CHAPTER IV.

LOCATING DISTRIBUTION BOX, LAYING MULTIPLE CABLE, AND MARKING OUT MINE

FIELD.

(NOTE.—The operations in Chapters IV and V are

described in what is thought to be the logical order, but

circumstances may alter their sequence, and, in fact,

several of the steps may be carried on simultaneously.)

For the work on the water there will be needed five boats, viz., a mine

planter or suitably fitted-up heavy tug, a small tug or heavy launch

called the distribution box boat, and three launches or yawls. The

capacity of the planter is such that a group of 19 mines can be handled

at one time.

The instructions to be observed by the master of a mine planter in

marking out a mine field and in planting mines are to be found in

Appendix No. 6.

=Determining location for distribution box.=—From an examination of

the chart, or of the approved scheme for mining, the locations of the

lines and groups of mines are determined. A distribution box is to be

placed about 350 feet in rear of the center of each group of mines. The

locations for the distribution boxes are marked on the plotting board

and their azimuths from each of the ends of the horizontal base or

their azimuth and range from the vertical base station are determined.

=Marking location of distribution box.=—An anchor with buoy attached

is placed upon the deck of a small tug and carried out to one of the

selected spots. By a system of signals the boat is directed to the

location determined and there the anchor is thrown overboard. The

locations for the other distribution boxes are marked in a like manner.

=Laying multiple cable.=—The cable-reel is placed upon the forward

deck of the planter and raised on the jacks. The planter then proceeds

as near the mining casemate as the depth of water permits, and one end

of the cable is passed ashore, either by a launch, by yawls, or by any

other suitable method. In case the planter can not approach nearer the

shore than 100 yards it will be necessary to coil more than enough

cable to reach the shore in a figure of eight in a yawl, which is then

towed toward the desired point on shore, the men aboard the yawl paying

out the cable as it proceeds. This end is drawn in through the conduit

or gallery to the casemate or terminal hut. It may be secured by taking

a telegraph hitch around it with a chain and spiking the chain to some

heavy timbers or fastening it to some holdfast. When cable ends have

already been laid they will be picked up and joined to the multiple

cable for the groups.

The shore end having been secured, the planter moves out to the

position of the distribution box, unreeling the cable as it goes.

If the water be very deep, a friction brake must be extemporized to

prevent the reel from overrunning. (While the planter is laying the

cable, the casemate party tags and attaches the shore end as explained

later.) To prevent kinks as far as possible cable should be laid with

as much tension as practicable.

If the cable is not long enough, a second one must be joined to it.

This is preferably done by passing the ends to a small boat. The

junction is made, either using a junction box with Turk’s-heads and

taped joints, or opening back the armor for about 5 feet from the ends,

making taped joints, protecting them with tape, and then rewrapping the

armor and seizing the ends with wire. Care must be taken to join the

proper conductors of the two ends.

In the meantime the distribution box boat with a detachment of one

noncommissioned officer and five men takes the distribution box and

moves out to the spot marked by the buoy. It picks up the buoy and

makes fast to the anchor line.

The planter continues laying the multiple cable until it reaches the

distribution box boat. The multiple cable is then cut and the end

passed to the distribution box boat, usually by a heaving line. The

cable is lashed to the boat; a Turk’s-head is worked upon the end and

then secured in the distribution box. As a precautionary measure for

the recovery of the distribution box, should it be lost overboard

during mine planting, it is well to have the multiple cable buoyed

about 100 yards in rear of the distribution box.

In case it may be desired not to use the distribution box at once, the

separate conductors of the multiple cable should be tagged, tested,

and insulated. The cable should be buoyed and dropped overboard to be

recovered subsequently.

=Identifying, tagging, and testing the conductors of the multiple

cable.=—_Tagging._—In the casemate the conductors are separated,

carefully identified, tagged, and attached to the corresponding

terminal of the terminal bar on the operating board. The mine switch

for No. 19 is opened and the telephone terminal attached to its stud

so as to use No. 19 for communicating with the distribution box boat.

The ends in the distribution box boat are separated, one terminal of a

boat telephone is attached to No. 19, and the other earthed either by

attaching to the cable armor or to an earth plate hanging overboard in

the water. Communication is thus established with the operator in the

casemate. Nos. 1, 13, and 19 are picked out easily; the remaining ones

are tagged in contraclockwise direction.

_Verifying the tagging._—The casemate is then notified that the boat

party is ready to check the tagging. This is done as follows: The power

switches on the operating board are all closed, except 19, and direct

current put on the cable by closing switch No. 3 up. The casemate

operator then directs the boat party to earth in regular succession the

various conductors. This is done most quickly by touching the conductor

to the cable armor. The corresponding automatic switch on the operating

board should drop. Any errors in tagging detected by this test should

be corrected at once. This test also checks the continuity of circuit

of each conductor.

_Insulation test._—The operator then directs the boat party to prepare

the cable end for insulation test. This is done by separating the

conductors, holding them in the air, and drying them if necessary.

When prepared, word is sent to the casemate operator, who tests as

follows: He closes switch No. 7 up. This throws D. C. power on the

mil-ammeter plug of the operating board and introduces in the circuit

the mil-ammeter and its protective lamp. The green lamp is then

unscrewed and the mil-ammeter plug used on the D. C. jaw.

If there be no leak in the multiple cable, since the ends at the

distribution box boat are held in the air, there will be no appreciable

reading of the mil-ammeter.

If there be a leak, this fact will be revealed by a reading on the

mil-ammeter. To discover the particular conductor or conductors on

which this leak exists, each power switch is opened in succession and

the mil-ammeter plug inserted on the jaw of the power switch.

No. 19 is now tested in the same way by first shifting both telephones

to No. 1, the boat end being held in the air. The operator reports the

result of the test.

Upon completion of these tests the power is turned off. Post power

should not be used for testing, because the negative side of the post

power may be grounded.

=Marking out the mine field.=—In using automatic anchors it is not

necessary to mark the mine field; but in using mushroom anchors it is

generally done. The material required consists of 1 measuring line with

reel and frame, 5 anchors, 5 keg buoys, and 5 raising ropes.

A buoyed anchor is dropped about 350 feet in front of the

distribution box buoy. This marks the position of mine No. 10 and of

the center of the group.

This marking buoy is picked up by a launch which makes fast to the

anchor rope. The planter now passes to the launch one end of a

measuring line, which has marks at 280, 300, 350, 580, and 600 feet.

These marks may be made by painting 3 feet of the measuring line

some distinctive color at the designated points. The planter moves

out slowly along the line to be occupied by the mines, unreeling the

measuring line as it goes, and drops buoys at the 300 and 600 foot

marks. It then returns and does the same for the other side of the

line. These five buoys mark the line to be occupied by the mines,

indicate the positions of mines Nos. 4, 7, 10, 13, and 16, and in

addition cut up the distance into 300-foot lengths, which enable the

planter to plant mines at a close approximation to 100 feet apart.

=Taking soundings on line of mines.=—When automatic anchors are used,

such information as may be required about depth of water may usually

be obtained from charts. This may not be sufficiently accurate for

planting with ordinary anchors. In the latter case soundings must be

taken at the spots where the mines are to be planted.

These soundings are made from the launches. The launches take a

measuring line marked at every 100 feet, stretch it between the planted

buoys, and take the soundings at every 100-foot point. The soundings

are recorded in a blank book showing the number of the corresponding

mine and state of the tide. It may be found more satisfactory to hold

one end of the measuring line at the buoy and circle across the line of

mines with the launch, getting the sounding at the point of crossing.

=Preparing mooring ropes.=—The mooring ropes are cut off with square

ends, and the ends passed through the holes in the mooring sockets. The

strands and wires are untwisted and spread out for a length equal to

the length of the socket hole. The rope is pulled back until the ends

are about flush with the top ends of the hole; a piece of marline is

tied about the rope below the socket. If necessary to hold the socket,

a piece of burlap may be wrapped around below the socket, and a fold

allowed to fall over the hand. Generally, means can be found to set

the socket upright while pouring full of alloy. The alloy consists of

9 parts of lead and 1 part of antimony melted together. A melting pot

heated by a plumber’s furnace, or preferably a Khotal lamp, is used for

this purpose. Great care must be taken to see that there is no oil or

water on the socket or mooring rope before pouring the alloy.

The length of the mooring rope for buoyant mines No. 32 equals the

depth at low tide, less 15 feet. This allows 5 feet for the length

of the mine, anchor, and shackles, and 10 feet for submergence. When

thimbles and clips are used the mooring rope is cut 3 feet longer and

is bent back a foot and a half at each end for the thimbles and clips.

For the larger mine cases, an additional allowance must be made for the

length of the cylindrical part of the case.

Each mooring rope is carefully tagged at each end with the number of

the corresponding mine.