OF THE COST OF CONSTRUCTING THE SEWERS AND DRAINS OF THE METROPOLIS.

The money actually expended in constructing the 1100 miles of sewers

and 4000 miles of drains, even if we were only to date from Jan. 1,

1800, is not and never can be known. They have been built at intervals,

as the metropolis, so to speak, _grew_. They were built also in many

sizes and forms, and at many variations of price, according to the

depth from the surface, the good or bad management, or the greater or

lesser extent of jobbery or “patronage” in the several independent

commissions. Accounts were either not presented in “the good old

times,” or not preserved.

Had the 1100 miles of sewers to be constructed anew, they would

be, according to the present prices paid by the Commissioners--not

including digging or such extraneous labour, but the cost of the sewer

only--as follows:--

366 miles of sewers of the first

class, or 1,932,480 feet, at 15_s._

per foot £1,449,360

366 miles, or 1,932,480 feet of

the second class, at 11_s._ per foot 1,062,864

Same length of third class, at

9_s._ per foot 869,616

----------

Total cost of the sewers of the

metropolis £3,381,840

As this is a lower charge than was paid for the construction of more

than three-fourths of the sewers, we may fairly assume that their cost

amounted to from three millions and a half to four millions of pounds

sterling.

The majority of the house-drains running into the sewers are brick, and

seldom less than 9 inches square; sometimes, in the old brick drains,

they are some inches larger, and in the very old drains, and in some

100 years old, wooden planks were often used instead of a brick or

stone construction, for the sake of reducing cost, and replaced when

rotted. The wood, in many cases, soon decayed, and since 1847 no wooden

sewers have been allowed to be formed, nor any old ones to be repaired

with new wood; the work must be of stone or brick, if not pipeage.

About two-thirds of the drains running from the houses to the sewers

are brick; the remaining third tubular, or earthenware pipes. The cost,

if now to be formed, would be somewhat as follows:--

1893-1/3 miles of brick drains, 5_s._

per foot, as average of sizes £2,499,200

945-2/3 feet of tubular drains, average

of sizes 2_s._ 6_d._ 624,800

-----------

Total cost of the house-drains of

London £3,124,000

The cost of the street or gully drains have still to be estimated.

The present cost of the 9-inch gully-pipe drains is about 3_s._ 6_d._ a

foot; of the 6-inch, 2_s._ 6_d._ Of the proportionate lengths of these

two classes of street-drains I have not been able to gain any account,

for, I believe, it has never been ascertained in any way approaching

to a total return. Taking 1200 miles, however, as quite within the

full length of the gully-drains, and calculating at the low average of

3_s._ the foot for the whole, the total cost of the street-drains of

the metropolis would be 950,400_l._, or, I am assured, one might say a

million sterling, and this, even if all were done at the present low

prices; the original cost would, of course, have been much greater.