal.

| | | | | |crete|

-------------+--------+---------+------+-------+-------+-----+------

| in. | in. | in. | in. | in. | in. | in.

Country roads| 6 | 3 | 4 | 9 | 4 | 4 | 3

Suburban „ | 9 | 3 | 5 | 9 | 6 | 6 | 5

Town streets | 9 | 6 | 5 | 15 | 6 | 10 | 5

-------------+--------+---------+------+-------+-------+-----+------

Chalk has sometimes been used for the bottom of a roadway, but where

this is likely to be affected by frost it is the worst material that can

be used, as it is likely to blow up the roadway.

With regard to the annual outlay upon macadamised roadways, the

following comparative tables[20] prepared by Mr. Ellice Clark, the then

Surveyor of Derby, may be of interest.

---------------+-------+--------------------------------------------

| | Annual Outlay.

+-------+----+------+--------+-------+-------+-------

| | | Sink-| | | |

| | | ing | | | |

| | |fund 3| | | |

| Ori- | | per | | | |

| ginal | | cent.| | | |

| cost | | com- | | | |

| per | In-| pound| | | |

Description of| square|ter-|inter-| Main- | Scav- | |

Pavement. | yard. |est.| est. |tenance.|enging.|Gravel.|Total.

---------------+-------+----+------+--------+-------+-------+-------

|_s. d._|_d._| _d._ |_s. d._|_s. d._| _d._ |_s. d._

Wood pavement |15 1·5| 7·5| 10·1 | 0 1·0| 0 2·7| 5·0 | 2 2·3

| | | | | | |

Val de Travers | | | | | | |

compressed |18 0·0| 9·7| .. | 0 3·6| 0 0·4| .. | 1 1·7

asphalte | | | | | | |

| | | | | | |

Granite setts | | | | | | |

7 inches by | | | | | | |

3 inches laid| | | | | | |

over a layer |17 9·0| 9·6| 0·5 | 0 1·3| 0 2·5| .. | 1 1·9

of 12 inches | | | | | | |

of cement | | | | | | |

concrete | | | | | | |

| | | | | | |

Macadam in | | | | | | |

south of | 4 9·0| 2·1| .. | 3 6·0| 1 0·0| .. | 4 8·1

England | | | | | | |

---------------+-------+----+------+--------+-------+-------+-------

-------------+------------------+------------------

| Load of Mud |Traffic per Annum

Material. | per area. |per yard of width.

-------------+------------------+------------------

|superficial yards.| tons.

| |

Macadam | 344 | 25,000

Granite setts| 500 | 50,000

Wood | 1666 | 25,000

Asphalte | 4000 | 500,000

-------------+------------------+------------------

The following is a table of the cost of streets in Paris per square yard

per annum.[21]

------------------------+------------+----------+---------

Description of Pavement.|Maintenance.|Cleansing.| Total.

------------------------+------------+----------+---------

| _s._ _d._ | _s._ _d._|_s._ _d._

Stone Pavement | 0 4·50 | 0 3·37| 0 7·87

Macadam | 0 9·25 | 0 7·31| 1 5·26

Asphalte | 0 10·20 | 0 4·17| 1 2·37

------------------------+------------+----------+---------

The cost of maintaining macadamised roadways as compared with that of

granite setts has been said to be as high as 5 to 1 and that this cost

if capitalised for 12 or 13 years will equal the first expense, interest

on money, and the necessary repairs for a granite paved roadway.

The following table gives the cost per annum per square yard for the

maintenance of macadamised roadways in different places, so far as I

have been able to collect them:

_s._ _d._ _s._ _d._

Bristol 4 to 1 0

Charing Cross (London) 5 0 (now paved)

Exeter 6 „ 2 6 including

cleansing

Glasgow 8¹⁄₂

Leeds 10 „ 1 2

Liverpool 2 „ 2 6

Manchester 6 „ 1 8

Merthyr Tydfil 4¹⁄₂

Newcastle 1 3 including

watering

Paris 9¹⁄₄ „ 10 9

Parliament Street (London) 3 6 repairs only

Regent Street (ditto) 3 7 (now paved with

wood)

Stockton 9 „ 1 6

Sheffield 1 8 „ 2 0

Wakefield 1 0 all paved

streets now.

In Birmingham the macadamised streets have worn down 6 inches in one

year, with a traffic of 2484 vehicles passing in 10 hours.

With reference to the great cost of maintenance in Paris, the following

particulars[22] may here be given;

“The surface of the street is picked by gangs of men, metal from 2¹⁄₂ to

9 inches in thickness is then laid on, a coating of sand is then spread

upon it, it is watered and rolled at per kilometre ton, that is, at per

ton weight of roller per kilometre travelled, at a cost of about

15·33_d._ per ton mile for the first 250,000 ton miles, and at reduced

rates for additional service. The materials used for the roads are

flints costing 4_s._ 6¹⁄₂_d._ per cubic yard for light traffic roads;

for medium traffic, hard millstone at 11_s._ 4_d._; and for the heaviest

and greatest traffic, porphyry at 15_s._ 9_d._ The average total cost of

maintenance of the streets is 1_s._ 8¹⁄₂_d._ per square yard per annum

for the first-class roads, and 1_s._ 1¹⁄₂_d._ for the lighter traffic;

the highest cost for maintenance is as high as 10_s._ 9_d._ per square

yard, the lowest 9¹⁄₄_d._ per annum.”

It may be well to mention that 73 per cent. of the streets in Paris are

paved, 5 per cent. are coated with asphalte, and 22 per cent. are

macadamised.

The contour, or best form of cross section that should be given to a

roadway, has often exercised the minds of engineers, but for all

practical purposes evenness of surface and regularity of section in a

macadamised roadway are of more importance than the slight difference

between straight lines and curves, which might only tend to confuse the

workmen. Formerly it was the practice to employ a complicated gauge in

the form of a straight-edge fitted with plummet or level and sliding

bars, but a good eye, assisted by a long straight-edge and spirit-level

and three boning rods, is generally found to be sufficient, and if the

centre of the roadway is kept level with the heel of the footpath, a

sightly cross-section is generally the result; or say 6 inches to 9

inches higher in centre of a roadway 30 feet in width between the kerbs,

3 inches to 4 inches where it is from 18 to 20 feet in width.

The following detailed section of a macadamised roadway is one which I

am in the habit of specifying for suburban districts, as it is easily

set out and constructed, and answers all purposes most admirably.

[Illustration]

The total width of street is 36 feet, of which the roadway takes 24,

leaving a footpath 6 feet in width on each side.

The surface of the finished roadway is a segment of a circle, the crown

being level with the heels of the footpaths on each side; the formation

surface is parallel with it, and of course the depth of this and the

thickness of foundations and metal must depend upon local circumstances.

It will be seen that the haunches are drained with 3-inch common

drain-pipes. This may be omitted if the ground is thoroughly dry, but it

is often a great help to a road.

The paths, kerbing, and channelling will be described in their

respective chapters.

It must be borne in mind that on a perfectly level road a more convex

section is necessary than on a gradient.

It is wrong to make the sides of a roadway weaker than the centre,

especially in streets with shops on each side, or on hills where drags

are likely to be used. On hills, too, be it remembered, the channels

should take the surface water; any ruts from wheel tracks acting as

watercourses are disastrous. Hauling timber on a macadamised roadway is

also very damaging.

The great objections to macadamised roadways are as follows:--

(1.) They manufacture too much mud and dust.[23]

(2.) They are too absorbent.

(3.) They are very noisy and damaging to vehicles and horses when fresh

metalled.

(4.) They constantly require mending, but never seem quite sound.

(5.) They are frequently encumbered by men and carts engaged in either

repairs, cleansing, or watering.

(6.) They are very expensive to maintain and cleanse.

(7.) They are bad for a horse to fall upon, as such falls generally

damage the knees.

The following notes upon the maintenance of macadamised roadways may

here be of service:--

(1.) Roads should be inspected in wet weather, as hollows and other

imperfections are then easily detected; a hollow place extends very

rapidly if neglected.

(2.) All ruts should be filled in at once. If there are three parallel,

the centre rut should be first filled in; the traffic is thus slightly

diverted, as a horse will avoid new metal.

(3.) Ruts should not be allowed to form; the surface of the road ought

never to lose its regular section.

(4.) A road should be thoroughly repaired directly it shows the least

sign of being fairly worn all over.

(5.) The right season of the year for repairs is the autumn, although

where a steam roller can be used almost any time will do. If the surface

of the road is very hard it should be “lifted”[24] previous to repairs.

(6.) All loose stones should be picked off at once or put together in

hollow places upon the roadway, as, if allowed to remain, they are not

only dangerous to horses, but are liable to be crushed, or to be forced

through the skin of the roadway, thus causing it damage.

(7.) Water lodging upon a road does great mischief, but it should not be

let off by digging a trench with a pickaxe to the side of roadway, as is

sometimes done.

(8.) A roadway when very dry sometimes suffers through disintegration of

the surface.

(9.) Scraping the mud off a roadway may damage it by loosening stones;

sweeping the surface when wet is best.

(10.) A heavy shower does a road good by washing it; a continuous

drizzle, especially after frost, is very ruinous to a roadway.

(11.) A good cleansing is sometimes worth a coat of metal.[25]

_Bituminous Roadways._

In some towns in England bituminous or asphalte macadamised roadways are

made. This consists in mixing ordinary coal tar with the road metal

ordinarily employed for macadamised roads, only it must be borne in mind

that the metal employed must be limestone or some other soft material,

otherwise it will not wear down evenly with the tar, and thus a lumpy

surface will be produced in course of time.

The method of mixing is by heating the stone, which has of course been

previously broken to the required size, and then thoroughly mixing and

incorporating it with the tar. This is then carried to the roadway, is

spread in the ordinary manner and well rolled to the proper contour, a

surface being afterwards given to it by a coating of about 2 inches

thick, composed of a similar mixture, the stones of which are of much

smaller size.

Another method is to place about 6 inches of the broken metal described

above upon the necessary foundation. Upon this a boiling mixture

composed of about 50 gallons of creosote oil and 1 ton of pitch is

poured until every interstice is filled with the mixture. Whilst this is

still warm, a thin layer of small broken stone is spread upon the

surface and well rolled; more small stones or chippings are added, and

the whole is rolled until the surface of the roadway has attained its

proper contour and presents a perfectly smooth and clean appearance,

little inferior to that of real asphalte.

Dry weather is essential whilst this class of roadway is in course of

construction, and they require careful watching, as, upon the skin

becoming broken, the whole roadway soon breaks up. They have, however,

many advantages over ordinary macadamised roadways when finished, not

the least of them being their imperviousness to moisture, and the ease

with which they are cleansed.

[12] The first road “engineer” in this country was John Metcalf of

Knaresborough, who was born in 1717, and who, although totally blind,

was the first person to introduce a methodical system of road repairs.

_Vide_ ‘Roads and Road Makers,’ by Henry Alexander Glass.

[13] _Vide_ ‘A Treatise on Roads,’ by Sir H. Parnell (1833).

[14] The total width of roadway being thirty feet.

[15] It is necessary to give a new roadway more convexity than it will

have when finished, for however carefully it is raked or attended to

when being rolled, the top is sure to flatten and spread towards the

haunches.

[16] Instead of parallel lines it is sometimes well to place these

stones diagonally from centre to kerb or “herring-bone” fashion, thus

greatly facilitating the under drainage.

[17] In metalling a road it is better to put on the coats gradually,

than to give the whole thickness of metal at once.

[18] The method adopted in Chicago, U.S.A., for forming their roadways

is as follows:--The road bed is prepared of the proper contour and

well-rolled with a 15-ton steam roller until it is even, firm, and

compact; on this bed rubble stone is carefully placed by hand with its

broadest surface downwards, then 12 inches of metal are added 6 inches

at a time, thoroughly rolled to bond it well, it is then topped with 4

inches of crushed trap rock or some other equally hard stone, which

will not disintegrate through the action of the weather, nor pulverise

under the pressure and wear of vehicles upon it; this is again,

thoroughly well rolled so as to compact and bind it together.

[19] “If roads be kept dry they will be maintained in a good state

with proportionally less expense. It has been well observed that the

statuary cannot saw his marble, nor the lapidary cut his jewels

without the assistance of the powder of the specific materials on

which he is acting; this, when combined with water, produces

sufficient attrition to accomplish his purpose. A similar effect is

produced on roads, since the reduced particles of the materials, when

wet, assist the wheels in rapidly grinding down the surface.”

Parnell’s ‘Treatise on Roads,’ 1883. More modern writers have likened

macadamised roadways to “stone mills on which the stones are ground

into dust when dry, or mud when wet.”

[20] _Vide_ ‘Minutes of Proceedings of the Institution of Civil

Engineers,’ vol. lx.

[21] _Vide_ ‘Annales industrielles de Paris,’ Oct. 21st and Nov. 4th,

1877.

[22] _Vide_ ‘Annales industrielles de Paris.’

[23] A report of the Paddington Vestry on “wood and other pavements,”

(1878) states macadam as a mud producing material is twelve times

worse than wood, and six times worse than granite cubes.

[24] This is also sometimes called “stocking” or “chequering,” and

consists of making furrows across a roadway with a sharp pickaxe,

about a couple of inches in depth, thus removing any irregularities,

and also allowing the new metal to bed properly.

[25] In Birmingham, good cleansing is said to have reduced the amount

of metal necessary for the maintenance of the roadways from 20,000

tons per annum to 13,000 tons.

CHAPTER VI.

ROAD METAL AND BREAKING.

The only true test of the fitness of any stone for use as a road metal

is by an experimental trial upon a certain length of roadway; but in

making the first selection for such trials it is well to make the

following investigations:--

(1.) Ascertain from local persons, such as masons, quarrymen, and

others, their opinion of the qualities of the stones in the

neighbourhood.

(2.) Make a trial of the stone for toughness. This can be done by

setting a good stone-breaker to work upon a heap of the stone as

quarried and carefully watching how much he can break in an hour.[26]

(3.) Ascertain what power the stone has to resist abrasion. This is done

in France by putting the broken metal into a revolving cylinder and then

carefully noting by weight what the cubes lose by contact with each

other. Another plan may be adopted by pressing the stone against a

grindstone with a uniform pressure, and noting the loss caused by such

contact.

(4.) The power to resist compression may be easily ascertained by

placing small cubes in an hydraulic press and noting under what

pressures each cube will crush.

(5.) The effect of weather is not easily ascertained artificially,

although it is suggested that a good test may be made by soaking the

stone in a saturated solution of sulphate of soda; and then on exposure

to the air, if soft, it is said the stone will disintegrate as if under

the action of thaw succeeding frost.[27]

The specific gravity of a stone is no criterion whatever as to its

fitness. Clay-slate has a higher specific gravity than a tough flint,

and yet the former is almost useless as a road metal; the latter, on the

contrary, often making excellent roadways.

The qualities necessary for a really good road metal are hardness,

toughness, not easily decomposed or affected by the weather, and at the

same time the stone when broken ought to have some power of cohesion

without the necessity of much binding material. The question of cost I

put aside at once, as it is well known that the best road metal is

always the cheapest where there is much or heavy traffic.

Local circumstances must to a great extent determine what stone to use

upon a roadway, but the following list may be of use:--

_Syenite._--This is a granite in which hornblende takes the place of

mica, and is an excellent road material; the darker the colour the more

durable it is found to be.

_Granite._--This should have more felspar than quartz, and have as

little mica as possible; the closer the grain the better. Coarse-grained

granites soon decompose.

_Trappean Rocks._--Some of these are excellent for road metal. Basalts

of dark colour and close grain should be selected. Greenstones with

similar characteristics are good; as is also Whinstone.

_Gneiss._--Is inferior to granite; it has mica in layers and is not a

good road metal.

_Clay Slates._--These are useless, as they crumble on exposure or

degenerate into mud.

_Limestone._--The Metamorphic, Silurian, and Carboniferous limestones

may be used if crystalline in appearance, but the Lias and Oolitic are

of little use.[28]

_Sandstones._--Some of these, if cherty or containing a large percentage

of iron, may be used; but as a rule they are quite unfitted for use as a

road metal.

_Flints._--These, if tough, make excellent roadways; but unfortunately

they are sometimes too brittle for heavy traffic. Surface-picked flints

are better than those from a quarry.[29]

_Pebbles._--These are found on sea shores and river beds. They are

composed of very various rocks, and are much water-worn and rounded;

when broken they sometimes answer very well if mixed with gravel to bind

them.

_Gravel._--This, if of a flinty character, and not too much mixed with

earthy matter, makes good roads for light traffic, if carefully watched

or well rolled during formation. Pit gravel should always be screened

through wire screens of 1¹⁄₂ to 1³⁄₄ gauge, and the small can be used

for footpaths.

In some places it is difficult to obtain any natural stone for the

purposes of road metal; in these cases slag from blast furnaces or

ordinary clinkers from furnaces are sometimes used. Oyster shells are

used on the roadways near the Gulf coasts[30] and charcoal in Michigan,

United States.[31] I have myself made a most excellent roadway with

coral on the coast of Jamaica, and no doubt many strange materials have

been, and still are, used for this purpose.

“I never mix” is an adage that should be followed by surveyors as

regards road metal. Do not mix a soft material with one that is harder

for either construction or maintenance of a roadway; the effect is what

is known as a “bumpy” road, arising from the fact of the soft stone

wearing faster than the hard. The hardest metal should be kept for the

top or surface layer of the roadway.

As an instance of the extreme difficulty besetting the question of the

best material for road metal, I will here give a table showing the

comparative coefficients of quality assigned to them by the engineers of

the French Department of the Ponts et Chaussées.[32]

COEFFICIENTS OF QUALITY OF ROAD MATERIALS.

Granitic gravel 23·8

Quartz gravel 21·4

Trap 20·0

Quartz 10·0 to 25·0 (in one instance 4·8)

Basalt 12·0 „ 20·0

Porphyry 10·0 „ 20·0 (in one instance 5·0)

Quartzite 11·0 „ 18·0

Devonian schist 16·0

Schist 4·0 to 12·0

Sandstone 12·0 „ 16·0

Granite 6·0 „ 20·0 (generally 10·0 to 12·0)

Syenite 12·0

Gneiss 9·0 to 12·0

Silicious pebbles and gravel 8·0 „ 19·0 (in one instance 6·0)

Silex 8·0 „ 16·0

Chalk flints 7·0 „ 11·6

Silicious limestone 6·0 „ 18·0 (generally about 10·0 to

12·0)

Compact limestone 14·0

Magnesian limestone 16·0

Carboniferous limestone 9·0

Oolitic limestone 5·0 to 12·0

Lias limestone 5·0 „ 10·0

Juranic limestone 5·0 „ 8·0

Limestone 5·0 „ 12·0

Mean of all France 10·63

It will be seen by the above table how different are the results

obtained from materials of the same character.

Breaking stone for the purpose of using it as a road metal was, until

comparatively recent years, always effected by hand; now, as in other

cases, machinery has stept in and somewhat supplanted manual labour.

Hand-broken road metal, however, still finds favour with road surveyors;

it is better broken, and in some districts, the occupation finds

employment for persons who otherwise would be thrown on the rates for

support.

In breaking stone by hand the breaker sits and strikes the stone with a

small cast-steel chisel-faced hammer, weighing about one pound, at the

end of a long, straight-grained but flexible ash stick.[33] The breaker

also has another hammer, weighing about five pounds, with which he

reduces the size of the large stones before breaking them into the

proper size for road metal. This latter size is often a matter of

choice, some engineers preferring it to be broken so small as will pass

through a ring of only 1¹⁄₂ inch in diameter; others are content with 3

inches, especially where the roads are steam rolled. An old method of

gauging used to be “such a size as the stone breaker could put in his

mouth,” but this was unsatisfactory to all persons concerned, and “to

pass all ways through a ring of 2¹⁄₂ inches internal diameter” is now

the size most generally adopted.

Mr. Codrington says[34] “a good stone breaker will break 2 cubic yards

of hard limestone to the ordinary gauge in a day, and some men will

break more. Hard silicious stones and igneous rocks can only be broken

at the rate of 1¹⁄₂ or of 1 cube yard per day; of some of the toughest,

such as Guernsey granite, a man can only break on an average half a cube

yard per day. River gravel, field stones, or flints, which are already

of a small size, can be broken at the rate of 3 or 4 cube yards per

day.”

This may be taken as fairly representing a day’s work, the price for

breaking however must vary considerably in different localities on

account of the variety of the stones to be broken and the value of

labour; in some districts the road metal does not cost more than 1_s._

per cube yard, in others 2_s._ 6_d._ and 2_s._ 8_d._ is not considered

too high, and it was to meet and reduce this great expense that steam

stone-breaking machines have been introduced. These machines are known

as “Ellison’s,” “Newall and Archer’s,” “Hope’s,” and “Blake’s,” the

latter being that which is best known and most generally used in this

country.

[Illustration: “ARCHER’S” STONE BREAKER.]

[Illustration: “BLAKE’S” STONE BREAKER.]

[Illustration: “NEWALL AND ARCHER’S” STONE BREAKER.]

The foregoing illustrations will give a general idea of the manner in

which the stone is broken or crushed between strong iron jaws; in all

cases a revolving perforated screen is necessary (not shown in the

drawings) to separate the stone broken to proper gauge from that which

is too large, and also from the spalls or chippings.

The Blake’s or “Blake Marsden’s” machines are of various sizes and

weights; the following particulars with respect to them, as advertised,

may be of use.[35]

------------+----------+---------+---------------+-------------

Size of | | | |

machine at | Approxi- | | Total weight |

mouth, | mate | | of machine |

showing what| quanti- | | with wheels, |

size of | ty of | Nominal | axles, horse |

stone each |road metal| horse- | shafts, auto- | Price of[36]

machine will| broken | power |matic screening| machine

take. | per hour.|required.|apparatus, etc.| complete.

------------+----------+---------+---------------+-------------

inches. | cube | H.P. | tons cwt. qrs.| £ _s._ _d._

| yards. | | |

10 × 8 | 3¹⁄₃ | 3 | 5 6 0 |157 0 0

12 × 8 | 4 | 3 | 5 11 0 |167 0 0

15 × 8 | 5 | 5 | 6 19 0 |200 0 0

15 × 10 | 6 | 6 | 8 5 0 |220 0 0

20 × 10 | 8 | 8 | 10 2 0 |265 0 0

24 × 13 | 12 | 10 | 15 5 0 |390 0 0

24 × 17 | 13 | 14 | 16 2 0 |415 0 0

24 × 19 | 14 | 16 | 19 17 0 |440 0 0

30 × 13 | 14 | 16 | 16 2 0 |440 0 0

------------+----------+---------+---------------+-------------

Mr. Till, the Borough Engineer of Birmingham, speaking of the work done

by one of Blake’s machines in 1874, says:[37] “The stone-breaking

machine at Holliday Street will break on an average 40 tons of ragstone

per day, at a cost, exclusive of wear and tear of machine, of 10¹⁄₂_d._

per ton, but it produces 16 per cent. of dust or fine stone; of the

remainder one-fifth has to be rebroken by hand, the whole is very

irregular in size and very flaky in comparison with hand-broken stone.

The machine is much more efficient in breaking granites or pebbles. It

has, however, been found very useful during the last two years, in

consequence of the difficulty of obtaining labour.”

Mr. Jacob, the Borough Engineer of Barrow in Furness, read an excellent

paper on the subject of stone-breaking machinery to the members of the

Association of Municipal and Sanitary Engineers, at their meeting in

Manchester in 1875,[38] giving a full description of one of Blake’s

machines, to which I will refer my readers.

Mr. Codrington[39] gives the result of breaking whinstone in a 16-inch

by 9-inch Hope machine, from which it appears that the total cost,

including wages, coal, oil, cottonwaste, etc., wear and tear of

machinery, and, I presume, interest on first cost of machine, was about

1_s._ per cube yard. This effected a saving of 10_d._ per cube yard as

compared with the same stone broken by hand, and the machine broke 40

tons of stone per diem.

To make a stone-breaking machine pay, it is necessary:

(1.) To give it nearly constant work.

(2.) That the stone to be broken shall be too tough to break

economically by hand.

(3.) That the machine shall be at the quarry, so as to save the expense

of much handling.

(4.) To exercise care in feeding, to give it a sufficient supply without

allowing an undue quantity of stone to pass in at one time.

(5.) As about 20 per cent. of grit or dust is produced, this must be

used for foot-paths, or as a binding material for roads, or in asphalte

or tar paving.

In addition to the grit which is produced, a great many long and thin

pieces of stone pass through the machine, which have to be again broken

by it before they could be used as road metal; and having once taken

this form, they will frequently pass several times through the machine

before they get properly broken.

The wear and tear of a stone-breaking machine is very considerable, as

can be easily imagined; it has been known to reach as high as 62·5 per

cent.[40] of the first cost of the machine in one year. The objections

to stone-breaking by machinery are principally:

(1.) In some districts labour can be successfully employed in this

manner.

(2.) Hand-broken stone is sharper in fracture, as it is done by a blow

and not by gradual pressure, whereas machine-broken stone is often flaky

or with rounded edges, and frequently each stone may be cracked and

shaken by the pressure.

(3.) Want of uniformity in the size of the stones.

The smaller the stone is broken the heavier a cubic yard of it will

weigh, as the percentage of vacant space between each stone will be

less. It has been found by experiment, however, that 55 per cent. of

ordinary road metal is solid, so that the weight of a cubic yard of it

can easily be ascertained in the following manner.[41]

Multiply the weight of a cubic foot of any stone by 27 to bring it to a

cubic yard, and then multiply this by 0·55: the result will be the

weight of a cubic yard of the same stone when broken for metalling.

A cubic yard of Guernsey granite broken to pass through a 2¹⁄₂ inch ring

has been weighed, and gives an average of 1 ton 3 cwt. 2 qrs.

tons cwt. qrs.

A cube yard of flint weighed 1 1 3

„ „ pit gravel weighed 1 4 3

„ „ limestone weighed 1 3 0

A cubic yard of ordinary broken road metal will, when properly spread,

cover an area of about 30 square yards of surface of a roadway.

The following specimen specification for the supply of stone either

unbroken or broken may be of use.

_Specification for the Supply of Road Metal._

(1.) The road metal must at all times be clean and free from clay or

other dirt, and fully equal to the sample; if required to be broken,

each cube must have a square face and sharp edges, and pass all ways

through a 2¹⁄₂ inch ring.

(2.) The metal must be delivered in (_name of town_) free of all charge

to the corporation, either at a railway station or at one of the depôts

of the corporation, at the option of the contractor, such option to be

declared in the tender.

(3.) The metal must be supplied on the order of the borough engineer in

such quantities as he may specify, and must be delivered within the time

specified in the order. The contractor shall not be required to supply

and deliver more than    tons in any one week; but the corporation will

be at all times ready to take the metal in larger quantities.

(4.) The bill of lading or railway invoice shall be taken as _primâ

facie_ evidence of the weight of metal supplied; but the corporation

retain the right to test the accuracy of such bill of lading or railway

invoice, by passing the metal over a weighbridge as it is received.

(5.) Metal delivered at a depôt by carts shall be measured when broken

and paid for at the rate of    cwt. per cubic yard.

(6.) The corporation retain the right to reject all metal which shall

not be equal to the sample, or at their option to pay a reduced price

according to its value.

(7.) Quarterly payments will be made by the corporation on the

certificate of the borough engineer, and within one month from the date

of such certificate.

(8.) The borough engineer shall be the sole judge as to the fitness of

the metal supplied, and his certificate, in writing, shall be conclusive

evidence upon the point as between the corporation and the contractor.

(9.) If the contractor shall make default in the supply and delivery of

road metal in accordance with the terms of this specification, and

within the time specified for the purpose in the order of the borough

engineer, the corporation shall be at liberty to obtain such road metal

as they may deem fit and necessary from another source, and any excess

in price or other loss they may consequently incur, shall be recoverable

by them from the contractor as liquidated and ascertained damages.

(10.) Tenders must be sent in only on the prescribed form, and the

person tendering must insert in his tender the name of two persons who

will join him in a joint and several bond to the corporation in the sum

of   _l._ for the due performance of the contract.

(11.) Each person tendering must send to the office of the borough

engineer a sample of the road metal he offers, accompanied by a full

description, and the name and position of the quarry from which it is

produced; such sample to be not less that one cwt. in weight, and to be

retained by the corporation in the event of the tender being accepted.

(12.) The corporation do not bind themselves to accept the lowest or any

tender; and they further retain the right to reject a contractor in the

event of his failing to find sureties to their satisfaction in

compliance with the 10th condition.

(13.) The word “corporation” shall mean the mayor, aldermen and

burgesses, of        in their capacity as the urban sanitary authority

for       . The word “contractor” shall mean the person whose tender is

accepted, and who has signed these conditions; and the words “borough

engineer” shall mean the engineer to the said corporation for the time

being.

Since writing this chapter my attention has been directed to a

stone-breaking machine which is said to substitute a “knapping” for that

of the usual crushing motion which is so generally the great defect in

these machines: I allude to that known as “Baxter’s patent

knapping-motion stone breaker,” by which a rapid jerk or blow is given

instead of the slow crushing movement, thus (it is contended) causing

less waste from dust and chippings, and also less strain of the

machinery and less power to drive it.

[26] Toughness is not all that is required. Leather would be very

difficult to break with a hammer, but it would not make a good road

metal.

[27] I have tried this experiment, but without success, except on such

soft stones as were evidently unfitted for use as a road metal.

[28] Many hundreds of miles of roadways in this country are made with

limestones; they often make an excellent surface, as they possess a

considerable power of binding together, but weather and very heavy

traffic affect them considerably: as they all have a strong affinity

for water, their very power of thus cementing themselves together

causes a quantity of dust in dry, and mud in wet weather.

[29] A flinty or quartzose stone seems to harden with exposure. This

is notably the case in pebbles; old pebble paving taken up and broken

makes a most hard and durable road metal.

[30] ‘Roads, Streets and Pavements,’ by Q. A. Gillmore, p. 10.

[31] _Ibid._

[32] _Vide_ ‘The Maintenance of Macadamised Roadways,’ by Thomas

Codrington, p. 33, a most excellent work upon this subject.

[33] Mr. W. Bold considered a hammer weighing 1¹⁄₄ lb. of an

elliptical form, pointed at the ends, the area of each end being about

¹⁄₁₀₀th of a square inch, to be the most suitable to break hard

stones. _Vide_ ‘Minutes of Proceedings, Institution of Civil

Engineers,’ vol. i. (1840) p. 50.

[34] ‘The Maintenance of Macadamised Roads,’ by Thomas Codrington, p.

38.

[35, 36] No doubt the price of the machine varies with the price of

iron, etc.

[37] _Vide_ ‘Report of the Borough Surveyor of Birmingham to the

Paving and Street Improvement Sub-Committee,’ p. 11.

[38] _Vide_ ‘Proceedings of the Association of Municipal and Sanitary

Engineers,’ vol. ii. p. 76.

[39] _Vide_ ‘The Maintenance of Macadamised Roadways,’ by Thomas

Codrington, p. 41.

[40] _Vide_ ‘Proceedings of the Association of Municipal and Sanitary

Engineers,’ vol. ii. p. 82.

[41] _Vide_ ‘The Maintenance of Macadamised Roadways,’ by Thomas

Codrington, p. 45.

CHAPTER VII.

ROAD ROLLING.

The march of civilisation has decided that road rolling is a necessity

for macadamised roads, instead of allowing the stones of which they are

composed to be worn in by the traffic, as was formerly the custom. In

Calcutta bullock rollers were used so long ago as the year 1855, and it

was the cruelty of this operation that suggested to Mr. W. Clark the

necessity for a steam roller,[42] the outcome of which was the

well-known roller as manufactured and supplied by Messrs. Aveling and

Porter of Rochester, and now so generally used throughout this country,

as well as in American and other foreign towns.[43]

Steam rolling saves money as well as suffering, and the legislature have

recognised the importance of a sanitary authority becoming possessed of

a steam roller by permitting money to be borrowed for the purchase of a

roller as for a permanent work. (Sect. 234 Glenn’s Public Health Act

1875, footnote to Sub. Sect. (1).)

Mr. Albert W. Parry, the Borough Surveyor of Reading, has prepared some

tables on the subject of steam road rollers, from information he

received on this subject, in answer to some questions he addressed to

the surveyors of a number of towns a few years ago. It appears from this

tabulated statement that thirty-three 15-ton steam rollers were in use,

six 10-ton rollers, one 21-ton roller, one 8-ton roller, one 9¹⁄₂ ton

roller, one 14¹⁄₂-ton roller, one 17-ton roller, and one 25-ton roller;

this latter not being much used, as it was found to be too heavy.

The average gross cost per annum of necessary repairs to the rollers,

other than those which could be effected by the men in charge of it,

amounted to 35_l._ 12_s._ The number of men employed to attend to the

roller and cost of labour per day varied considerably, from one case

(South Shields) where “one engine-man at 26_s._ per week, and an old

scavenger with the flag” were found to be sufficient; to another

(Gloucester) where the cost per day is stated as follows: “one man works

the engine at 5_s._ per day, one boy with signal flag, 1_s._ 8_d._, two

men spreading gravel or sand at 3_s._, two men watering and sweeping to

keep water from running off in channels.”

Some of the older rollers require a steersman as well as a driver, and

the Locomotives Amendment Act requires two men with flags, but this is

seldom really necessary. The sweepers, spreaders and sprinklers should

be taken as irrespective of the actual cost of the roller, which may

therefore be assumed to be the wages of the engine-man, say 5_s._ per

diem, and a boy or old man with a flag at 2_s._, thus making a total for

labour of 7_s._ per diem.

The fuel that is consumed by a 15-ton roller seems to be from 3 to 5

cwt. of coke per diem, common gas coke being generally used, though

steam coal would no doubt answer equally well, some of the smokeless

Welsh descriptions being of course necessary.

With regard to the question “When not used for rolling roads, to what

other use (if any) do you put the engine power?” there are not many

towns that use the machine for any other purpose than rolling, but the

following uses may be enumerated to which the machines have been

applied:--Driving a stone-breaker, a mortar-mill, a saw-bench, a

chaff-cutting machine, a bean-crusher, etc. It has also been used in

connection with pumping, and to produce the necessary power for the

electric light, and it is frequently employed as a traction engine.

The driving rollers usually have provision by which spikes may be fitted

into holes in their faces, in order that they may be used for lifting or

chequering roads. These, however, apparently do not answer; the working

of a machine in this manner is said to shake and strain it considerably,

and the holes in the rollers, which are plugged with wood when not in

use, are objectionable, as these plugs wear out and the road metal gets

into the holes, and the surface of the road is picked up as the rolling

proceeds; besides this, the spikes seem to have no effect unless the

surface of the roadway being operated upon is soft.

With reference to the use of binding material, the most commonly used

and that which receives most favour is road grit or scrapings,[44] sharp

sand is also employed, as well as gravel if clean, and also stone

chippings and screenings; these should be of the same material of which

the road is made, if possible, and no doubt _newly_ constructed roads

require more care in the binding material than simple repairs. The

steepest gradient upon which a roller will act appears to be 1 in 9 in

Blackburn, with a 15-ton roller, but this must require a very heavy

pressure of steam, and 1 in 14 seems to be a gradient that gives no

trouble to roll either up or down; in going down hill, of course it is a

mere question of sufficient break power.

The number of superficial yards rolled per day must vary extremely with

circumstances: the class of material, the amount of binding and water

used, the gradient and pressure of steam maintained, and the amount of

rolling considered necessary,[45] being amongst the various influences.

From the above returns I find that the number of square yards rolled

varies from 500 to 3000 per diem, the average for 42 towns being 1105

square yards per diem.

The cost per square yard rolled, including all charges, may be assumed

to be between ¹⁄₂_d._ and 1_d._, and the cost of binding material about

3_d._ per square yard. With reference to the necessity of binding

material, the following, facts are interesting.