CHAPTER III.

LOADING ROOM DUTIES.

=Making a telegraph joint.=—The insulation is removed from the ends for

1½ inches and the wires brightened. The ends to be joined are placed

across each other about one-third distance from the insulation, making

an angle of about 45° with each other. The wires are grasped firmly at

the junction and each free end wound tightly around the other wire for

four turns; the winding should be in opposite directions. The ends of

the wires are trimmed down so they will be smooth and present no sharp

points.

When wires are joined with brass jointers three-fourths inch of each

wire is bared and the wires are inserted in the jointer; each end is

crimped with pliers in the direction of the longer axis; the rest of

the jointer is crimped and the ends or sharp points rounded off. When

brass jointers are used care should be exercised not to crimp them

too hard, as the wires may be partly cut through and finally broken.

Special care must be used with the fuse leads, as the secondary circuit

of the mine transformer can not be tested after the compound plug is

assembled.

=Insulating a joint.=—A piece of rubber tape about 2 inches long is

used, with ends cut diagonally. The tape is stretched, and starting

at a point about three-fourths inch back on the insulation, with the

long edge of the tape on the inside, it is wound around the joint under

tension, each turn covering the previous turn about one-third. The

wrapping is continued until the same amount of insulation is covered on

each side, when the wrapping is worked backward over the joint and the

end is secured by pressing it firmly a short time or placing a drop of

cement under it.

=Making a water-tight joint.=—The two ends of wire are scraped clean

for about three-fourths of an inch and joined by a brass jointer,

which is then crimped. The insulation is scraped clean about 2 inches

on each side of the jointer and covered with rubber cement. (Cement

is not absolutely essential.) Two strips of rubber tape are cut about

6 inches long, with diagonal ends, and stretched. Beginning about

1½ inches along the insulation, the tape, with the long edge on the

inside, is wrapped firmly and tightly until about one-fourth of an inch

of the insulation on the other side is covered; it is wound back and

forth over the joint so as to taper toward the ends. The other piece

of tape is used, beginning at the other end and wrapping as before.

The finished insulation should be thick at the middle and taper toward

the ends. It should be firm and tight. The insulation is covered with

tin foil, wrapped with protective tape, and vulcanized for about 30

seconds. The protective tape and tin foil are then removed, the joint

inspected, and new protective tape wrapped on, using two pieces,

starting at opposite ends and finally ending each beyond the center.

=Making a Turk’s-head.=—The cable is trimmed square and a wrapping

of four or five turns of marline is made about 15 inches from the

end. The collar, flat side first, is slipped on until it rests on the

marline; the iron wires are bent back regularly over the collar. The

jute wrapping is unwound to the collar and trimmed, and all the iron

wires are cut with the pliers, removing all but 4 inches and 6 inches

from alternate strands; the iron wires are bent separately to fit the

collar closely (making two right angles with the pliers), and the ends

arranged smoothly along the cable; the end of a piece of marline is

engaged under one of the wires near the collar and wrapped regularly

and closely around the cable, and the free end of marline secured with

two half hitches. About 15 feet of marline are required for single

conductor cable; 24 feet for multiple cable.

=Testing fuses.=—The following apparatus is used for testing in the

loading room: A double-pole double-throw switch, a 150-volt voltmeter,

and sufficient dry cells to give a full throw when using the lower

scale of the voltmeter. The apparatus is connected up on the testing

table so as to make resistance measurements by the voltmeter method.

To test fuses, leads are carried from the switch to an iron or other

suitable receptacle outside of the building and the fuse leads joined

thereto. A full deflection should be obtained when the circuit is

closed through the fuses.

=Preparing a compound plug for service.=—The transformer to be used is

first tested for a good circuit between the red wires, a poor circuit

between the ends of the black wire, a good circuit between the black

or primary lead and the reactance terminal, no circuit between the red

and black wires, and no circuit between any wire and the case. The

resistance of the circuits is determined by the voltmeter method. The

upper end of the black wire (see fig. 8) is prepared for use by baring

the wire for about one-half inch and securing it to the binding post in

the neck of the transformer. The ball seat is screwed home. The spring

plate, distance ring, and ball are placed in the circuit-closer cap,

which is held inverted and the transformer screwed into it, the threads

being coated with ruberine.

(_a_) =Old model, brass fuse can.=—Starting with the compound plug

dismantled.

A piece of loading wire is cut about 3 feet long and the ends bared.

One end is joined by a telegraph joint to the primary terminal of the

transformer and the joint is taped. This wire and the two secondary

wires are drawn through the fuse can, which is screwed on the

transformer, the threads of the latter having first been coated with

ruberine.

Two mine service fuses, which have been tested for continuity of

circuit, are connected in multiple across the secondary (red) terminals

and the joints taped.

The can is held vertically and the explosive, if trotol, poured in

up to the screw threads for the fuse can cap; if dynamite, inclosed

in a cloth bag and placed in the can. The fuses are embedded in the

explosive.

The loading wire is drawn through a lead washer and the fuse can cap;

the latter, its threads having been coated with ruberine, is screwed

into place.

A rubber packing is pushed over the loading wire into the stuffing

box in the fuse can cap, a brass gland is threaded down so that it is

close against the rubber packing, and the follower is screwed home with

moderate pressure. The lower tube is screwed into place, compressing

a lead washer between it and the fuse can cap. The threads of the

follower and lower tube are coated with ruberine.

The loading wire is drawn through a lead washer and the hole in the

plug proper, and the latter screwed hard against the lower tube.

A rubber packing and a brass gland are placed upon the loading wire and

forced into their seat in the plug proper by means of the follower, the

threads of which have been coated with ruberine.

(_b_) =Rubber fuse can.=—Starting with the compound plug dismantled.

Two mine service fuses, which have been tested for continuity of

circuit, are cut with 9-inch leads, wires bared for about 1 inch and

connected in multiple. A piece of loading wire is cut about 3 feet long

and the ends bared for telegraph joints. It is threaded through a hole

in a cake of dry guncotton. The two fuses are inserted by pushing each

separately into the same hole and the loading wire drawn up until it is

the same length above the cake as the fuse leads.

Three other primer cakes are threaded on the wire; two above the fuses,

and one below. This arrangement will leave the fuses in the third cake.

The cakes are held in one hand with the fuse leads upright, and the

fuse can slipped over the cakes, being careful to thread the fuse leads

and loading wire through the opening.

The screw threads of the fuse can cap are covered with ruberine and it

is screwed firmly into place onto the fuse can. The stuffing box of the

cap is assembled.

The plug proper is held upright in a vise. The fuse can, the threads

of the cap having been coated with ruberine, is screwed home and

secured by its set-screw. The loading wire must be pulled through the

opening in the plug proper with extreme care. It must not be injured

in placing the fuse can in position and in screwing it home. The

transformer leads are cut about 6 inches long, and the ends bared for 1

inch. The brass collar is screwed on the transformer; a little ruberine

on the screw threads facilitates the operation. The connecting collar

is slipped over the fuse leads and loading wire and allowed to rest

on the fuse can. The transformer is supported by allowing two of the

connecting bolts to slip into the holes in the collar; telegraph joints

or brass jointers may be used between the secondary leads and the fuses

and between the primary lead and the loading wire. The joints are wound

with rubber tape, care being taken that there are no sharp ends to cut

through the tape.

The transformer is raised vertically above the fuse can until the lead

wires are extended. It is lowered and at the same time the leads are

coiled in the base of the transformer. As the transformer and collar

approach their position on the connecting bolts, the connecting collar

is screwed on the transformer, the threads of the transformer having

been covered with ruberine. The connecting collar will take care of

the remainder of the leads and joints. The set-screw in the connecting

collar is screwed home; the brass collar is placed on the connecting

bolts and secured in position by the nuts and cotter pins.

The lips of the fuse can and connecting collar are covered with a

thin covering of rubber cement. A piece of rubber tape is cut about

18 inches long and laid around this opening without stretching. A

piece of protective tape is cut about 18 inches long and laid over the

rubber tape with considerable stress. This forces the soft tape over

the lips on the connecting collar and the fuse can and makes a tight

but flexible joint. The stuffing box in the plug proper is prepared as

under (_a_).

Great care must be taken not to injure the insulation of the loading

wire in tightening up the follower in the stuffing box of the fuse can

or of the plug proper.

(_c_) =Trotol fuse can.=—Starting with the compound plug dismantled.

Two mine service fuses, which have been tested for continuity of

circuit, are cut with 12-inch leads, the wires bared for 1 inch and

connected in multiple. A piece of loading wire is cut about 3 feet long

and the ends bared for telegraph joints. The loading wire is threaded

through the fuse can and cap. The threads of the fuse can are covered

with ruberine. The can is screwed into the cap. The threads of the

connecting collar are coated with ruberine and the collar is screwed

down entirely. The loading wire should project about 4 inches above the

connecting collar. The stuffing box of the cap is prepared. The plug

proper is held upright in a vise. The fuse can cap, its threads having

been coated with ruberine, is screwed firmly into the plug proper by

means of a spanner wrench. The loading wire must be pulled through the

opening in the plug proper with extreme care. It must not be injured in

placing the fuse can in position and screwing it home.

The fuses are inserted in the fuse can, which is filled with trotol

to the top of the connecting collar. The transformer leads are cut 4

inches long and the ends bared for 1 inch. The threads of the brass

collar are covered with ruberine. It is screwed on the transformer.

The latter is raised vertically above the fuse can and lowered on the

connecting bolts.

Telegraph joints are made between the secondary leads and the fuses

and the primary lead and the loading wire. The joints are wound with

rubber tape, care being taken that no sharp ends cut through the tape.

The leads and joints are coiled in the base of the transformer. The

connecting collar, its threads having been covered with ruberine,

is screwed upon the transformer against the brass collar. The

bolt-securing nuts and cotter pins are placed in position. The stuffing

box in the plug proper is assembled as under (_a_).

The actual resistance of the assembled plug in the vertical and the

horizontal positions is determined by testing with a voltmeter.

In service, after the loaded plug tests out satisfactorily, all set

screws are set up.

When compound plugs are prepared for drill or for instruction purposes

the use of ruberine or other waterproofing material on the screw

threads is omitted; care must be taken that the transformer leads are

not needlessly shortened.

=Loading a mine.=—The mine case is carried from the storeroom to the

loading room and placed on a loading skid or other receptacle with

the loading hole up. The plug is removed and the screw threads are

thoroughly cleaned. The explosive detail brings in a box of explosive

from the explosive house and inserts a loading funnel into the loading

hole. The charge for a 32-inch mine case is 100 pounds of explosive.

For the larger cases, the charge should be the maximum that the

conditions warrant; it is specified at present as 200 pounds, though

larger charges are desirable if enough explosive can be obtained and

the excess buoyancy of the case will warrant the use of more than

200 pounds. The cartridges of dynamite, the trotol, or the blocks of

guncotton are inserted by hand and so placed in the mine case that

there will be ample room for inserting the compound plug. Only one box

of explosive for each mine being loaded is brought into the loading

room at one time. After the proper amount of explosive has been placed

in the mine case the screw threads are thoroughly cleaned with button

brushes and then coated with ruberine or other material to prevent

access of water. The compound plug, with its screw threads similarly

coated, is screwed home with the socket wrench, a lead washer being

used between the plug and mine case. A bar put through holes in the

sides of the skids and through the maneuvering ring will prevent the

case from falling over and from turning while the compound plug is

being screwed home.

In order to insure setting the compound plug tight, it is advisable to

tap the end of the lever of the socket wrench a few times with a large

mallet or a large wooden bar. The mine cap is bolted on and the mine

put in a tank for test. If time admits, it may remain in the water 24

hours. It should show practically the same resistance as the compound

plug. If this test be made, the loading wire must be long enough for

this purpose.

Upon completion of this test the mine is taken from the tank, the

loading wire pushed inside the cap to avoid injury in handling, and the

loaded mine taken to the planting wharf.

The precautions to be observed in handling explosives and loading mines

are given in Appendix 1.

Manual for submarine mining · 第 3 / 8 章